Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20065H982 | 1 October 1982 | Submits GE Understanding of Major Agreements & Ground Rules Re NRC Review of Gessar Ii,In Response to NRC Request at 820915 Meeting.Concurrence Requested | |
ML20065Q378 | 18 October 1982 | Forwards Amend 8 to Gessar Ii,Responding to NRC 811203 Acceptance Review Ltr Re Geotechnical,Radiation Sources & Failure Mode & Effects Analysis & Committing Applicant to Address NRC Acceptance Criteria | |
ML20066H534 | 19 November 1982 | Forwards Draft Responses to Commission 821005 Request for Addl Info on Chapter 7 of Gessar II Sar.Responses Reflect Nrc/Ge Info Exchange 821014-15 Meetings in Bethesda,Md | Safe Shutdown Anticipated operational occurrence Scram Discharge Volume |
ML20066J455 | 8 November 1982 | Forwards Proprietary Portion of Amend 9 to GESSAR-II, Describing Main Control Room & Control Ctrs Outside Control Room.Affidavit Encl.Info Withheld (Ref 10CFR2.790) | Affidavit |
ML20066J496 | 10 November 1982 | Forwards Final Draft Responses to Structural Engineering Branch 820825 Request for Addl Info.Responses Reflect Nrc/Ge 821007-26 Info Exchange Meeting in Bethesda.Remaining Responses Will Be Submitted in Dec 1982 | Safe Shutdown High winds Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Safe Shutdown Earthquake Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Tornado Generated Missile Stress corrosion cracking Earthquake Control of Heavy Loads Grace period Overspeed trip |
ML20066J507 | 8 November 1982 | Forwards Amend 9 to Gessar Ii.Amend Furnishes Chapter 18, Human Factors, & Clarifies Discrepancies | |
ML20067D270 | 23 November 1982 | Forwards Proprietary Amend 10 to Gessar II Re Enhanced Level Instrumentation.Amend Withheld (Ref 10CFR2.790) | |
ML20067D343 | 23 November 1982 | Forwards Amend 10 to Application for Review of Gessar Ii. Amend Furnishes App 1D,assessment of Reg Guide 1.97,Revision 2 Against Gessar II Design | |
ML20067E151 | 3 December 1982 | Requests 830105 Meeting to Discuss Review Status & Schedule for SER & Final Design Approval | |
ML20069A127 | 9 March 1983 | Reaffirms Request Re Issuance of Final Design Approval for GESSAR-II.Resolution of Technical Requirements Currently Imposed by NRC Proposed in Submittal Docketed 820222 | |
ML20069B842 | 15 March 1983 | Forwards Revised Final Draft Responses to Power Sys & Reactor Sys Branch Questions,Per 820825 & 1115 Requests.Only Mods (New or Revised) to Responses of Referenced Ltrs Provided | |
ML20069C519 | 16 March 1983 | Forwards Final Draft Responses to Auxiliary Sys Branch Questions & Equipment Qualification Branch Discussion Items, in Response to NRC 820825 Request for Info | |
ML20069E653 | 18 March 1983 | Forwards Revised Final Draft Responses to Selected Commission 820825 & 1005 Questions Re Fire Protection,Leak Rate Testing & ESF Sys.Proposed Resolution Discussion Items Encl | Safe Shutdown High Energy Line Break Integrated leak rate test |
ML20070C804 | 3 December 1982 | Forwards Proprietary Portion of Amend 11 to GESSAR-II Re Pra.Affidavit for Withholding Only Encl | Probabilistic Risk Assessment |
ML20070D106 | 3 December 1982 | Forwards Nonproprietary Amend 11 to Gessar Ii,Revising App 15D,Section 3, PRA of BWR/6 Std Plant. Proprietary Version Only Encl & Withheld (Ref 10CFR2.790) | Probabilistic Risk Assessment |
ML20070E979 | 15 December 1982 | Summarizes 821214 Meeting Discussions Between NRC & GE Re Status of GESSAR-II Final Design Approval (Fda) Review | |
ML20070H275 | 17 December 1982 | Forwards Response to Mechanical Engineering Branch Draft SER Questions.Remaining Responses Will Be Completed by 830114. Amend Scheduled for Jan 1983 Will Formalize Responses Requiring Changes to Facility | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Emergency Lighting Finite Element Analysis Earthquake |
ML20070H328 | 17 December 1982 | Forwards Final Draft Responses to Radiation Assessment Branch,Effluent Treatment Sys Branch,Auxiliary Sys Branch & Power Sys Branch 820825 Info Request | |
ML20070L448 | 27 December 1982 | Forwards Final Draft Responses to Reactor Sys Branch Questions Raised at Commission 821115 Info Request. Responses to Core Performance Branch Questions to Be Provided 2 Wks After Second Ge/Nrc Meeting | |
ML20070N728 | 21 January 1983 | Forwards Draft Responses to Instrumentation & Control Sys Branch 821005 Request for Addl Info.Gessar Amend Scheduled for Feb 1983 to Formalize Responses | Safe Shutdown Reactor Vessel Water Level Anticipated operational occurrence Safe Shutdown Earthquake Temporary Modification High Energy Line Break Scram Discharge Volume Feedwater Controller Failure Failure to Scram |
ML20070R248 | 25 January 1983 | Forwards Rev to Gessar Chapter 15 Re Radiological Dose Calculations for Inside Containment Loca.Rev Demonstrates Capability of Suppression Pool to Retain Particulate Fission Products | Fuel cladding |
ML20070S400 | 19 January 1983 | Forwards Amend 13 to 238 GE Ssar,Amending GESSAR-II by Correcting Rev Designation of Proprietary Pages Provided Under Amend 1.Nonproprietary Version Not Included | |
ML20070S408 | 19 January 1983 | Forwards Proprietary Portion of Amend 13,replacing Proprietary Pages of Amend 1 to Ssar.Encl Withheld (Ref 10CFR2.790) | Affidavit |
ML20070U120 | 8 February 1983 | Forwards Draft Responses to NRC 830131 Request for Addl Info Re GESSAR-II | |
ML20070V425 | 9 February 1983 | Forwards Info Re GE Response to Gessar II Question 490.01, Re Fuel Rod Cladding & Deformation Per M Tokar Request at 830125 & 26 Meetings | Fuel cladding |
ML20071B647 | 22 February 1983 | Commits to Review Each Human Engineering Discrepancy in Apps a & B of Gessar II SER Identified During 821211-13 Control Room Design Audit at Black Fox Simulator | |
ML20071C703 | 3 March 1983 | Forwards Listing of Major NSSS & Balance of Plant Documents Supporting Gessar II Design,Including Equipment Vendor Independent Documents Reviewed by Mechanical & Structural Engineering Branches During Audits | FLEX |
ML20071D674 | 9 March 1983 | Forwards Revised Final Draft Responses to NRC 820825 & 1115 Requests & Mechanical Engineering Branch SER Meetings.Draft Revs to Reg Guides 1.31 & 1.44 Encl | Tornado Missile Hydrostatic Tornado Generated Missile Earthquake |
ML20071E274 | 9 March 1983 | Documents Agreements on Credit for Suppression Pool Scrubbing in GESSAR-II,Chapter 15 Re Radiological Dose Calculations.Potential Decontamination Capability Provided by Scrubbing Will Be Recognized | Fuel cladding Control Room Habitability |
ML20071J693 | 20 April 1982 | Clarifies Significance of Thermal Operating Limits Specified in App 6A of Gessar Ii.App 6A Transmitted on 820225 Contains Technical Basis for BWR LOCA Decay Heat Correlation Based on Ansi/Ans 5.1-1979 Revised Decay Heat Std | |
ML20071N535 | 24 May 1983 | Forwards Amend 15 to Application for Review of Amend 15 to GESSAR-II,consisting of Proprietary & Nonproprietary Portions.Proprietary Portion Withheld (Ref 10CFR2.790) & Submitted Under Separate Cover | |
ML20071N698 | 24 May 1983 | Forwards Proprietary Portion Amend 15 to GESSAR-II Re Human Factors Sys Analysis Emergency Procedures.Info Withheld (Ref 10CFR2.79) | |
ML20071P889 | 22 December 1982 | Forwards Final Draft Responses to Commission 821005 Info Request Re GESSAR-II.Instrumentation & Control Sys Branch Responses Will Be Provided Following Ge/Nrc Meeting in Jan 1983 | |
ML20071Q726 | 7 June 1983 | Forwards Draft Amend 17 to GESSAR-II Re CP/multi-plant Licensing & SRP Rules | Probabilistic Risk Assessment Control Room Habitability |
ML20072B661 | 3 March 1983 | Requests Review of Gessar Ii,Section 3.11 in Parallel W/ Current Review of NEDE-24326-1-P, GE Environ Qualification Program. Marked-up Proposed Plan Encl | |
ML20072D339 | 17 March 1983 | Forwards Revised Draft Responses to 821005 Info Request Re GESSAR-II | |
ML20072F555 | 23 March 1983 | Forwards Revised Draft Responses to Discussion Items & Questions from NRC Power Sys Branch,Containment Sys Branch, Instrumentation & Control Sys Branch & QA Sys Branch Re GESSAR-II | Ultimate heat sink Integrated leak rate test |
ML20072H264 | 25 March 1983 | Forwards GESSAR-II SRP Assessments,Describing Compliance w/NUREG-0800.Section-by-section Comparison of GESSAR-II Design to SRP,NUREG-0800,will Be Provided by 830915 | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Internal Flooding Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Incorporated by reference Finite Element Analysis Tornado Generated Missile Abnormal operational transient Stress corrosion cracking Integrated leak rate test Earthquake Turbine Missile Liquid penetrant Pressure Boundary Leakage Power change Unidentified leakage Failure to Scram |
ML20072H464 | 15 June 1983 | Forwards Proprietary Amend 16 to GESSAR-II,describing Design Considerations to Reduce Sabotage Risk.Amend Withheld (Ref 10CFR2.790) | |
ML20072H489 | 15 June 1983 | Forwards Nonproprietary Amend 16 to GESSAR-II,providing Assessment of Design Features Which Reduce Sabotage Risk | |
ML20072H518 | 15 June 1983 | Forwards Amend 17 to GESSAR-II,furnishing New App 1G & Revised Section 1.8 & Clarifying Discrepancies in Text | |
ML20072L401 | 29 March 1983 | Forwards Supplemental Response to Instrumentation & Control Sys Branch Question on Manual Initiation of Safety Sys & Proposed Resolution of Meteorology & Effluent Treatment Branch Discussion Items | |
ML20073B590 | 8 April 1983 | Forwards GESSAR-II Action Plan for Resolving J Humphrey Containment Design Issues for Review.Balance of Info to Be Completed by 830722 | |
ML20073G644 | 14 April 1983 | Forwards Revised Draft Responses to Power Sys Branch, Containment Sys Branch,Matls Engineering Branch & Structural & Geotechnical Engineering Branch Questions Re 238 Nuclear Island GESSAR-II | Stress corrosion cracking |
ML20073J894 | 15 April 1983 | Forwards Proposed Resolutions to Selected Outstanding Issues | |
ML20073R061 | 29 April 1983 | Provides Statement of GE Objectives for Final Design Approval in Light of Current Commission Proposed Policy Statement on Severe Accidents.Acrs Review of Gessar II SER (NUREG-0979) Recommended | Probabilistic Risk Assessment |
ML20073T071 | 5 May 1983 | Forwards Proposed Resolution of Containment Sys & Instrumentation & Control Sys Branches Outstanding SER Issues Re Gessar II | |
ML20076C818 | 18 May 1983 | Forwards marked-up Revised Response to Question 460.09 of NRC 820825 Request Re GESSAR-II Std SAR | |
ML20076D889 | 24 May 1983 | Forwards Supplemental Responses to Power Sys Branch Questions Re GESSAR-II Ac/Dc Power sys/balance-of-plant Interfaces.Responses Will Be Included W/Amend 15 to SER | |
ML20076D894 | 24 May 1983 | Forwards Draft Amend 15 to GESSAR-II.Amend Resolves Selected Outstanding & Confirmatory Issues Identified in SER (NUREG-0979) & Completes Subsection 1.9.1 on GESSAR-II/FSAR Interfaces | Safe Shutdown Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operator Manual Action Emergency Lighting Tornado-Generated Missile Abnormal operational transient Tornado Missile Protection Scram Discharge Volume Process Control Program Stress corrosion cracking Earthquake Power-Operated Valves Power Operated Valves Turbine Missile Fuel cladding Overspeed trip Overspeed |