Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
ML08234079427 August 2008Notice of Meeting with Nine Mile Point Nuclear Station to Discuss Proposed Extended Power Uprate Related to Steam Dryer Analysis for Unit No. 2
ML0824805599 September 2008Notice of Meeting with Amergen Energy Company, LLC, to Discuss Three Mile Island, Unit 1, Rod Control System Replacement
ML0825202669 September 2008Notice of Meeting with Nine Mile Point Nuclear Station to Discuss Extended Power Uprate for Nine Mile Point, Unit No. 2
ML08255030817 April 2008Table for AST Methodology Issue (Email)
ML08256006511 September 2008Draft Request for Additional Information
ML08266040217 September 2008Draft Request for Additional Information
ML08266091422 September 2008E-mail from D.Vandeputte to R. Guzman Relief Request 2ISI-007 Summarizing Conference Call on September 17, 2008
ML08273005626 September 2008Clarification for Sump Buffer Amendment
ML0827607612 October 2008Draft Request for Additional Information Regarding Proposed License Amendment Technical Specification Requirements for Inoperable Inverters
ML08281051930 September 2008Licensee Review of Draft SE for Proprietary Information
ML08290056714 October 2008E-mail from D.Vandeputte to R.Guzman Third ISI Interval Relief Request 2ISI-009
ML08295043321 October 2008Electronic Transmission, Draft Request for Additional Information Regarding Review of Steam Generator Tube Inspection Report for the 2007 Outage
ML08297017422 October 2008Draft Request for Additional Information, Upcoming Conference Call
ML08298018323 October 2008Draft Request for Additional Information
ML08323009620 November 2008Draft Request for Additional Information
ML08331008726 November 2008Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Beaver Valley Power Station, Unit No. 2. the Current Title in the Profile Is the Title to Another Document Not This on So Please Remove and Replace
ML0833805903 December 2008Draft Request for Additional Information
ML0833908054 December 2008Electronic Transmission, Draft Request for Additional Information Regarding Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability,:
ML08359017024 December 2008Request for Additional Information-Hope Creek Generating Station Technical Specification Changes to Add LCO 3.0.8 on the Inoperability of Snubbers
ML08365030810 December 2008Incoming Letter from Douglas Bedell of Resource Relations Re Three Mile Island Joint Information Center Move from Susquehanna to Coatesville
ML0900704457 January 2009Request for Change in LAR Implementation Time
ML09012059312 January 2009Draft Request for Additional Information
ML09030006226 January 2009Clarification on Peach Bottom Relief Request I3R-45
ML09030045210 February 2009Electronic Transmission, Draft Request for Additional Information Regarding Proposed Technical Specification Changes to Reflect Steam Generator Replacement
ML09050015219 February 2009Notice of Forthcoming Meeting with Calvert Cliffs Power Plant, Inc. and Areva to Discuss Transition from Westinghouse to Areva Fuel
ML0906808089 March 2009State Consultation - Susquehanna Amendment Application, NRC TAC Nos. MD9572 and MD9573
ML09075036016 March 2009Electronic Transmission, Draft Request for Additional Information Regarding Proposed Technical Specification Changes to Reflect Control Rod Drive Control System Replacement
ML0909705827 April 2009Phone Call Summary with Licensees and Alion Science and Technology on April 2, 2009 to Address NRC Staff Position on Chemical Effects Refinements
ML09105057715 April 2009Draft Request for Additional Information
ML09117016527 April 2009Draft Request for Additional Information
ML0912400744 May 2009Electronic Transmission, Draft Request for Additional Information Regarding License Amendment Request to Adopt TSTF-490-A, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity
ML09134013315 May 2009Notice of Forthcoming Meeting with Dominion Nuclear Connecticut, Inc. to Discuss the Submittal of a License Amendment Request Regarding the Removal of Charging Pumps from the Technical Specifications for Millstone Power Station, Unit No. 2
ML09135024114 May 2009Draft Request for Additional Information
ML09148002128 May 2009Electronic Transmission, Draft Request for Additional Information Regarding Third Interval Inservice Testing Relief Requests
ML09148007828 May 2009Electronic Transmission, Draft Remaining Issue List Concerning Exelon'S Response to a Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation.
ML09169039712 June 2009ME0727, Comments from Ny State on Application for Exemption from 10 CFR 50, Appendix R Section III.G.2 Requirements Based on Manual Actions
ML09174045622 June 2009Request to Return Electronic Copy of Presentation
ML09175101424 June 2009Acceptance Review for RR for Temporary Non-Code Repair
ML0918907578 July 2009Electronic Transmission, Draft Remaining Issue List, Rev. 1, Concerning Exelon'S Response to a Request for Additional Information Regarding Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirc..
ML09195040614 July 2009Draft Request for Additional Information
ML09211051930 July 2009RR-89-61 Rev. 2 Need Date for DNC
ML0921202794 August 2009Draft Request for Additional Information Regarding Control Rod Drive Rod Notch Testing Frequency
ML0921206124 August 2009Electronic Transmission, Draft Request for Additional Information Regarding Proposed Technical Specification Changes to Reflect Control Rod Drive Control System Replacement
ML09225058028 August 2009Forthcoming Conference Call with Exelon Generation Company, LLC, to Discuss Three Mile Island, Unit 1, Generic Letter 2004-02 Supplemental Response
ML09238050214 September 2009Notice of Meeting with Exelon Generation Company, LLC, to Discuss Oyster Creek Nuclear Generating Station, License Amendment Request Regarding Secondary Containment Operability
ML0924606783 September 2009Draft Request for Additional Information
ML09254023611 September 2009Draft Request for Additional Information Regarding Secondary Containment Operability
ML09257055714 September 2009Draft Request for Additional Information Regarding Secondary Containment Operability
ML09258034117 September 2009Revised Notice of Meeting with Exelon Generation Company, LLC, to Discuss Oyster Creek Nuclear Generating Station, License Amendment Request Regarding Secondary Containment Operability
ML09260079021 September 2009Electronic Transmission, Draft Request for Additional Information Regarding Response to Generic Letter 2008-01