Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitle
HNP-02-050, Request for License Amendment Startup Test Report1 April 2002Request for License Amendment Startup Test Report
HNP-02-124, Cycle 11, Startup Test Report Revision 119 September 2002Cycle 11, Startup Test Report Revision 1
HNP-04-060, Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval15 April 2004Response to the Request for Additional Information Concerning the License Amendment Request for a One-Time Increase in Steam Generator Inspection Interval
HNP-04-076, One Year Special Report, Steam Generator Tube Inspection Results7 May 2004One Year Special Report, Steam Generator Tube Inspection Results
HNP-04-083, Day Special Report, Steam Generator Tube Plugging27 May 2004Day Special Report, Steam Generator Tube Plugging
HNP-05-088, One-Year Special Report - Steam Generator Tube Inservice Inspection Results1 August 2005One-Year Special Report - Steam Generator Tube Inservice Inspection Results
HNP-06-026, Response to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results13 February 2006Response to Request for Additional Information (RAI) Regarding the One-Year Special Report for the Steam Generator Tube Inservice Inspection Results
HNP-07-032, License Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes20 August 2007License Renewal Application, Amendment 1: Changes Resulting from Responses to Requests for Additional Information, Site Audit Questions, and Applicant - Identified Changes
HNP-08-045, Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a5 February 2009Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a
HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program24 September 2009Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program
HNP-10-059, Request for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval27 May 2010Request for Approval of Proposed Alternative I3R-07 in Accordance with 10 CFR 50.55a(a)(3)(i) for the Third Ten-Year Interval Inservice Interval
IR 05000400/200400426 July 2004IR 05000400-04-004 on 03/28/2004 - 06/26/2004 for Shearon Harris, Unit 1; Inservice Inspection
IR 05000400/200700710 September 2007IR 05000400-07-007 on 07/09/2007 - 07/27/2007, Shearon Harris Nuclear Power Plant, Unit 1, License Renewal Inspection Program, Aging Management Program
IR 05000400/201000322 July 2010IR 05000400-10-003, Carolina Power and Light Company; April 1, 2010 - June 30, 2010; Shearon Harris Nuclear Power Plant, Unit 1; Post Maintenance Testing, and Event Follow-up
IR 05000400/201000528 January 2011IR 05000400-10-005; October 1, 2010 - December 31, 2010; Shearon Harris Nuclear Power Plant, Unit 1; Equipment Alignment, Maintenance Effectiveness, Plant Modifications, Post-Maintenance Testing, Surveillance Testing
IR 05000400/20130031 August 2013IR 05000400-13-003, Carolina Power and Light Company on April 1, 2013 June 30, 2013, Shearon Harris Nuclear Power Plant, Unit 1, Equipment Alignment
IR 05000400/201500229 July 2015IR 05000400/2015002; April 1, 2015, - June 30, 2015; Shearon Harris Nuclear Power Plant, Unit 1, Operability Determinations and Functionality Assessments, Plant Modifications
IR 05000400/201600227 July 2016NRC Integrated Inspection Report 05000400/2016002, April 1, 2016 Through June 30, 2016
IR 05000400/20190025 August 2019Nuclear Regulatory Commission Integrated Inspection Report 05000400/2019002
IR 05000400/20190046 February 2020Integrated Inspection Report 05000400/2019004
ML03098077425 March 2003Presentation Material for Annual Assessment Meeting for Shearon Harris Nuclear Power Plant
ML04344036312 January 2005Summary of Conference Call with Carolina Power & Light Company Regarding Spring 2004 Steam Generator Tube Inspections at Shearon Harris Nuclear Power Plant Unit 1
ML08080024326 March 2008Audit Summary Regarding the License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1
ML09006073730 November 2008NUREG-1916, Volume 1, (2:2) Chpt 3 - End, Safety Evaluation Report Related to the License Renewal of Shearon Harris Nuclear Power Plant, Unit 1
ML09127041321 July 2009Request for Additional Information Regarding Relief Request 2R1-018 on Final Documentation for the Second 10-Year Inservice Inspection Program for Limited Coverage of Welds in Examination Category B-F
ML1008204638 April 2010Request for Relief 2R1-018 for the Second 10-Year Interval Inservice Inspection Program Plant
ML13137A29416 May 2013Notification of Inspection and Request for Information from June 10-14, 201,IP 71111.07, Heat Sink Performance, Triennial Review
ML16113A00620 April 2016Notification of Inspection and Request for Information
ML18004A36728 July 1986Forwards Updated Status Re Tdi Owners Group Dr/Qr Phase I Diesel Generator Components Recommendations,Per 860708 Conference Call
ML18004B94121 September 1987Forwards Response to Generic Ltr 87-12, Loss of Residual RHR While RCS Partially Filled.
ML18005A70010 November 1988Responds to NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors. Program Consistent W/Bulletin Recommendations Will Be Formally Implemented by Engineering Periodic Test Procedure EPT-114, Eddy Current Testing....
ML18011A78916 February 1995Vols 1 & 2 of Special Rept - SG Tube ISI Results RFO #5.
ML18011A94327 June 1995Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes.
ML18012A20812 April 1996Forwards Rept Per 10CFR50.59(b)(c) of Changes,Tests & Experiments for Plant for 940712-951212
ML18016A83528 November 1998ISI Summary 8th Refueling Outage for Shearon Harris Power Plant,Unit 1.
ML18016A96325 May 1999Forwards Periodic Update to FSAR for Hnp.Amend 49 Is Current Through 981128 (End of RFO 8).Some Changes & Analysis Completed After 981128 Have Also Been Included in Amend
ML18016A97328 November 1998Changes,Tests & Experiments, for Harris Nuclear Plant.Rept Provides Brief Description of Changes to Facility & Summary & of SE for Each Item That Was Implemented Under 10CFR50.59 Between 970608-981128.With 990527 Ltr
ML18018B84920 December 1984Forwards Emergency Diesel Generator Equipment & Vols 1-4 of Tdi Diesel Generator Design Review & Quality Revalidation Rept.
ML18018B85117 December 1984Emergency Diesel Generator Equipment.
ML18022A61128 January 1988Forwards Inservice Insp 10-Yr Plan of Shearon Harris Nuclear Power Plant Unit 1. Plan Describes Exams & Schedules for Performing ASME Code Insps of Class 1,2 & 3 Components & Supports,Per 10CFR50.55(a)
ML18022A97029 September 1995Part 21 Rept Re Failure of Charging SI Pump Miniflow Check Valves.Caused by Cocking of Piston Towards Valve Outlet Port Due to Large Hydraulic Surge.Valves That Experienced Failures Replaced
ML18022A99526 October 1995Vols I & II of Eddy Current Exam Rept for Sept 1995.
ML18022B00127 February 1997Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld
ML18022B03526 January 1998Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval.
ML18022B05015 July 1997Vols I & II of IR-ISI-164, Steam Generator Eddy Current Exam Rept, for Shearon Harris Npp,Unit 1.Page 39 in Analysis Guidance Portion of Incoming Submittal Not Included
ML18041A13911 September 1986Forwards Addl Info Per NRC Request Re Facility Tdi Diesel Generators,Including Owners Group Recommendations & Proposed License Conditions
ML19128A32620 June 2019Alternative to Depth Sizing Qualification Examination of Welds
ML19129A2579 May 2019Heat Sink RFI
ML20054F97115 June 1982Response to Chapel Hill Anti-Nuclear Group Effort & Environ Law Project 820514 & 24 Suppl & Amend to Petition to Intervene & 820512 Motion for Consolidation.Applicants Do Not Oppose Granting of Petitions & Motion
ML20083K5309 April 1984Response to Joint Intervenor General Interrogatories & Interrogatories on Contention VII (First Set).Related Correspondence