U Harris Nuclear Plant Safety Focus I
Bob Duncan Director of Site Operations Harris Nuclear Plant I
I C Progress Energy Agenda
- Key Safety Indicators I
Plant Performance Indicators
- Risk Reduction Activities
- Refueling Outage Risk Reduction Activities I
I
~*2 Progress Energy I
L Occupational Safety Industrial Safety: Lost Time Injuries Per 200,000 Hours Worked 1.6I 1
L.C C-I, I
0 1997 1998 1999 2000 2001 2002 2003 YTD I
C Progress Energy 2
Nuclear Safety Radiation Exposure (Person-Rem) 300 260 E 200 c
160 li 60 IL 0
1997 1998 1999 2000 2001 2002 2003 YrD
! Progress Energy 3
Plant Performance Forced Outage Hours GMi C
0 7i 400 300 200 1-C) t I
100 70 0
I 1997 1998 1999 2000 2001 1
2002 2003YrD e Progress Energy 4
5
- Risk Reduction Activities
- Plant Security I
Emergency Planning
- Fire Protection S
self Evaluation
- Foreign Material Discovery
- Charging System Venting
- Zero Tolerance For Equipment Failure
- Secondary Chemistry Improvements I.
Employee Radiation Dose Reduction l
~Ci Progress Energy Harris Plant Security
- Key Focus Area In 2002
- NRC "Interim Compensatory Measures Order" (Feb. 25, 2002)
- Facility modifications
- Plant equipment upgrade
- Process/Procedure changes
- Security staffing & training i Plant access controls l
- Coordination & Liaison With Federal, State & Local Agencies
- Security-specific Drills And Program Evaluations I Progress Energy 6
- Successful NRC/FEMA Graded Exercise March 4, 2003
- Continued Communications And Coordination With State And Counties P Siren replacements
- Evacuation time estimates updated
- Regular Communications To Residents Within The Plant Vicinity
- Continued Outreach And Community Information I
- Harris Plant Media Day i School/civic group presentations P Visitors Center - 7000+ studentsI Progress Energy Fire Protection
- Significant Plant Modifications To Improve Safety
- Additional suppression and qualified fire barrier
- Additional fire barrier between rooms
- Additional barriers will be added in 2003 I
C Progress Energy 7
Fire Protection
- 2003 Fire Protection Project I
Validate Safe Shutdown Analysis
- implement modifications to enhance safety
- Reduce reliance on manual operator actions I
C Progress Energy Foreign Material
- Rubber Material In Residual Heat Removal PipingI Immediately Took Measures To Ensure Safety
- Low To Moderate Safety Significance
- Cause: Improper Work Practice In 1991
- Corrective Actions
- Removed material i Comprehensive search for additional material I
- Improved procedures IC Progress Energy 8
, Refueling Outage 11 Risk Reduction Activities I
Reactor Vessel Head Bare Metal Inspection
- Boric Acid Walkdowns
- Ongoing Testing of Plant Equipment I
- Instrumentation Pressure Boundary Design Improvement l
A' Progress Energy
' Conclusion
- Harris Plant Performing In A Safe Reliable Manner Producing Affordable Electricity For Our Customers
- Safety Continues To Be The Top Priority
- Ongoing Effort To Focus On Risk Reduction
- Self Evaluation Cornerstone Of Continuous Improvement I
Progress Energy 9