MONTHYEARHNP-08-045, Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a2009-02-0505 February 2009 Second Ten-Year Interval Inservice Inspection Program-Final Documentation Including Requests for Relief in Accordance with 10 CFR 50.55a Project stage: Request ML0912701882009-05-19019 May 2009 Acceptance Review Regarding Relief Requests on Final Documentation for the Second 10-Year Inservice Inspection Program for Limited Coverage of Welds in Multiple Exam Categories Project stage: Acceptance Review ML0912704132009-07-21021 July 2009 Request for Additional Information Regarding Relief Request 2R1-018 on Final Documentation for the Second 10-Year Inservice Inspection Program for Limited Coverage of Welds in Examination Category B-F Project stage: RAI HNP-09-095, Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program2009-09-24024 September 2009 Response to Request for Additional Information Regarding Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, & 2R2-011 for the Second 10-Year Inservice Inspection Program Project stage: Response to RAI ML0935614192010-01-0707 January 2010 Requests for Relief 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, and 2R2-011 for the Second 10-Year Interval Inservice Inspection Program Plan (TAC Nos. ME0609, ME0610, ME0611, ME0612, ME0613. Project stage: Other HNP-10-005, Response to Request for Clarifications Regarding Relief Request 2R1-0182010-02-11011 February 2010 Response to Request for Clarifications Regarding Relief Request 2R1-018 Project stage: Request ML1008204632010-04-0808 April 2010 Request for Relief 2R1-018 for the Second 10-Year Interval Inservice Inspection Program Plant Project stage: Other 2009-09-24
[Table View] |
|
---|
Category:Letter
MONTHYEARML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20243012023-05-15015 May 2023 – Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 05000400/LER-2022-007-01, Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus2023-01-26026 January 2023 Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) 05000400/LER-2022-006, Auxiliary Feedwater Pump Inoperability2022-12-20020 December 2022 Auxiliary Feedwater Pump Inoperability 2024-09-10
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24101A0522024-04-10010 April 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - ITS Alignments LAR (L-2023-LLA-0078) ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21258A3652021-09-15015 September 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2021011) and Request for Information (RFI) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation ML19331A4002019-11-27027 November 2019 Request for Additional Information Regarding Licensing Action to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19204A2682019-07-23023 July 2019 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for the Escw System TS AOT Extension and Removal of an Expired Note in TS Risk Informed LAR (L-2019-LLA-0025) ML19136A2712019-05-28028 May 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19060A0912019-03-18018 March 2019 Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18332A4392018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for EAL Scheme Changes ML18337A1272018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding the Rts/Esfas Trip Setpoints Modification LAR ML18264A0282018-10-0909 October 2018 RAI Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization Aad Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18145A1812018-06-18018 June 2018 Request for Additional Information, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18116A1052018-04-25025 April 2018 NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7602018-04-18018 April 2018 NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18058B2242018-02-26026 February 2018 Emailed Radiation Safety RFI ML18005A5482018-01-0808 January 2018 Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303) ML17345A8772017-12-11011 December 2017 NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17339A0722017-12-0404 December 2017 NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17289A3062017-10-23023 October 2017 Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (CAC No. MF9828; EPID L-2017-LLA-0244) ML17250B0172017-09-18018 September 2017 Shearon Harris, Unit 1 - Request for Additional Information Re: License Amendment Request Proposing New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods that Exceed the LHGR Limit Detailed in RG 1.183, Table 3 (CAC No. MF9740) ML17241A0182017-08-30030 August 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Spent Fuel Storage Pool Criticality Analyses ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17123A1332017-05-0909 May 2017 Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Re: License Amendment Request to Relocate Specific TS Parameters to the COLR, Remove Reference to a Plant Procedure as it Pertains to the COLR in TSs, etc. (CAC No. MF8894) ML17109A2912017-04-19019 April 2017 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to Adopt TSTF-339, TSTF-5 and Other Administrative Changes ML16363A0112016-12-27027 December 2016 Notification of Shearon Harris Nuclear Power Plant Design Basis Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2017007 ML16335A0462016-12-0606 December 2016 Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request to Modify Diesel Fuel Oil Testing Surveillance Requirements (CAC No. MF7775) ML16288A0782016-10-26026 October 2016 Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694) ML16288A0042016-10-26026 October 2016 Shearon Harris Nuclear Plant, Unit 1 - Request For Additional Information Regarding License Amendment Request To Relocate The Explosive Gas Mixture And Liquid Holdup Tanks Technical Specifications Requirements (CAC No. MF8067) ML16223A4172016-08-0808 August 2016 Notification of Inspection and Request for Information ML16209A2642016-08-0202 August 2016 Shearon Harris Nuclear Plant, Unit 1 - Second Request For Additional Information Regarding License Amendment Request For A Temporary Change To Technical Specifications For The 'A' Emergency Service Water Pump Replacement (CAC No. MF7017) ML16028A1972016-02-0808 February 2016 Request for Additional Information Regarding License Amendment Request for a Temporary Change to Technical Specifications for the 'A' Emergency Service Water Pump Replacement ML15344A0302015-12-17017 December 2015 Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873) 2024-07-31
[Table view] |
Text
~"R REGU{ UNITED STATES
~v'- "I~
~ 0'1' NUCLEAR REGULATORY COMMISSION
! ~0 WASHINGTON, D.C. 20555-0001
<{
~
~
r;;
~1-':1 ~O*' July 21, 2009 Chris L. Burton, Vice President Shearon HNP Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 SUB..IECT: SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, AND 2R2-011 FOR THE SECOND 10-YEAR INSERVICE INSPECTION PROGRAM (TAC NOS. ME0608, ME0609, ME0610, ME0611, ME0612, ME0613, ME0614, AND ME0615)
Dear Mr. Burton:
By letter dated February 5,2009, Carolina Power & Light Company (the licensee), now doing business as Progress Energy Carolinas, Inc., submitted Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, and 2R2-011 for the second 10-year inservice inspection interval at the Shearon Harris Nuclear Power Plant, Unit 1, which was in effect from February 2, 1998, through and including May 1, 2008.
The licensee requests relief in accordance with Title 10 of the Code of Regulations Section 50.55a(g)(5)(iii) from applicable requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," related to inspection of welds with limited coverage in ASME Code examination Categories B-F, B-A, B-A, B-D, B-B, C-A, C-B, and C-A.
The U.S. Nuclear Regulatory Commission staff has determined that it needs additional information in order to complete its review. Please respond to the enclosed requests by September 18, 2009, in order to facilitate a timely completion of the staff review. Please contact me at 301-415-3178 if you have any questions on this issue, would like to participate in a conference call, or if you require additional time to submit your responses.
~
arlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
As stated cc w/enclosure: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 RELIEF REQUESTS 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, AND 2R2-011 ON FINAL DOCUMENTATION FOR THE SECOND 10-YEAR INSERVICE INSPECTION PROGRAM FOR LIMITED COVERAGE OF WELDS IN EXAMINATION CATEGORIES B-F, B-A. B-A. B-D, B-B, C-A. C-B, AND C-A. RESPECTIVELY DOCKET NO. 50-400
1.0 BACKGROUND
By letter dated February 5, 2009 (Agencywide Documents Access & Management System Accession No. ML090540055), Carolina Power & Light Company (the licensee), now doing business as Progress Energy Carolinas, Inc., submitted Relief Requests (RRs) 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, and 2R2-011, for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP). The proposed RRs are for the second 10-year inservice inspection (lSI) interval, in which the licensee adopted the 1989 Edition of the ASME Code,Section XI, No Addenda, as the Code of Record. The second 10-year lSI interval at HNP was in effect from February 2, 1998, through and including May 1, 2008.
The proposed RRs request relief in accordance with Title 10 of the Code of RegUlations (10 CFR) Section 50.55a(g)(5)(iii) from applicable requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," related to inspection of welds with limited coverage in ASME Code examination Categories B-F, B-A, B-D, B-B, C-A, C-B, and C-A. The ASME Code requires that 100 percent of the examination volumes or surface areas described in ASME Code,Section XI, Tables IWB-2500 and IWC-2500, be inspected during each interval. The licensee stated that 100 percent of the ASME Code-required volumes or surface areas are impractical to obtain at HNP.
10 CFR 50.55a(g)(5)(iii) states that when licensees determine that conformance with ASME Code requirements is impractical at their facility, they shall submit information to support this determination. The U.S. Nuclear Regulatory Commission (NRC) will evaluate such requests based on impracticality, and may impose alternatives, giving due consideration to public safety and the burden imposed on the licensee.
Pacific Northwest National Laboratory and the NRC have reviewed the information submitted by the licensee, and based on this review determined the folloWing information is required to complete the evaluation.
Enclosure
-2 2.0 REQUEST FOR ADDITIONAL INFORMATION
- 1. General-Information Required on All Requests for Relief In all cases, the licensee has provided only general information regarding the impracticality of obtaining ASME Code-required vOlumetric or surface examinations, as applicable. Statements such as "physical obstructions and geometric surface conditions," "design configurations," or "inner diameter counterbore and root configuration," are inadequate to explain the bases for not obtaining the ASME Code-required examination volumes. No sketches with dimensional information showing the causes of limited accessibility have been1ncluded.
Please submit detailed and specific information to support the bases for limited examination in all requests for relief in order to demonstrate impracticality. Specifically:
a) Include descriptions (written and/or sketches, as necessary) of the interferences present for applied nondestructive examination (NDE) techniques.
b) As applicable, describe NDE equipment (ultrasonic scanning apparatus), details of the listed obstructions (size, shape, proximity to the weld, etc.) to demonstrate accessibility limitations, and discuss whether alternative methods or advanced technologies could be employed to maximize ASME Code coverage.
c) Fully clarify the wave modality and insonification angles used for all ultrasonic examinations.
d) Provide cross-sectional coverage plots to describe the ASME Code volumes examined.
e) If not included, state whether any indications were discovered as a result of these examinations, and how these indications have been dispositioned.
- 2. Request for Relief 2R2-01 0, ASME Code,Section XI. Examination Category C-B, Item C2.21, Nozzle-to-Shell Weld The licensee has requested relief from the requirement to examine 100 percent of the ASME Code-required inspection volume for two Boron Injection Tank nozzle-to-vessel welds: II-BIT-01NTHW-03 and II-BIT-01NTHW-04.
a) Please state whether the inspection techniques used to examine these welds included refracted longitudinal waves.
b) Please state the material used (austenitic or ferritic steel) and the wall thickness for each of these components.
- 3
- 3. Request for Relief 2R1-018, ASME Code,Section XI. Examination Category B-F, Item B5.130, NPS 4 or Larger Dissimilar Metal Butt Welds a) The licensee has requested relief from the requirement to examine 100 percent of the ASME Code-required inspection volume for the following dissimilar metal welds on the primary coolant system:
RVNOlCI-N-05SE Inlet Nozzle DM weld at 95 degrees RVNOlB I-N-03SE Inlet Nozzle DM weld at 215 degrees RVNOZAI-N-01 SE Inlet Nozzle DM weld at 335 degrees It is unclear from the licensee's submittal why inlet nozzle welds RVNOlCI-N-05SE and RVNOlBI-N-03SE were not included in the previous 1O-year lSI request for relief. Please submit information explaining why these welds were not included previously.
b) Please provide more detailed information on the ultrasonic testing (UT) inspections performed (Le., probe type, incident angle. geometrical interference, scanned coverage, etc).
c) Please explain how the "Combined UT [Ultrasonic] Coverage Total Percentage" in Sections 6.1, 6.2, and 6.3 of 2R1-018 is obtained.
d) Please provide information regarding when the ultrasonic testing inspection for each weld was performed (e.g., what ASME Code criteria were required Appendix VIII or Section V)?
e) Please provide more detailed information on the eddy current inspection methods performed, the inner diameter surface conditions of the affected welds, and an assessment of the ability to perform the eddy current testing exam effectively on these types of surface conditions.
- 4. Request for Relief 2R1-022, ASME Code,Section XI. Examination Category B-B, Item B2.40, Pressure Retaining Welds in Vessels Other than Reactor Vessels The licensee has requested relief from the requirement to examine 100 percent of the ASME Code-required inspection volume for steam generator tubesheet-to-head weld II-SG-001 SGA-TSTHW-06-1.
HNP is a 3-loop pressurized water reactor plant; there are three steam generators. each containing a tubesheet-to-head weld. The ASME Code states that "the examination may be limited to one vessel among the group of vessels performing similar functions."
Please clarify whether all three steam generator tubesheet-to-head welds were examined. Because the licensee was unable to meet the ASME Code-required inspection volume on tubesheet-to-head weld II-SG-001 SGA-TSTHW-06-1, if the other tubesheet-to-head welds were examined, please describe whether the same coverage area limitations apply to these similar welds on the remaining two steam generators.
July 21, 2009 Chris L. Burton, Vice President Shearon HNP Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 SUB~IECT: SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUESTS 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, AND 2R2-011 FOR THE SECOND 10-YEAR INSERVICE INSPECTION PROGRAM (TAC NOS. ME0608, ME0609, ME0610, ME0611, ME0612, ME0613, ME0614, AND ME0615)
Dear Mr. Burton:
By letter dated February 5, 2009, Carolina Power & Light Company (the licensee), now doing business as Progress Energy Carolinas, Inc., submitted Relief Requests 2R1-018, 2R1-019, 2R1-020, 2R1-021, 2R1-022, 2R2-009, 2R2-010, and 2R2-011 for the second 10-year inservice inspection interval at the Shearon Harris Nuclear Power Plant, Unit 1, which was in effect from February 2, 1998, through and including May 1, 2008.
The licensee requests relief in accordance with Title 10 of the Code of Regulations Section 50.55a(g)(5)(i;;) from applicable requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," related to inspection of welds with limited coverage in ASME Code examination Categories B-F, B-A, B-A, B-D, B-B, C-A, C-B, and C-A.
The U.S. Nuclear Regulatory Commission staff has determined that it needs additional information in order to complete its review. Please respond to the enclosed requests by September 18, 2009, in order to facilitate a timely completion of the staff review. Please contact me at 301-415-3178 if you have any questions on this issue, would like to participate in a conference call, or if you require additional time to submit your responses.
Sincerely, IRA!
Marlayna Vaaler, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
As stated cc w/enclosure: Distribution via ListServ DISTRIBUTION:
PUBLIC RidsNrrPMShearonHarris RidsNrrDciCpnb LPL2-2 RlF RidsNrrLACSola RidsRgn2MailCenter RidsNrrDorlLpl2-2 RidsOgcRp RidsAcrsAcnw_MailCTR ADAMS Accession Number' ML091270413 NRR-088 OFFICE LPL2-2/PM LPL2-2/LA CPNB/BC LPL2-2/BC NAME MVaaler CSoia MMitchell" EBrown for TBoyce DATE 06/18/09 06/18/09 6/9/2009 07/21/09