Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000461/200800410 November 2008IR 05000461-08-004; on 07/01/08 - 09/30/08; Clinton Power Station, Unit 1; Maintenance Effectiveness, Operability EvaluationsReactor Vessel Water Level
Ultimate heat sink
Fire Barrier
Internal Flooding
Past operability
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Significance Determination Process
Operability Determination
Flow Induced Vibration
Power Uprate
IR 05000461/200840319 November 2008NRC Security Baseline Inspection Report 05000461-08-403(DRS) Preliminary Greater than Green FindingEnforcement Discretion
Significance Determination Process
ML08275007223 December 2008Unit 1 - Public Safety Evaluation by the Office of Nuclear Reactor Regulation Direct Transfer of Facility Operating Licenses from Amergen Energy Co., LLC to Exelon Generation Co., LLC
ML08275017623 December 2008Order Approving Transfer of the Operating License and Conforming Amendment
ML08275019223 December 2008Draft Amendment to Facility Operating LicenseSafe Shutdown
Safeguards Contingency Plan
Fire Protection Program
ML0827601162 October 2008Acceptance Review for Clinton LAR and Per LIC-109
ML08289018414 November 2008Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
ML08294001030 October 2008Issuance of Amendment Technical Specification Change as Part of Implementation of TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil
ML08296088521 October 2008Ltr Clinton MOD 50.59 Request for InformationCommercial Grade Dedication
ML08303014121 October 2008Engine Systems, Inc., Transmittal of 10CFR21-0095, Rev. 0 Reporting of Defects and Non-Compliance, Ingersoll-Rand Series 89 Air Start Motors, P/N 8367694-ESI
ML08308022529 October 2008Letter Submittal of Knowledge and Abilities Statements That Will Be Excluded from the Random Exam Generation Process
ML0831105937 November 2008Notice of Closed Meeting to Exelon Generation Company for SCWE Survey ReviewInattentive
ML08319028814 November 2008Acceptance Review of Clinton Relief Request No. 2210 from OM Code 5-year Test Interval for Safety Relief Valves
ML08326034019 November 2008IR 05000461-08-403, (Drs), on 10/27/2008, for Clinton, Security Baseline InspectionSignificance Determination Process
ML08330036525 November 2008Final Medical Services Drill Report
ML08331007326 November 2008Summary of Meeting with Exelon to Review the Results of Security Organization Safety Conscious Work Environment (SCWE) Surveys at Exelon Nuclear Operating Reactors
ML0833804153 December 2008Relief Request CR-26 Acceptance Review
ML0834501614 December 2008GFE Annual Registration Letter - 2009 ExaminationsGeneric Fundamentals Examination
ML08347039311 December 2008Local Outreach Initiative Letter - Dewitt County Board of Commissioners - Clinton, Il
ML08364023723 December 2008Public Letter and Order Notice - Order Approving Transfer of the Operating License and Conforming Amendment
RA-08-107, Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums13 November 2008Unit 1, 2008 Annual Report -Guarantees of Payment of Deferred Premiums
RA-08-115, Request for NRC Written Consent to Proposed Amendments to Trust Agreement the Merger of Amergen Energy Company, LLC Into Its Parent, Exelon Generation Company, LLC3 December 2008Request for NRC Written Consent to Proposed Amendments to Trust Agreement the Merger of Amergen Energy Company, LLC Into Its Parent, Exelon Generation Company, LLC
RA-08-116, Unit 1 - Notification of Expected Date of Transfer of Nuclear Units to Exelon Generation Company, LLC29 December 2008Unit 1 - Notification of Expected Date of Transfer of Nuclear Units to Exelon Generation Company, LLC
RS-08-131, General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-0114 October 2008General Company, LLC and Amergen Energy Company, LLC, Nine-Month Response to Generic Letter 2008-01Surveillance Frequency Control Program
Generic Issues Program
GOTHIC
RS-08-141, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors31 October 2008Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors
RS-08-144, Request for Relief from ASME OM Code 5-Year Test Interval for Safety Relief Valves (Relief Request No. 2210)3 November 2008Request for Relief from ASME OM Code 5-Year Test Interval for Safety Relief Valves (Relief Request No. 2210)Scaffolding
Grace period
RS-08-156, Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections3 December 2008Proposed Alternative to 10CFR 50.55a Examination Requirements for Reactor Pressure Vessel Weld Inspections
RS-08-157, Request to Use Later Edition and Addenda to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code3 December 2008Request to Use Later Edition and Addenda to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel CodeIncorporated by reference
TAC:ME004414 November 2008
TAC:ME02173 December 2008
TAC:ME15463 November 2008