Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML012990362 | 21 July 1995 | Issuance of Amendments Nos. 196 and 136, Revising TS to Lower Anticipated Transient Without Scramrecirculation Pump Trip Setpoint by Approximately 2 Feet 2 Inches | Reactor Vessel Water Level Hydrostatic Fuel cladding |
ML020570316 | 20 February 2002 | Response to Request for Additional Information on Technical Specifications Revision Request: Diesel Generator Change | Mission time Large early release frequency Containment Hardened Vent Maintenance Rule Program Offsite Circuit |
ML020570318 | 21 February 2002 | Request to Revise Technical Specifications: One Time Extension of Hatch Unit 1 and Unit 2 Technical Specification 3.8.1 for Diesel Generator 1B - Rev.1 | Offsite Circuit |
ML020930092 | 27 March 2002 | Response to Request for Additional to Information Relative to Request to Revise Technical Specifications, 18-to 24-Month Fuel Cycle Extension | Reactor Vessel Water Level Scram Discharge Volume |
ML020930422 | 28 March 2002 | Part 1 of 2, Edwin I. Hatch Nuclear Plant, Units 1 & 2, Technical Specifications | Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Squib Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Spiral reload Overtravel Hardened vent Pressure Boundary Leakage Offsite Circuit Fire Protection Program Unidentified leakage |
ML021020430 | 5 April 2002 | Issuance of Amendment (Tac No. MB3756) | Reactor Vessel Water Level |
ML021410288 | 17 May 2002 | Tech Spec Pages for Amendment 173 Regarding Technical Specifications to Eliminate the Response Time Testing Requirements for the Reactor Protection System Signals of Reach High Steam Dome Pressure and Reactor Vessel Water Level Low | Reactor Vessel Water Level Scram Discharge Volume |
ML021410338 | 17 May 2002 | Technical Specification - Hatch 1 & 2, Amendment 231 and 172 (TAC MB2886 and MB2887) | Safe Shutdown Offsite Circuit |
ML022000324 | 11 July 2002 | Request to Revise Technical Specifications, Deletion of Technical Specification 3.3.1.1.I.2 | |
ML022030455 | 12 July 2002 | Tech Spec Pages, Amendment No. 174 Dated July 12, 2002 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence Squib Qualified Offsite Circuit Scram Discharge Volume Battery sizing Offsite Circuit |
ML022030467 | 12 July 2002 | Tech Spec Pages Amendment No. 232 Dated July 12, 2002 | Safe Shutdown Reactor Vessel Water Level High Radiation Area Anticipated operational occurrence Squib Qualified Offsite Circuit Scram Discharge Volume Battery sizing Offsite Circuit |
ML022040014 | 16 July 2002 | Revision to Request to Revise Technical Specifications: Quarterly Surveillance Extension | |
ML022560197 | 12 September 2002 | Amendment Nos. 233 & 175, Revise TSs to Allow Mode 2 (Startup) Operation with Two Out of Four, Rather than Three Out of Four, Required Intermediate Range Monitor Channels Per Trip System | Anticipated operational occurrence Fuel cladding |
ML022660211 | 12 September 2002 | Technical Specification Pages for Amendment No. 233, Revise TSs to Allow Mode 2 (Startup) Operation with Two Out of Four, Rather than Three Out of Four, Required Intermediate Range Monitor Channels Per Trip System | |
ML022660217 | 12 September 2002 | Technical Specification Pages for Amendment No. 175, Revise TSs to Allow Mode 2 (Startup) Operation with Two Out of Four, Rather than Three Out of Four, Required Intermediate Range Monitor Channels Per Trip System | |
ML022700231 | 26 September 2002 | Technical Specification for Amendment 234 Revising the TS to Support Extension of Certain Surveillance Requirements from 92 Days to 92 Days on an Alternate Test Bases. | Pressure Boundary Leakage |
ML022700243 | 26 September 2002 | Technical Specification for Amendment 176 Revising the TS to Support Extension of Certain Surveillance Requirements from 92 Days to 92 Days on an Alternate Test Bases. | Shutdown Margin Pressure Boundary Leakage |
ML023010288 | 25 October 2002 | Tech Spec Pages, Amendment No. 176, Turbine Bypass System Respones Time | |
ML023160038 | 1 November 2002 | Editorial Correction to Technical Specification Table 3.3.1.1-1 | Reactor Vessel Water Level Scram Discharge Volume |
ML023290259 | 22 November 2002 | Technical Specifications, Correction, Removing Response Time Surveillance Requirement for Reactor Vessel Water Level low-3 Reactor Protection System (RPS) Trip & Reactor Vessel Steam Dome Pressure High RPS Trip | Reactor Vessel Water Level |
ML023530595 | 18 December 2002 | Technical Specification for Amendment 235 & 177 | |
ML031640174 | 15 January 2002 | Issuance of Renewed Operating Licenses for Hatch Units 1 & 2 (Technical Specifications, Appendix a) | Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Squib Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Spiral reload Overtravel Hardened vent Pressure Boundary Leakage Offsite Circuit Fire Protection Program Unidentified leakage |
ML032691352 | 23 September 2003 | Technical Specification Pages for Amendment Nos. 238 and 180 | Reactor Vessel Water Level Anticipated operational occurrence Feedwater Controller Failure Fuel cladding Fire Protection Program |
ML040130196 | 12 January 2003 | Technical Specification Page 3.3-51, Primary Containment Isolation Instrumentation | |
ML040550524 | 20 February 2004 | Attachment 5, Technical Specification Page 3.3-69, Amendment No. 174, Electric Power Monitoring, 3.3.8.2 | |
ML040570280 | 20 February 2004 | Attachment 3, Technical Specifications Pages 3.0.3, SR Applicability 3.0, Amendments 228 & 170 | Time of Discovery |
ML041460307 | 25 May 2004 | Enclosure 1, Amendment No. 240 | Scram Discharge Volume |
ML041460308 | 25 May 2004 | Enclosure 2, Amendment 183 | Scram Discharge Volume |
ML041540110 | 28 May 2004 | Tech Spec Page for Amendment 241, Revising the Technical Specifications for the Primary Containment Leakage Rate Testing Program | |
ML041540112 | 28 May 2004 | Tech Spec Page for Amendment 184, Revising the Technical Specifications for the Primary Containment Leakage Rate Testing Program | |
ML041590370 | 3 June 2004 | 6/3/04, Hatch, Units 1 & 2, Enclosure 2, Amendment No. 185 | Annual Radiological Environmental Operating Report |
ML041590374 | 3 June 2004 | 6/3/04, Hatch, Units 1 & 2, Enclosure 1, Amendment No. 242 | Annual Radiological Environmental Operating Report |
ML043280655 | 22 November 2004 | Technical Specifications, Amendment Re Loss of Offsite Power Instrumentation Logic System Functional Test Surveillance. TAC No MC3615 and MC3616 | |
ML050330157 | 1 February 2005 | Tech Spec Page for Amendment 187, Primary Containment Leakage Rate Testing Program | |
ML050590040 | 23 February 2005 | Hacth Units 1 & 2, Enclosure, Amendment No. 244- PAM Instrumentation 3.3.3.1 and Amendment No. 188 Appendix a TS Revised Pages (Tac No. MC3226, MC3227) | Reactor Vessel Water Level Ultimate heat sink Post Accident Monitoring |
ML050760404 | 8 March 2005 | Technical Specifications, Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
ML053490058 | 13 December 2005 | Tech Spec Pages for Amendments 246 and 190 Regarding Increased Flexibility in Mode Restraints | Ultimate heat sink Grab sample Post Accident Monitoring Offsite Circuit |
ML060060116 | 5 January 2006 | Enclosure, Technical Specifications, Amd MC5109, Standby Liquid Control System | |
ML060230172 | 20 January 2006 | Tech Spec Pages for Amendments 248 and 192 Appendix J Leakage Rate Test for Containment Purge Valves | Squib |
ML060600286 | 28 February 2006 | Edwin I. Hatch Nuclear Plant, Technical Specifications Bases Changes for 2005 | |
ML062490253 | 29 August 2006 | Enclosure 5, E. I. Hatch Request to Implement an Alternative Source Term - Marked-Up TS and Bases Pages | Shutdown Margin Reactor Vessel Water Level Loop seal Ultimate heat sink Anticipated operational occurrence Hydrostatic Squib Scram Discharge Volume Fuel cladding |
ML062490255 | 29 August 2006 | Enclosure 6, E. I. Hatch, Request to Implement an Alternative Source Term - Clean Typed TS and Bases Pages | Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Stroke time Anticipated operational occurrence Hydrostatic Squib Scram Discharge Volume Power Operated Valves Hardened vent Fuel cladding |
ML071410099 | 17 May 2007 | Technical Specifications, Issuance of Amendments Nos 251 & 195 Regarding Technical Specification Task Force Change TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities | Hydrostatic Fire Protection Program |
ML071590020 | 7 June 2007 | Technical Specifications, Issuance of Amendments Regarding Changes to Sections 2 & 5 of the Technical Specifications Reflecting Site VP Organizational Structure (TAC Nos. MD4202 & MD4203) | Reactor Vessel Water Level Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Fire Protection Program |
ML072820058 | 4 October 2007 | Technical Specifications, Issuance of Amendments Regarding Refueling Interlocks (TAC Nos. MD4444 & MD4445) | Shutdown Margin Ultimate heat sink Hydrostatic Fire Protection Program |
ML082280076 | 2 October 2008 | Issuance of Amendments Regarding Completion Time for Inoperable Swing Diesel Generator (Tac Nos. MD6947 and MD6948) | Offsite Circuit Fire Protection Program |
ML090540222 | 1 October 2008 | Technical Specifications, Issuance of Amendments Regarding Improved Control Rod Insertion Process, TSTF 476, Revision 1 | Fire Protection Program |
ML091770664 | 4 September 2009 | Southern Nuclear Operating Company Plants, License Amendments, Regarding Elimination of Working Hour Restrictions from Technical Specifications | Fire Protection Program |
ML14147A410 | 29 August 2014 | Issuance of Amendments Regarding Control Room Habitability | Safe Shutdown Shutdown Margin Loop seal High Radiation Area Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Earthquake Fire Protection Program |
ML14279A261 | 10 December 2014 | Issuance of Amendments Regarding the Control Room Air Conditioning System | Fire Protection Program |