Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML01299036221 July 1995Issuance of Amendments Nos. 196 and 136, Revising TS to Lower Anticipated Transient Without Scramrecirculation Pump Trip Setpoint by Approximately 2 Feet 2 InchesReactor Vessel Water Level
Hydrostatic
Fuel cladding
ML02057031620 February 2002Response to Request for Additional Information on Technical Specifications Revision Request: Diesel Generator ChangeMission time
Large early release frequency
Containment Hardened Vent
Maintenance Rule Program
Offsite Circuit
ML02057031821 February 2002Request to Revise Technical Specifications: One Time Extension of Hatch Unit 1 and Unit 2 Technical Specification 3.8.1 for Diesel Generator 1B - Rev.1Offsite Circuit
ML02093009227 March 2002Response to Request for Additional to Information Relative to Request to Revise Technical Specifications, 18-to 24-Month Fuel Cycle ExtensionReactor Vessel Water Level
Scram Discharge Volume
ML02093042228 March 2002Part 1 of 2, Edwin I. Hatch Nuclear Plant, Units 1 & 2, Technical SpecificationsTime of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Squib
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Spiral reload
Overtravel
Hardened vent
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Unidentified leakage
ML0210204305 April 2002Issuance of Amendment (Tac No. MB3756)Reactor Vessel Water Level
ML02141028817 May 2002Tech Spec Pages for Amendment 173 Regarding Technical Specifications to Eliminate the Response Time Testing Requirements for the Reactor Protection System Signals of Reach High Steam Dome Pressure and Reactor Vessel Water Level LowReactor Vessel Water Level
Scram Discharge Volume
ML02141033817 May 2002Technical Specification - Hatch 1 & 2, Amendment 231 and 172 (TAC MB2886 and MB2887)Safe Shutdown
Offsite Circuit
ML02200032411 July 2002Request to Revise Technical Specifications, Deletion of Technical Specification 3.3.1.1.I.2
ML02203045512 July 2002Tech Spec Pages, Amendment No. 174 Dated July 12, 2002Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
Squib
Qualified Offsite Circuit
Scram Discharge Volume
Battery sizing
Offsite Circuit
ML02203046712 July 2002Tech Spec Pages Amendment No. 232 Dated July 12, 2002Safe Shutdown
Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
Squib
Qualified Offsite Circuit
Scram Discharge Volume
Battery sizing
Offsite Circuit
ML02204001416 July 2002Revision to Request to Revise Technical Specifications: Quarterly Surveillance Extension
ML02256019712 September 2002Amendment Nos. 233 & 175, Revise TSs to Allow Mode 2 (Startup) Operation with Two Out of Four, Rather than Three Out of Four, Required Intermediate Range Monitor Channels Per Trip SystemAnticipated operational occurrence
Fuel cladding
ML02266021112 September 2002Technical Specification Pages for Amendment No. 233, Revise TSs to Allow Mode 2 (Startup) Operation with Two Out of Four, Rather than Three Out of Four, Required Intermediate Range Monitor Channels Per Trip System
ML02266021712 September 2002Technical Specification Pages for Amendment No. 175, Revise TSs to Allow Mode 2 (Startup) Operation with Two Out of Four, Rather than Three Out of Four, Required Intermediate Range Monitor Channels Per Trip System
ML02270023126 September 2002Technical Specification for Amendment 234 Revising the TS to Support Extension of Certain Surveillance Requirements from 92 Days to 92 Days on an Alternate Test Bases.Pressure Boundary Leakage
ML02270024326 September 2002Technical Specification for Amendment 176 Revising the TS to Support Extension of Certain Surveillance Requirements from 92 Days to 92 Days on an Alternate Test Bases.Shutdown Margin
Pressure Boundary Leakage
ML02301028825 October 2002Tech Spec Pages, Amendment No. 176, Turbine Bypass System Respones Time
ML0231600381 November 2002Editorial Correction to Technical Specification Table 3.3.1.1-1Reactor Vessel Water Level
Scram Discharge Volume
ML02329025922 November 2002Technical Specifications, Correction, Removing Response Time Surveillance Requirement for Reactor Vessel Water Level low-3 Reactor Protection System (RPS) Trip & Reactor Vessel Steam Dome Pressure High RPS TripReactor Vessel Water Level
ML02353059518 December 2002Technical Specification for Amendment 235 & 177
ML03164017415 January 2002Issuance of Renewed Operating Licenses for Hatch Units 1 & 2 (Technical Specifications, Appendix a)Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Squib
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Spiral reload
Overtravel
Hardened vent
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Unidentified leakage
ML03269135223 September 2003Technical Specification Pages for Amendment Nos. 238 and 180Reactor Vessel Water Level
Anticipated operational occurrence
Feedwater Controller Failure
Fuel cladding
Fire Protection Program
ML04013019612 January 2003Technical Specification Page 3.3-51, Primary Containment Isolation Instrumentation
ML04055052420 February 2004Attachment 5, Technical Specification Page 3.3-69, Amendment No. 174, Electric Power Monitoring, 3.3.8.2
ML04057028020 February 2004Attachment 3, Technical Specifications Pages 3.0.3, SR Applicability 3.0, Amendments 228 & 170Time of Discovery
ML04146030725 May 2004Enclosure 1, Amendment No. 240Scram Discharge Volume
ML04146030825 May 2004Enclosure 2, Amendment 183Scram Discharge Volume
ML04154011028 May 2004Tech Spec Page for Amendment 241, Revising the Technical Specifications for the Primary Containment Leakage Rate Testing Program
ML04154011228 May 2004Tech Spec Page for Amendment 184, Revising the Technical Specifications for the Primary Containment Leakage Rate Testing Program
ML0415903703 June 20046/3/04, Hatch, Units 1 & 2, Enclosure 2, Amendment No. 185Annual Radiological Environmental Operating Report
ML0415903743 June 20046/3/04, Hatch, Units 1 & 2, Enclosure 1, Amendment No. 242Annual Radiological Environmental Operating Report
ML04328065522 November 2004Technical Specifications, Amendment Re Loss of Offsite Power Instrumentation Logic System Functional Test Surveillance. TAC No MC3615 and MC3616
ML0503301571 February 2005Tech Spec Page for Amendment 187, Primary Containment Leakage Rate Testing Program
ML05059004023 February 2005Hacth Units 1 & 2, Enclosure, Amendment No. 244- PAM Instrumentation 3.3.3.1 and Amendment No. 188 Appendix a TS Revised Pages (Tac No. MC3226, MC3227)Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
ML0507604048 March 2005Technical Specifications, Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure ReportsOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
ML05349005813 December 2005Tech Spec Pages for Amendments 246 and 190 Regarding Increased Flexibility in Mode RestraintsUltimate heat sink
Grab sample
Post Accident Monitoring
Offsite Circuit
ML0600601165 January 2006Enclosure, Technical Specifications, Amd MC5109, Standby Liquid Control System
ML06023017220 January 2006Tech Spec Pages for Amendments 248 and 192 Appendix J Leakage Rate Test for Containment Purge ValvesSquib
ML06060028628 February 2006Edwin I. Hatch Nuclear Plant, Technical Specifications Bases Changes for 2005
ML06249025329 August 2006Enclosure 5, E. I. Hatch Request to Implement an Alternative Source Term - Marked-Up TS and Bases PagesShutdown Margin
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Squib
Scram Discharge Volume
Fuel cladding
ML06249025529 August 2006Enclosure 6, E. I. Hatch, Request to Implement an Alternative Source Term - Clean Typed TS and Bases PagesShutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Hydrostatic
Squib
Scram Discharge Volume
Power Operated Valves
Hardened vent
Fuel cladding
ML07141009917 May 2007Technical Specifications, Issuance of Amendments Nos 251 & 195 Regarding Technical Specification Task Force Change TSTF-484, Use of TS 3.10.1 for Scram Time Testing ActivitiesHydrostatic
Fire Protection Program
ML0715900207 June 2007Technical Specifications, Issuance of Amendments Regarding Changes to Sections 2 & 5 of the Technical Specifications Reflecting Site VP Organizational Structure (TAC Nos. MD4202 & MD4203)Reactor Vessel Water Level
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Fire Protection Program
ML0728200584 October 2007Technical Specifications, Issuance of Amendments Regarding Refueling Interlocks (TAC Nos. MD4444 & MD4445)Shutdown Margin
Ultimate heat sink
Hydrostatic
Fire Protection Program
ML0822800762 October 2008Issuance of Amendments Regarding Completion Time for Inoperable Swing Diesel Generator (Tac Nos. MD6947 and MD6948)Offsite Circuit
Fire Protection Program
ML0905402221 October 2008Technical Specifications, Issuance of Amendments Regarding Improved Control Rod Insertion Process, TSTF 476, Revision 1Fire Protection Program
ML0917706644 September 2009Southern Nuclear Operating Company Plants, License Amendments, Regarding Elimination of Working Hour Restrictions from Technical SpecificationsFire Protection Program
ML14147A41029 August 2014Issuance of Amendments Regarding Control Room HabitabilitySafe Shutdown
Shutdown Margin
Loop seal
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Fire Protection Program
ML14279A26110 December 2014Issuance of Amendments Regarding the Control Room Air Conditioning SystemFire Protection Program