ML040130196
| ML040130196 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/12/2003 |
| From: | NRC/NRR/DLPM |
| To: | |
| Bloom S D, NRR/DLPM,415-1313 | |
| Shared Package | |
| ML040140264 | List: |
| References | |
| TAC MB6953 | |
| Download: ML040130196 (1) | |
Text
Primary Containment Isolation Inrstrumentation 3.3.6.1 Table 3.3.6.1-1 (page 1 of 4)
Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Reactor Vessel Water Level - Low Low Low, Level I 1,2,3 2
D SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 SR 3.3.6.1.7 2-113 inches
- b. Main Steam Line Pressure - Low 1
2 E
SR 3.3.6.1.3 SR 3.3.6.1.6 2 825 psig
- c. Main Steam Line Flow - High
- d. Condenser Vacuum - Low 1,2,3 1,
2(a), 3(a) 2 per MSL 2
D D
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 SR 3.3.6.1.7 SR 3.3.6.1.3 SR 3.3.6.1.6 s 138% rated steam flow 2 7 Inches Hg vacuum
- e. Main Steam Tunnel Temperature - High
- f. Turbine Building Area Temperature - High 1,2,3 1,2,3 6
16(b)
D D
SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 5 1940F S 2000F I
- 2.
Primary Containment Isolation
- a. Reactor Vessel Water Level - Low, Level 3
- b.
Drywell Pressure -
High 1,2,3 1,2,3 2
2 G
G SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 SR 3.3.6.1.1 SR 3.3.6.1.2 SR 3.3.6.1.5 SR 3.3.6.1.6 2 0 inches s 1.92 psig (continued)
(a) With any turbine stop valve not closed.
(b) With 8 channels per trip string. Each trip string shall have 2 channels per main steam line, with no more than 40 ft separating any two OPERABLE channels.
HATCH UNIT 2 3.3-51 Amendment No. 181