Issue date | Title | Topic | |
---|---|---|---|
ML13311A278 | 15 December 1978 | 2AP&ALM-AR Style B C5-N/SRC Current Production & 2AP&ALM-AR Style a Naturally Aged Alarm,Relay Output. | Safe Shutdown Earthquake |
ML13311A279 | 15 April 1981 | Addendum to Review of Seismic Qualification Documentation for Certain Balance of Plant & NSSS Items. | |
ML18039A937 | 6 June 1994 | Approval Seismic Testing of High Voltage Shutdown Relay. | Seismically rugged |
ML20002A591 | 10 October 1980 | Nonproprietary Version of CEN-140(S)-NP, Data Transmittal for Southern CA Edison Fuel Audit Analysis. | |
ML20010C774 | 5 August 1981 | Nonproprietary Version of Cpc/Ceac Sys Phase II Software Verification Test Rept. | |
ML20010C782 | 5 August 1981 | Nonproprietary Version of Cpc/Ceac Sys Phase I,Software Verification Test Rept. | |
ML20050B802 | 5 April 1982 | Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 1 Executive Summary | |
ML20050B804 | 5 April 1982 | Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 2 Program Results | |
ML20050B809 | 5 April 1982 | Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 3 Potential Finding Repts Book 1 | |
ML20050B810 | 5 April 1982 | Independent Verification of San Onofre Nuclear Generating Station Units 2 & 3 Seismic Design & QA Program Effectiveness, Vol 3 Potential Finding Repts Book 2 | |
ML20053F006 | 31 March 1982 | Performance Test Rept,Prompt Alerting Sys for San Onofre Nuclear Generating Station. One Oversize Map Encl.Aperture Card Available in PDR | |
ML20073L882 | 3 January 1983 | Rev 0 to Plant Protection Sys Preoperational Test,San Onofre Nuclear Generating Station Unit 3 | |
ML20073L902 | 19 January 1983 | Rev 0 to Plant Protection Sys Response Time Testing,San Onofre Generating Station Unit 3 | |
ML20073L919 | 21 April 1982 | Rev 0 to Plant Protection Sys Response Time Testing,San Onofre Generating Station Unit 2 | |
ML20079M636 | 25 January 1984 | Leakage Reduction Program Test Results | |
ML20080U493 | 31 January 1984 | Evaluation of Natural Circulation Cooldown Test Performed at San Onofre Nuclear Generating Station | |
ML20095F924 | 31 March 1984 | Nonproprietary Version of Rev 0 to Cpc/Ceac Sys Phase II Software Verification Test Rept | |
ML20095F945 | 31 March 1984 | Nonproprietary Version of Rev 2 to Cpc/Ceac Sys Phase I Software Verification Test Rept | |
ML20097D483 | 5 June 1992 | Reactor Containment Bldg Integrated Leak Rate Test San Onofre Nuclear Generating Station,Unit 3 | |
ML20099C258 | 30 November 1984 | Nonproprietary Rev 2 to Core Protection Calculator/Control Element Assembly Calculator Sys Phase II Software Verification Test Rept | |
ML20099C277 | 30 November 1984 | Nonproprietary Rev 3 to Core Protection Calculator/Control Element Assembly Calculator Sys Phase I Software Verification Test Rept | |
ML20132E405 | 5 October 1983 | Suppl II to San Onofre Nuclear Generating Station Unit 2 Initial Startup Rept | |
ML20141N881 | 30 November 1985 | Reactor Containment Bldg Integrated Leak Rate Test Final Rept | |
ML20147D635 | 15 November 1996 | Rev 0 to LOCA Test of 'Moisture Dam' Modified Rockbestos RSS-6-104/LE Coaxial Cable,Abb/Ce Mineral Insulated Triaxial Cable & Conax Coaxial Penetration Feedthroughs for Reg Guide 1.97 Hrrm Sys | Boric Acid Moisture barrier |
ML20151N853 | 30 November 1985 | Remote Initiation of Shutdown Cooling Test Performed 850916-17 at San Onofre Nuclear Generating Station Unit 3 | |
ML20151T925 | 31 January 1986 | End-of-Cycle 1 Diagnostic Fuel Exam Rept | |
ML20151X077 | 31 July 1977 | Vol 1, Main - Technical Discussion, of Final Rept of Onshore Tracer Tests Conducted Dec 1977 - Mar 1977 at San Onofre Nuclear Generating Station | |
ML20151X091 | 31 July 1977 | Vol 2, Meteorological Data Summaries W/Description of Instrumentation & Calibr, of Final Rept of Onshore Tracer Tests Conducted Dec 1976 - Mar 1977 at San Onofre Nuclear Generating Station | |
ML20155J354 | 31 July 1988 | Reactor Containment Bldg Integrated Leak Rate Test, Final Rept | |
ML20197A458 | 20 August 1986 | Rept of Analysis | |
ML20203D842 | 28 August 1997 | Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 | Hydrostatic Finite Element Analysis |
ML20203D876 | 2 July 1997 | Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles | |
ML20203D898 | 3 July 1997 | Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests | Boric Acid Hydrostatic |
ML20203E120 | 11 September 1997 | Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 | Hydrostatic |
ML20203K846 | 24 April 1996 | Rev 1 to Electromagnetic Interference (EMI) Test Rept on Radiation Monitoring Sys | |
ML20217K008 | 16 October 1997 | Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Flow Induced Vibration |