ML13302A165 | 4 February 1981 | LOCA, Emergency Operating Instruction | Boric Acid Packing leak High Radiation Area |
ML13302A167 | 4 February 1981 | Loss of Feedwater, Emergency Operating Instruction | Boric Acid |
ML13302A168 | 4 February 1981 | Steam Generator Tube Rupture, Emergency Operating Instruction | Boric Acid Shutdown Margin |
ML13302A170 | 4 February 1981 | Emergency Plant Shutdown, Emergency Operating Instruction | Shutdown Margin |
ML13302A474 | 11 September 1980 | Preservice Insp Program Plan | |
ML13302A525 | 15 May 1981 | to Program Plan for Piping Verification Program (Thermal Expansion,Steady State Vibration & Dynamic Effects). | Boric Acid Flow Induced Vibration |
ML18029A932 | 15 April 1984 | Flora:Program for Direct Generation of Floor Response Spectra,Users Manual,Version 3A. | |
ML19309B138 | 10 May 1979 | Quality Class I & Ii,Asme Code,Section Iii:Design Spec for RCS Piping Components,Sys 1201. Thirty-two Oversize Drawings Encl | Boric Acid |
ML19347E095 | 27 November 1978 | 2AI-I3V Style a CS-N/SRC Current Production & Style a Naturally Aged Current-to-Voltage Converters. | Earthquake |
ML19351C968 | 11 September 1980 | Inservice Testing Program | Boric Acid Stroke time |
ML20003A835 | 4 February 1981 | Determination of Adequate Core Cooling, Operating Instruction | |
ML20010A297 | 13 August 1980 | Precritical Vibration Monitoring Program Project Procedure for Visual Insp of Reactor Vessel Internals. | |
ML20010A303 | 12 June 1980 | Precritical Vibration Monitoring Program Std Procedure for Visual Insp of Reactor Vessel Internals for 3410-Type Plants. | Liquid penetrant Scaffolding |
ML20039A621 | 1 December 1981 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures S023-VIII-12 Re Unusual event,S023-VIII-13 Re Alert & S023-VIII-14 Re Site Emergency | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Met Tower Earthquake |
ML20039D454 | 30 November 1981 | of Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20040E996 | 29 January 1982 | to Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20040G889 | 9 February 1982 | to Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20041B113 | 16 February 1982 | to Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20041F534 | 25 February 1982 | to Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual |
ML20049H872 | 23 February 1982 | Inservice Insp & Testing Program Plan. | High Radiation Area Non-Destructive Examination Hydrostatic Liquid penetrant Dissimilar Metal Weld |
ML20058Q380 | 2 August 1990 | Rev 22 to ODCM | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Power change |
ML20065D002 | 1 April 1994 | Rev 6 to SO23-V-3.4, Inservice Testing of Pumps Program | Boric Acid Grace period |
ML20065D005 | 28 March 1994 | Rev 8 to SO23-V-3.5, Inservice Testing of Valves Program | Safe Shutdown Boric Acid Stroke time Probabilistic Risk Assessment Power-Operated Valves Power Operated Valves Scaffolding |
ML20066F948 | 15 November 1982 | to Offsite Dose Calculation Manual.One Oversize Map Encl.Aperture Card Is Available in PDR | Offsite Dose Calculation Manual |
ML20070M129 | 31 January 1983 | Natural Circulation Test Program,San Onofre Nuclear Generating Station,Unit 2,Natural Circulation Cooldown | Boric Acid Shutdown Margin |
ML20073L847 | 20 April 1982 | Rev 1 to MPES008, Maint Procedure for Undervoltage Tripping Device of GE AK-2-25 Circuit Breakers in Reactor Trip Switchgear,San Onofre Nuclear Generating Station Units 2 & 3 | Nondestructive Examination |
ML20073N917 | 5 July 1979 | Seismic Vibration Testing of One Hydrogen Analyzer Assembly, Test Procedure | |
ML20076C906 | 5 July 1983 | Action Plan for Improvement of Operation of San Onofre Nuclear Generating Station,Units 2 & 3 | Temporary Modification |
ML20079K224 | 31 August 1991 | Offsite Dose Calculation Manual for Nuclear Generation Site,Units 2 & 3,Rev 24 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20079R812 | 31 January 1984 | Rev 0 to Procedure M37327, Control Room Design Review Plan, San Onofre Nuclear Generating Station Units 2 & 3 | |
ML20080F702 | 21 December 1994 | Rev 27 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20080L232 | 17 February 1995 | Editorial Correction 0-1 to Rev 0 of Training Procedure S023-XXI-3.1.2, Simulator Performance Test Scheduling | Shutdown Margin |
ML20082K357 | 12 April 1995 | Rev 3 of San Onofre Unit 2 Nuclear Generating Station Nuclear ISI Program Second Interval from 940401-030817 | |
ML20082K363 | 14 April 1995 | Rev 3 of San Onofre Unit 3 Nuclear Generating Station Nuclear ISI Program Second Interval from 940401-030817 | |
ML20082Q204 | 27 June 1991 | Surveillance Rept SOS-108-91, Licensed Operator Requalification Program | |
ML20084T867 | 28 February 1991 | Rev 23 to ODCM for San Onofre Units 2 & 3 | |
ML20087G168 | 31 March 1982 | Rev 1 to EPRI PWR Safety & Relief Valve Test Program Guide for Application of Valve Test Program Results to Plant-Specific Evaluations | Loop seal Safe Shutdown Earthquake |
ML20087Q028 | 6 April 1984 | Procedures Generation Package | |
ML20090M244 | 28 February 1992 | Rev 25 to Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Power change |
ML20091K404 | 23 December 1991 | Temporary Change Notice 7-16 for Rev 7 to S023-V-3.5, Inservice Testing of Valves Program | |
ML20091N340 | 24 August 1995 | Temporary Change Notice to Rev 9 to S023-V-35, IST of Valves Program | Safe Shutdown Boric Acid Stroke time Probabilistic Risk Assessment Power-Operated Valves Scaffolding |
ML20092M950 | 18 May 1983 | Rev 10 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20108A873 | 14 August 1984 | Rev 15 to Offsite Dose Calculation Manual. Description of 840826 Challenge to Unit 2 Safety Valves Encl | Offsite Dose Calculation Manual |
ML20112C182 | 16 October 1995 | Temporary Change Notice 6-36 to Rev 6 to Operating Instruction SO23-5-1.7, Power Operations | Boric Acid Fuel cladding Power change Downpower |
ML20113C508 | 30 June 1996 | PRA Barrier Control Program | Probabilistic Risk Assessment Design basis earthquake |
ML20126J754 | 11 April 1985 | Rev 16 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual |
ML20128L568 | 31 July 1985 | Rev 5 to Inservice Testing Plan, for Unit 3 | |
ML20133E845 | 30 September 1985 | Surveillance Guidelines for San Onofre Nuclear Generating Station Unit 1 Intake Structure | |
ML20133Q320 | 13 January 1985 | Rev 7 to Operating Instruction SO23-3-2.7, HPSI Pump P-019 Alignment | |
ML20133Q337 | 18 January 1985 | Rev 2 to Operating Instruction SO23-0-35, Procedure Mod Permit |