to Program Plan for Piping Verification Program (Thermal Expansion,Steady State Vibration & Dynamic Effects).
ML13302A525
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/15/1981
From:
Southern California Edison Co
To:
Shared Package
ML13302A521 List:
References
PROC-810508, NUDOCS 8105210365
Download: ML13302A525 (1)


Text

PROGRAM PLAN for PIPING VERIFICATION PROGRAM (THERMAL EXPANSION, STEADY STATE VIBRATION, AND DYNAMIC EFFECTS)

SOUTHERN CALIFORNIA EDISON COMPANY SAN ONOFRE NUCLEAR GENERATING STATION UNITS 2 & 3 SAN ONOFRE, CALIFORNIA File No. S023-708-L-1 Revision 7 May 8, 1981 e052 10

Table of Contents Page

1. SCOPE OF PROGRAM 1.1 Objective 1.2 General Overview of Program 1.2.1 Thermal Expansion 1.2.2 Steady State Vibration 1.2.3 Dynamic Effects 1-1 1.3 General Method of Data Collection 1-1 1.3.1 Thermal Expansion 1-2 1.3.2 Steady State Vibration .1-2 1.3.3 Dynamic Effects 1-2 1.4 Acceptance Criteria 1-2 1.4.1 Basis-Line and Point Selection Criteria 1-2 1.4.2 Acceptance Criterai 1-3 1.4.2.1 Thermal Expansion 1-3 1.4.2.2 Steady State Vibration 1-3 1.4.2.3 Dynamic Effects 1-3 1.5 Resolution of Discrepancies 1-3
2. DISCUSSION 2-1 2.1 - Thermal Expansion Program 2-1 2.1.1 Scope of Test 2-1 2.1.2 Method of Performance 2-1 2.2 Steady State Vibration Program 2-2 2.2.1 Scope of Test 2-2 2.2.2 Method of Performance 2-3 2.3 Dynamic Effects Program 2-4 2.3.1 Scope of Test 2-4 2.3.2 3.

0Method of Performance (Breakdown by Power Level)

CONDUCT OF TESTING 2-5 3-1 3.1 Qualifications of Personnel 3-1 3.2 Training 1-3-1.

3.3 Reportability 3-1 Appendix A - Line and Point Designations Appendix B - Data Acquisition System

1. SCOPE OF PROGRAM 1.1 OBJECTIVE Objective of the piping verification program is to assure the structural and functional integrity of piping systems important to safety.

1.2 GENERAL OVERVIEW OF PROGRAM The piping verification program consists of three parts: thermal expan sion, steady state vibration, and dynamic effects testing.

1.2.1 THERMAL EXPANSION ASME Section III Classes 1, 2, and 3 lines and High Energy lines that experience a significant thermal differential (from ambient to greater than 200oF) are to be inspected for thermal expansion. Selected ASME Section III Classes 1, 2 and 3 lines and High Energy lines will be instru mented for this testing while the remaining lines will be visually inspected by a qualified engineer.

1.2.2 STEADY STATE VIBRATION ASME Section III, Classes 1, 2, and 3 piping and High Energy steam and feedwater piping will be visually examined by a qualified engineer who will ascertain if detailed test data for the evaluation of the effects of flow induced vibration are required.

1.2.3 DYNAMIC EFFECTS Dynamic effects testing shall be performed on those piping systems that are important to safety and are expected to undergo significant transient behavior due to: fast valve closure, pump starts and stops, steam hammer, and water hammer. Selected ASME Section III, Classes 1, 2, and 3 lines will be instrumented for this testing while the remaining lines will be visually inspected by a qualified engineer.

1.3 GENERAL METHOD OF DATA COLLECTION The Data Collection System consists of primary sensors, signal conditioning, and a data-logger. Data acquisition will be performed with instruments of required accuracy and sensitivity as specified by two categories of tests thermal expansion, and-dynamic effects. In each case, the data acquisition system will be designed for highly reliable and low-noise data collection.

1-1

SCOPE OF PROGRAM 1.3.1 THERMAL EXPANSION During this test, base line data will be obtained by taking cold ambient measurements of selected points of the RCS and other selected piping sys tems. Measurements must be taken of the RCS at predetermined temperature plateaus during heat up. Other piping systems need to be only visually inspected for free expansion. At maximum system temperature and displace ment, measurements will be taken of systems that require measurements.

After cooldown, cold ambient measurements are to be taken again to ascertain that the systems returned to their approximate original loca tions.

1.3.2 STEADY STATE VIBRATION Piping will be checked by visual means for steady state vibration during normal systems operation. If quantitative measurement is required, tem porary vibration-monitoring instruments will be used.

1.3.3 DYNAMIC EFFECTS These tests are performed to verify the adequacy of piping systems during transient conditions, normal plant operations, and trips. The transients are monitored in terms of pressure fluctuations within pipes, pipe displace ments, and pipe support reactions or load-changes. Instruments required will be of high frequency response with necessary ranges covering the physical quantity being measured. Instruments, from sensor selection, its installation, cablings, and the recording instruments will be designed as a system meeting these criteria.

Pressure fluctuations are measured by gauges and/or piezoelectric trans ducers depending upon frequency response requirement. Pipe displacements are measured by lanyards. Support loads are measured by load-cells.

Depending upon the number of points to be monitored and their frequency response requirements, data are recorded on F.M. and/or oscillographic recorders, or monitored through high-speed multiplexer by the test com puter. High-speed scans will be conducted at 20,000 samples/sec.-channel and stored on drum or mag. tape for subsequent data analysis. A visual inspection will be performed on all systems prior to and after the systems have undergone a transient.

1.4 ACCEPTANCE CRITERIA 1.4.1 BASIS-LINE AND POINT SELECTION CRITERIA Line and point selection criteria are based on the criteria provided in:

FSAR sections 3.6 and 3.9.2, the Basic Concepts for the Preoperational Test Program on Piping for Thermal Expansion, Steady State Vibration and Dynamic Effects; and "Dynamic Testing and Analysis of Systems, Components and Equipment", Revision 1, section 3.9.2'of the U.S. Nuclear Regulatory Com mission Standard Review Plan.

1-2

SCOPE OF PROGRAM 1.4.2 ACCEPTANCE CRITERIA 1.4.2.1 Thermal Expansion There shall be no unacceptable restraint of normal thermal motion. Where thermal deflection is measured, the deflections shall be compared to the thermal stress analysis of the piping system.

1.4.2.2 Steady State Vibration Through visual inspection of the systems being tested no excessive vibration is detected.

For significant observed system vibration that requires additional testing, the maximum measured amplitude shall not induce a stress in the piping greater than one-half the endurance limit as defined in section III of ASHE Boiler and Pressure Vessel Code, 1974.

1.4.2.3 Dynamic Effects Instrumented dynamic effects testing will be performed on those piping systems where significant transient behavior is expected. Measured dis placements, pressures, snubber loads, and temperatures will be compared to those used for design. A determination by a qualified engineer will be made of the effects and the need for any additional test data. The object is to determine if structural integrity is significantly degraded by the transients. Visual inspection shall also be used to determine if there is any indication of damage to the piping, pipe whip restraints, pipe supports, penetration sleeves where piping passes through walls and floors, or other components in the system.

1.5 RESOLUTION OF DISCREPANCIES When test results fail to meet the required acceptance criteria, this con dition will be documented on a Test Exception Report (TER). All TERs will be routed to the NSSS Test Operations Supervisor who will assign the responsibility of resolving the TER. Test Exception Reports, documenting proposed design modification or design deficiencies, will be assigned to either SCE or BPC Engineering for review, approval, and implementation.

Resolved TERs will be routed to the NSSS Test Operations Supervisor who will determine the extent of retesting necessary based upon the approved design requirements.

1-3

2. DISCUSSION 2.1 THERMAL EXPANSION PROGRAM 2.1.1 SCOPE OF TEST The Thermal Expansion Program will be implemented through two tests to ensure that the systems being surveyed will be viewed at representative operating temperatures. Most systems will be inspected during the Pre Core Load Hot Functional Test and the remaining portions will be inspected during the Power Ascension Test Program.

Applicable portions of the following systems as outlined in Section 1.2.1 will be tested during the Pre-Core Load Hot Functional Test.

A. Main steam system (partial, piping from the steam generators up to the main steam isolation valves, 2HV8204 and 2HV8205, and the auxiliary feedwater pump turbine).

B. Steam Generator Blowdown System C. Pressurizer Surge/Spray System Piping/Pressure Relief D. Safety Injection System E. Chemical and Volume Control System F. Shutdown Cooling System G. Letdown System Piping H. Reactor Coolant System Applicable portions of the following systems as outlined in Section 1.2.1 will be tested during the Power Ascension Test Program.

A. Main Steam System (portions not previously tested).

B. Main Feedwater System.

2.1.2 METHOD OF PERFORMANCE Primary objective of this test is to verify that, during the process of heating up and cooling down the plant, piping, subjected to various steady state temperature conditions, is free to expand and contract with no stress in excess of code allowables generated, from piping supports, hangers, stops, or the piping itself.

2-1

DISCUSSION This portion of the program involves monitoring all applicable systems for piping expansion due to temperature changes of the metal itself. The monitoring shall be by instrumentation temporarily installed on the piping, installed measuring devices, as on all snubbers, and through visual inspec tion. Specified RCS temperature plateaus shall be attained for plant heatup and cooldown. All necessary data will then be obtained and recorded.

Detail of line and point designations covered under the Thermal Expansion Test are tabulated in Appendix A, Table 1, of this plan. All instrumented lines covered would include, but not be limited to, line number, location on the line (i.e. node), and calculated deflections.

The visually inspected lines covered would include, but not be limited to, line number, verbal line description, and isometric drawing numbers.

All snubbers covered would include, but not be limited to, recording the snubber number and the location of the snubber (i.e. node). Calculated motions from cold to hot positions of the snubbers are tabulated in Appen dix A, Table 2 of this plan.

All results of the test shall be evaluated and approved in accordance with Startup and Test Program, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results." Further analyses shall be performed on unex pected results to ascertain the cause of the deviation. These exceptions shall be documented in accordance with Startup and Test Program, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results," and if applicable, Test Instruction No. .28, "Startup Non-Conformance Reports."

If additional restraints are installed or piping rerouted which affects the high energy line break analysis, the NRC will be notified. The analysis that verifies system response is within acceptable limits will be on file.

2.2 STEADY STATE VIBRATION PROGRAM 2.2.1 SCOPE OF TEST The Steady State Vibration Test, shall be divided into three parts.

Test 1 will be performed (per 1.2.2 and below) during the Preoperational Testing Phase; Test 2 will be performed (per 1.2.2 and below) during the Hot Functional Testing Phase. Both tests will cover ASME Section III portions (Plus High Energy Piping for Main and Auxiliary Steam) of the following systems:

A. Shutdown Cooling System B. Steam Generator Blowdown System C. . Chemical and Volume Control System D. Letdown System E. Auxiliary Feedwater System 2-2

DISCUSSION F. Salt Water Cooling System G. Component Cooling System H. Diesel Fuel Oil Transfer System I. Spent Fuel Pool Cooling System J. Chilled Water System K. Safety Injection System L. Boric Acid Makeup System M. Main Steam System Test 3 will be performed during the Power Ascension testing phase and shall include the high energy portions of the following systems not previ ously tested:

  • Main Feedwater Inspection will be performed at various power levels for the main steam and main feedwater systems to ascertain, qualitatively, flow-induced or mechani cally induced vibrations obtained during various modes of operation.

2.2.2 METHOD OF PERFORMANCE The primary objective of steady state vibration testing is to verify, through visual inspection, that vibrations in the piping system, induced by flow in the pipe and by equipment motion, do not produce significant vibration levels of the piping. Should significant system vibration be evidenced during the test, additional testing shall be pursued. Where the vibration frequencies and maximum amplitude shall be measured by means of a portable vibration monitoring device, refer to section 1.4.2.2 for acceptance criteria.

Detail of the line designations for inspection shall be tabulated in Appendix A, Table 3 of this plan.

All results of the test shall be evaluated and approved in accordance with Startup and Test Program, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results," and all internal administrative procedures applicable to evaluation and approval of the steady state vibration test results. Test exceptions shall be documented in accordance with Startup and Test Program, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results," and if applicable, Test Instruction No. 28, "Startup Non-Conformance Reports."

2-3

DISCUSSION If additional restraints are installed as a result of the piping tests, the NRC will be notified. The analysis that verifies system response is within acceptable limits will be on file.

2.3 DYNAMIC EFFECTS PROGRAM 2.3.1 SCOPE OF TEST The Dynamic Effects Program will be broken down into four test phases.

Test 1 shall be performed during the Preoperation Testing Phase; Test 2 shall be performed during the Hot Functional Testing Phase. These two phases will include all systems to be tested under the scope of testing for dynamic effects except the Steam and Feedwater Systems and Steam Generator Feedwater Hammer Test.

Test 1 covers ASME Section III portions of the following systems:

A. Safety Injection System B. Chemical and Volume.Control C. Letdown System D. Steam Generator Blowdown E. Pressurizer Spray System F. Shutdown Cooling System G. Salt Water Cooling System H. Component Cooling Water System I. Diesel Fuel Oil Transfer System J. Spent Fuel Pool Cooling System K. Chilled Water System L. Boric Acid Makeup System M. Auxiliary Feedwater Test 3, the Steam Generator Feedwater Hammer Test, will be performed during Pre-Core Hot Functional Testing.

In the past, successful testing of instrumented Auxiliary Feedwater Systems of similar design precluded the necessity for further instrumented testing; therefore, a visual examination shall be the only criteria basis for this 2-4

DISCUSSION test. Successful instrumented testing on Steam Generator Auxiliary Feedwater System has been performed at such places as:

  • ARKANSAS NUCLEAR ONE - UNIT 2 (Modified J - Tube Type)
  • FARLEY NUCLEAR PLANT - UNIT 1 (J - Tube Type)

Test 4, which will include the Steam and Main Feedwater Systems, will be performed during the Power Ascension testing phase, thereby obtaining more conclusive data.

The Dynamic Effects Program shall be implemented to verify that the piping and piping restraints, as tabulated in Appendix A, Table 4, will withstand dynamic effects due to transients such as pump starts and stops, and valve closures, with resultant loads within acceptable levels.

2.3.2 METHOD OF PERFORMANCE Monitoring of specified lines and points shall be by the instrumentation, temporarily installed on the piping,'and through visual inspection. Con ditions, as outlined below, shall be established, instrumentation (i.e.,

recorders) actuated, and the transient initiated. Conditions established for the transients would include:

A. Preoperational and Hot Functional Testing

1. Start and stop of the charging pumps - during conditions of both low and high pressure within the reactor coolant system.
2. Letdown System - opening and closing of valves while the Reactor Coolant System is in operation.
3. Opening and closing of the pressurizer spray control valves under maximum flow condition.
4. Shutdown Cooling System - opening of the isolation valves and operation of the LPSI pumps with the system aligned for shut down cooling.
5. Steam Generator Blowdown - opening and closing of the isolation valves while the steam generator is at normal operating conditions.
6. Safety Injection - during start, full operation, and shutdown of the HPSI and LPSI pumps.
7. Steam Generator Hammer - lowering steam generator water level and initiation of auxiliary feedwater under simulated operating conditions. Will be performed at Pre-core Hot Functional Testing.

2-5

DISCUSSION

8. Starting and stopping:
a. Boric Acid Pumps
b. Salt Water Cooling Pumps
c. Component Cooling Water Pumps
d. Chilled Water Pumps
e. Diesel Fuel Oil Transfer Pumps
f. Containment Spray Pumps (Placed on Recirculation)
g. HPSI/LPSI Pumps
h. Auxiliary Feedwater Pumps
9. Initiation of Fuel Pool Cooling System.

B. Power Ascension Testing

1. Main steam flow transients will be performed at 50 and 100 percent power level.
2. Main F.W. flow transients will be performed at 50 and 100 percent power level.
3. Turbine steam dump and bypass valves will be cycled at low and high pressure conditions.

All results of the testing shall be evaluated and approved in accordance with Startup and Test Program, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results". Exceptions shall be documented in accor dance with Startup and Test Program Manual, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results" and, if applicable, Test Instruction No. 28, "Startup Non-Conformance Reports".

If additional restraints are installed or piping rerouted as a result of the preoperation piping test, the NRC will be notified. The analysis that verifies system response is within acceptable limits will be on file.

2-6

3. CONDUCT OF TESTING All tests developed for the Piping Verification Program shall be adminis tered and functionally controlled in accordance with the scope of testing outlined in the Startup and Test Program Manual (Test Instructions) and as specified in Chapter 14 on the FSAR.

Changes to the Piping Verification Program tests shall be made as neces sary to improve the tests or to incorporate modifications for existing technical or regulatory requirements that affect testing. Change approval shall be in accordance with the applicable Test Instructions.

3.1 QUALIFICATIONS OF PERSONNEL Personnel, as listed in Paragraph 14.2.2.3 of the FSAR, involved in the conduct of testing under the Piping Verification Program shall be qualified to perform, review, and manage the test program in accordance with ANSI N45.2.6-1973 as interpreted in Paragraph 14.2.7.2.3 of the FSAR. Individ ual qualifications shall also be forwarded, in resume form, to SCE Manage ment for review and approval.

3.2 TRAINING Indoctrination or speciar training and certification required for person nel involved in the testing shall be in accordance with the Startup and Test Program, Test Instruction No. 26, "Startup Training".

3.3 REPORTABILITY All results and analyses of the program testing shall be reviewed, evaluated, and approved in accordance with Startup and Test Program Test Instruction No. 4, "Review, Evaluation and Approval of Test Results". All documentation shall be maintained in accordance with Startup and Test Program, Test Instruction No. 5, "Document Control".

Test Procedure exceptions shall be documented in accordance with Startup and Test Program, Test Instruction No. 4, "Review, Evaluation and Approval of Test Results", and if applicable, Test Instruction No. 28, "Startup Non-conformance Reports".

Resolution of any discrepancies shall be as outlined in Section 1, Subsection 1.5 of this plan.

3-1

ATTACHMENTS

1. Appendix A - Line and Point Designations Table 1 - Thermal Expansion Line and Point Designations Table 2A - Thermal Expansion Calculated Hot and Cold Snubber Positions - Hot Functional Table 2B - Thermal Expansion Calculated Hot and Cold Snubber .Positions - Power Ascension Table 3 - Line Designation List for Steady State Vibrations Table 4 - Line Designation for Dynamic Effects Testing
2. Appendix B - Data Acquisition System Block Diagram, Figure 1.

APPENDIX A Line and Point Designations

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Coolant Chemical and Volume Control SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1208-010-1, 009-2"-C-EEO Outlet from Regenerative Heat 1208-062-1 Exchanger E-063 to Reactor Coolant Loop lA.

2-1208-010-1, 010-2"-C-EEO Outlet from Regenerative Heat 2-1201-061-1 Exchanger E-063 to Reactor Coolant Loop 2A 2-1208-010-1 011-2"-C-EEO Outlet from Regenerative Heat Exchanger E-063 to Auxiliary Spray to Reactor Coolant System 2-1208-010-1, 046-2"-C-EEO Regenerative Heat Exchanger E-063 side 2-1201-062-1 of Bypass piping around Valve 2HV-9203

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant System SHEET 1 OF 3

'ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION P&ID 40111 001-42"-A-C Reactor Coolant Hot Leg-piping to Steam Generator E-089 P&ID 40111 003-30"-A-C Reactor Coolant Pump P-001 Suction Piping from Steam Generator E-089 P&ID 40111 007-30"-A-C Reactor Coolant Loop 1A Cold Leg Piping Discharge from RCP P-001 P&ID 40111 005-30"-A-C Reactor Coolant Pump P-003 Suction Piping from Steam Generator E-089 P&ID 40111 009-30"-A-C Reactor Coolant Loop lB Cold Leg Piping Discharge from RCP-P-003 P&ID 40111 002-42"-A-C Reactor Coolant Hot Leg Piping to Steam Generator E-088 P&ID-40111 004-30"-A-C Reactor Coolant Pump P-004 Suction Piping from Steam Generator E-088 P&ID 40111 008-30"-A-C Reactor Coolant Loop 2A Cold Leg Piping Discharge from RCPP-004 P&ID 40111 006-30"-A-C Reactor Coolant Pump P-002 Suction Piping from Steam Generator E-088 P&ID 40111 010-30"-A-C Reactor Coolant Loop 2B Cold Leg Piping Discharge from RCP P-002 2-1201-022-1 022-2"-A-FEO Reactor Coolant Loop lB Supply to Letdown Heat Exchanger E-063 2-1201-061-1 061-2"-A-FEO Reactor Coolant Supply from Regener ative Heat Exchanger E-063

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant System SHEET 2 OF 3 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-062-1 062-2"-A-FEO Reactor Coolant Supply from Regener ative Heat Exchanger E-063 1201-062-1 056-2"-A-EEO Reactor Coolant Bypass of Regenerative Heat Exchanger Outlet Valve 2HV-9203 1201-062-1 063-2"-A-FEO Reactor Coolant Bypass of Regenerative Heat Exchanger Outlet Valve 2HV-9203 2-1208-010-1 060-2"-A-FEO Reactor Coolant Supply to Aux. Spray to Reactor Coolant System from Regenerative Heat Exchanger E-063 2-1201-012, 012-4"-A-FEO Pressurizer Spray Line from Reactor 1201-012-2 Coolant Spray Valve 2PV-O100A to PZR E-087 2-1201-012-1 014-4"-A-FEO Pressurizer Spray Line from Reactor Coolant Spray Valve 2PV-O100B to Line 012-4"-A-FEO 2-1201-012-1 013-4"-4-FEO Pressurizer Spray Valve Supply to Valve 2PV-O100A from Loop lB 2-1201-012-1 013-3"-A-FEO Pressurizer Spray.Valve Supply to Valve 2PV-0100A from Loop lB 2-1201-012-1 011-4"-A-FEO Pressurizer Spray Valve Supply to Valve 2PV-0100B from Loop 1A 2-1201-012-1 011-3"-A-FEO Pressurizer Spray Valve Supply to Valve 2PV-0100B from Loop 1A 1201-015-1 015-12"-A-EEO Pressurizer Surge Line 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Let 1201-016-3 to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Let to LPSI Pumps Suction

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant System SHEET 3 OF 3 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 1201-016-2, Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps 1201-017-3, 1201-016-2 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015 1201-025-1 025-8"-C-KE1 Shutdown Cooling System Bypass Warmup Valve

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System SHEET 1 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 3-1204-033-1 033-14"-C-KEO Shutdown Reactor Coolant Supply to LPSI Pump P-016 Suction Piping 1204-033-1 033-16"-C-KEO LPSI Pump P-016 Suction Piping 1204-032-1 032-14"-C-KEO Shutdown Reactor Coolant Supply to LPSI Pump P-015 Suction Piping 1204-032-1 032-16"-C-KEO LPSI Pump P-015 Suction Piping 1204-038-1 034-10"-C-KE1 LPSI Pump P-015 Discharge Piping 1204-038-1, 038-10"-C-KE1 LPSI Pump P-016 Discharge Piping 1204-132-1 1204-038-1, 038-14"-C-KE1 LPSI System Common Discharge 1204-038-2, Header 1204-038-3, 1204-038-4, 1204-038-5 2-1204-052-1 052-2"-C-GEO Low Pressure Safety Injection Pump P-015 Minimum Flow Line 1204-052-1, 052-4"-C-GEO Safety Injection System Pumps HPSI 1204-053-2, Pump P-017 and LPSI Pump P-015 Common Minimum 1204-151-1 Flow Line to Refueling Water Tank T-005 1204-151-1 151-4"-D-LLO Safety Injection System Pumps HPSI Pump P-017 and LPSI Pump P-015 Common Minimum Flow Line to Refueling Water Tank T-005 1204-151-1 151-6"-D-LLO Safety Injection System Pumps HPSI Pump P-017 and LPSI Pump P-015 Common Minimum Flow Line to Refueling Water Tank T-005

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System SHEET 2 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-132-1 051-2"-C-KE1 Low Pressure Safety Injection Pump P-016 Minimum Flow Line 1204-132-1 132-2"-C-GEO Low Pressure Safety Injection Pump P-016 Minimum Flow Line 1204-132-1, 048-4"-C-GEO Safety Injection System Pumps HPSI 1204-151-1 Pump P-019 and LPSI Pump P-016 Common Minimum Flow Line to Refueling Water Tank T-005 1204-151-1 131-4"-D-LLO Safety Injection System Pumps HPSI Pump P-019 and LPSI Pump P-016 Common Minimum Flow Line to Refueling Water Tank T-005 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1. 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat Exchanger 1206-027-1 E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System SHEET 3 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 & E-004 to LPSI System Header 1204-139-1, 139-3"-C-KE1 LPSI System Supply to Letdown Heat 1204-139-2, Exchanger E-062 2-1204-139-3, 1204-139-4, 2-1204-139-4 1204-037-2, 038-8"C-KE1 Low Pressure Safety Injection Line to 1204-037-3 Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant System Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low.Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO-Safety Injection System Common Header to Reactor Coolant System Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant System Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System SHEET 4 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-004-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common 1204-045-2 Header to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-061-1 057-12"-C-HEO Safety Injection Tank T-009 Surge Line 1204-061-1 061-12"-A-FEO Safety Injection Tank T-009 Surge Line 1204-046-1 058-12"-C-HEO Safety Injection Tank T-010 Surge Line 1204-046-1 062-12'.'-A-FEO Safety Injection Tank T-010 Surge Line 1204-059-1 055-12"-C-HEO Safety Injection Tank T-008 Surge Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System SHEET 5 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-059-1 059-12"-A-FEO Safety Injection Tank T-008 Surge Line 1204-044-1 056-12"-C-HEO Safety Injection Tank T-007 Surge Line 1204-044-1 060-12"-A-FEO Safety Injection Tank T-007 Surge Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Steam Generator Blowdown System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-015-1 015-3"-C-HK1 Blowdown Outlet Line from Steam Generator E-088 1301-015-1 015-6"-C-HK1 Blowdown Piping from Steam Generator E-088 through the Containment 2-1301-553-1 553-6"-R-HKO S/G E-088 Blowdown Piping from Containment to Flash Tank T-176 2-1301-553-1, 553-4"-R-HKO Blowdown Piping to Blowdown Flash Tank 2-1301-553-2, T-176 from S/G E-088 1301-553-3 1301-553-3 644-4"-R-ZZO Blowdown Piping Inlet to Blowdown Flush Tank T-176 from S/G E-088 1301-016-2 016-3"-C-HK1 Blowdown Outlet Line from Steam Generator E-089 1301-016-1, 016-6"-C-HK1 Blowdown Piping from Steam Generator 1301-016-2, E-089 through the Containment 1301-554-1 1301-554-1 554-6"-R-HKO S/G E-089 Blowdown Piping from Containment to Flash Tank T-176 1301-554-1, 554-4"-R-HKO Blowdown Piping to Blowdown Flash 2-1301-554-2, Tank T-176 from S/G E-089 1301-554-3 1301-554-3 643-4"-R-ZZO Blowdown Piping Inlet to Blowdown Flash Tank T-176 from S/G E-089 NC130-557-1 557-6"-R-LL1 Main Steam Blowdown Piping from Flash Tank T-176 to Blowdown Heat Exchanger E-007

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Main Steam System SHEET 1 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-001-1 001-42"-C-HK1 Main Steam Outlet from Steam Generator E-088 1301-001-1, 001-40"-C-HK1 Main Steam Header through the 1301-001-2 Containment from Steam Generator E-088 1301-001-4 363-34"-C-HK1 Main Steam Supply to Main Steam Dump Valve and Main Steam Relief Valves from Steam.Generator E-088 1301-595-1 595-8"-C-HK1 Main Steam Supply to Main Steam Dump Valve 2HV-8419 from S/G E-088 1301-001-5 001-2"-C-HK1 Main Steam Isolation Valve 2HV-8205 Bypass Line 1301-001-4 580-26"-C-HK1 Main Steam Supply to Main Steam Reliefs from S/G E-088 1301-017-1 578-6"-C-HK1 main Steam Supply to Auxiliary Feed water Pump Turbine K-007 1301-017-1 578-4"-C-HK1 Main Steam Supply to Auxiliary Feed water Pump Turbine K-007 1301-017-1 017-4"-D-HKO Main Steam Supply to Auxiliary Feed water Pump Turbine K-007 1301-577-1, 017-6"-D-HKO Main Steam Supply to Auxiliary Feed 2-1301-017-2 water Pump Turbine K-007 2-1301-017-3 017-3"-D-HKO Auxiliary Feedwater Pump Turbine K-007 Steam Inlet 1301-002-1 002-42"-C-HK1 Main Steam Outlet from Steam Generator E-089

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/HOT FUNCTIONAL TABLE 1 SYSTEM: Main Steam System SHEET 2 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-002-1, 002-40"-C-HK1 Main Steam Header through the 1301-002-2 Containment from Steam Generator E-088 1301-002-4 309-34"-C-HK1 Main Steam Supply to Main Steam Dump Valve and Main Steam Relief Valves from Steam Generator E-089 1301-582-1 582-8"-C-HK1 Main Steam Supply to Main Steam Dump Valve 2HV-8421- from S/G E-089 1301-002-4 583-26"-C-HK1 Main Steam Supply to Main Steam Relief Valves from S/G E-089.

1301-002-5 002-2"-C-HKO Main Steam Isolation Valve 2HV-8204 Bypass Line 1301-296-1 296-8"-R-HKO Main Steam Supply to Auxiliary Boiler System and Flange Heating System 1301-296-1 012-8-R-HKO Main Steam Supply to Flange Heating System 1301-296-1 268-21/2"-R-HKO Flange Heating System Steam Supply P&ID 40141 & Vendor Supplied Piping to Flange Heating Isolation 40142 Valves 2HV-2178 and 2HV-2177 1301-296-1 296-8"-R-HKO Main Steam Supply from S/G E-089 to Auxiliary Boiler System

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 3 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-001-3 003-40"-R-HKO Main Steam Line from Steam Generator E-088 1301-001-3 003-12"-R-HKO Main Steam Line from Steam Generator E-088 to High Pressure Drain Line 1301-500-1 297-14"-R-HKO Main Steam Supply to the Reheater Live Steam Coils 1301-500-1 500-4"-R-HKO Main Steam Supply to the Reheater Live Steam Coils 1301-500-1 500-6"-R-HKO Main Steam Supply to the Reheater Live Steam Coils 1301-500-1 501-4"-R-HKO Main Steam Supply to the Reheater Live Steam Coils 1301-500-1, 297-10"-R-HKO Main Steam Supply to Reheater 1301-297-1 E-113 Live Steam Coils 1301-297-1 297-8"-R-HKO Main Steam Supply to Reheater E-113 Live Steam Coils 1301-297-1 317-8"-R-HKO Main Steam Supply to Reheater E-113 Live Steam Coils 1301-299-1, 299-10"-R-HKO Main Steam Supply to Reheater E-112 1301-500-1 1301-299-1 299-8"-R-HKO Main Steam Supply to Reheater E-112 1301-299-1 505-8"-R-HKO Main Steam Supply to Reheater E-112 1301-152-1 152-12"-R-KK2 Reheater E-112 Steam Supply to Feedwater Pump Turbine K-005

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 4 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-151-1 151-12"-R-KK2 Reheater E-113 Steam Supply to Feedwater Pump Turbine K-006 1301-001-3 006-28"-R-HKO Main Steam Line Supply to High Pressure Turbine Center K-001 1301-001-3 007-28"-R-HKO Main Steam Line Supply to High Pressure Turbine K-001.

1301-001-3 367-24"-R-HK2 Main Steam Cross Connection Between Steam Generator E-088 and E-089 1301-002-3 364-40"-R-HKO Main Steam Line from Steam Generator E-089 1301-002-3 364-12"-R-HKO Main Steam Line from Steam Generator E-088 to High Pressure Drain Line 1301-002-3 008-28"-R-HKO Main Steam Line Supply to High Pressure Turbine East K-001 1301-002-3 009-28"-R-HKO Main Steam Line Supply to High Pressure Turbine Central East K-001 1301-296-1 296-8"-R-HKO Main Steam Supply to Aux Blr. Steam System 1301-270-1, 370-18"-R-HKO Main Steam Supply to the Main Steam (Later) Bypass System and Air Ejectors 1301-013-1, 013-2"-R-HKO Main Steam Supply to the Air Ejectors 1301-013-2 1301-288-1 041-24"-R-KK1 First Point Extraction to First Point Reheater E-036 & E-037 1301-288-1 142-24"-R-KK1 First Point Extraction to First Point Reheater E-036 & E-037

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 5 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-288-1 041-36"-R-KK1 First Point Extraction Common Supply to First Point Reheaters E-036 & E-037 1301-288-1 287-20"-R-KK1 Common Supply from First Point Extractors to Moisture Separator Reheater Bled Steam Tube Bundle E-112 and E-113 1301-287-1, 287-12"-R-KK1 Supply to Moisture Separator Reheater 1301-288-1 Bled Steam Tube Bundle E-113 1301-287-1, 287-6"-R-KK1 Supply( to Moisture Separator Reheater 1301-287-2, Bled Steam Tube Bundle E-113 1301-287-3 1301-287-2 319-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-113 1301-287-2 318-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-113 1301-287-2 320-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-113 1301-288-1, 288-12"-R-KK1 Supply to Moisture Separator Reheater 1301-288-2 Bled Steam Tube Bundle E-112 1301-288-2 326-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-112 1301-288-2 327-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-112 1301-288-2 328-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-112 1301-288-2 288-6"-R-KK1 Supply to Moisture Separator Reheater Bled Steam Tube Bundle E-112

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 6 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-041-1 041-18"-R-KK1 Supply to First Point Heater E-037 1301-042-1 042-18"-R-KK1 Supply to First Point Heater E-036 1301-043-1, 043-20"-R-KK2 Supply to Second Point Heater 1301-043-2 E-038 from H.P. Turbine Exhaust 1301-043-2 095-20"-R-KK2 Supply to Second Point Heater E-038 from line H.P. Turbine Exhaust 1301-043-1 043-24"-R-KK2 Inlet Steam Line to Second Point Heater E-038 1301-044-1, 044-20"-R-KK2 Supply to Second Point Heater 1301-044-2 E-039 from Line H.P. Turbine Exhaust 1301-044-2 104-20"-R-KK2 Supply to Second Point Heater E-039 from Line H.P. Turbine Exhaust (Later) 044-24"-R-KK2 Inlet Steam Line to Second Point Heater E-039 1301-333-2 333-6"-R-KK1 Bled Steam from Reheater E-112 to Common Bled Steam Drain Line to Tank T-099 1301-333-1, 333-10"-R-KK1 Common Bled Steam Drain Drain Line 1301-333-2 to Bled Steam Drain Tank T-099 1301-333-2 137-6"-R-KK1 Bled Steam from Reheater E-112 to Common Bled Steam Drain Line 1301-333-2 138-6"-R-KK1 Bled Steam from Reheater E-112 to Common Bled Steam Drain Line 1301-133-1, 133-4"-R-KK1 Bled Steam Tube Bundle Vent Drain 1301-133-2 Line to Tank T-099

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 7 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-133-2 145-4"-R-KK1 Bled Steam Tube Bundle Vent Drain to Line 133-4"-R-KK1 1301-133-2 329-4"-R-KK1 Bled Steam Tube Bundle Vent Drain to Line 133-4"-R-KK1 1301-133-1 125-4"-R-KK1 Bled Steam Tube Bundle Vent Drain to Line 133-4"-R-KK1 1301-130-1 130-10"-R-HKO Reheater Main Steam Drain Line 1301-130-1 129-10"-R-HKO Reheater Main Steam Drain Line to Tank T-101 1301-090-2 090-6"-R-KK2 Drain Line from Reheater E-112 to Common Drain Line 090-20"-R-KK2 1301-090-2 091-6"-R-KK2 Drain Line from Reheater E-112 to Common Drain Line 090-20"-R-KK2 1301-090-2 331-6"-R-KK2 Drain Line from Reheater E-112 .to Common Drain Line 090-20"-R-KK2 1301-090-2 090-20"-R-KK2 Common Drain Line to Moisture Separator/Reheater Drain Tank T-100 1301-090-1 094-6"-R-KK2 Drain Line from Reheater E-112 to Common Drain Line 094-20"-R-KK2 1301-090-1 093-6"-R-KK2 Drain Line from Reheater E-112 to Common Drain Line 094-20"-R-KK2 1301-090-1 332-6"-R-KK2 Drain Line from Reheater E-112 to Common Drain Line 094-20"-R-KK2 1301-090-1 092-6"-R-KK2 Drain Line from Reheater E-112 to Common Drain Line 094-20"-R-KK2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 8 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-090-1, 094-20"-R-KK2 Common Drain Line to Moisture 1301-090-2 Separator/Reheater Drain.Tank T-100 (Later) 513-3"-R-KK1 Reheater E-112 Drain Line to Moisture Separator/Reheater Drain Tank T-100 (Later) 108-12"-R-KK2 Drain Tank T-100 Supply to Second Point Heater Shell Side (E-038)

(Later) 475-12"-R-ZZO Supply Line to Second Point Heater E-038 Shell Side (Later) 126-2"-R-HKO Steam Line from Reheater Main Steam Drain Tank T-101 to Reheater E-112 (Later) 126-1-1/2"-R-HKO Inlet to Moisture Separator/

Reheater E-112 from Reheater Drain Tank T-101 (Later) 134-1-1/2"-R-HKO Inlet to Moisture Separator/

Reheater E-117 from Reheater Drain Tank T-101 1301-111-1 111-10"-R-HKO Drain Line from Tank T-101 to the Condenser & 1st Point Shell Side E-038 1301-083-1, 083-10"-R-HKO Drain Line from Tank T-101 to the 1301-083-2, 2nd Point Shell Side E-038 1301-083-3 1301-083-3 478-10"-R-ZZO Inlet to Ist Point Shell Side E-037 1301-333-1 330-6"-R-KK1 Bled Steam from Reheater E-112 to Common Bled Steam Line 1301-325-1 325-6"-R-KK1 Bled Steam from Reheater E-113 to Common Bled Steam Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 9 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-325-1, 325-10"-R-KK1 Common Bled Steam Line from Reheater 1301-325-2, E-113 to Drain Tank T-097 1301-325-3 1301-123-1 123-6"-R-KK1 Bled Steam from Reheater E-113 to Common Drain Line 1301-139-1 139-6"-R-KK1 Bled Steam from Reheater E-113 to Common Drain Line 1301-140-1 140-6"-R-KK1 Bled Steam from Reheater E-113 to Common Drain Line 1301-135-1, 135-4"-R-KK1 Bled Steam Tube Bundle Vent Drain 1301-135-2, Line to Tank T-097 1301-125-3 1301-120-1 120-4"-R-KK1 Bled Steam Tube Bundle Vent Drain To Line 135-4"-R-KK1 1301-127-1 127-4"-R-KK1 Bled Steam Tube Bundle Drain to Line 135-4"-R-KK1 1301-147-1 147-4"-R-KK1 Bled Steam Tube Bundle Drain to Line 135-4"-R-KK1 1301-131-1, 131-10"-R-HKO Reheater E-113 Main Steam Drain 1301-131-2 Line 1301-132-1, 132-10"-R-HKO Reheater Main Steam Drain Line 1301-132-2 1301-103-1 103-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 103-20"-R-KK2 1301-103-1 101-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 103-20"-R-KK2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 10 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-103-1 322-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 102-20"-R-KK2 1301-098-1 098-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 098-20"-R-KK2 1301-098-1 099-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 098-20"-R-KK2 1301-098-1 321-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 098-20"-R-KK2 1301-098-1 100-6"-R-KK2 Drain Line from Reheater E-113 to Common Drain Line 098-20"-R-KK2 1301-098-1 098-20"-R-KK2 Common Drain Line from Reheater E-113 to Line 103-20-R-KK2 1301-103-1, 103-20"-R-KK2 Common Drain Line from Reheater 1301-098-1 E-113 to Moisture Separator/Reheater Drain Tank T-096 (Later) 514-3"-R-KK1 Drain Line from Reheater E-113 to Moisture Separator/Reheater Drain Tank T-096

.(Later) 482-12"-R-KK2 Drain Line from Drain Tank T-096 to Condenser and 2nd Point Heater E-039 (Later) 483-12"-R-KK2 Drain Line from Tank T-096 to Condenser (Later) 484-12"-R-ZZO Drain Line from Tank T-096 to Condenser (Later) 485-12"-R-ZZO Drain Line from Tank T-096 to 2nd Point Heater E-039

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 11 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 324-2"-R-HKO Steam Line from Reheater Drain Tank T-098 to Reheater E-113 (Later) 128-2"-R-HKO Steam Line from Reheater Drain Tank T-098 to Reheater E-113 (Later), 128-1-1/2"-R-HKO Inlet Steam Line from Reheater Drain Tank T-098 to Reheater E-113 (Later) 136-1-1/2"-R-HKO Inlet Steam Line from Reheater Drain Tank T-098 to Reheater E-113 1301-112-1 112-10"-R-HKO Reheater Main Steam Drain Tank T-098 Outlet Line 1301-084-1 084-10"-R-HKO Reheater Drain Tank T-098 Supply to First Point Heater E-036 Shell Side 1301-487-1 487-10"-R-ZZO First Point Heater E-036 Supply from Reheater Tank T-098.

(Later) 476-12"-R-KK2 Moisture Separator Reheater Drain Tank T-100 Supply to the Condenser (Later) 477-12"-R-ZZO Reheater Tank T-100 Supply to the Condenser (Later) 109-10"-R-KK1 Supply to Condenser and 2nd Point Heater E-038 from Drain Tank T-099 (Later) 521-10"-R-KK1 Supply from Drain Tank T-009 to 2nd Point Heater E-038 Shell Side (Later) 474-10"-R-ZZO Supply to 2nd Point Heater E-038 from Drain Tank T-099 (Later) 110-10"-R-KK1 Supply to Condenser and 2nd Point Heater E-039 Shell Side from Drain Tank T-097

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 12 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 088-10"-R-KK1 Supply to 2nd Point Header E-039 Shell Side from Drain Tank T-097 (Later) 480-10"-R-ZZO Supply to 2nd Point Heater E-039 Shell Side from Drain Tank T-097 1301-540-1 085-12"-R-KK1 Outlet from First Point Heater E-037 to 2nd Point Heater E-038 1301-540-1 540-14"-R-ZZO Supply to Second Point Heater E-038 1301-540-1 540-16"-R-ZZO Inlet Supply for 2nd Point Heater E-038 1301-541-1 086-12"-R-KK1 Outlet from First Point Heater E-036 to Second Point Heater E-039 1301-541-1 541-14"-R-ZZO Supply to Second Point Heater E-039.

1301-541-1 541-16"-R-ZZO Inlet Supply for Second Point Heater E-039 (Later) 217-1"-R-KK1 First Point Heater E-037 Vent to the Condenser (Later) 217-3"-R-KK1 First Point Heater E-037 Vent to the Condenser (Later) 217-4"-R-KK1 First Point Heaters E-037 & E-036 Vent Line to the Condenser (Later) 218-1"-R-KKL First Point Heater E-036 Vent to the Condenser (Later) 218-3"-R-KK1 First Point Heater E-036 Vent to the Condenser

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 13 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 412-3"-R-KK1 First Point Heater E-037 Common Vent Line to Line 217-3"-R-KKL (Later) 415-3"-R-KK1 First Point Heater E-036 Common Vent Line to Line 218-3"-R-KK1 (Later) 080-12"-R-KK2 2nd Point Heater E-038 Outlet (Later) 080-24"-R-KK2 3rd Point Heater E-040 Inlet from Second Point Heater E-038 (Later) 079-12"-R-KK2 2nd Point Heater E-039 Outlet (Later) 079-24"-R-KK2 3rd Point Heater E-041 Inlet from 2nd Point Heater E-039 P&ID Drawing High Pressure Steam Inlet Piping Between Valve 40142 2UV-2200E and Turbine K-001 P&ID Drawing High Pressure Steam Inlet Piping Between Valve 40142 2UV-2200A and Turbine K-001 P&ID Drawing High Pressure Steam Inlet Piping Between Valve 40142 2UV-2200H and Turbine K-001 P&ID Drawing High Pressure Steam Inlet Piping Between Valve 40142 & 40143 2UV-2200D and Turbine K-001 P&ID Drawing Steam from High Pressure Turbine K-001 to Cold 40142 & 40143 Steam Reheater E-112 P&ID Drawing Steam from High Pressure Turbine K-001 to Cold 40142 & 40143 Steam Reheater E-112 P&ID Drawing Steam from High Pressure Turbine K-001 to Cold 40142 & 40143 Steam Reheater E-113

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 14 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION P&ID Drawing Steam from High Pressure Turbine K-001 to Cold 40142 & 40143 Steam Reheater E-113 P&ID Drawing 10" T.D. Steam Piping Between Free and Low 40142 Pressure Ends of Turbine K-001 P&ID Drawing 6" I.D. Steam Piping Between Free and Low 40142 Pressure Ends of Turbine K-001 P&ID Drawing 5" I.D. Steam Piping Between Free and Low 40142 Pressure Ends of Turbine K-001 P&ID Drawing Steam Supply to Low Pressure Turbine #3 K-004 40143 & 40144 from Cold Steam Reheater E-112 P&ID Drawing Steam Supply to Low Pressure Turbine #3 K-004 40143 & 40144 from Cold Steam Reheater E-113 P&ID Drawing Steam Supply to Low Pressure Turbine #2 K-003 40143 & 40144 from Cold Steam Reheater E-113 P&ID Drawing Steam Supply to Low Pressure Turbine #2 K-003 40143 & 40144 from Cold Steam Reheater E-112 P&ID Drawing Steam Supply to Low Pressure Turbine #1 K-002 40143 & 40144 from Cold Steam Reheater E-113 P&ID Drawing Steam Supply to Low Pressure Turbine #1 K-002 40143 & 40144 from Cold Steam Reheater E-112 1301-010-1, 010-18"-R-HKO Main Steam Supply to Main Steam 1301-010-4 Dump Bypass System 1301-010-1 010-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8424 1301-010-2 010-18"-R-HKO Steam Bypass to Main Condenser from Valve 2HV-8424

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 15 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-010-1 421-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8423 1301-010-2 421-18"-R-KK2 Steam Bypass to Main Condenser from Valve 2HV-8423 1301-370-01, 370-18"-R-HKO Main Steam Supply to Main Steam 1301-370-2 Dump Bypass System and Air Ejectors 1301-370-2 370-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8426 1301-370-2 419-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8426 (Later) 005-6"-R-HKO Main Steam Supply Line to Feedwater Pump Drive Turbine K-005 1301-011-1, 011-6"-R-HKO Main Steam Supply Line to Feedwater 1301-011-2 Pump Drive Turbine K-006 (Later) 479-10"-R-ZZO Drain Line from Tank T-101 to Condenser (Later) 473-10"-R-ZZO Drain Line from Tank T-099 to Condenser (Later) 481-10"-R-ZZO Drain Line from Tank T-097 to Condenser (Later) 486-10"-R-ZZO Drain Line from Tank T-098 to Condenser P&ID Drawing High Pressure Steam to Feedwater Pump Turbine 40155 K005 from Line 005-6"-R-HKO P&ID Drawing High Pressure Steam to Feedwater Pump Turbine 40155 K005 from Line 152-12"-R-KK2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Steam System SHEET 16 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION P&ID Drawing High Pressure Steam to Feedwater Pump Turbine 40155 K006 from Line 011-6"-R-HKO P&ID Drawing High Pressure Steam to Feedwater Pump Turbine 40155 K006 from Line 151-12"-R-KK2 1301-017-2 017-6"-D-HKO Main Steam to Aux. Feed Pump Turbine K007 1301-017-2 017-6"-D-HKO Main Steam to Aux. Feed Pump Turbine K007 1301-296-1 012-8"-R-HKO Main Steam to Flange Heating System 1301-296-1 286-2 1/2"-R-HKO Main Steam to Flange Heating System

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Feedwater System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 018-20"-R-KK1 5th Point Heater E-045 Discharge Header to 4th Point Heater E-043 (Later) 018-22"-R-KK1 4th Point Heater E-043 Inlet Supply Header 1305-042-1 042-20"-R-KK1 5th Point Heater E-045 Discharge Header to 4th Point Header E-043 1305-042-1 042-22"-R-KK1 4th Point Heater E-042 Inlet Supply Header (Later) 019-22"-R-KK1 4th Point Heater E-043 Outlet Piping (Later) 019-20"-R-KK1 4th Point Heater E-043 Discharge Header (Later) 019-22"-R-KK1 3rd Point Heater E-041 Inlet Piping (Later) 043-22"-R-KK1 4th Point Heater E-042 Outlet Piping (Later) 043-20"-R-K1 4th Point Heater E-042 Discharge Header (Later) 043-22"-R-KK1 3rd Point Heater E-040 Inlet Piping (Later) 279-18"-R-KK1 4th Point Heaters E-042 and E-043 Discharge Cross Connect/3rd Point and 2nd Point Heaters Bypass Supply Line NC1305-020-1 020-22"-R-KK1 3rd Point Heater E-041 Outlet Piping NC1305-020-1 020-20"-R-KK1 3rd Point Heater E-041 Discharge Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Feedwater System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC1305-020-1 020-24"-R-KK1 2nd Point Heater Common Supply NC1305-020-2 Piping from 3rd Point Heater E-041 & Heater Drain Tank NC1305-020-2 020-26"-R-KK1 2nd Point Heater E-039 Inlet Piping NC1305-045-2 045-22"-R-KK1 3rd Point Heater E-040 Outlet Piping NC1305-045-1, 045-20"-R-KK1 3rd Point Heater E-040 Discharge NC1305-045-2 Header NC1305-045-1, 045-24"-R-KK1 2nd Point Heater Common Supply NC1305-045-3 Piping from 3rd Point Heater E-040 & Heater Drain Tank NC1305-045-3 045-26"-R-KK1 2nd Point Heater E-038 Inlet Piping 1305-021-1 021-26"-R-KK1 2nd Point Heater E-039 Outlet Piping 1305-021-1, 021-24"-R-KK1 Feed Pump P-063 Suction Header 2-1305-021-2 1305-046-1 046-26"-R-KK1 2nd Point Heater E-038 Outlet Piping 1305-046-1,. 046-24"-R-KK1 Feed Pump P-062 Suction Header 2-1305-046-2 1305-021-1, 023-20"-R-KK1 Feed Pumps P-062 & P-063 Suction 1305-046-1 Cross Connect Line 2-1305-027-1 041-24"-R-GK2 Feed Pump P-063 Discharge Piping 2-1305-027-1 041-20"-R-GK2 Feed Pump P-063 Discharge Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Feedwater System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-024-1 024-20"-R-GKO Feed Pump P-063 Supply to 1st Point Heater E-036

.1305-024-1 024-28"-R-GKO 1st Point Heater E-036 Inlet Piping 1305-038-1 038-24"-R-GK2 Feed Pump P-062 Discharge Piping 1305-038-1 038-20"-R-GK2 Feed Pump P-062 Discharge Piping 1305-038-1 022-20"-R-GKO Feed Pump P-062 Supply to 1st Point Header E-037 1305-038-1 022-28"-R-GKO 1st Point Heater E-037 Inlet Piping 2-1305-025-4 028-28"-R-GKO 1st Point Heater E-037 Outlet Piping 2-1305-025-4 028-20"-R-GKO 1st Point Heater E-037 Supply to Steam Generators E-088 and E-089 2-1305-025-4 025-28"-R-GKO 1st Point Heater E-036 Outlet Piping 2-1305-025-4 025-20"-R-GKO 1st Point Heater E-036 Supply to Steam Generators E-088 and E-089 2-1305-025-3, 025-30"-R-GKO Feedwater Supply Header to Steam 2-1305-025-4 Generators E-088 and E-089 1305-025-1, 025-20"-R-GKO Feedwater Supply Header to Steam 1305-025-2, Generators E-088 and E-089 2-1305-025-3 2-1305-025-1, 189-20"-C-GK1 Feedwater Supply Header to Steam 1305-189-1 Generator E-088 1305-189-1 189-18"-C-GK1 Feedwater Inlet Piping for Steam Generator E-088

PIPING VERIFICATION PROGRAM SONGS 2&3.

APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Main Feedwater System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1305-025-3, 026-20"-R-GKO Feedwater Supply Header to Steam 1305-026-1, Generator E-089 1305-026-2 1305-026-1, 190-20"-C-GK1 Feedwater Supply Header to Steam 1305-190-1 Generator E-089 1305-190-1 190-18"-C-GK1 Feedwater Inlet Piping for Steam Generator E-089 NC1305-162-1, 162-14"-R-KK1 Heater Drain Pump P-059 Discharge NC1305-162-2 Header NC1305-163-1, 163-14"-R-KK1 Heater Drain Pump P-058 Discharge NC1305-163-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Auxiliary Feed SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-099-4, 222-6"-C-GK1 Aux. Feedwater to S/G E-088 1305-221-1 1305-099-1 1305-099-1 099-6"-D-GKO Aux. Feedwater Pump P-141 Discharge 1305-099-2 to S/G E-088 1305-099-3 1305-099-4 1305-099-5 1305-101-1 101-6"-D-GKO Aux. Feedwater Pump P-140 Discharge to S/G E-088 1305-047-1 047-8"-D-LLO Aux. Feedwater Pump P-141 Suction 1305-047-2 1305-047-3 1305-048-1 078-2"-D-GKO Aux. Feedwater Pump P-141 Mini-Flow Line 1305-223-1 223-6"-C-GK1 Aux. Feedwater to S/G E-089 1305-098-1 098-6"-D-GKO Aux. Feedwater Pump P-140 to S/G 1305-098-2 E-089 1305-098-3 1305-098-4 1305-101-1 1305-100-1 100-6"-D-GKO Aux. Feedwater Pump P-141 to S/G E-089 1305-050-1 079-2"-D-GKO Aux. Feedwater Pump P-140 Mini-Flow Line 1305-050-1 050-2"-D-GEO Aux. Feedwater Pump P-140 Mini-Flow Line 1305-048-1 048-2"-D-GEO Aux. Feedwater Pump P-141 Mini-Flow Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A THERMAL EXPANSION LINE DESIGNATION/POWER ASCENSION TABLE 1 SYSTEM: Auxiliary Feed SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-049-1 049-8"-D-LLO Aux. Feedwater Pump P-140 Suction 1305-049-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant System SHEET 1 OF 2 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 001-2-A-FEO 2-RC-021-0-520 H-001 & H-002 Reactor Coolant Loop lB Supply to RC DRN TK T-012 022-2"-A-FEO 2-RC-022-0-182 H-001 Reactor Coolant Supply to the Letdown HX 022-2"-A-FEO 2-RC-002-0-172 H-002 Reactor Coolant Supply to the Letdown HX 022-2"-A-FEO 2-RC-022-0-167 H-003 & H-004 Reactor Coolant Supply to the Letdown HX 022-2"-A-FEO 2-RC-002-0-156 H-005 Reactor Coolant Supply to the Letdown HX 022-2"-A-FEO 2-RC-022-0-147 Reactor Coolant Supply to the Letdown HX 001-2"-C-FEO S2-VC-001-00-137 H-007 & H-008 Coolant Inlet Piping for the Letdown HX 001-2"-C-FEO 2-VC-001-00-128 H-010 Coolant Inlet Piping for the Letdown HX 001-2"-C-FEO 2-VC-001-00-124 H-012 Coolant Inlet Piping for the Letdown HX

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT .FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant System SHEET 2 OF 2 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION OO1-2"-C-FEO 2-VC-001-00-119 H-014 Coolant Inlet Piping for the Letdown HX 001-2"-C-FEO 2-VC-001-00-117 H-015 Coolant Inlet Piping for the Letdown HX 001-2"-C-FEO 2-VC-001-00-105 Letdown delay Coolant Inlet Piping for the mech. nozzle Letdown HX 001-2"-C-FEO 2-VC-001-00-60 H-020 Coolant Inlet Piping for the Letdown HX 001-2"-C-FEO 2-VC-001-00-56 H-021 Coolant Inlet Piping for the Letdown HX

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Pressurizer Relief Valve Piping SHEET 1 OF LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 032-6"-A-FEO 2-RC-032-1-27 H-001 & H-002 Pressurizer Outlet to Relief Valve 2PSV-0200 033-6"-A-FEO 2-RC-033-1-227 H-021 & H-022 Pressurizer Outlet to Relief Valve 2PSV-0201

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Pressurizer Spray Piping SHEET 1 of 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 011-4"-A-FEO 2-RC-011-01-20 H-001 Reactor Spray Line to PZR =. H-002 from 2PV-O100A H-019 013-4"-A-FEO 2-RC-013-03-78 H-003 & H-004 Reactor Spray Outlet from 2PV-0100B to 012-4"-A-FEO 013-3"-A-FEO 2-RC-013-03-83 H-001 Reactor Spray Piping from Loop 1 to Valve 2PV-0100B 012-4"-A-FEO 2-RC-012-06--630 H-026 Reactor Spray Line to PZR H-025 from 2PV-0100A H-027 012-4"-A-FEO 2-RC-012-06-620 H-023 Reactor Spray Line to PZR from 2PV-0100A 012-4"-A-FEO 2-RC-012-07-645 H-029 & H-030 Reactor Spray Line to PZR from 2PV-O100A 012-4"-A-FEO 2-RC-012-08-670 Pressurizer Reactor Spray Line to PZR Spray Nozzle from 2PV-0100A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Pressurizer Surge Line SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 015-12"-A-FEO. 2-RC-015-4-35 H-016 Pressurizer Surge Line 015-12"-A-FEO 2-RC-015-3-45 H-017 Pressurizer Surge Line 015-12"-A-FEO 2-RC-015-3-55 H-018 & H-019 Pressurizer Surge Line 015-12"-A-FEO 2-RC-015-2-60 H-020 Pressurizer Surge Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant Piping Supply SHEET 1 OF 2 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 016-18"-A-FEO 2-RC-016-1 36 H-007 & H-008 Reactor Coolant Supply to Shutdown Cooling 016-18"-A-FEO 2-RC-016-3 53 H-005 Reactor Coolant Supply to Shutdown Cooling 016-18"-A-FEO 2-RC-016-3 253 H-004 Reactor Coolant Supply to Shutdown Cooling 016-16"-A-FEO 2-RC-016-3 69 H-010 & H-009 Reactor Coolant Supply to Shutdown Cooling.

072-10"-A-FEO 2-RC-072-1 78 H-001 & H-002 Reactor Coolant Supply to Shutdown Cooling Bypass Line 072-10"-A-FEO 2-RC-072-2 83 H-003 Reactor Coolant Supply to Shutdown Cooling Bypass Line 072-10"-A-FEO 2-RC-072-2 283 H-004 Reactor Coolant Supply to Shutdown Cooling Bypass Line 071-10"-A-KEO 2-RC-071-1 91 H-002 & H-003 Reactor Coolant Supply to Shutdown Cooling (Bypass Line) 016-16"-A-FEO 2-RC-016-4 98 H-001 Reactor Coolant Supply to Shutdown Cooling .

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Reactor Coolant Piping Supply SHEET 2 OF 2 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 016-16"-A-FEO 2-RC-016-5 104 H-002 & H-003 Reactor Coolant Supply to Shutdown Cooling 017-16"-A-KEO 2-RC-017-28 109 H-080 & H-030 Reactor Coolant Supply to Shutdown Cooling 017-16"-A-KEO 2-RC-017-28 111 H-031 Reactor Coolant Supply to Shutdown Cooling 017-18"-C-KEO 2-RC-017-29 120 H-035 Reactor Coolant Supply to Shutdown Cooling 017-18"-C-KEO 2-RC-017-17 130 H-039 Reactor Coolant Supply to Shutdown Cooling

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: High Pressure Safety Injection Header SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION (1201)147-3"-A-FEO 2-RC-147-01 103 H-001 Coolant Inlet to the RC Hot Leg from No. 2 HPSI System Header 165-3"-A-FEO 2-SI-165-01 130 H-008 Supply from No. 2 HPSI System Header (Inside Containments) 165-3"-A-FEO 2-SI-165-01 140 H-007 Supply from No. 2 HPSI System Header (Inside Containments) 165-3"-A-FEO 2-SI-165-01 150 H-005 & H-006 Supply from No. 2 HPSI System Header (Inside Containments) 165-3"-A-FEO 2-SI-165-7 186 H-012 Supply from No. 2 HPSI System Header (Inside Containments)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System Piping SHEET 1 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 152-3"-A-FEO HPSI 2-SI-152-2 53 H-001 Header Tie In to Common Safety Injection System Supply to Loop lA 043-8"-A-FEO 2-SI-043-4 80 H-014 Safety Injection System Common Supply to Loop lA 043-12"-A-FEO 2-SI-043-3 99 H-018 Safety Injection System Common Supply to Loop 1A 043-12"-A-FEO 2-SI-043-2 110 H-019 Safety Injection System Common Supply to Loop 1A 043-12"-A-FEO 2-SI-043-2 117 H-020 & H-021 Safety Injection System Common Supply to Loop 1A 059-12"-A-FEO 2-SI-059-2 147 H-009 & H-007 Safety Injection T-008 Surge Line 059-12"-A-FEO 2-SI-059-1 167 H-008 Safety Injection T-008 Surge Line 044-8"-A-FEO 2-SI-044-6 58 H-004 & H-005 Safety Injection System Common Supply to Loop 1B 044-12"-A-FEO 2-SI-044-5 75 BB 10'-5" East Safety Injection System Common of H-006 Supply to Loop 1B H-007

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System Piping SHEET 2 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 044-12"-A-FEO 2-SI-044-4 82 H-006 & H-007 Safety Injection System Common Supply to Loop 1B 044-12"-A-FEO 2-SI-044-3 87 H-008 & H-009 Safety Injection System Common Supply to Loop lB 060-12"-A-FEO 2-SI-060-2 157 H-003 Safety Injection Tank T-007 Surge Line 046-8"-A-FEO 2-SI-046-2 73 H-002 Safety Injection System Common Supply to Loop 2B 046-8"-A-FEO 2-SI-046-3 77 H-003 & H-004 Safety Injection System Common Supply to Loop 2B 046-8"-A-FEO 2-SI-046-4 83 H-005 Safety Injection System Common Supply to Loop 2B 046-8"-A-FEO 2-SI-046-4 89 H-006 & H-007 Safety Injection System Common Supply to Loop 2B 046-8"-A-FEO 2-SI-046-5 94 H-008 Safety Injection System Common Supply to Loop 2B 046-12"-A-FEO 2-SI-046-7 107 Safety Injection System Common Supply to Loop 2B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System Piping SHEET 3 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 062-12"-A-FEO 2-SI-046-6 133 H-010 Safety Injection Tank T-010 H-011 Surge Line H-012 062-12"-A-FEO 2-SI-062-2 143 H-001 Safety Injection Tank T-010 H-002 Surge Tank H-003 045-8"-A-FEO 2-SI-045-4 63 H-003 Safety Injection System Common Supply to Loop 2A 045-8"-A-FEO 2-SI-045-5 71 H-004 & H-005 Safety Injection System Common Supply to Loop 2A 045-8"-A-FEO 2-SI-045-6 77 H-007 & H-008 Safety Injection System Common Supply to Loop 2A 045-8"-A-FEO 2-SI-045-8 83 H-011 & H-010 Safety Injection System Common Supply to Loop 2A 045-8"-A-FEO 2-SI-045-10 93 H-012 & H-013 Safety Injection System Common Supply to Loop 2A 045-12"-A-FEO 2-SI-045-11 103 H-014 & H-015 Safety Injection System Common Supply to Loop 2A 045-12"-A-FEO 2-SI-045-12 120 E-11 East of Safety Injection System Common check 12" Supply to Loop 2A 031-A-551

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Safety Injection System Piping SHEET 4 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 061-12"-A-FEO 2-SI-061-1 143 H-002 Safety Injection Tank T-009 Surge Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Charging Line Inside the Containment SHEET 1 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION (1201) 062-2"-A-FEO 988 S2-RC-062 Reactor Coolant Piping Charg- H-012 ing Supply to Loop 1A (1201) 062-2"-A-FEO 984 S2-RC-062 Reactor Coolant Piping Charg- H-011 ing Supply to Loop 1A (1201) 062-2"-A-FEO 982 S2-RC-062 Reactor Coolant Piping Charg- H-009 ing Supply to Loop 1A (1201) 062-2"-A-FEO 975 S2-RC-062 Reactor Coolant Piping Charg- H-008 ing Supply to Loop 1A (1201) 062-2"-A-FEO 965 S2-RC-062 Reactor Coolant Piping Charg- H-007 ing Supply to Loop 1A (1201) 062-2"-A-FEO 945 S2-RC-062 Reactor Coolant Piping Charg- H-005 ing Supply to Loop 1A (1201) 062-2"-A-FEO 925 S2-RC-062 Reactor Coolant Piping Charg- H-004 ing Supply to Loop lA (1201) 062-2"-A-FEO 910 S2-RC-062 Reactor Coolant Piping Charg- H-002 H-003 ing Supply to Loop 1A (1201) 062-2"-A-FEO 890 S2-RC-062-H Reactor Coolant Piping Charg- 014, 015 &

ing Supply to Loop lA 016

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Charging Line Inside the Containment SHEET 2 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION (1201) 063-2"-A-FEO 780 S2-RC-056 Reactor Coolant Piping Bypass H-001.

Line for Valve 2HV-9203 (1208) 046-2"-C-FEO 760 S2-VC-046 Reactor Coolant Piping Bypass H-001 Line for Valve 2HV-9203 009-2"-C-EEO 860 S2-VC-009 Coolant Charging Line Outlet H-012 for RHX E-063 009-2"-C-EEO 345 S2-VC-009-H Coolant Charging Line Outlet 009, 010, for RHX E-063 011 (1201) 061-2"-A-FEO 10 S2-RC-061 Reactor Coolant Piping Charg- H-012 H-013 ing Supply to Loop 2A (1201) 061-2"-A-FEO 13 S2-RC-061 Reactor Coolant Piping Charg- H-011 H-009 ing Supply to Loop 2A (1201) 061-2"-A-FEO 16 S2-RC-061 Reactor Coolant Piping Charg- H-007 ing Supply to Loop 2A (1201) 061-2"-A-FEO 20 S2-RC-061 Reactor Coolant Piping Charg- H-006 ing Supply to Loop 2A (1201) 061-2"-A-FEO 28 S2-RC-061 Reactor Coolant Piping Charg- H-002 ing Supply to Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Charging Line Inside the Containment SHEET 3 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 010-2"-C-EEO 65 S2-VC-010 Coolant Charging Supply to H-035 Reactor Coolant Loop 2A 010-2"-C-EEO 75 S2-VC-010 Coolant Charging Supply to H-031 Reactor Coolant Loop 2A O10-2"-C-EEO 85 S2-VC-010 Coolant Charging Supply to H-029 Reactor Coolant Loop 2A 010-2"-C-EEO 90 S2-VC-010 Coolant Charging Supply to H-026 H-027 Reactor Coolant Loop 2A 010-2"-C-EEO 100 S2-VC-010 Coolant Charging Supply to H-025 Reactor Coolant Loop 2A 010-2"-C-EEO 105 S2-VC-010 Coolant Charging Supply to H-023 H-022 Reactor Coolant Loop 2A.

010-2"-C-EEO 115 S2-VC-010 Coolant Charging Supply to H-021 H-020 Reactor Coolant Loop 2A O01-2"-C-EEO 125 S2-VC-010 Coolant Charging Supply to H-017 Reactor Coolant Loop 2A 010-2"-C-EEO 145 S2-VC-010 Coolant Charging Supply to H-002 Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Charging Line Inside the Containment SHEET 4 OF 4 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION O01-2"-C-EEO 165 S2-VC-010 Coolant Charging Supply to H-036 Reactor Coolant Loop 2A 010-2"-C-EEO 175 S2-RC-010 Coolant Charging Supply to H-006 Reactor Coolant Loop 2A 010-2"-C-EEO 190 S2-RC-010 Coolant Charging Supply to H-009 Reactor Coolant Loop 2A 010-2"-C-EEO 200 S2-VC-010 Coolant Charging Supply to H-032 Reactor Coolant Loop 2A 010-2"-C-EEO 210 S2-VC-010 Coolant Charging Supply to H-034 Reactor Coolant Loop 2A 010-2"-C-EEO .215 S2-VC-010 Coolant Charging Supply to H-014 H-103 Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Charging Pumps Common Discharge Header SHEET 1 OF 1 Inside the Containment LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 104-2"-C-FEO 25 S2-VC-104 Charging Supply Inlet Piping H-009 to RHX E-063 104-2"-C-FEO 50 S2-VC-104 Charging Supply Inlet Piping H-014 to RHX E-063 104-2"-C-FEO 60 Regen. H/X Charging Supply Inlet Piping Nozzle to RHX E-063

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Letdown Line Inside the Containment SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 001-2"-C-FEO 2-VC-001-00 52 H-022 Reactor Coolant Inlet to RHX E-063 from Delay Mech.

001-2"-C-FEO 2-VC-001-00 45 Regen. H/X Reactor Coolant Inlet to RHX Nozzle E-063 from Delay Mech.

002-2"-C-FEO 2-VC-002-00 40 Regen. H/X Reactor Outlet from RHX Nozzle E-063 to Letdown HX E-062 002-2"-C-FEO 2-VC-002-00 26 H-003 Reactor Outlet from RHX E-063 to Letdown HX E-062 002-2"-C-FEO 2-VC-002-00 18 H-002 Reactor Outlet from RHX E-063 to Letdown HX E-062

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Letdown Line Outside the Containment up to SHEET 1 OF 2 the Letdown Heat Exchanger LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 003-2"-C-FEO 328 S2-VC-003 Coolant Supply to Letdown HX H-020 E-062 003-2"-C-FEO 342 S3-VC-003 Coolant Supply to Letdown HX H-011 E-062 003-2"-C-FEO 357 S2-VC-003 Coolant Supply to Letdown HX H-013 E-062 003-2"-C-FEO 387 S3-VC-003 Coolant Supply to Letdown HX H-007 E-062 003-2"-C-FEO 470 S2-VC-003 Coolant Supply to Letdown HX H-006 E-062 110-2-1/2"-C-HEO 2-VC-110-1 600 Letdown H/X Letdown HX E-062 Inlet Supply Nozzle Piping 110-2-1/2"-C-HEO 2-VC-110-2 625 H-001 Letdown HX E-062 Inlet Supply Piping 110-2-1/2"-C-HEO 2-VC-110-4 663 H-004 Letdown HX E-062 Inlet Supply Piping 110-2-1/2"-C-HEO 2-VC-110-4 666 H-005 Letdown HX E-062 Inlet Supply Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Letdown Line Outside the Containment up to SHEET 2 OF 2 the Letdown Heat Exchanger LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 110-2"-HEO 709 S2-VC-012 Letdown HX E-062 Inlet Supply H-004 Piping 110-2"-HEO 725 S2-VC-003 Letdown HX E-062 Inlet Supply H-018 Piping 110-2"-HEO 727 S2-VC-003 Letdown HX E-062 Inlet Supply H-017 Piping 003-2"-C-FEO 757 S2-VC-003 Coolant Supply to Letdown HX H-016 E-062 003-2"-C-FEO 810 S3-VC-003 Coolant Supply to Letdown HX H-002 E-062 014-2"-C-HEO 845 S2-VC-014 Coolant Supply from Valve H-001 2HV-O11OB 012-2"-C-FEO 877 S3-VC-012 Coolant Supply to Valve H-001 2HV-0110B 012-2"-C-FEO 925 S2-VC-012 Coolant Supply to Valve H-006 2HV-0110B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Steam Generator E-088 Blowdown System SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO..DATA PT. 1 LOCATION 015-2"-C-HKI 2-ST-015-8 5 E-088 Blowdn S/G E-088 Blowdown Outlet Nozzle 015-3"-C-HKI 2-ST-015-8 18 H-001 & H-002 S/G E-088 Blowdown Piping 015-3"-C-HKI 2-ST-015-7 47 H-005 & H-006 S/G E-088 Blowdown Piping 015-3"-C-HKI 2-ST-015-7 50 H-014 S/G E-088 Blowdown Piping 015-6"-C-HKI 2-ST-015-6 70 H-008 S/G E-088 Blowdown Piping H-012 thru the Containment H-013 015-6"-C-HKI 2-ST-015-4 90 H-011 S/G E-088 Blowdn Piping thru the Containment

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Steam Generator E-089 Blowdown System SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 016-2"-C-HKI 2-ST-016-17 5 E-089 Blowdn S/G E-089 Blowdown Outlet Nozzle 016-3'-C-HKI 2-ST-016-17 11 H-002 & H-003 S/G E-089 Blowdown Piping 016-6"-C-HKI 2-ST-016-2 22 H-006 S/G E-089 Blowdown Piping thru the Containment 016-6"-C-HKI 2-ST-016-4 44 H-009 & H-024 S/G E-089 Blowdown Containment 016-6"-C-HKI 2-ST-016-4 49 H-011 & H-026 S/G E-089 Blowdown Piping thru the Containment 016-6"-C-HKI 2-ST-016-8 53 H-013 & H-028 S/G E-089 Blowdown Piping thru the Containment 016-6"-C-HKI 2-ST-016-9 62 H-014 S/G E-089 Blowdown Piping thru the Containment 016-6"-C-HKI 2-ST-016-10 68 H-015 S/G E-089 Blowdown Piping thru the Containment 016-6"-C-HKI 2-ST-016-13 76 H-019 S/G E-089 Blowdown Piping thru the Containment 016-6"-C-HKI 2-ST-016-15 89 H-022 S/G E-089 Blowdown Piping thru the Containment

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Main Steam Piping from Steam Generator E-088 SHEET 1 OF 1 to Containment Penetration No. 33 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 001-42"-C-HKI 2-ST-001-1 5 S/G E-088 S/G E-088 Steam Outlet Piping Nozzle 001-40"-C-HKI 2-ST-001-2 42 H-003 S/G E-088 Steam Header thru H-004 Containment H-005 001-40"-C-HKI 2-ST-001-2 50 H-006 S/G E-088 Steam Header thru H-007 Containment H-008 H-009

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX THERMAL EXPANSION POINT DESIGNATIONS/HOT FUNCTIONAL TABLE 1 SYSTEM: Main Steam Piping from Steam Generator E-089 SHEET 1 OF 1 to Containment Penetration No. 32 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 002-42"-C-HKI 2-ST-002-1 5 S/G Nozzle S/G E-089 Steam Outlet Piping 002-40"-C-HKI 2-ST-002-2 42 H-003 S/G E-089 Steam Header thru H-004 Containment H-005 002-40"-C-HKI 2-ST-002-2 50 H-006 S/G E-089 Steam Header thru H-007 Containment H-008 H-009

PIPING VERIFICATION PROGRAM SONGS 2&3 THERMAL EXPANSION POINT DESIGNATIONS/POWER ASCENSION TABLE 1 SYSTEM: Main Steam SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER.AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 001-40"-C-HKI 2ST-001-9 118 H-031 001-40"-C-HKJ 2ST-001-10 105 H-104 H-021 001-40"-C-HKI 2ST-001-10 100 H-022 001-40"-C-HKI 2ST-001-11 85 H-016 H-023 001-40"-C-HKI 2ST-001-12 65 H-030 580-26"-C-HKI 2ST-580-1 262 H-002 363-34"-C-HKI 2ST-363-1 312 H-003 037-10"-R-HK2 315 Disch. side 2PSV-8406 040-10"-R-HK2 265 Disch. side 2PSV-8409 367-24"-R-HK2 2ST-367-5 13 H-001 003-40"-R-HKO 2ST-003-1 12 H-021 003-40"-R-HKO 2ST-003-4 51 H-003 003-40"-R-HKO 2ST-003-10 67 H-014 003-28"-R-HKO 2ST-003-10 78 H-019 007-28"-R-HKO 2ST-007-2 92 H-001 006-28"-R-HKO 2ST-006-2 202 H-001.

PIPING VERIFICATION PROGRAM SONGS 2&3 THERMAL EXPANSION POINT DESIGNATIONS/POWER ASCENSION TABLE 1 SYSTEM: Main Feedwater Inside Containment SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 189-18"-C-GKI 2FW-189-6 5 S/G Feedwater nozzle 189-18"-C-GKI 2FW-189-5 30 H-012.

H-013 189-20"-C-GKI 2FW-189-4 59 H-014 H-015 189-20"-C-GKI 2FW-189-4 75 H-017 189-20"-C-GKI 2FW-189-3 85 H-018 189-20"-C-GKI 2FW-189-2 105 H-019 190-18"-C-GKI 2FW-190-6 5 S/G Feedwater nozzle 190-18"-C-GKI 2FW-190-5 35 H-013.

H-014 190-20"-C-GKI 2FW-190-4 51 H-015 H-016 190-20"-C-GKI 2FW-190-3 90 H-019 190-20"-C-GKI 2FW-190-2 103 H-020

PIPING VERIFICATION PROGRAM SONGS 2&3 THERMAL EXPANSION POINT DESIGNATIONS/POWER ASCENSION TABLE 1 SYSTEM: Main Steam from Pene.32 to Stop Valves 3 & 4 SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 009-28"-R-HKO 2ST-009-2 400 S.V. #3 Inlet Nozzle 008-28"-R-HKO 2ST-008-2 600 S.V. #4 Inlet Nozzle 009-28"-R-HKO 2ST-364-8 376 H-013 H-014 364-40"-R-HKO 2ST-364-7 365 H-009 364-40"-R-HKO 2ST-364-5 361 H-006 364-40"-R-HKO 2ST-364-4 347 H-003 002-40"-C-HKI 2ST-002-10 75 H-017 002-40"-C-HKI 2ST-002-10 83 H-016 002-40"-C-HKI 2ST-002-9 105 H-014 002-40"-C-HKI 2ST-002-8 115 H-026 002-40"-C-HKI 2ST-002-8 120 H-013 002-40"-C-HKI 2ST-002-6 150 2'-3" below H-012 583-26"-C-HKI 2ST-583-1 350 H-002 029-10"-R-KK2 375 @ 24" stack near 2PSV 8418 309-34"-C-HKI 2ST-309-1 440 H-003 025-10"-R-KK2 520 @ 24" stack near 2PSV 8414

PIPING VERIFICATION PROGRAM SONGS 2&3 THERMAL EXPANSION POINT DESIGNATIONS/POWER ASCENSION TABLE 1 SYSTEM: Pressurizer Surge Line SHEET 1 OF 1 LANYARD LOCATION LINE NUMBER AND DESCRIPTION SPOOL NO. DATA PT. 1 LOCATION 015-12"-A-FEO 2RC-015-3 55 H-018 Pressurizer Surge H-019

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 1 of 24)

SYSTEM: MAIN STEAN Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2ST001 2CO6 #

H001 40483 2.6 ins. 3.5 ins. 560'F ins. OF ins. OF ins. oF /

S2ST001 2CO6 #1 1002 40483 1.16 ins. 4.5 ins. 560aF ins. OF ins. OF ins. OF /

S2ST001 2CO6 # #

H004 40483 1.875 ins.- 4.125 ins. 560 0 F ins. OF ins. OF ins. oF S2ST001 2CO6 # #

1005 40483 2.35 ins. 3.65 ins. 560'F ins. OF ins. oF ins. OF /

S2ST001 2CO6 # #

0 H007 40483 2.5 ins. 3.49 ins. 560 F ins. OF ins. OF ins. OF /

S2ST001 2CO6 # #

H008 40483 2.0 ins. 4.0 ins. 5601F ins. OF ins. OF ins. OF /

S2ST001 2CO6 # #

H009 40483 3.062 ins. 2.938 ins. 560'F ins. OF ins. OF ins. OF /

S2ST001 2CO2 #I 0

H014 40483 3.188 ins. 2.812 ins. 560 F ins. OF ins. OF ins. OF S2ST001 2CO2 # #

H021 40483 3.5 ins. 2.5 ins. 560*F ins. OF ins. OF ins. OF S2ST001 2CO2 # #

0 H022 40483 3.312 ins. 2.812 ins. 560 F ins. oF ins. OF ins. OF /

S2ST001 2CO2 2.75/ 3.118/ # # North Snubber H023 40483 3.25 ins. 2.812 ins. 560aF ins. OF ins. OF ins. OF South Snubber /

S2ST001 2CO2 # #

0 H031 40483 3.25 ins. 2.75 iris. 560OF ins. OF ins. F ins. OF /

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 2 of 24)

SYSTEM: MAIN STEAM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Heasur ment Measurement Installation Deflec- Design Instrument & Instrument & I Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (9F) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2ST001 2CO2 # #

H034 40483 2.25 ins. 1.0 ins. 560'F ins. OF ins. OF ins. OF /

S2ST001 2CO2 2CO6 1.0 # . # No flow in H040 40362, 40372 - by-pass line 0

40376, 40399 1.75 ins. 3.0 ins. 560 F ins. OF ins. OF ins. OF Flow in /

by-pass line S2ST001 2CO6, 2CO2 1.125 # # No flow in H042 40362, 40372 - by-pass line 40376, 40399 2.0 ins. 2.625 ins. 560aF ins. OF ins. OF ins. OF Flow in /

by-pass line S2ST001 2CO2 2CO6 13.0 # # No flow in H044 40362, 40372 - by-pass line 0

40376, 40399 2.25 ins. 1.125 ins. 560 F ins. OF ins. OF ins. OF Flow in /

by-pass line S2ST002 2C05 # #

H001 40484 2.995 ins. 3.894 ins. 560F ins. OF ins. OF ins. OF /

S2ST002 2C05 .# #

H002 40484 1.4 ins. 4.6 ins. 5600]? ins. OF ins. OF ins. OF /

S2ST002 2CO5 # #.

H004 40483 2.375 ins. 3.625 ins. 560'F ins. OF ins. OF ins. OF /

S2ST002 2C05 # #

H005 40483 1.875 ins. 4.125 ins. 560 0 F ins. OF ins. OF ins. OF /

S2ST002 2C05 3.0 3.31 # # West Snubber H007 40483 2.62 ins. 3.31 ins. 560 0F ins. OF ins. OF ins. OF East Snubber /

S2ST002 2CO5 # #

11008 40483 2.062 ins. 4.0 ins. 560'F ins. OF ins. OF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 3 of 24)

SYSTEM: MAIN STEAM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2ST002 2CO5 #

0 H009 40483 2.875 ins. 2.625 ins. 560 F ins. OF ins. OF ins. OF /

S2ST002 2C01 # #

H014 40483 1.25 ins. 4.25 ins. 560OF ins. OF ins. OF ins. OF /

S2ST002 2C01 #I H026 40483 3.062 ins. 2.938 ins. 560oF ins. OF ins. OF ins. OF S2STOO2 2C01 # #

H034 40352 3.5 ins. 2.25 ins. 560OF ins. OF ins. OF ins. OF /

S2ST002 2C05 0

H022 40483 3.812 ins. 2.188 ins. 560 F ins. OF ins. OF ins. OF /

S2ST002 2C01 # #

0 1040 40352 2.0 ins. 1.0 ins. 560 F ins. OF ins. OF ins. OF /

S2ST002 2C01 # #

1041 40352 2.062 ins. 1.062 ins. 560aF ins. OF ins. OF ins. OF /

S2ST002 2C01 # #

H042 40352 1.75 ins. 2.75 ins. 560aF ins. OF ins. OF ins. OF /

S2ST017 2C06 I ______

1H004 40412 3.0 ins. 1.0 ins. 560 0 F ins. OF ins. OF ins. OF /

S2ST017 2CO6 #I 1(005 40412 3.125 ins. 0.875 ins. 560aF ins. OF ins. OF ins. oF _ _/ __

S2ST017 2CO6 11008 40412 0.75 ins. 3.25 ins. 5601F ins. OF ins. OF ins. OF /

S2ST017 2CO6 # #

H1009 40412 1.0 ins. 1.5 ins. 560 0 F ins. OF ins. OF ins. oF I

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 4 of 24)

SYSTEM: MAIN STEAM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (OF) Calibration Calibration ins. OF ins.. OF. ins. OF Remarks Initial/Date S2ST309 2C01 #I H003 40483 2.562 ins. 2.312 ins. 560-F ins. OF ins. OF ins. . OF S2ST578 2CO2 # #

H001 40362, 40372 2.125 ins. 1.875 ins. 560 0 F, ins. OF ins.. OF ins. . F /

S2ST578 2C02 H003 40362, 40372 1.75 ins. 2.25 ins. 560*F ins. *F ins. "F ins. "F S2ST580 2CO2 #I H002 40483 3.312 ins. 2.625 ins. 560'F ins. OF ins. OF ins. OF /

S2ST583 2C01 #I H003 40483 3.125 ins. 2.875 ins. 560'F ins. OF ins. OF ins. OF /

S2ST001 # #

H025 3-13/16 2-3/16 . 560*F ins. OF ins. OF ins. OF S2ST001 # #

H048 1-3/4 2-1/4 560*F 0 ins. OF ins. F ins. OF S2ST001 # #

H049 2-1/2 1-1/2 560'F ins. OF ins. OF ins. OF S2ST002 # #

H046 2-3/8 1-5/8 560*F . ins. *F ins. *F ins. *F S2ST002 # #

H047 2-13/16 2-3/4 560*F ins. OF ins. OF ins. OF S2ST017 # #

1001 2 1-3/8 560'F ins. OF ins. OF ins. OF S2ST363 #I H002 2-5/8 3-3/8 560OF ins. OF ins. OF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 5 of 24)

SYSTEM: STEAM GENERATOR BLOWDOWN Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (OF) Calibration Calibration ins. OF ins. oF ins. OF Remarks Initial/Date S2ST015 2CO6 # #

H016 40399, 40402 3.25 ins. 2.75 ins. 560*F ins. OF ins. OF ins. *F /

S25T015 2CO6 # #

H017 40399, 40402 3.188 ins. 2.812 ins. 560*F ins. OF ins. OF ins. OF /

S2ST015 2CO6 H018 40399, 40402 2.25 ins. 3.75 ins. 560*F ins. "F ins. OF ins. OF /

S2STO15 2CO6 H019 40399, 40402 2.25 ins. 3.625 ins. 560'F ins. OF ins. OF ins. OF /

S2ST016 2CO9 # #

H002 40386 3.125 ins. 2.875 ins. 560*F ins. oF ins. OF ins. OF S2ST016 2CO9 # #

H003 40386 1.812 ins. 2.188 ins. 560OF ins. OF ins. "F ins. OF /

S2ST016 2C09 /#/

H031 40386 3.5 ins. 2.875 ins. 0 0 560*F ins. F ins. F ins. oF S2ST015 # #

H013 2-3/8 2-7/8 560*F ins. OF ins. "F ins. OF S2ST015 # #

H014 2-5/8 1-3/8 560OF ins. OF ins. "F ins. OF S2ST015 # #

H004 2-1/8 1-11/16 560*F ins. OF Ins. OF Ins. OF S2ST015 # #

H005 3.06 .94 560*F ins. OF ins. OF ins. OF S2ST015 # #

H012 3.0 7/8 560*F ins. OF ins. *F ins. OF S2ST016 #

H009 1.75 3.25 560*F ins. OF ins. OF ins. OF S2ST016 H010 3.93 1.06 560*F ins. OF ins. OF ins.

I OF S2ST0 16 #F H011 3.5 8.62 560oF ins. *F ins. "F in

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 6 of 24)

SYSTEM: STEAM GENERATOR BLOWDOWN Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (OF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2ST016 # #

1012 8 2 560 ins. OF ins. "F ins. OF S2ST016 # #

H013 8.25 1.75 560 ins. OF ins. OF ins. "F S2ST016 # #

H014 0 6.25 1.75 560 ins. OF ins. OF ins. F S2ST016 . # #

H015 4.166 .834 560 ins. OF ins. OF ins. oF S2ST016 # #

H016 0 2.68 1.32 560 ins. F ins. *F ins. OF

0 Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet- 7 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions - Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2RCO11 2CO9 # #

HOO1 40385 2.688 ins. 2.312 ins. 650 0 F ins. OF ins. OF ins. IF /

S2RC012 2CO9 # #

H026 40386 1.625 ins. 3.375 ins. 650 0 F ins. oF ins. OF ins. oF /

S2RC-013 2C05 # #

H002 40424 2.188 ins. 1.812 ins. 650'F ins. OF ins. OF ins. OF /

S2RC015 2C05 # #

1017 40423 3.875 ins. 2.125 ins. 700 0F ins. OF ins. oF ins. OF S2RC015 2CO5 #

1018 40423 1.875 ins. 4.125 ins. 700 0 F ins. OF ins. OF ins. OF S2RC015 2CO9 # #

H020 40386 2.312 ins. 4.312 ins. 700 0 F ins. OF ins. OF ins. OF /

S2RC016 2CO6 # #

1010 '40400, 40402 3.0 ins. 3.0 ins. 650aF ins. OF ins. OF ins. OF /

S2RC016 2CO6 1.79 4.21 # #Horizontal Snubber H003 40400, 40402 3.0 ins. 3.062 ins. 650'F ins. OF ins. OF ins. OF Vertical /

Snubber S2RC016 2CO6 1#

1004 40400, 40402 2.52 ins. 3.47 ins. 650aF ins. OF ins. OF ins. OF /

S2RC016 2CO6 #

1008 40400, 40402 0 3.45 ins. 4.35 ins. 650 F ins. OF ins. OF ins. OF /

S2RC016 2CO6 # #

H009 40400, 0 40402 2.13 ins. 3.85 ins 650 F ins. OF ins. OF ins. F /

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 8 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design IInstrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF . ins. OF Remarks Initial/Date S2RC017 2C01 # #

0 H002 40355 0.75 ins. 0.9 ins. 400 F ins. OF ins. oF ins. O/

S2RC017 2CO6 - 40387 # #

H030 40386, 40400 3.75 ins. 2.188 ins. 400aF ins. OF ins. OF ins. OF S2RC017 2CO6 - 40400 # #

H033 40402 1.5 ins. 3.375 ins. 400aF ins. oF ins. OF ins. OF /

S2RC017 2CO5 # #

H036 40387, 40385 1.812 ins. 2.938 ins. 400aF ins. OF ins. OF ins. OF /

S2RC017 2CO5 # #

0 H038 40387, 40385 1.125 ins. 3.125 ins. 400 F ins. OF ins. OF ins. OF /

S2RC017 2CO5 # #

H040 40387, 40386 3.25 ins. 2.75 ins. 400'F ins. OF ins. OF ins. OF /

S2RC017 2C01 # #

1044 40355, 40366 2.81 ins. 1.07 ins. 400OF ins. OF ins. OF ins. OF /

S2RC017 2C01 # #

H050 40355, 40366 3.045 ins. 2.064 ins. 400'F ins. OF ins. OF ins. OF /

S2RC017 2C05 # #

H052 40387, 40386 1.75 ins. 4.393 ins.j 4000F ins. OF ins. OF ins. OF /

S2RCO17 2COS # #

H054 40387, 40386 2.75 ins. 2.5 ins. 4000F ins. OF ins. OF ins. OF /

S2RC017 2COS # #

1o5 40387, 40386 3.35 ins. 1.65 ins. 4000F ins. OF ins. OF ins. OF /

S2RC017 2C05 # #

11056 40387, 40386 2.94 ins. 2.27 ins. 4000F ins. OF ins. oF ins. OF /

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 9 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument &! Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2RC017 2C05 # #

H057 40387, 40386 2.47 ins. 2.03 ins. 4001F ins. OF ins. OF ins. OF /

S2RC017 2C01 # #

H076 40355 2.5 ins. 2.438 ins. 400aF ins. OF ins. OF ins. OF /

S2RC017 2C01 # #

H077 40355 2.375 ins. 2.75 0

ins. 400 F ins. OF ins. oF ins. OF /

S2RC017 2CO6 #

H080 40400, 40402 4.312 ins. 1.562 ins. 400 0 F ins. OF ins. OF ins. OF S2RC017 2C01 # #

0 H081 40400, 40402 1.375 ins. 3.5 ins. 400 F ins. OF ins. OF ins. OF /

S2RCO17 2C01 # #

H090 40355 1.062 ins. 1.438 ins. 400aF ins. OF ins. OF ins. OF /

S2RC022 2C05 # #

0 1002 40386 2.812 ins. 1.188 ins. 650 F ins. OF ins. OF ins. OF /

S2RC022 2C05 OF!

H004 40386 1.59 ins. 2.46 ins. 650aF ins. OF ins. of ins. OF /

S2RC022 2CO5 #

1010 40386 1.5 ins. 1.0 ins. 650'F ins. OF ins. OF ins. OF /

S2RC025 2C05 - 40385 # #

H002 40386, 40387 2.76 ins. 2.365 ins. 4001F ins. OF ins. OF ins. OF /

S2RC025 2C05 - 40385 H006 40386, 40387 1.9 ins. 0.215 ins. 400aF ins. OF ins. OF ins. OF /

S2RC025 2C05 - 40385 # #

1009 40386, 40397 2.125 ins. 2.365 ins. 400 0 F ins. OF ins. oF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 10 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. oF ins. OF ins. OF Remarks Initial/Date S2RC025 2C05 - 40385 # #

0 H011 40386, 40397 2.75 ins. 2.25 ins. 400 F ins. OF ins. OF ins. OF /

S2RC025 2C05 - 40385 1013 40386, 40397 2.25 ins. 2.75 ins. 400 0 F ins. OF ins. OF ins. OF /

S2RC050 2CO2 # #

0 H021 40366 2.875 ins. 3.125 ins. 400 F ins. OF ins. OF ins. OF /

S2RC060 2CO9 - 40423 1# #

H003 40424, 40435 1.25 ins. 1.625 ins. 650 0 F ins. OF ins. OF ins. OF /

S2RC060 2CO9 - 40423 # #

H009 40424, 40435 2.312 ins. 1.688 ins. 650OF ins. OF ins. oF ins. OF /

S2RCO60 2CO9 - 40423 ins.]

1012 40424, 40435 2.437 ins. 2.18 ins. 650aF ins. OF ins. OF ins. OF S2RC061 2C06 - 40423 # t 0

H012 40424, 40435 2.625 ins. 3.125 ins. 650 F ins. OF ins. OF ins. OF /

S2RC061 2CO6 - 40423 # # I H013 40424, 40435 2.062 ins. 1.75 ins. 650'F ins. OF ins. OF ins. OF S2RC061 2CO6 - 40423 # #

0 H014 40424, 40435 1.625 ins. 0.875 ins. 650 F ins. OF1 ins. IF ins. OF /

S2RC061 2CO6 - 40423 I H016 40424, 40435 2.5 ins. 1.5 ins. 650'F ins. OF ins. OF ins. OF S2RC062 2CO9 - 40424 # #

H003 40434, 40435 1.312 ins. 2.688 ins. 650'F ins. OF ins. OF ins. OF /

S2RC062 2CO9 - 40424 # #

11009 40434, 40435 1.5 ins. 1.0 ins. 650 0 F ins. OF ins. OF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 11 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2RC062 2CO9 - 40424 # #

1012 40434, 40435 2.062 ins. 3.0 ins. 650aF ins. oF ins. oF ins. OF /

S2RC062 2CO9 - 40424 # #

H013 40434, 40435 1.5 ins. 2.5 ins. 650aF ins. OF ins. OF ins. OF /

S2RC062 2CO9 - 40424 # #

1014 40434, 40435 1.75 ins. 1.812 ins. 650aF ins. OF ins. oF ins. OF S2RC062 2CO9 - 40424 # #

1015 40434, 40435 2.0 ins. 2.188 ins. 650 0 F ins. OF ins. OF ins. OF /

S2-RC-012 # #

H-029 3.812 2.062 650 ins. OF ins. OF ins. OF S2-RC-012 # #

H-032 1.938 2.062 650 ins. OF ins. OF ins. OF S2-RC-012 # #

H-033 2.188 1.75 650 ins. OF ins.[ OF ins. OF S2-RC-012 # #

H-034 2.188 1.75 650 ins. OF ins. OF ins. OF S2-RC-014 # #

H-035 2.375 2.125 650 ins. OF ins. OF ins. OF S2-RC-015 # #

11-903 3.00 3.062 700 ins. OF ins. OF ins. F S2-RC-017 # #

H-048 0.375 2.8 400 ins. OF ins. OF ins. OF S2-NC-017 # #

11-067 5.25 4.38 400 ins. OF ins.1 0F ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 12 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (OF) Calibration Calibration ins. .OF ins. .. . OF ins. oF Remarks Initial/Date S2RC017 # #

H069 2.64 2.36 400 ins. OF ins.. OF ins. OF S2RC017 #I H070 2.00 2.16 400 ins. "F ins. "F ins. "F S2RC017 #I H071 3.21 2.79 400 ins. oF ins. OF ins. OF S2RC017 # #

H072 2.75 4.05 400 ins. OF ins. OF ins. OF S2RC017 # #

H084 1.75 2.00 400 ins. *F . ins. OF ins. OF S2RC017 # #

H085 3.125 3.375 400 0 ins. F ins. OF ins. OF S2RC017 # #

H091 2.5 2.562 400 . ins. OF . ins. OF ins. *F S2RC021 # #

H001 2.75 1.25 250 . ins. OF ins.. OF ins. OF S2RC021 # #

H002 1.812 2.188 250 ins. OF ins.. OF ins. *F S2RC022 # #

H008 1.375 3.00 650 ins. OF . ins. OF ins. *F S2RC022 # #

H009 2.75 1.562 650 ins. *F ins. OF ins. *F S2RC032 #I H002 4.25 2.312 700 ins. "F ins. "F ins. *F S2RC033 # #

H022 4.25 2.132 700 ins. OF ins. 'F ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 13 of 24)

SYSTEM: REACTOR COOLANT SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2-RC-050 # #

H-005 2.875 3.188 300 ins. OF ins. OF ins. OF S2-RC-050 # #

H-007 2.77 2.24 400 ins. OF ins. OF ins. OF S2-RC-050 # #

H-014 2.1 1.9 400 ins. OF ins. OF ins. OF S2-RC-050 # #

H-019 2.875 3.125 400 ins. OF ins. OF ins. OF S2-RC-061 # #

H-010 2.31 1.65 650 ins. OF ins. OF ins. OF S2-RC-071 # #

-001 3.29 1.71 400 ins. oF ins. OF ins. OF H-003 t2-RC-071 1.67 4.33 400 0

ins. F ins. OF ins. oF S2-RC-072 # #

1-002 4.205 1.795 650 ins. OF ins. OF ins. oF S2-RC-072 # #

H-004 3.0 1.34 , 650 ins. OF ins. OF ins. 0 F

S2-RC-147 # #

H-001 TOP 2-5/8 1-3/4 650 ins. OF ins. OF ins. OF S2-RC-147 # #

H-001 BOT. 2-13/16 1-15/16 650 ins. OF ins. ins.

OF OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 14 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location -Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2SIO01 2CO2 - 40364 # #

H024 40365, 40368 2.812 ins 3.188 ins. 3001F ins. OF ins. OF ins. OF /

S2SIO32 2C01 #

H004 40355 2.54 ins. 2.46 ins. 400'F ins. OF ins. OF ins. OF /

S2SIO33 2CO2 1007 41866 2.875 ins. 3.375 ins. 4001F ins. OF ins. OF ins. OF S2S1034 2C01 # #

0 H003 40354 2.0 ins. 2.812 ins. 400 F ins. OF ins. OF ins. OF /

S2SIO34 2C01 # #

1011 40354 1.625 ins. 0.875 ins. 400 0 F ins. OF ins. OF ins. OF /

S2SIO36 2C05 # #

1003 40387, 40386 1.48 ins. 1.02 ins. 400OF ins. OF ins. OF ins. OF /

S2SIO36 2CO5 # #

H005 40387, 40386 2.19 ins. 1.87 ins. 400 0 F ins. OF ins. OF ins. OF /

S2SIO36 2C05 # #

H007 40387, 40386 1.38 ins. 1.04 ins. 400'F ins. OF ins. OF ins. OF /

S2SIO36 2C05 # #

0 1010 40387, 40386 2.125 ins. 2.875 ins. 400 F ins. OF ins. OF ins. OF /

S2S1037 2CO9 # #

0 H002 40425, 40429 3.12 ins. 2.88 ins. 400 F ins. OF ins. OF ins. OF /

S2SIO38 2CO2 - 40171 # #

H006 40365, 40366 1.5 ins. 1.0 ins. 400aF ins. OF ins. OF ins. OF /

S2S1038 2CO2 - 40171 # #

H012 40365, 40366 2.25 ins. 2.01 ins. 400'F ins. OF ins. OF ins. 'F /

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 15 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (OF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2SIO38 2CO2 - 40171 -# #

0 H013 40365, 40366 2.03 ins. 1.98 ins. 400*F. ins. OF ins. OF ins. F /

S2SIO38 2C05 - 40387 # #

H015 40390 2.4 ins. 1.082 ins. 400*F. ins. OF ins. OF ins. OF S2SIO38 2C02 - 40365 # #

H021 40366, 40368 2.15 ins. 1.85 ins. 400*F. ins. OF ins. OF ins. OF /

S2SIO38 2C02 - 40365 # #

H030 40366, 40368 2.41 ins. 2.59 ins. 400*F ins. *F ins. OF ins. OF /

S2SIO38 2C01 # #

H039 40354 4.375 ins. 1.625 ins. 400*F ins. OF ins. OF ins. OF S2SIO38 2C01 # #

H041 40354 1.312 ins. 2.688 ins. 400*F ins. *F ins. OF ins. OF S2SIO38 2C01 # #

H044 40354 3.705 ins. 0.2955 ins. 400 0 F ins. OF ins. *F ins. OF /

S2SIO38 2C02 - 40365 # #

H060 40366, 40368 2.875 ins. 3.0 ins. 400 0 F ins. "F ins. OF ins. OF /

S2SIO38 2CO2 - 40335 # #

H061 40366, 40368 2.865 ins. 3.137 ins. 400 0 F, ins. OF ins. *F ins. F /

S2SIO38 2C02 - 40365 # #

H062 40366, 40368 2.75 ins. 3.25 ins. 400OF ins. OF ins. "F ins. OF /

S2SIO38 2CO2 - 40365 # #

H067 40366, 40368 2.7 ins. 2.3 ins. 400*F ins. OF ins. OF ins. .F /

S2SIO38 2CO2 - 40365 # #

0 0 H068 40366, 40368 3.1 ins. 2.25 ins. 400*F ins. OF ins. F ins. F /

S2SIO38 2C01 # #

0 0 11072 40354 3.125 ins. 0.875 ins. 400*F ins. OF ins. F ins. F /

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 16 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2SIO38 2CO9 # #

H076 40425, 40429 4.875 ins., 0.125 ins. 400*F ins. *F ins. OF ins. OF __/

S2SIO38 2CO9 # #

H078 40425, 40429 8.875 ins. 2.625 ins. .4000 F ins. OF ins. *F ins. OF /

S2SIO38 2C04 # #

H081 40425, 40429 0.375 ins. 4.375 ins. 400 0 F. ins. OF ins. .OF ins. OF /

S2SIO38 2CO9 # #

H084 40425, 40429 0.5 ins. 2.75 ins. 400*F . ins. *F ins. OF ins. OF /

S2SIO38 2CO9 # #

H087 40387 2.52 ins. 1.48 ins. 400*F ins. OF ins. OF ins. OF /

S2SIO38 2C05 - 40387 # #

H089 40390 1.75 ins. 1.25 ins. 400*F ins. OF ins. OF ins. OF /

S2SIO38 2C02 - 40171 # #

H092 40365, 40366 0.875 ins. 1.312 ins. 400*F - ins. "F ins. "F ins. F /

S2SIO38 2CO2 - 40171 # #

H094 40365, 40366 1.812 ins. 1.938 ins. 400*F ins. OF ins. OF ins. OF /

S2SIO38 2C01 # #

H095 40354 2.19 ins. 2.81 ins. 400*F ins. OF ins. "F ins. *F /

S2SIO38 2C13 # #

H100 40425 0.25 ins. 2.25 ins. 400'F ins. OF ins. OF ins. *F /

S2SIO38 2CO9 # #

H104 40387 2.875 ins. 1.125 ins. 400*F ins. OF ins. OF ins. *F /

S2SIO38 2C14 - 40470 # #

0 H105 40461, 40469 2.234 ins. 2.703 ins. 400 ins. *F ins. *F ins. *F /

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 17 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (OF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2SIO38 2CO9 # #

H106 40425, 40429 0.75 ins. 7.5 ins. 400'F ins. OF ins. OF ins. OF /

S2S1043 2CO9 # #

H016 40423, 40424 2.938 ins. 3.062 ins. 400 0 F ins. OF ins. OF ins. OF /

S2SIO43 2CO9 # #

11018 40423, 40424 2.0 ins. 1.75 ins. 4001F ins. OF ins. OF ins. OF S2SIO43 2CO9 # #

H020 40423, 40424 3.375 ins. 2.625 ins. 400 0 F ins. OF ins. OF ins. OF /

S2SIO43 2CO9 # #

0 H021 40423, 40424 2.75 ins. 3.0 ins. 400 F ins. OF ins. oF ins. OF /

S2SIO44 2C05 - 40384 # #

1001 40385, 40386 3.125 ins. 2.875 ins. 650'F ins. OF ins. OF ins. OF S2SIO44 2C05 - 40384 # #

H003 40385, 40386 3.125 ins. 3.0 ins. 650 0 F ins. OF ins. OF ins. OF /

S2SIO44 2C05 - 40384 # #

11004 40385, 40386 2.5 ins. 2.805 ins. 650'F ins. OF ins. OF ins. OF /

S2SIO44 2C05 - 40384 #

11006 40385, 40386 2.312 ins. 3.688 ins. 650 0 F ins. OF ins. OF ins. OF /

S2SIO44 2C05 - 40384 # #

H009 40385, 40386 3.125 ins. 2.875 ins. 650'F ins. OF ins. OF ins. OF /

S2S1045 2CO5 8 # #

H005 40385, 40386 3.25 ins. 1.75 ins. 650'F ins. OF ins. OF ins. OF /

S2S1045 2C05 8 # #

11008 0 40385, 40386 4.55 ins. 1.46 ins. 650'F ins. F ins. oF ins. _/

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 18 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2SIO45 2CO6 8 # #

H011 40399, 40400 2.125 ins. 3.875 ins. 650'F ins. OF ins. OF ins. OF /

S2SIO45 2CO6 12 # #

1015 40399, 40400 3.77 ins. 5.32 ins. 6501F ins. OF ins. OF ins. OF /

S2SIO45 2CO6 12 # #

H018 40399, 40400 3.125 ins. 2.5 ins. 650'F ins. OF ins. OF ins. OF S2SIO46 2C10 - 40438 # #

H002 40440, 40439 2.812 ins. 2.188 ins. 650aF ins. OF ins. OF ins. F /

S2SIO46 2C10 - 40438 # #

11003 40440, 40439 3.25 ins. 2.75 ins. 650 0 F ins. OF ins. oF ins. OF /

S2SIO46 2C10 # #

0 H006 40438 2.688 ins. 2.312 ins. 650 F ins. OF ins. OF ins. OF /

S2SIO46 2C10 - 40438 # #.

1010 40440, 40439 2.5 ins. 3.5 ins. 650*F ins. OF ins. OF ins. oF S2SIO46 2C10 - 40440 # #

H012 40438, 40439 3.25 ins. 2.75 ins. 650aF ins. OF ins. OF ins. OF /

S2SIO48 2CO2 - 40365 # #

H011 40366, 40364 1.95 ins. 2.05 ins. 400aF ins. OF ins. OF ins. OF /

S2SIO48 2C02 # #

1012 40368, 40370 1.95 ins. 2.05 ins. 400 OF ins. OF ins. OF ins. OF /

S2S1052 2CO2 - 40355 # #

H010 40365, 40366 1.48 ins. 1.02 ins. 400 0 F ins. OF ins. OF ins. OF S2S1062 2C10 - 40438 # #

11001 40439, 40440 3.688 ins. 3.062 ins. 650 0 F ins. OF ins. OF ins. 0 F

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 19 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2SIO62 2C10 - 40458 # #

H002 0 40439, 40440 2.625 ins. 3.375 ins. 650 F ins. OF. ins. OF ins. OF /

S2S1131 2C02 # #

11006 40364 1.95 ins. 2.05 ins. 4001F ins. OF ins. OF ins. oF /

S2SI132 2CO2 # #

H002 40365, 40366 1.185 ins. 1.315 ins. 400'F ins. OF ins., OF ins. OF /

S2SI139 2C01 # #

1015 40354 2.125 ins. 3.375 ins. 400aF ins. OF ins. OF ins. OF /

S2SI139 2C01 # #

H031 40354 2.875 ins. 1.125 ins. 400aF ins. OF ins. OF ins.. OF /

S2SI145 2C05 # #

H003 40386, 40387 0.51 ins. 0.75 ins. 400aF ins. OF ins. OF ins. oF /

S2SI151 2CO2 # #

1007 0 40364 2.0 ins. 2.125 ins. 400 F. ins. OF ins. OF ins. OF /

S2S1151 2CO2 # #

H008 40364 2.6 ins. 2.73 ins. 400aF ins. OF ins. OF ins. OF /

S2SI151 2CO2 # #

1011 40364 2.14 ins. 1.86 ins. 400aF ins. OF ins. OF ins. OF /

S2SI151 2CO2 # #

11013 40364 2.26 ins. 1.74 ins. 400'F ins. OF ins. OF ins. OF /

S2-SI-059 #1 H-009 7/8 3/4 650 ins. OF ins. OF S2-SI-062 #I 11-005 2-7/8 3-7/16 650 ins. OF ins. OF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 20 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (IF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2-SI-131 #- #

H-009 1.92 2.08 400 ins. OF ins. OF ins. OF S2-SI-139 # #

H-005 2.22 1.78 400 ins. OF ins. OF ins. OF S2-SI-139 # #

H-012 2.53 1.47 / 400 ins. OF ins. OF ins. OF S2-SI-145 # #

H-005 1-7/16 1-9/32 400 ins. OF ins. OF ins. oF S2-SI-152 # #

H-001 1-3/4 2-1/4 400 ins. OF ins. OF ins. OF S2-SI-155 # #

H-001 2-1/8 1-7/8 650 ins. OF ins. OF ins. OF S2-SI-165 # #

H-006 1-3/4 2-1/4 650 ins. OF ins. OF ins. OF S2-SI-165 # #

H-007 TOP 1-9/16 13/16 650 ins. OF ins. OF ins. OF S2-SI-165 # #

H-007 HOT. 1-5/16 9/16 650 ins. OF ins. OF ins. OF S2-SI-034 # #

H-003 3/4 1-17/32 400 ins. OF ins. OF ins. OF S2-SI-035 # #

11-008 1-3/8 7/8 400 ins. OF ins. OF ins. OF S2-SI-038 # #

11-044 3.705 0.2955 400 ins. OF ins. OF ins. oF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 21 of 24)

SYSTEM: SAFETY INJECTION SYSTEM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2-SI-052

-022 3/4 7/8 400 ins. OF ins. oF ins. OF S2-SI-052 # #

H-023 1-7/8 1-13/16 400 ins. OF ins. oF ins. oF S2-SI-045 H-028 N-S 2 2-3/16 650 ins. OF ins. OF ins. OF S2-SI-045 # #

H-028 E-W 2 2 650 ins. OF ins. OF ins. OF S2-SI-048 # #

H-004 1.635 2.365 400 ins. OF ins. OF ins. OF S2-SI-048 #

H-007 1.25 1.99 400 ins. OF ins. OF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 22 of 24)

SYSTEM: CHEMICAL AND VOLUME CONTROL Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2VC009 2CO9 # #

1010 40386, 40424 1.0 ins. 1.75 ins. 650 0 F ins. OF ins. OF ins. OF /

S2VC009 2CO9 # #

H011 40386, 40424 2.312 ins. 1.688 ins. 650OF ins. OF ins. OF ins. OF /

S2VC100 2CO9 - 40399 # #

H014 40400, 40402 2.188 ins. 1.812 ins. 650'F ins. OF ins. OF ins. OF S2VCO1O 2CO6 - 40399 # #

0 H020 40400, 40402 6.25 ins. 3.312 ins. 650 F ins. OF ins. OF ins. OF /

S2VC010 2006 - 40399 # #

0 H022 40400, 40402 1.188 ins. 2.812 ins. 650 F ins. OF ins. OF ins. OF /

S2VCO10 2CO6 - 40399 # #

H027 40400, 40402 1.0 ins. 2.375 ins. 650aF ins. OF ins. OF ins. OF S2VC010 2CO6 - 40399 # #

H029 40400, 40402 .1.375 ins. 2.625 ins. 650aF ins. OF ins. OF ins. OF /

S2VCO1O 2CO6 - 40399 #

H031 40400, 40402 1.65 ins. 0.85 ins. 650aF ins. OF ins. OF ins. oF /

S2VCO1O 2C05 # #

0 H006 40386, 40395 1.625 ins. 2.375 ins. 650 F ins. OF ins. OF ins. OF /

S2VC011 2CO9 #/

H011 40386 1.25 ins. 2.75 ins. 650aF ins. OF ins. OF ins. OF /

S2VC046 2CO9 - 40435 # #

1001 40424, 40434 0.438 ins. 1.562 ins. 650aF ins. OF ins. OF ins. OF S2-VC-001 #

H-008 1-1/2 1 650 ins. OF ins. oF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 23 of 24)

SYSTEM: CHEMICAL AND VOLUME CONTROL Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2-VC-001 # #

H-009 2-1/8 .375 650 ins. OF ins. OF ins. oF S2-VC-001 # #

H-010 0.9375 2.7865 650 ins. OF ins. OF ins. oF S2-VC-001 # #

H-013 2.0 2-3/16 650 ins. OF ins. OF ins. .0 F S2-VC-001 # #

H-014 1.32 2.67 650 ins. OF ins. OF ins. OF S2-VC-001 # #'11-015 1.6 2.4 650 ins. OF ins. OF ins. OF S2-VC-001 # #

H-016 1-3/4 2-1/4 650 ins. OF ins. OF ins. OF S2-VC-003 # #

H-017 2.241 1.759 550 ins. OF ins. OF ins. OF S2-VC-003 # #

H-019 EAST 1-3/4 2-1/4 550 ins. OF ins. OF ins. OF S2-VC-003 # #

H-019 WEST 1-13/16 2-3/16 550 ins. OF ins. OF ins. OF S2-VC-009 # #

H-012 1-1/8 2-7/8 650 ins. OF ins. OF ins. OF S2-VC-010 # #

H-013 1.93 2.07 650 ins. OF ins. OF ins. OF S2-VC-010 # #

1-032 1-13/16 2-3/16 650 ins. OF ins. OF ins. OF

Table 2A SNUBBER DEFLECTION DATA - HOT FUNCTIONAL TEST (Sheet 24 of 24)

SYSTEM: CHEMICAL AND VOLUME CONTROL Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Installation Deflec- Design Instrument & Instrument &

Snubber Location Setting tions Temp. Date of Last Date of Last Deflec. Temp. Deflec. Temp. Deflec. Temp.

Number Area Dwg. ins. ins. (oF) Calibration Calibration ins. OF ins. OF ins. OF Remarks Initial/Date S2-VC-012 # #

0 H-007 2-1/4 2-5/8 550 ins. OF ins. OF ins. F S2-VC-014 # # 0 H-002 2.18 1.81 550 ins. OF ins. OF ins. F S2-VC-014 # #

H-003 1.85 2.14 550 ins. oF ins. OF ins. OF S2-VC-104 ##

H-009 1-1/16 1-7/16 250 ins. OF ins. OF ins. OF S2-VC-104 # #

H-013 2 1-7/8 250 ins. OF ins. OF ins. OF S2-VC-104 # #

H-014 2-3/16 2-1/16 250 ins. oF ins. OF ins. OF S2-VC-104 # #

H-019 EASI 1-3/8 1-3/4 250 ins. OF ins. OF ins. OF S2-VC-104 #

1-019 WES1 1-3/8 1-7/16 250 ins. OF ins. OF ins. oF S2-VC-116 # #

n-007 1.42 2.74 550 ins. OF ins. OF ins. OF

Table 2B SNUBBER DEFLECTION DATA - POWER ASCENSION (Sheet 1 of 5)

SYSTEM: MAIN STEAM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Instrument & Instrument &

Snubber Location Installation Deflec- Design Date of Last Date of Last Number Area Dwg. Setting tions Temp. Calibration Calibration Deflec. Temp. Deflec. Temp. Deflec. Temp. Remarks Initial/Date S2ST001 2C06 H001 40483 2.6, ins. 3.5 ins. 560aF ins. OF ins. OF ins. OF /

S2ST001 2C06 # #

H002 40483 1.16 ins. 4.5 ins. 560*F ins. OF ins. OF ins. OF /

S2ST001 2C06 # #

H004 40483 1.875 ins. 4.125 ins. 560 0F ins. OF ins. OF ins. F /

S23T001 2C06 # #

H005 40483 2.35 ins. 3.65 ins. 560OF ins. OF ins. OF ins. OF /

S28T001 2C06 # #

1007 40483 0 2.5 ins. 3.49 ins. 560 F ins. OF ins. OF ins. OF /

S2ST001 2C06 # _#

H008 40483 2.0 ins. 4.0 ins. 560'F ins. OF ins. oF ins. OF /

S2ST001 2C06 # #

H009 40483 3.062 ins. 2.938 ins. 560'F ins. oF ins. OF ins. OF /

S2ST001 2C02 # #

1014 0 40483 3.188 ins. 2.812 ins. 560 F ins. OF ins. OF ins. OF /

S2ST001 2C02 # _#

H021 40483 3.5 ins. 2.5 ins. 560aF ins. OF ins. oF ins. OF /

S2ST001 2CO2 # #

H022 40483 3.312 ins. 2.812 ins. 560OF ins. OF ins. oF ins. OF /

S2ST001 2C02 # #

1023 40483 3.25 ins. 2.812 ins. 5601F ins. oF ins. OF ins. OF /

82STOO1 #

H025 3.812 ins. 2.187 ins. 560aF ins. oF ins. OF ins. OF /

S0 Table 2B SNUBBER DEFLECTION DATA - POWER ASCENSION (Sheet 2 of 5)

SYSTEM: MAIN STEAM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Instrument & Instrument &

Snubber Location Installation Deflec- Design Date of Last Date of Last Number Area Dwg. Setting tions Temp. Calibration Calibration Deflec. Temp. Deflec. Temp. Deflec. Temp. Remarks Initial/Date S2ST001 2C02 # #

H031 40483 3.25 ins. 2.75 ins. 560oF ins. OF ins. OF ins. OF /

S2ST002 2C05 # #

1001 40484 2.995 ins. 3.894 ins. 560*F ins. OF ins. OF ins. oF S2STOO2 2C05 # #

1002 40484 1.4 ins. 4.6 ins. 560*F ins. OF ins. OF ins. OF S2ST002 2C05 # #

1004 40483 2.375 ins. 3.625 ins. 560*F ins. OF ins. OF ins. OF /

82ST002 2C05 # #

H005 40483 1.875 ins. 4.125 ins. 560oF ins. OF ins. OF ins. OF /

828T002 2C05 3.0 4.0 # # West Snubber 1007 40483 2.62 ins. 3.62 ins. 560*F ins. OF ins. OF ins. oF East Snubber /

S2ST002 2C05 # #

1008 40483 2.062 ins. 4.0 ins. 560aF ins. OF ins. OF ins. OF /

S2ST002 2C05 # #

1009 40483 2.875 ins. 2.625 ins. 560oF ins. OF ins. OF ins. OF /

S2ST002 2C01 # #

1014 40483 1.25 ins. 4.25 ins. 560'F ins. OF ins. OF ins. OF /

S2ST002 2C05 # #

H022 40483 3.812 ins. 2.188 ins. 560aF ins. OF ins. OF ins. OF /

S2ST002 2C01 # #

H026 40483 3.062 ins. 2.938 ins. 560aF ins. OF ins. OF ins. OF - /

S2ST003 # #

H005 3.125 ins. 2.312 ins. 560aF ins. OF ins. OF ins. OF /

Table 2B SNUBBER DEFLECTION DATA - POWER ASCENSION (Sheet 3 of 5)

SYSTEM: MAIN STEAM Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Instrument & Instrument &

Snubber Location Installation Deflec- Design Date of Last Date of Last Number Area Dwg. Setting tions Temp. Calibration Calibration Deflec. Temp. Deflec. Temp. Deflec. Temp. Remarks Initial/Date S2ST003 H011 4.875 ins. 1.125 ins. 560aF ins. OF ins. OF ins. OF /

828T003 # #

H019 2.75 ins. 3.312 ins. 560oF ins. 0 oF ins. F ins. OF /

82ST003 # #

H020 4.57 ins. 0.43 ins. 560aF ins. OF ins. OF ins. OF 82ST364 # #

H013 1.25 ins. 4.75 ins. 560aF ins. OF ins. OF ins. OF /

S2ST364 # #

1014 1.875 ins. 2.375 ins. 560aF ins. 0 OF ins. F ins. OF /

0

Table 2B SNUBBER DEFLECTION DATA - POWER ASCENSION (Sheet 4 of 5)

SYSTEM: MAIN FEEDWATER Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Instrument & Instrument &

Snubber Location Installation Deflec- Design Date of Last Date of Last Number Area Dwg. Setting tions Temp. Calibration Calibration Deflec. Temp. Deflec. Temp. Deflec. Temp. Remarks Initial/Date S2FW189 # #

1010 3.07 ins. 2.93 ins. 480aF ins. OF ins. OF ins. OF /

S2FW189 # #

H012 3.725 ins. 2.27 ins. 480 oF ins. OF ins. oF ins. OF ._/

S2FW189 #

0 H013 2.01 ins. 3.99 ins. 480 F ins. OF ins. OF ins. F /F S2FW189 # #

H014 3.50 ins. 2.50 ins. 480OF ins. OF ins. OF ins. OF /

S2FW189 # #

H017 3.10 ins. 2.91 ins. 480oF ins. OF ins. OF ins. OF /

S2FW190 # #

H011 3.06 ins. 2.94 ins. 480oF ins. OF ins. OF ins. F /

S2FW190 # #

1013 3.725 ins. 2.25 ins. 480'F ins. OF ins. OF ins. OF S2FW190 # #

H014 2.01 ins. 3.99 ins. 480aF ins. OF ins. OF ins. OF S2FW190 # #

H015 3.50 ins. 2.50 ins. 480aF ins. OF ins. OF ins. OF S2FW190 # #

H018 3.10 ins. 2.91 ins. 480oF ins. OF ins. OF ins. OF /

S2FW025 # #

H002 2.50 ins. 3.50 ins. 480oF ins. oF ins. OF ins. OF /

S2FW025 # #

H009 0.49 ins. 1.10 ins. 480aF ins. OF ins. OF ins. F /

S2FW025 # #

1011 4.62 ins. 1.38 ins. 480OF ins. oF ins. OF ins. OF /

Table 2B SNUBBER DEFLECTION DATA - POWER ASCENSION (Sheet 5 of 5)

SYSTEM: MAIN FEEDWATER Design Hot Deflection Temperature Initial Cold Hot Final Cold Measuring Measuring Measurement Measurement Measurement Instrument & Instrument &

Snubber Location Installation Deflec- Design Date of Last Date of Last Number Area Dwg. Setting tions Temp. Calibration Calibration Deflec. Temp. Deflec. Temp. Deflec. Temp. Remarks Initial/Date S2FW025 # #

H014 7.775 ins. 4.225 ins. 480'F ins. OF ins. OF ins. OF /

S2FW025 # #

1017 4.32 ins. 0.69 ins. 4801F ins. OF ins. OF ins. OF /

S2FW025 #_#

H030 1.75 ins. 3.25 ins. 480*F ins. oF ins. oF ins. OF S2FW025 # _#

H031 4.57 ins. 1.43 ins. 480aF ins. OF ins. OF ins. OF /

S2FW025 # #

H033 3.25 ins. 3.125 ins. 480OF ins. OF ins. OF ins. OF /

S2FW025 # #

H043 0 2.66 ins. 3.34 ins. 480 F ins. OF ins. OF ins. OF /

S2FW026 # _#

H023 9.21 ins. 2.80 ins. 480oF ins. OF ins. OF ins. OF /

S2FW026 #

H023 2.48 ins. 3.08 ins. 480aF ins. OF ins. OF ins. OF /

S2FW026 #

H036 2.788 ins. 3.212 ins. 480aF ins. OF ins. OF ins. OF /

S2FW028 # #

H002 2.90 ins. 2.10 ins. 480*F ins. OF ins. OF ins. F /

S2FW097 H003 2.28 ins. 2.72 ins. 390'F ins. OF ins. OF ins. OF /

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/POWER ASCENSION TABLE 3 SYSTEM: Main Feedwater SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-021-1, 2 021-24"-R-KK1 Feed Pump P-063 Suction Heater 1305-021-2 1305-021-1 023-24"-R-KK1 Feed Pumps P-062 and P-063 cross 1305-046-1 connect line 2-1305-27-1 041-24"-R-GK2 Feed Pump P-063 Discharge Piping 2-1305-027-1 041-20"-R-GK2 Feed Pump P-063 Discharge Piping 1305-024-1 024-20"-R-GKO Feed Pump P-063 Supply to First Point Heater E-036 Inlet Piping 1305-025-4 025-28"-R-GKO Feedwater Outlet Line First Point Heater E-036 1305-025-1 025-20"-R-GKO Feedwater Outlet First Point 1305-025-2 Heater E-036 .

1305-025-3 1305-025-4 1305-025-3 025-30"-R-GKO Common Feedwater Supply Line 1305-025-3 025-20"-R-GKO Supply to Feedwater regulating valve 2FV-1121 1305-189-1 189-20"-C-GK1 Outlet Feedwater regulating valve 1305-025-1 2FV-1121 to Steam Generator E-088 1305-026-1 026-20"-R-GKO Feedwater Supply Line to Feedwater 1305-026-2 regulating valve 2FV-1111 1305-026-3 1305-102-1 102-6"-R-GKO Feedwater regulating valve 2FV-1111 by bypass line 1305-026-1 190-20"-C-GK1 Feedwater Outlet Line from Feed 1305-190-1 regulating valve 2FV-1111 to Steam Generator E-089

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/POWER ASCENSION TABLE 3 SYSTEM: Main Feedwater SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1305-027-1 027-20"-R-GKO Main Feed Pump Bypass Line 2-1305-027-1 061-20"-R-GKO Main Feed Pump Balance Line 1305-046-1 046-24"-R-KK1 Feed Pump P-062 Suction Header 2-1305-046-2 1305-021-1 023-24"-R-KK1 .Feed Pumps P-062 and P-063 Cross 1305-046-1 Connect Line 2-1305-038-1 038-24"-R-GK2 Feed Pump P-062 Discharge Piping 2-1305-038-1 038-20"-R-GK2 Feed Pump P-062 Discharge Piping 2-1305-038-1 022-20"-R-GKO Feed Pump P-062 Supply to First Point Heater E-037 2-1305-038-1 022-28"-R-GKO First Point Heater E-037 Inlet Piping 1305-025-4 028-20"-R-GKO Outlet 1st Point Heater E-037 1305-025-4 028-28"-R-GKO Outlet 1st Point Heater E-037

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Saltwater Cooling System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1413-001-1, 001-30"-D-NSI Saltwater Cooling Pump P-112(A) 1403-004-1 Discharge Header 1413-004-1, 004-30"-D-NSI Saltwater Outlet from CCW Heat 1403-003-2 from CCW Heat Exchanger E-001(A) 1413-004-2 004-36"-D-NS1 Saltwater Common Discharge Header to Box Culvert Circ. Water Return Line 1413-004-2, 020-30"-D-NS1 Saltwater Outlet from CCW Heat 1413-005-2 Exchangers E-001(A) and E-002(B) to Seawall Overflow Header 1413-005-2 019-36"-D-NS1 Saltwater Outlet from CCW Heat Exchangers E-001(A) and E-002(B) Seawall Overflow Header 1413-002-1 002-30"-D-NSI Saltwater Cooling Pump P-113(B)

Discharge Header 1413-003-1, 003-30"-D-NS1 Saltwater Cooling Pump P-113(B) and 1413-005-1 P-114(B) Common Discharge Header 1413-005-1, 005-30"-D-NS1 Saltwater Outlet from CCW Heat 1413-005-2 Exchanger E-002(B) 1413-005-2 020-30"-D-NS1 Saltwater Outlet from CCW Heat Exchangers E-001(A) and E-002(B) to Seawall Overflow Header 1413-001-1 025-30"-D-NS1 Saltwater Cooling Pump P-307(A)

Discharge Header 1413-003-1 003-30"-D-NS1 Saltwater Cooling Pump P-114(B)

Discharge Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 1 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-145-1 145-28"-D-LL1 CCW Pump Discharge Header to CCW Heat Exch. E-001(A) 1203-005-4 005-28"-D-LL1 CCW Heat Exch. E-001(A) Discharge to Critical & Non Critical Loops 1203-005-3 005-18"-D-LL1 CCW Loop A Supply to Shutdown Heat Exch. E-004 1203-318-1 318-6"-D-LL1 CCW Loop A Critical Loop Supply to HPSI Pump P-017, LPSI Pump P-015. Containment Spray Pump P-012, HPSI Pump P-018 (Loop A) 1203-032-1 023-2"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-032-1 023-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-032-1 .032-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-032-1 384-3/4"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-020-1 020-1-1/2"-D-LL1 CCW Loop A Supply to LPSI Pump P-015 1203-020-1 098-1-1/2"-D-LL1 CCW Loop A Supply to LPSI Pump P-015 1203-020-1 388-3/4"-D-LL1 CCW Loop A Supply to LPSI Pump P-015 1203-043-1 043-1-1/2"-D-LL1 CCW Loop A Supply to Containment Spray Pump P-012 1203-043-1 110-1-1/2"-D-LL1 CCW Loop A Supply to Containment Spray Pump P-012 1203-043-01 377-3/4"-D-LL1 CCW Loop A Supply to Containment Spray Pump P-012

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 2 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-246-01 246-8"-D-LL1 CCW Loop A Supply to Control Rm Emergency Chiller E-336 2-1203-246-1 305-8"-D-LL1 CCW Loop A Supply to Control Rm Emergency Chiller E-336 1203-243-1 243-8"-D-LL1 CCW Loop A Supply to Letdown Heat Exch. E-062 1203-243-3 228-8"-D-LL1 CCW Supply to Letdown Heat Exch.

E-062 1203-092-01 & 2 092-3"-D-LL1 CCW Loop A Supply to Post Accident Cleanup Unit E-370 1203-005-03 009-28"-D-LL1 CCW Non Critical Loop Supply Line 1203-009-01 & 2 009-24"-D-LL1 CCW Non Critical Loop Supply Line 1203-231-01 231-10"-0-LL1 CCW Non Critical Loop CEDM and RCP Supply Line 1203-231-01 200-10"-D-LL1 CCW Non Critical Loop CEDM and RCP 1203-247-02 Supply Line 1203-247-01, 247-10"-D-LL1 CCW Non Critical Loop CEDM and RCP 1203-247-02, Supply Line 1203-247-03 1203-247-01, 247-8"-D-LL1 CCW Non Critical Loop CEDM and RCP 1203-247-02, Supply Line 1203-247-03 1203-247-03 247-6"-D-LL1 CCW Non Crirical Loop CEDM and RCP Supply Line 1203-008-01, 008-4"-D-LL1 CCW Non Critical Loop Supply to RCP 1203-008-02 Pumps P-001 and P-003 (Seals)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 3 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-247-2 074-6"-D-LL1 CCW Non Critical Loop Supply to RCP Pumps P-001 and P-003 Motor Coolers 1203-008-01, 008-2-1/2"-D-LL1 CCW Non Critical Loop Supply to 1203-008-02 RCP Pump P-001 (Seal) 1203-008-01, 014-2-1/2"-D-LL1 CCW Non Critical Loop Supply to 1203-008-02 RCP Pump P-003 (Seal) 1203-070-1 070-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-003 Motor Cooler 1203-074-01, 074-4"-D-LL1 CCW Non Critical Loop Supply to RCP 1203-247-2 Pump P-001 Motor Cooler 1203-078-01 078-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-002 Motor Cooler 1203-082-01 082-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-004 Motor Cooler 1203-013-01 013-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-002 and .P-004 (Seals) 1203-012-01 012-2-1/2"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-004 (Seals) 1203-013-01, 013-2-1/2"-D-LL1 CCW Non Critical Loop Supply to 1203-013-02 RCP Pump P-002 (Seals) 1203-012-01 375-1-1/2"-D-FEO CCW Non Critical Loop Supply to RCP Pump P-004 (Seals) 1203-013-01, 373-1-1/2"-D-FEO CCW Non Critical Loop Supply to 1203-013-02 RCP Pump P-002 (Seals) 1203-008-02 372-1-1/2"-D-FEO CCW Non Critical Loop Supply to RCP Pump P-001 (Seals)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 4 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-374-01 374-1-1/2"L1 CCW Non Critical Loop Supply to RCP Pump P-003 (Seal) 1203-064-01 064-3"-D-LL1 CCW Non Critical Loop Supply to CEDM Unit E-403(A) 1203-011-01 011-12"-D-LL1 CCW Unit 2/Unit 3 Cross Connect Supply Header Non Critical Loop 1203-011-03, 130-8"-D-LL1 CCW Non Critical Loop Supply to 1203-130-01 Misc. Waste Evaporators WO81 & W082 (Later) 361-1-1/2"-D-LL1 CCW Non Critical Loop Supply to RCR Sample Cooler AX7546 1203-011-01, 125-8"-D-LL1 CCW Non Critical Loop Supply to 1203-125-1 Boric Acid Concentrator 1203-108-01 108-6"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-354 1203-108-01 108-3"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-354 1203-328-01 328-6"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-355 1203-328-01 328-3"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-355 1203-102-01, 102-16"-D-LL1 CCW Non Critical Loop Supply to 1203-102-02 Spent Fuel Pool Heat Exchangers E-005 & E-006 1203-102-02 102-12"-D-LL1 CCW Non Critical Loop Supply to Spent Fuel Pool Heat Exchanger E-005 1203-102-02 293-12"-D-LL1 CCW Non Critical Loop Supply to Spent Fuel Pool Heat Exchanger E-006

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 5 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-117-01 117-2"-D-LL1 CCW Non Critical Loop Supply to Waste Gas Compressors C010 & CO11 2-1203-038-1, 024-2"-D-LL1 CCW Return from HPSI Pump P-017 2-1203-038-2 2-1203-038-1 024-1-1/2"-D-LL1 CCW Return from HPSI Pump P-017 2-1203-038-1 038-1-1/2"-D-LL1 CCW Return from HPSI Pump P-017 2-1203-038-1 385-3/4"-DLL1 CCW Return from HPSI Pump P-017 2-1203-021-1 021-1-1/2"-DLL1 CCW Return from LPSI Pump P-015 2-1203-021-1 101-1-1/2"-D-LL1 CCW Return From LPSI Pump P-015 2-1203-021-1 389-3/4"-D-LL1 CCW Return from LPSI Pump P-015 2-1203-044-1 044-1-1/2"-D-LL1 CCW Return from Containment Spray Pump P-012 2-1203-044-1 111-1-1/2"-D-LL1 CCW Return from Containment Spray Pump P-012 2-1203-044-1 378-3/4"-D-LL1 CCW Return from Containment Spray Pump P-012 2-1203-306-1 307-8"-D-LL1 CCW Return from Control Rm Emergency Chiller Unit E-336 2-1203-306-1 306-8"-D-LL1 CCW Return from Control Rm. Emergency Chiller Unit E-336 2-1203-229-1 229-10"-D-LL1 CCW Return from Letdown Heat Exchanger E-062 2-1203-100-1 210-10"-D-LL1 CCW Return from Letdown Heat 2-1203-210-2 Exchanger E-062 2-1203-210-2 1203-094-01 094-3"-D-LL1 CCW Return from Post Accident Cleanup Unit E-370

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 6 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-151-01 151-10"-D-LL1 CCW Minimum Flow Line for Pump P-024 1203-265-1 265-6"-D-LL1 CCW Return Header for HPSI Pumps 1203-265-2 P-017 & P-018 LPSI Pump P-015, and Containment Spray Pump P-012 1203-265-1 158-6"-D-LL1 CCW Surge Tank T-003(A) Supply Header 2-1203-015-2 265-18"-D-LL1 CCW Return Header for Shutdown Heat Exchanger E-004 1203-142-01 265-24"-D-LL1 CCW Critical Loop Common Return Header 1203-142-01 142-24"-D-LL1 CCW Critical Loop Common Return Header 1203-142-01, 265-18"-D-LL1 CCW Return Header from Control Rm.

1203-142-02 Emergency Chiller Unit E-336, Letdown. Heat Exchanger E-062 and Post Accident Cleanup Unit E-370.

1203-140-1, 209-28"-D-LL1 CCW Pump P-024 Suction Piping 1203-209-1 1203-139-1, 139-24"-D-LL1 CCW Non Critical Loop Common Return 1203-139-2, Header 1203-140-1 1203-106-1 106-16"-D-LL1 CCW Non Critical Loop Return from Spent Fuel Pool Heat Exchangers E-005 and E-006 O

1203-106-2 106-12"-D-LL1 CCW Non Critical Loop Return from Spent Fuel Pool Heat Exchanger E-005 1203-106-2 103-12"-D-LL1 CCW Non Critical Loop Return from Spent Fuel Pool Heat Exchanger E-006

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling.Water System SHEET 7 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-161-1, 161-12"-D-LL1 CCW Unit 2/Unit 3 Cross Connect 3-1203-161-2 Return Header Non Critical Loop 3-1203-329-1 329-6"-D-LL1 CCW Non Critical Loop Return from Gas Stripper E-355 3-1203-112-1 112-6"-D-LL1 CCW Non Critical Loop Return from Gas Stripper E-354 3-1203-118-1 118-2"-D-LL1 CCW Non Critical Loop Return from Waste Gas Compressors CO1 and CO11 1203-132-1, 132-8"-D-LL1 CCW Non Critical Loop Return from 1203-132-2 Misc. Waste Evaporator W081 & W082 1203-127-1, 127-8"-D-LL1 CCW Non Critical Loop Return from 1203-127-2 Boric Acid.Concentrator W080 & W079 1203-252-1 252-10"-D-LL1 CCW Non Critical Loop Return Header 1203-139-2, 162-10"-D-LL1 CCW Non Critical Loop Return Header 1203-252-1 1203-252-1, 252-8"-D-LL1 CCW Non Critical Loop Return Header 1203-252-2 1203-252-2 252-6"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-002 & P-004 Motor Coolers 1203-010-1 010-4"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-002 & P-004 (Seals) 1203-010-2 010-2-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-002 (Seals) 1203-010-2 365-1-1/2"-D-FEO CCW Non Critical Loop Return from RC Pump P-002 (Seals) 1203-010-1 004-2-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-004 (Seals)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 8 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-010-1 367-1-1/2"-D-FEO CCW Non Critical Loop Return from RC Pump P-004 (Seals) 2-1203-084-1, 084-4"-D-LL1 CCW Non Critical Loop Return from 1203-084-2 RC Pump P-004 Motor Cooler 1203-080-1, 080-4"-D-LL1 CCW Non Critical Loop Return from 1203-252-2 RC Pump P-002 Motor Cooler 1203-091-1 091-3"-D-LL1 CCW Non Critical Loop Return from CEDM Cooling Unit E-403(A) 1203-091-1 076-6"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-001 & P-003 Motor Coolers 1203-076-1 076-4"-D-LL1 CCW Non Critical Loop Return from RC Pump P-001 Motor Cooler 1203-072-1, 072-4"-D-LL1 CCW Non Critical Loop Return from 1203-091-1 RC Pump P-003 Motor Cooler 2-1203-006-2 006-4"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-001 & P-003 (Seals) 2-1203-006-2 001-2-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-003 (Seals) 1203-366-1 366-1-1/2"D-LL1 Non Critical Loop Return from RC Pump P-003 (Seals) 1203-006-1, 006-2-1/2"-D-LL1 CCW Non Critical Loop Return 2-1203-006-2 RC Pump P-001 (Seals) 2-1203-368-1 364-1-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-001 (Seals) 1203-146-01, 146-28"-D-LL1 CCW Pump P-026 Discharge Header 1203-150-01

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 9 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-164-01, 164-28"-D-LL1 CCW Heat Exchanger E-002(B) 1203-007-02, Discharge Header to Critical and Noncritical Loops 1203-005-03 1203-007-01, 007-18"-D-LL1 CCW Loop B Supply to the Shutdown 1203-007-02 Heat Exchanger E-003 1203-017-1 017-6"-D-LL1 CCW Loop B Critical Loop Supply to HPSI Pumps P-019 & P-018, LPSI Pump P-016 and Containment Spray Pump P-013 1203-292-01, 292-18"-D-LL1 CCW Loop B Critical Loop Supply to 1203-292-02, CCW Pumps, Letdown Heat Exch. E-062 and 1203-292-03 Containment Emergency Cooler E-402.

1203-052-01 052-1-1/2"-D-LL1 CCW Loop B Supply to Containment Spray Pump P-013 1203-052-01 109-1-1/2"-D-LL1 CCW Loop B Supply to Containment Spray Pump P-013 1203-052-01 379-1-1/2"-D-LL1 CCW Loop B Supply to Containment Spray Pump P-013 2-1203-046-1 046-1-1/2"-D-LL1 CCW Loop B Supply to LPSI Pump P-016 2-1203-046-1 -105-1-1/2"-D-LL1 CCW Loop B Supply to LPSI Pump P-016 2-1203-046-1 390-3/4"-D-LL1 CCW Loop B Supply to LPSI Pump P-016 1203-049-1 049-2"-D-LL1 CCW Loop B Supply to HPSI Pump P-019 1203-049-1 049-1-1/2"-D-LL1 CCW Loop B Supply to HPSI Pump P-019

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE.DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 10 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-049-1 033-1-1/2"-D-LL1 CCW Loop B Supply to HPSI Pump P-019 1203-049-1 386-3/4"-D-LL1 CCW Loop B Supply to HPSI Pump P-019 2-1203-289-2 289-8"-D-LL1 CCW Loop B Supply to Control Rm 1203-292-1 Emergency Chiller Unit E-335 2-1203-289-2 301-8"-D-LL1 CCW Loop B Supply to Control Rm Emergency Chiller Unit E-335 2-1203-099-1, 099-8"-D-LL1 CCW Loop B Supply to Letdown Heat 1203-292-1 Exchanger E-062 1203-093-1, 093-3"-D-LL1 CCW Loop B Supply to Post Accident 1203-093-2 Cleanup E-371 2-1203-018-1 018-1-1/2"-D-LL1 CCW Loop B Return from Contain ment Spray Pump P-013 2-1203-018-1 107-1-1/2"-D-LL1 CCW Loop B Return from Contain ment Spray Pump P-013 2-1203-018-1 380-3/4"-D-LL1 CCW Loop B Return from Containment Spray Pump P-013 2-1203-047-1 047-1-1/2"-D-LL1 CCW Loop B Return from LPSI Pump P-016 2-1203-047-1 1104-1-1/2"-D-LL1 CCW Loop B Return from LPSI Pump P-016 2-1203-047-1 391-1-1/2"-D-LL1 CCW Loop B Return from LPSI Pump P-016 1203-050-1 050-2"-D-LL1 CCW Loop B Return from HPSI Pump P-019 1203-050-1 050-1-1/2"-D-LL1 CCW Loop B Return from HPSI Pump P-019

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY .STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 11 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-050-1 036-1-1/2"-D-LL1 CCW Loop B Return from HPSI Pump P-019 1203-050-1 387-3/4"-D-LL1 CCW Loop B Return from HPSI Pump P-019 2-1203-302-1, 302-8"-D-LL1 CCW Loop B Return from Control Rm 2-1203-302-2 Emergency Chiller Unit E-335 2-1203-100-1 100-8"-D-LL1 CCW Loop B Return from Letdown Heat Exchanger Unit E-062 2-1203-095-1, 095-3"-D-LL1 CCW Loop B Return from Post Accident 1203-095-2 Cleanup Unit E-371 1203-216-1 216-10"-D-LL1 CCW Loop B Return from Post Accident Cleanup Unit E-371 and Containment Emergency Cooling Unit E-402 2-1203-217-1, 266-18"-D-LL1 CCW Loop B Return from Letdown.

2-1203-217-2, Heat Exchanger E-062 and Containment Emergency 2-1203-217-3 Cooling Unit E-402 2-1203-217-1 266-24"-D-LL1 CCW Loop B Common Return Header 1203-140-1 144-24"-D-LL1 CCW Loop B Common Return Header Suction Side of CCW Pumps 1203-140-1, 140-28"-D-LL1 CCW Loop B Suction Piping for CCW 1203-147-1 Pumps P-026 & P-25 1203-148-1 1203-266-1, 266-6"-D-LL1 CCW Loop B Common Return from HPSI 1203-266-2 Pumps P-019 & P-018 LPSI Pump P-016 and Containment Spray Pump P-013 1203-159-1 159-6"-LL1 CCW Surge Tank T-003(A) Supply Header 1203-157-2 155-10"-D-LL1 CCW Minimum Flow Line for Pump P-026 1203-148-1 148-28"-D-LL1 CCW Pump P-025 Suction Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 12 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-147-1 147-28"-D-LL1 CCW Pump P-025 Suction Piping 1203-149-1 149-28"-D-LL1 CCW Pump P-025 Discharge Header to CCW "Loop A" 1203-157-1 153-10"-D-LL1 CCW Pump P-025 Minimum Flow Line 1203-249-1, 249-3"-D-LL1 CCW Pumps P-024 and P-025 Cooling 1203-249-2, Water Supply Line 1203-290-1 1203-247-2 090-3"-D-LL1 CCW Non Critical Loop Supply to CEDM Cooling Unit E-404(B)

(Later) 081-2"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 (Later) 081-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 (Later) 039-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 (Later) 382-3/4"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 1203-252-2 065-3"-D-LL1 CCW Non Critical Loop Return from CEDM Cooling Unit E-404(B)

(Later) 319-2"-D-LL1 CCW Loop A Return from HPSI Pump P-018 (Later) 319-1-1/2"-D-LL1 CCW Loop A Return from HPSI Pump P-018 (Later) 062-1-1/2"-D-LL1 CCW Loop A Return from HPSI Pump P-018 (Later) 383-3/4"-D-LL1 CCW Loop A Return from HPSI Pump P-018

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS-LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 13 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-148-1 148-28"-D-LL1 CCW Pump P-025 Suction Header 1203-150-1 150-28"-D-LL1 CCW Pump P-025 Discharge Header to CCW "Loop B" 1203-290-1 290-3"-D-LL1 CCW Pumps P-025 and P-026 Cooling Water Supply Line (Later) 017-2"-D-LL1 CCW Loop B Supply to HPSI Pump P-018 (Later) 053-2"-D-LL1 CCW Loop B Return from HPSI Pump P-018 1203-005-1, 005-18"-D-LL1 CCW Loop A Supply to Shutdown Heat 1203-005-2 Exchanger E-004 1203-007-1, 007-18"-D-LL CCW Loop B Supply to Shutdown Heat 1203-007-2 Exchanger E-003 2-1203-015-1, 015-18"-D-LL1 CCW Loop A Return from Shutdown 2-1203-015-2 Heat Exchanger E-004 1203-041-1, 041-18"-D-LL1 CCW Loop B Return from Shutdown Heat 1203-041-2 Exchanger E-003 1203-205-1 205-10"-D-LL1 CCW Loop A Supply to Containment Emergency Cooling Unit E-399 1203-205-1, 277-10"-C-LL1 CCW Loop A Supply to Containment 1203-277-1 Emergency Cooling Unit E-399 1203-244-1 204-10"-D-LL1 CCW Loop A Supply to Containment Emergency Cooling Unit E-401 1203-244-1, 281-10"-D-LL1 CCW Loop A Supply to Containment 1203-281-1 Emergency Cooling Unit E-401 1203-203-1 203-10"-D-LL1 CCW Loop B,Supply to Containment Emergency Cooling Unit E-400 1203-285-1, 283-10"-C-LL1 CCW Loop B Supply to Containment 1203-203-1 Emergency Cooling Unit E-400

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A.

STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Component Cooling Water System SHEET 14 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-202-1 202-10"-D-LL1 CCW Loop B Supply to Containment Emergency Cooling Unit E-402 1203-202-1, 273-10"-C-LL1 CCW Loop B Supply to Containment 1203-273-1 Emergency Cooling Unit E-402 1203-142-2, 283-10"-D-LL1 CCW Loop A Return from Containment 1203-283-1 Emergency Cooling Unit E-401 1203-142-2 211-10"-D-LL1 CCW Loop A Return from Containment Emergency Cooling Unit E-401 1203-213-1, 279-10"-C-LL1 CCW Loop A Return from Containment 1203-279-1 Emergency Cooling Unit E-399 1203-213-1 213-10"-D-LL1 CCW Loop A Return from Containment Emergency Cooling Unit E-399 1203-217-3, 287-10"-D-LL1 CCW Loop B Return from Containment 1203-287-1 Emergency Cooling Unit E-400 1203-217-3 215-10"-D-LL1 CCW Loop B Return from Containment Emergency Cooling Unit E-400 1203-216-1, 275-10"-C-LL1 CCW Loop B Return from Containment 1203-275-1 Emergency Cooling Unit E-402 1203-216-1 216-10"-D-LL1 CCW Loop B Return from Containment Emergency Cooling Unit E-402

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Diesel Generator System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-065-1 065-2-1/2"-D-LL1 Air Line from Starting Air Package C012 to the 20 cyl Diesel Engine 2420-067-1 067-2"1/2"-D-LL1 Air Line from Starting Air Package C012 to the 20 cyl Diesel Engine 2420-036-1, 036-3"-D-LL1 from Diesel Generator G-002 2420-036-2 Expansion Tank T-190 to Engine Auxiliary Systems.

2420-041-1 041-8"-D-LL1 from Engine Auxiliary Systems to Radiator E-550 on Diesel Generator G-002 16 cyl Diesel Engine 2420-042-1 042-8"-D-LL1 from Radiator E-550 to Auxiliary Systems on Diesel Generator G-002, 16 cyl Diesel Engine.

2420-042-1 042-6"-D-LL1 from Radiator, E-550 to Auxiliary Systems on Diesel Generator G-002 16 cyl Diesel Engine.

2420-043-1 043-2"-D-LL1 from Fuel Oil Day Tank T-133 to Diesel Generator G-002 16 cyl Diesel Engine 2420-044-1 044-2"-D-LL1 from Diesel Generator G-002 16 cyl Diesel Engine to Fuel Oil Day Tank T-133 2420-045-1 045-24"-D-LL1 from Air Intake Filter F-440 to Diesel Generator G-002 16 cyl Diesel Engine 2420-046-1 046-22"-D-LL1 from Diesel Generator G-002 16 cyl Diesel Engine to Exhaust Silencer F-438 2420-047-1 047-22"-D-LL1 from Exhaust Silence F-438 to Atmosphere 2420-049-1 049-3"-D-LL1 from Diesel Generator G-002 Expansion Tank T-162 to Engine Auxiliary Systems

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Diesel Generator System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-054-1 054-8"-D-LL1 from Engine Auxiliary Systems to Radiator E-546 on Diesel Generator G-002 20 cyl Diesel Engine 2420-055-1. 055-8"-D-LL1 from Radiator E-546 to Auxiliary Systems on Diesel Generator G-002, 20 cyl Diesel Engine 2420-055-1 055-6"-D-LL1 from Diesel Radiator E-546 to Auxiliary Systems on Diesel Generator G-002, 20 cyl Diesel Engine 2420-056-1 056-2"-D-LL1 from Fuel Oil Day Tank T-133 to Diesel Generator G-002 20 cyl Diesel Engine 2420-057-1 .057-2"-D-LL1 from Diesel Generator G-002 20 cyl Diesel Engine to Fuel Oil Day Tank T-133 2420-058-1 058-24"-D-LL1 from Air Intake Filter F-436 to Diesel Generator G-002, 20.cyl Diesel Engine 2420-059-1 059-22"-D-LL1 from Diesel Generator G-002 20 cyl Diesel Engine to Exhaust Silencer F-442 2420-060-1 060-24"-D-LL1 from Exhaust Silencer F-442 to atmosphere 2420-032-1 032-2-1/2"-D-LL1 Air Line From Starting Air Package C013 to Diesel Generator G-003 20 cyl Diesel Engine 2420-034-1 034-2-1/2"-D-LL1 Air Line from Start Air Package C013 to Diesel Generator G-003 20 cyl Diesel Engine 2420-002-1 002-3"-D-LL1 from Diesel Generator G-003 Expansion Tank T-189 to Engine Auxiliary Systems 2420-007-1 007-8"-D-LL1 from Diesel Generator G-003 Engine Auxiliary Systems to Radiator E-549

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Diesel Generator System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-008-1 008-8"-D-LL1 from Radiator E-549 to Diesel Generator G-003 Engine Auxiliary Systems 2420-008-1 008-6"-D-LL1 from Radiator E-549 to Diesel Generator G-003 Engineer Auxiliary Systems 2420-009-1 009-2"-D-LL1 from Fuel Oil Day Tank T-134 to Diesel Generator G-003 16 cyl Diesel Engine 2420-010-1 010-2"-D-LL1 from Diesel Generator E-003 16 cyl Diesel Engine to Fuel Oil Day Tank T-134 2420-011-1 011-24"-D-LL1 from Air Intake Filter F-441 to Diesel Generator G-003 16 cyl Diesel Engine 2420-012-1 012-22"-D-LL1 from Diesel Generator G-003 16 cyl Diesel Engine to Exhaust Silencer F-439 2420-013-1 013-22"-D-LL1 from Exhaust Silencer F-439 to Atmosphere 2420-016-1 016-3"-D-LL1 from Diesel Generator G-003 Expan sion Tank T-161 to Engine Auxiliary Systems 2420-021-1 021-8"-D-LL1 from Diesel Generator G-003 Engine Auxiliary Systems to Radiator E-547 2420-022-1 022-8"-D-LL1 from Radiator E-547 to Diesel Generator G-003 Engine Auxiliary Systems 2420-022-1 022-6"-D-LL1 from Radiator E-547 to Diesel Generator G-003 Engine Auxiliary Systems 2420-025-1 025-2"-D-LL1 from Fuel Oil Day Tank T-134 to Diesel Generator G-003 20 cyl Diesel Engine 2420-026-1 026-2"-D-LL1 from Diesel Generator G-003 20 cyl Diesel Engine to Fuel Oil Day Tank T-134

PIPING VERIFICATION PROGRAM SONGS 2&3

  • APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Diesel Generator System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-027-1 027-24"-D-LL1 from Air Intake Filter F-437 to Diesel Generator G-003 20 cyl Diesel Engine 2420-028-1 028-24"-D-LL1 from Diesel Generator G-003 20 cyl Diesel Engine to Exhaust Silencer F-443 2420-029-1 029-24"-D-LL1 from Exhaust Silencer F-443 to Atmosphere

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Diesel Fuel Storage System SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2421-018-1 018-2"-D-LL1 Discharge from Fuel Transfer Pump 2-2421-018-2 P-096 to Fuel Oil Day Tank T-133 2-2421-018-3 2421-018-3 018-3"-D-LL1 Diesel Fuel Oil Transfer Pumps P-098 and P-093 Common Discharge Cross Connect Line 2421-023-1 023-3"-D-LL1 Diesel Fuel Storage Tank T-035 Vent Line 2421-018-2 019-2"-D-LL1 Fuel Oil Filter F-135 Line 2421-018-3 020-2"-D-LL1 Fuel Oil Transfer Pump P-093 Discharge Line 2421-068-1 068-3"-D-LL1 Fuel Oil Day Tank (T-133) Overflow 2-2421-068-2 Line to Diesel Fuel Storage Tank (T-035) 2-2421-022-1 022-3"-D-LL1 Diesel Fuel Oil T-035 Recirc Line 2-2421-017-1 017-4"-D-LL1 Diesel Fuel Storage Tank T-035 Fill Line 2421-027-1, 027-2"-D-LL1 Discharge from Fuel Transfer Pump 2421-027-2 P-095 to Fuel Oil Day Tank T-134 2421-027-3 027-3"-D-LL1 Diesel Fuel Oil Transfer Pumps P-095 & P-094 Common Discharge Cross Connect Line 2421-032-1 032-3"-D-LL1 Diesel Fuel Storage Tank T-036 Vent Line 2-2421-018-2 028-2"-D-LL1 Fuel Oil Filter F-135 Line 2-2421-018-3 029-2"-D-LL1 Fuel Oil Transfer Pump P-094 Discharge Line 2-2421-066-1 066-3"-D-LL1 Fuel Oil Day Tank (T-134) Overflow Line to Diesel Fuel Storage Tank (T036)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Diesel Fuel Storage System SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-2421-066-2 .085-3"-D-LL1 Fuel Oil Day Tanks T-133 and T-134 Overflow Lines Cross Connect Line 2421-027-3 031-3"-D-LL1 Diesel Fuel Oil Storage Tank T-036 Recirc Line 2421-026-1 026-4"-D-LL1 Diesel Fuel Oil Storage Tank T-036 Fill Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Spent Fuel Pool Cooling System SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1219-010-1, 010-14"-D-LL1 Spent Fuel Pumps Suction Header 1219-010-2 from Spent Fuel Pool 1219-007-2 009-10"-D-LLO Refueling Cavity Drain Line Cross Connect with Spent Fuel System 1219-010-1 010-10"-D-LLO Spent Fuel Pump P-010 Suction Line 1219-011-1 011-10"-D-LLO Spent Fuel Pump P-010 Discharge Line to Spent Fuel Pool Heat Exchanger E-005 1219-025-1, 025-10"-D-LLO Spent Fuel Pool Heat Exchanger 1219-025-2 E-005 Outlet 1219-025-1, 025-12"-D-LLO Spent Fuel Pool Heat Exchangers 1219-025-2 E-005 & E-006 Common Outlet Header 1219-025-3 031-10"-D-LLO Spent Fuel Pool Return Line from Common Outlet Header 025-12"-D-LLO 1219-025-3 063-8"-D-LLO Spent Fuel Pool Distribution Header 1219-025-3 064-8"-D-LLO Spent Fuel Pool Distribution Header 1219-025-4 025-4"-D-LLO Spent Fuel Pool Skimmer Line 1219-024-1 023-3"-D-LLO Spent Fuel Pump P-010 Recirc Line 1219-024-1 024-4"-D-LLO Spent Fuel Pumps P-010 & P-009 Common Recirc Line 1219-010-1 012-10"-D-LLO Spent Fuel Pump P-009 Suction Line 1219-011-1 013-10"-D-LLO Spent Fuel Pump P-009 Discharge Line to Spent Fuel Pool Heat Exchanger E-006

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Spent Fuel Pool Cooling System SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1219-011-1 014-10"-D-LLO Spent Fuel Pool Heat Exchanger E-005 & E-006 Cross Connect Line 1219-025-1 026-10"-D-LLO Spent Fuel Pool Heat Exchanger E-006 Outlet 1219-024-1 024-3"-D-LLO Spent Fuel Pump P-009 Recirc Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 1 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-242-1 242-8"-D-LL1 Discharge Line from Pump P-162 to Chiller Unit E-336 1513-244-1, 244-8"-D-LL1 Discharge Line from Chiller E-336 to

.1513-244-2 the Aux. Bldg., Safety Equip. Bldg., and Fuel Handling Bldg.

1513-252-1 252-6"-D-LL1 Supply to Aux. Bldg. ESF Switch Gear Rm and Control Rm Unit 2 & Unit 3 1513-242-1 263-1-1/2"-D-LL1 Supply to Chiller E-336 Oil Cooler 1513-244-2 264-1-1/2"-D-LL1 Return from Chiller E-336 Oil Cooler 1513-244-1 253-4"-D-LL1 Cross Connect to Unit 3 Safety Equipment Building 1513-252-2, 325-3"-D-LL1 Common Supply to Aux. Bldg. ESF 1513-325-1 Switch Gear Rm. E-255 (Unit 2) & E-255 (Unit 3) 1513-252-2, 325-2-1/2"-D-LL1 Supply to Aux. Bldg. Control Rm.

1513-325-1 Cabinet Area E-424 Unit 2 1513-325-1 367-2-1/2"-D-LL1 Supply to Aux. Bldg. Control Rm.

Cabinet Area E-427 Unit 3 1513-252-2 373-3"-D-LL1 Common Supply to Aux. Bldg. ESF Switchgear Rm. E-255 (Unit 2 and E-255 (Unit 3) 1513-252-2 373-2-1/2"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm. E-255 Unit 1513-252-2 373-3"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm E-255 Unit 1513-252-2, 331-2-1/2"-D-LL1 Supply to Aux. Bldg. ESF Switch 1513-331-1 gear Rm E-255 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 2 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-331-1 331-3"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm. E-255 Unit 2.

1513-252-1 385-4"-D-LL1 Supply to Aux. Bldg. Control Rm E-418 Units 2&3 1513-372-1. 372-2-1/2"-D-LL1 Return from Aux. Bldg.

Control Rm. Cabinet Area E-427 Unit 3 1513-330-1, .330-3-1/2"-D-LL1 Return from Aux. Bldg. Control 1513-330-2, Rm. Cabinet Area E-424 Unit 2 1513-330-3 1513-330-3 330-3"-D-LL1 Common Return from Aux. Bldg. Control Rm Cabinet Areas E-424 & E-427 Units 2 & 3 1513-336-2 336-3"-D-LL1 Return from Aux. Bldg. ESF Switch gear Rm. E-255 Unit 2 1513-336-1, 336-2-1/2"-D-LL1 Return from Aux. Bldg. ESF 1513-336-2 Switchgear Rm. E-255 Unit 2 1513-378-1 378-3"-D-LL1 Return from Aux. Bldg. ESF Switch-,

gear Rm E-255 Unit 3 1513-378-1, 378-2-1/2"-D-LL1 Return from Aux. Bldg. Switch

.1513-378-2 gear Rm. E-255 Unit 3 1513-378-1, 378-3"-D-LL1 Common Return from Aux. Bldg. ESF 1513-378-2 Switchgear Rms E-255 Unit 2 & E-255 Unit 3 1513-260-1, 260-6"-D-LL1 Common Return from Aux. Bldg.

1513-378-2 Control Ri. Cabinet Area Units 2&3, Aux. Bldg.

ESF Switchgear Rm. Units 2&3, and Control Rm.

Units 2&3 3-1513-390-1, 390-4"-D-LL1 Return from Aux. Bldg. Control Rm 1513-390-2 E-418 Units 2&3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 3 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-244-1, 251-2"-D-LL1 Common Supply to Aux. Bldg. Charging 1513 (Later) Pump Rms (Unit 2), Boric Acid Makeup Pump Rms, (Unit 2) and Fuel Handling Bldg. Pump Rm (Unit 2)

(Later) 283-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-437 Unit 2 (Later) 283-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-437 Unit 2 (Later) 289-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-438 Unit 2 (Later) 289-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-438 Unit 2 (Later) 277-1-1/2"-D-LL1 Common Supply to Aux. Bldg.

Boric Acid Makeup Pump Rms E-439 & E-440 Unit 2 (Later) 277-3/4"-D-LL1 Supply to-Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 2 (Later) 277-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 2 (Later) 087-3/4"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 087-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 271-1-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-441 Unit 2 (Later) 271-2-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-441 Unit 2 (Later) 276-2-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-441 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 4 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 276-1-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-441 Unit 2 1513-259-1, 257-2"-D-LL1 Common Return from Aux. Bldg.

1513 (Later) Charging Pump Rms Units 2&3, Boric Acid Makeup Pump Rms Unit 2&3, and Fuel Handling Bldg.

Pump Rms Units 2&3 (Later) 092-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 092-3/4"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 282-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm. E-439 Unit 2 (Later) 282-3/4"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 2 (Later) 282-1-1/2"-D-LL1 Common Return from Aux. Bldg.

Boric Acid Makeup Pump Rms E-440 & E-439 Unit 2 (Later) 294-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-438 Unit 2 (Later) 294-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-438 Unit 2 (Later) 288-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-437 Unit 2 (Later) 288-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-437 Unit 2 (Later) 256-2"-D-LL1 Common Supply to Aux. Bldg. Charging Pump Rms. Boric Acid Makeup Pump Rms, and Fuel Handling Bldg. Pump Rm Unit 3 (Later) 301-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-437 Unit 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 5 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 301-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-437 Unit 3 (Later) 307-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-438 Unit 2 (Later) 307-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-438 Unit 3 (Later) 295-1-1/2"-D-LL1 Common Supply to Aux. Bldg. Boric Acid Makeup Pump Rms E-439 & E-440 Unit 3 (Later) 295-3/4"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 3 (Later) 295-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm. E-439 Unit 3 (Later) 114-3/4"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 3 (Later) 114-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm. E-440 Unit 3 (Later) 256-1-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-441 Unit 3 (Later) 324-1-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-441 Unit 3 (Later) 324-2"-D-LL1 Common Return from Aux. Bldg.

Charging Pump Rms, Boric Acid Makeup Pump Rms and Fuel Handling Bldg. Pump Rm Unit 3 (Later) 119-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 3 (Later) 119-3/4"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 6 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 300-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 3 (Later) 300-3/4"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 3 (Later) 300-1-1/2"-D-LL1 Common Return from Aux. Bldg.

Boric Acid Makeup Pump Rms E-449 & E-440 Unit 3 (Later) 312-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-438 Unit 3 (Later) 312-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-438 Unit 3 (Later) 306-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm 3-437 Unit 3 (Later) 306-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-437 Unit 3 1513-244-1, 255-4"-D-LL1 Common Supply to Safety Equipment 1513-255-2 Bldg. Pump Rms Unit 2 1513-349-1 349-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-454 Unit 2 (Later) 349-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-454 Unit 2 1513-255-2, 255-3"-D-LL1 Common Supply to Safety Equipment 2-1513-265-1 Bldg. Pump Rms Unit 2 1513-355-1 355-2"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 008 Unit 2 1513-355-1 355-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 008 Unit 2 1513-265-1 265-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015, E-517 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 7 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-265-1 265-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015, E-517 Unit 2 1513-343-1 343-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 005 E-417 Unit 2 1513-343-1 343-3"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 005 E-417 Unit 2 1513-348-1 348-3"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 005 E-417 Unit 2 1513-348-1 348-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 005 E-417 Unit 2 1513-259-3, 259-3"-D-LL1 Common Return from Safety Equipment 1513-259-4 Bldg. Pump Rms Unit 2 1513-270-1 270-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 015 E-517 Unit 2 1513-270-1 270-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 015, E-517 Unit 2 1513-360-1 360-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 008, E-453 Unit 2 1513-360-1 360-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 008 E-453 Unit 2 1513-259-3 259-4"-D-LL1 Common Return from Safety Equipment Bldg. Pump Rms Unit 2 1513-354-1 354-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 007 Unit 2 1513-354-1 354-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 007 Unit 2 1513-259-1, 239-8"-D-LL1 Common Return/P-162 Suction from 1513-260-1 Aux. Bldg. Charging Pump Rm, Boric Acid Makeup Pump Rms, Fuel Handling Bldg. Pump Rm for Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 8 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-259-1 262-4"-D-LL1 Cross Connect Return from Unit 3 Safety Equipment Bldg.

(Later) 245-1"-D-LL1 Compression Tank Tie-In Line (Later) 247-1"-D-LL1 Compression Tank Drain Line (Later) 248-1/2"-D-LL1 Compression Tank Vent Line 1513-252-1 389-3"-D-LL1 Aux. Bldg. Control Room E-418 Units 2&3 Bypass Line 1513-073-1 073-8"-D-LL1 Discharge Line from Pump P-162 to Chiller Unit 335 1513-150-1, 277-8"-D-LL1 Discharge Header from Chiller E-335 1513-180-1 to the Aux. Bldg., Safety Equip. Bldg. & Fuel Handling Bldg.

1513-182-1, 132-6"-D-LL1 Supply to Aux. Bldg. ESF Switchgear 1513-130-1 Rm and Control Rm Unit 2 & Unit 3 1513-150-1 074-8"-D-LL1 Supply to Aux. Bldg. Unit 2 & 3, Fuel Handling Bldg. and Safety Equip. Bldg. Unit 2 (Later) 425-1-1/2"-D-LL1 Supply to E-335 Oil Cooler (Later) 426-1-1/2"-D-LL1 Return from E-335 Oil Cooler 1513-150-1 227-4"-D-LL1 Cross Connectto Unit 3 Safety Equipment Building 1513-132-1 132-3"-D-LL1 Common Supply to Aux. Bldg. Control Rm Cabinet Area E-423 (Unit 2) & E-426 (Unit 3)

.1513-132-3, 132-2-1/2"-D-LL1 Supply to Aux. Bldg. Control Rm 1513-132-4 Area E-423 (Unit 2) 3-1513-076-1 076-2-1/2"-D-LL1 Supply to Aux. Bldg. Control Rm Area E-426 (Unit 3)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 9 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-132-1 192-3"-D-LL1 Common Supply to Aux Bldg. ESF Switchgear Rm E-257 (Unit 2) and E-257 (Unit 3) 1513-192-1 192-2-1/2"-D-LL1 Supply to Aux. Bldg ESF Switch gear Rm E-257 Unit 3 1513-192-1 192-3"-D-LL1 Supply to Aux. Bldg ESF Switchgear Rm E-257 (Unit 3) 1513-144-1, 144-2-1/2"-D-LL1 Supply to Aux. Bldg ESF Switch 1513-192-1 gear Rm E-257 (Unit 2) 1513-144-1 144-3"-D-LL1 Supply to Aux. Bldg ESF Switchgear Rm E-257 (Unit 2)

(Later) 098-2-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-436 Unit 2 (Later) 081-1-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 081-2-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 086-2-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 086-1-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 078-2"-D-LL1 Common Return from Aux. Bldg.

Charging Pump Rms Unit 2 and Fuel Handling Bldg.

Pump Unit 2 (Later) 102-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-436 Unit 2 (Later) 102-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-436 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 10 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 097-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 Unit 2 (Later) 097-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 (Later) 108-2"-D-LL1 Common Supply to Aux. Bldg Charging Pump ha Unit 3 and Fuel Handling Pump Rm Unit 3 (Later) 108-1-1/2"-D-LL1 Supply to Fuel Handling Pump Rm Unit 3 (Later) 126-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-436 Unit 3 (Later) 126-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-436 Unit 3 15513-180-1, 180-4"-D-LL1 Supply to Aux. Bldg. Control Rm 1513-180-2 Complex E-419 Units 2&3 3-1513-077-1 077-2-1/2"-D-LL1 Return from Aux. Bldg. Control Rm Cabinet Area E-426 Unit 3 1513-137-1 137-2-1/2"-D-LL1 Return from Aux. Bldg. Control Rm Cabinet Area E-423 1513-137-2, 137-3"-D-LL1 Common Return from Bldg. Control Rm 1513-137-3 Cabinet Area E-423 (Unit 2) and E-426 (Unit 3) 1513-149-1 149-3"-D-LL1 Return from Aux. Bldg. ESF Switch gear Rm E-257 Unit 2 1513-149-1, 149-2-1/2"-D-LL1 Return from Aux. Bldg. ESF 1513-197-1 Switchgear Rm E-257 Unit 2 1513-197-1 197-3"-D-LL1 Return from Aux. Bldg. ESF Switchgear Rm E-257 Unit 3 1513-197-1 197-2-1/2"-D-LL1 Return from Aux. Bldg. ESF Switchgear Rm E-257 Unit 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 11 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-197-2 197-3"-D-LL1 Common Return from Aux. Bldg. ESF Switchgear Rms E-257 Unit 2 & E-257 Unit 3 3-1513-137-2 137-6"-D-LL1 Common Return from Aux. Bldg. ESF Switchgear and Control Rm Cabinet Area Units 2&3 1513-185-1 185-4"-D-LL1 Return from Aux. Bldg. Control Rm Complex E-419 Units 2&3 1513-150-1, 074-2"-D-LL1 Common Supply to Aux. Bldg. Charging 1513 (Later) Pump Rm Unit 2 & Fuel Handling Bldg Pump Rm Unit 2 (Later) 093-1-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-435 Unit 2 (Later) 093-2-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-435 Unit 2 (Later) 098-1-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-436 Unit 2 (Later) 120-1-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-435 Unit 3 (Later) 120-2-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-435 Unit 3 (Later) 131-2-1/2"-D-LL1 Return from Aux. Bldg Charging Pump Rm E-436 Unit 3 (Later) 131-1-1/2"-D-LL1 Return from Aux. Bldg Charging Pump Rm E-436 Unit 3 (Later) 125-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 Unit 3 (Later) 125-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 Unit 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 12 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 113-2"-D-LL1 Common Return from Aux. Bldg.

Charging Pump Rms Unit 3 and Fuel Handling Bldg.

Pump Rm Unit 3 (Later) 113-1-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-442 Unit 3 1513-150-1, 150-4"-D-LL1 1513-150-2, Common Supply to Safety Equipment 1513-150-3, Bldg Pump Rms Unit 2 1513-162-1 162-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-518 Unit 2 1513-162-1 162-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-518 Unit 2 1513-168-1 168-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 006 E-455 Unit 2 1513-168-1 168-2-1/2"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 006 E-455 Unit 1513-150-4, 150-3"-D-LL1 Common Supply to Safety Equipment 1513-150-5 Bldg. Pump Rms Unit 2 1513-156-1 156-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015 E-445 Unit 2 1513-156-1 156-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015 E-445 Unit 2 1513-150-5 150-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 002 E-416 Unit 2 1513-150-5 150-3"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 002 E-416 Unit 2 1513-155-5 155-3"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 002 E-416 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 13 OF 13 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-155-4, 155-2"-D-LL1 Return from Safety Equipment Bldg.

1513-155-5 Pump Rm 002 E-416 Unit 2 1513-155-3, 155-3"-D-LL1 Common Return from Safety Equipment 1513-155-4 Bldg. Pump Rms Units 2 2-1513-161-1 161-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 015 E-445 Unit 2 2-1513-161-1 161-2-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 015 E-445 Unit 2 1513-155-1, 155-4"-D-LL1 Common Return from Safety Equipment 1513-155-2, Bldg. Pump Rms Unit 2 1513-155-3 1513-173-1 173-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 006 E-455 Unit 2 1513-173-1 173-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 006 E-455 Unit 2 2-1513-167-1 167-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 007 E-518 Unit 2 2-1513-167-1 167-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 007 E-518 Unit 2 1513-155-1 078-8"-D-LL1 Common Return from Safety Equipment Bldg. Unit 2, Aux. Bldg. Units 2 & 3 and Fuel Handling Bldg. Unit 2 1513-155-1, 070-4"-D-LL1 Cross Connect Return from Unit 3 3-1513-155-3 Safety Equipment Bldg.

3-1513-070-1, 070-8"-D-LL1 Common Return/P-160 Suction Line 1513-155-1 from Aux. Bldg. Units 2 & 3 Safety Equipment Bldg. Unit 2, and Fuel Handling Bldg. Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Boric Acid Makeup System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1218-022-3 006-4"-D-LLO Boric Acid Makeup Tank T-072 Outlet 2-1218-003-1 003-3"-D-LLO Boric Acid Makeup Pump P-175 Suction.

Line 1218-025-1, 025-3"-D-LLO Boric Acid Makeup Pump P-175 2-1218-031-1 Discharge Line 1218-028-1, 028-2"-D-LLO Boric Acid Makeup Tank T-072 Recirc 1218-028-2, Line 2-1218-031-1 1218-029 029-1/2"-D-LLO Boric Acid Makeup Tank T-072 Relief Valve Discharge & Recirc Line (Later) 025-1"-D-LLO Boric Acid Normal Supply to Volume Control Tank (Later) 068-1"-C-LLO Boric Acid Normal Supply to Volume Control Tank 2-1218-037-1, 037-3"-C-LLO Boric Acid Normal Supply to Volume 1218-037-2 Control Tank 2-1218-037-2 036-3"-C-LLO Boric Acid Normal Supply to Volume Control Tank 2-1218-037-2 099-3"-E-LLO Boric Acid Normal Supply to Volume Control Tank (1208) 2-1218-031-1, 031-3"-D-LLO Boric Acid Emergency Boron Supply 2-1218-031-2 Line 2-1218-031-2 086-3"-C-LLO Boric Acid Emergency Boron Supply Line 2-1218-022-1 007-4"-D-LLO Boric Acid Makeup Tank T-071 Outlet

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Emergency Chilled Water System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 069-1"-D-LL1 Compression Tank T-122 Tie-In Line (Later) 222-1"-D-LL1 Compression Tank Drain Line (Later) 232-1/2"-D-LL1 Compression Tank Vent Line 1513-180-2, 184-4"-D-LL1 Aux. Bldg. Control Rm E-419 Units 2 1513-185-1 & 3 Bypass Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Boric Acid Makeup System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1218-004-1 023-3"-D-LLO Boric Acid Makeup Pump Suction Cross Connect .Line 2-1218-004-1, 004-3"-D-LLO Boric Acid Makeup Pump P-174 Suction 2-1218-022-1 Line 1218-025-1, 024-3"-D-LLO Boric Acid Makeup Pump P-174 2-1218-031-1 Discharge Line 2-1218-026-1, 026-2"-D-LLO Boric Acid Makeup Tank T-071 Recirc 2-1218-031-1 Line 2-1218-027-1 027-1/2"-D-LLO Boric Acid Makeup Tank T-071 Relief Valve Discharge & Recirc Line (Later) 034-1"-D-LLO Boric Acid Makeup System VAlve 2HV-9247 Bypass Line 3-1218-030-1 030-2"-D-LLO Boric Acid Makeup Tank Recirc Cross Connect 2-1218-022-1, 022-3"-D-LLO Boric Acid Makeup Gravity Feed Line 2-1218-022-2, to Chem. & Vol. Control Charging Pump Leader 2-1218-022-3 2-1218-022-1, 021-3"-D-LLO Boric Acid Makeup Gravity Feed Line 2-1218-022-2 from Tank T-071 to Line 022-3"-D-LL1 (Later) 062-1"-D-LLO Control Boration Cross Connect Line to the Chem and Vol. Control Charging Pump Suction Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Nuclear Sampling System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1212-167-2 023-3/4"-A-FEO Reactor Coolant Hot Leg No. 1 Outlet from Reactor Coolant Loop 2-1212-167-1 030-3/4"-C-FEO Reactor Coolant Hot Leg No. 1 2-1212-167-2 Sample Line 2-1212-167-1 031-3/4"-C-FEO Reactor Coolant Hot Leg No. 1 Sample Line 2-1212-167-1 065-3/4"-A-FEO Reactor Coolant Hot Leg No. 2 Outlet from Reactor Coolant Loop 2-1212-167-2, 167-3/4"-C-FEO Reactor Coolant Hot Leg No. 1 2-1212-167-3, Sample Line 2-1212-167-4, 2-1212-167-5 2-1212-167-5 168-3/4"-C-FEO Reactor Coolant Hot Leg No. 2 Sample Line 1212-037-2 034-3/4"-A-EEO Reactor Coolant Pressurizer Vapor Space Outlet Line 1212-037-1, 036-3/4"-C-EEO Reactor Coolant Pressurizer Vapor 1212-037-2 Space Sample Line 1212-037-2, 037-3/4"-C-EEO Reactor Coolant Pressurizer Vapor 1212-037-3 Space Sample Line (Later) 049-3/4"-A-EEO Reactor Coolant Pressurizer Surge Line Outlet Sample Line (Later) 042-3/4"-C-EEO Reactor Coolant Pressurizer Surge Line Sample Line (Later), 043-3/4"-C-EEO Reactor Coolant Pressurizer Surge 1212-043-1 Line Sample Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Nuclear Sampling System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 074-3/4"-C-LLO Reactor Coolant Sample Line between Containment Isolation Valves 2HV-0516 and 2HV-0515 1212-072-1 072-3/4"-C-LLO Reactor Coolant Sample Line between Containment Isolation Valves 2HV-0514 and 2HV-0515 (Later) 075-3/4"-D-KEO Tank No. 1 (T-083) Sampling Line (Later) 034-3/4"-D-KEO Tank No. 2 (T-084) Sampling Outlet Line (Later) 076-3/4"-D-KEO Tank No. 2 (T-084) Sampling Line (Later) 077-3/4"-D-KEO Tank No. 3 (T-085) Sampling Line (Later) 036-3/4"-D-KEO Tank No. 4 (T-086) Sampling Outlet Line (Later) 078-3/4"-D-KEO Tank No. 4 (T-086) Sampling Line (Later) 079-3/4"-D-KEO Tank No. 5 (T-087) Sampling Line (Later) 080-3/4"-D-KEO Tank No. 6 (T-088) Sampling Line (Later) 082-3/4"-D-LLO Waste Gas Surge Tank (T-082)

Sample Line (Later) 045-1"-C-KEO Shutdown Cooling Line Nuclear Sampling Line (Later) 172-1"-C-KEO Shutdown Cooling Line Nuclear Sampling Line (Later) 004-1"-C-GEO Injection Pumps P-018 and P-019 Minimum Recirc Sampling Line (Later) 177-1"-C-GEO Safety Injection Pumps P-017 and P-018 Minimum Recirc Sampling Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Nuclear Sampling System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER &.DESCRIPTION (Later) 160-1"-C-GEO Safety Injection Pumps P-017 and P-018 Minimum Recire Sampling Line (Later) 001-3/4"-C-KE1 Shutdown Heat Exchanger Outlet Sampling Line (Later) 008-3/4"-H-LLO Letdown Strainer Outlet Sampling Line (Later) 008-1/2"-H-LLO Letdown Strainer Outlet Sampling Line (Later) 012-3/4"-H-LLO Purification Filter Inlet Sampling Line (Later) 012-1/2"-H-LLO Purification Filter Inlet Sampling Line (Later) 171-3/4"-H-LLO Purification Ion Exchanger Inlet Sampling Line (Later) 013-1/2"-H-LLO Purification Ion Inlet Sampling Line (Later) 136-3/4"-E-LLO Volume Control Tank Liquid Sample Line (Later) 052-1"-E-LLO Volume Control Tank Liquid Sample Line (Later) 166-3/4"-E-LLO Volume Control Tank (T-077) Gaseous Sample Line (Later) 082-3/4"-E-LLO Volume Control Tank (T-077) Gaseous Sample Line 1212-117-1, 117-1"-C-LLO Post Accident Monitor Sample Line (Later)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Nuclear Sampling System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1212-118-1, 118-1"-C-LLO Post Accident Monitor Sample Line (Later)

(Later) 124-1"-C-LLO Post Accident Monitor Sample Line (Later) 125-1"-C-LLO Post Accident Monitor Sample Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Steam Generator Blowdown System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-015-1 015-3"-C-HK1 Steam Generator E-088 Blowdown Piping 1301-015-1, 015-6"-C-HK1 Steam Generator E-088 Blowdown Piping 2-1301-553-1 1301-016-2 016-3"-C-HKO Steam Generator E-089 Blowdown Piping 1301-016-1, 016-6"-C-HKO Steam Generator E-089 Blowdown Piping 1301-016-2, 1301-554-1 1301-553-1 553-6"-R-HKO Steam Generator E-088 Blowdown Piping to Main Stm. Flash Tank T-176 1301-553-1, 553-4"-R-HKO Steam Generator E-088 Blowdown Piping 2-1301-553-2, to Main Stm. Flash Tank T-196 1301-553-3 1301-553-3 664-4"-R-ZZO Steam Generator E-088 Blowdown Piping to Main Stm. Flash Tank T-176 1301-554-1 554-6"-R-HKO Steam Generator E-089 Blowdown Piping to Main Stm. Flash Tank T-176 1301-554-1, 554-4"-R-HKO Steam Geenerator E-089 Blowdown Piping 2-1301-554-2, to Main Stm. Flash Tank T-176 1301-554-3 1301-554-3 663-4"-R-HKO Steam Generator E-089 Blowdown Piping to Main Stm. Flash Tank T-176

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Charging System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charging Pump Suction Header 2-1208-055-1 055-4"-C-LL1 CCW Charging Pump P-190 Suction Header 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 Discharge to Reactor Coolant Systems 2-1208-008-2, 008-2"-C-FEO Charging Pumps Common Discharge 1208-008-3 Header to the Regenerative Heat Exchanger 1208-008-3 008-2-1/2"-C-FEO Charging Pumps Common Discharge Header to the Regenerative Heat Exchgr.

1208-008-3, 104-2"-C-FEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-2"-A-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-FEO Charging Header to Reactor Coolant Loop 1A 2-1208-055-1 056-4"-C-LLO Charging P-191 Suction Line 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharge Header 2-1208-010-1 010-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-A-FEO Charging Header to Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Charging System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charging Pump P-192 2-1208-008-1 008-2"-C-FEO Charging Pump P-192 Discharge Header 2-1208-007-1 007-4"-C"-LLO Volume Control Tank Outlet to Charging Pump Suction Header 2-1208-055-1 055-4"-C-LLO Charging Pump P-190 Suction Line 2-1208-055-1 056-4"-C-LLO Charging Pump P-191 Suction Line 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 Discharge to Reactor Coolant System 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharger Header 2-1208-008-1, 008-2"-C-EEO Charging Pumps Common Discharge 2-1208-008-2, Header to the Regenerative Heat Exchanger 2-1208-008-3 2-1208-008-3 008-2-1/2-C-EEO Charging Pump Common Discharge Header to Regenerative Heat Exchanger 2-1208-008-3, 104-2"-C-EEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Charging System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-2"-C-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-EEO Charging Header to Reactor Coolant Loop 1A 2-1208-007-1 007-4"-C-LLO Charging Pump P-192 Suction Header 2-1208-008-1 008-2"-C-EEO Charging Pump P-192 Discharge Header 2-1208-010-1 010-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-A-FEO Charging Header to Reactor Coolant Loop 2A 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charging Pumps 2-1208-055-1 055-4"-C-LLO Charging Pump P-190 Suction Header 2-1208-055-1 056-4"-C-LLO Charging Pump P-191 Suction Header.

2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 to Reactor Coolant Systems 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharge Header 2-1208-008-1, 008-2"-C-FEO Charging Pumps Common Discharge 2-1208-008-2, Header to Regenerative Heat Exchanger 1208-008-3 2-1208-008-3 008-2-1/2"-C-FEO Charging Pumps Common Discharge Header to Regenerative Heat Exchanger

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Charging System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1208-008-3, 104-2"-C-FEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-22-C-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-FEO Charging Header to Reactor Coolant Loop 1A 2-1208-010-1 010-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-C-FEO Charging Header to Reactor Coolant Loop 2A 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header S'upply from Charging System 2-1201-012-1I 012-4"-A-FEO Pressurizer Spray Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 1 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regener ative Heat Exchanger 2-1208-001-1 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-O11OA 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-110-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 2-1208-004-1 004-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201B Piping NC-1208-005-1 005-3"-C-LLO Letdown System Back Pressure Valve 2PV-0201B Outlet Piping NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into Purifica 1,6,7,8, & 9 tion Ion Exchangers NC-2418-072-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 2 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 017-1-1/2"-H-LLO Letdown System Inlet to the Boronometer (Later) 025-1/2"-H-LLO Letdown System Outlet from the Boronometer NC-1208-066-1, 006-3"-H-LLO Letdown System Outlet from Purifi cation Ion Exchangers to Volume Control Tank NC-1901-112-5 1208-093-1 093-3"-E-LLO Letdown System Return to Volume C- Control Tank 2-1208-110-2 012-2"-C-FEO Letdown System Flow Control Valve 2LV-0110B Inlet Piping 2-1208-110-2 012-1"-C-FEO Letdown System Flow Control Valve 2LV-0110B Piping 2-1208-110-2 014-2"-C-HEO Letdown System Flow Control Valve 2LV-0110B Outlet Piping 1208-015-1 015-2"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Inlet Piping 1208-015-1 015-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Piping 1208-015-1 015-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-1208-016-2 016-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-2418-072-2 021-2"-H-LLO Letdown System Filter Bypass Line NC-1208-092-1 092-3"-H-LLO Purification Ion Exchangers E-075, E-074 and E-078 Bypass Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 3 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-1208-092-1, 098-3"-H-LLO Letdown System Tie Into the Safety NC-1208-098-3, Injection System NC-1208-098-2 1201-027-1 1201-027-1 027-3"-C-KEO Safety Injection System Tie-In with the Letdown System 2-NC-1208-028-2 028-3"-H-LLO Common Supply for Purification Ion Exchanger E-074 and E-078 2-NC-1208-028-2 029-3"-H-LLO Supply to Purification Ion Exchanger E-074 NC-1208-006-2 036-3"-H-LLO Outlet Piping from Purification Ion Exchanger E-074 NC-1208-028-3, 028-3"-H-LLO Common Supply to Purification Ion NC-1208-028-4 Exchangers E-074 and E-078 NC-1208-006-1 037-3"-H-LLO Outlet from Purification Ion Exchanger E-078 2-NC-1208-119-1 119-3"-H-LLO Purification Ion Exchanger E-075 Inlet/Purification Ion Exchanger E-074 Outlet Bypass Cross Connect Line NC-1208-028-3 030-3"-H-LLO Purification Ion Exchanger E-075 NC-1208-006-6 and E-074 Bypass Line NC-1208-028-3 031-3"-H-LLO Purification Ion Exchangers E-074 NC-1208-006-2 and E-078 Bypass Line 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regen erative Heat Exchanger

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM:. Letdown System SHEET 4 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-001-1 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-01 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-110-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown.System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 2-1208-004-1 004-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201B Piping 2-1208-005-1 005-3"-C-LLO Letdown System Back Pressure Valve 2PV-0201B NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into Purifica 6,7,8, & 9 tion Ion Exchangers NC-2418-072-2 (Later) 017-1/2"-H-LLO Letdown System Inlet to the Boronometer (Later) 025-1/2"-H-LLO Letdown System Outlet from the Boronometer

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 5 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-1208-006-1, 006-3"-H-LLO Letdown System Outlet from Purifica 7,9 tion Ion Exchangers to Volume Control Tank NC-1901-112-5 1208-093-1 093-3"-E-LLO Letdown System Return to Volume Control Tank 2-1208-110-2 012-2"-C-FEO Letdown System.Flow Control Valve 2LV-0110B Inlet Piping 2-1208-110-2 012-1"-C-FEO Letdown System Flow Control Valve 2LV-0110B Piping 2-1208-110-2 014-2"-C-HEO Letdown System Flow Control Valve 2LV-O110B Outlet Piping 1208-015-1 015-2"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Inlet Piping 1208-015-1 015-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Piping 1208-015-1 015-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-1208-016-2 016-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-2418-072-2 021-2"-H-LLO Letdown System Filter Bypass Line NC-1208-092-1 092-3"-H-LLO Purification Ion Exchangers E-075, E-074 and E-078 Bypass Line NC-1208-092-1, 098-3"-H-LLO Letdown System Tie into the Safety NC-1208-098-3 Injection System NC-1208-098-2, NC-1201-027-1

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 6 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-1201-027-1 027-3"-C-KEO Safety Injection System Tie-In with the Letdown System 2-NC-1208-028-2 028-3"-H-LLO Common Supply for Purification Exchangers E-074 and E-028 2-NC-1208-028-2 029-3"-H-LLO Supply to Purification Ion Exchanger E-074 NC-1208-006-2 036-3"-H-LLO Outlet Piping from Purification Ion Exchanger E-074 NC-1208-028-3, 028-3"-H-LLO Common Supply to Purification Ion NC-1208-028-4 Exchangers E-074 and E-078 NC-1208-006-1 037-3"-H-LLO Outlet from Purification Ion Exchanger E-078 2-NC-1208-119-1 119-3"-H-LLO Purification Ion Exchanger E-075 Inlet/Purification Ion Exchanger E-074 Outlet Bypass Cross Connect Line NC-1208-028-3 030-3"-H-LLO Purification Ion Exchangers E-075 NC-1208-006-6 and E-074 Bypass Line NC-1208-028-3 031-3"-H-LLO Purification Ion Exchangers E-074 NC-1208-006-2 and E-078 Bypass Line 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 7 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-110-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Let down Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 2-1208-004-1 004-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201B Piping 2-1208-005-1 005-3"-C-LLO Letdown System Back Pressure Valve 2PV-0201B NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into Purifica 1,6,7,8, & 9, tion Ion Exchangers NC-2418-072-2 (Later) 017-1/2"-H-LLO Letdown System Inlet to the Boronometer (Later) 025-1/2"-H-LLO Letdown System Outlet from the Boronometer NC-1208-006-1, 006-3"-H-LLO Letdown System Outlet from Purifica 7,9, tion Ion Exchangers to Volume Control Tank NC-1901-112-5 1208-093-1 093-3"-E-LLO Letdown System Return to Volume Control Tank

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 8 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-110-2 012-2"-C-FEO Letdown System Flow Control.Valve 2LV-0110B Inlet Piping 2-1208-110-2 012-1"-C-FEO Letdown System Flow Control Valve 2LV-0110B Piping 2-1208-110-2 014-2"-C-HEO Letdown System Flow Control! Valve 2LV-O11OB Outlet Piping 1208-015-1 015-2"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Inlet Piping 1208-015-1 015-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Piping 1208-015-1 015-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-1208-016-2 016-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-2418-072-2 021-2"-H-LLO Letdown System Filter Bypass Line NC-1208-092-1 092-3"-H-LLO Purification Ion Exchangers E-075, E-074 and E-078 Bypass Line NC-1208-092-1, 098-3"-H-LLO Letdown System Tie into the Safety NC-1208-098-3, Injection System NC-1208-098-2, NC-1201-027-1 NC-1201-027-1 027-3"-C-KEO Safety Injection System Tie-In with the Letdown System 2-NC-1208-028-2 028-3"-H-LLO Common Supply for Purification Ion Exchanger E-074 and E-028 2-NC-1208-028-2 029-3"-H-LLO Supply to Purification Ion Exchanger E-074

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Letdown System SHEET 9 OF 9 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-1208-006-2 036-3"-H-LLO Outlet Piping from Purification Ion Exchanger E-074 NC-1208-028-3, 028-3"-H-LLO Common Supply to Purification Ion NC-1208-028-4 Exchangers E-074 and E-078 NC-1208-006-1 037-3"-H-LLO Outlet from Purification Ion Exchanger E-078 2-NC-1208-119-1 119-3"-H-LLO Purification Ion Exchanger E-075 Inlet/Purification Ion Exchanger E-074 Outlet Bypass Cross Connect Line NC-1208-028-3 030-3"-H-LLO Purification Ion Exchanger E-075 NC-1208-006-6 and E-074 Bypass Line NC-1208-028-3 031-3"-H-LLO Purification Ion Exchanger E-074 NC-1208-006-2 and E-078 Bypass Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 1 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-001-1 108-24"-C-LLO Safety Injection System Suction Supply from Refueling Water Tank T-005 1204-003-2 007-10"-C-LLO HPSI Pumps P-017 and P-018 Common Suction Supply 1204-003-2 007-8"-C-LLO HPSI Pump P-017 Suction Supply 1204-002-2 007-6"-C-LLO HPSI Pump P-017 Suction Supply 1204-020-1, 020-4"-C-GEO HPSI No. 1 High Pressure Discharge 1204-020-2, Header 1204-020-3, 1204-020-4, 1204-020-5 1204-020-6, 020-2"-C-GEO HPSI No. 1 High Pressure Header 1204-021-5 Discharge to Reactor Coolant Loop.2B 1204-021-5 025-2"-C-FEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 2B 1204-021-5, 021-3"-C-FEO HPSI Common Discharge Header to 1204-046-2 Reactor Coolant Loop 2B 2-1204-046-2 155-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2B 2-1204-046-2 046-8"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2B 1204-019-1 018-2"-C-GEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 1A 1204-019-1 022-2"-C-FEO HPSI No. 1 High Pressure Header Discharge to Reactor Collant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 2 OF 10 ISOMETRIC DRAWING. LINE NUMBER & DESCRIPTION 1204-019-1 019-3"-C-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-043-2 152-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-043-2 043-4"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-043-1 043-8"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-015-1 015-2"-C-GEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 1B 1204-015-1 023-2"-C-FEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop lB 1204-012-1 012-3"-C-FEO HPSI Common Discharge Header to 1204-044-1 Reactor Coolant Loop 1B 1204-044-1 153-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop lB 1204-044-1 044-8"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop lB 1204-044-1 044-12"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop lB 1204-024-1 016-2"-C-GEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 2A 1204-024-1 024-2"-C-FEO HPSI No. 1 High Pressure Header to Reactor Coolant Loop 2A 1204-017-2 017-3"-C-FEO HPSI Common Discharge 1204-045-1 Header to Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET .3OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-045-1 154-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2A 1204-045-1, 045-8"-A-FEO HPSI System Common Discharge Header 1204-045-2 to Reactor Coolant .Loop 2A 1204-045-1, 045-12"-A-FEO HPSI System Common Discharge Header 1204-045-2 to Reactor Coolant Loop 2A 1204-020-1, 047-2"-C-GEO HPSI Pump P-017 Minimum Flow Recirc.

1204-052-1 Line 1204-052-1 052-4"-C-GEO Safety Injection Pumps Common Minimum Recirc Flow Line 1204-151-1 151-4"-D-LLO Safety Injection Pumps Common Minimum Recirc Flow Line 1204-151-1 151-6"-D-LLO Safety Injection Pumps Common Minimum Recirc. Flow Line 1204-080-1, 080-6"-D-LLO Safety Injection Pumps Recirc. Line 1204-080-2, to Refueling Water Tank T-005 1204-080-3, 1204-080-4, 1204-080-5, 1204-151-1 1204-080-5 107-10"-C-LLO Refueling Water Tank Return from Safety Injection Recirc. Line 1204-001-1, 001-24"-C-LLO Safety Injection System Supply from 1204-001-2, Refueling Tank T-005 1204-001-3, 1204-001-4, 1204-001-5 2418-004-4 T-009 141-1"-C-KEO N 2 Supply to Safety Injection Tank

PIPING VERIFICATION PROGRAM SONGS. 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 4 OF 10 ISOMETRIC DRAWING ..LINE NUMBER & DESCRIPTION 2418-004-4 142-1"-C-KEO N 2 Supply to Safety Injection Tank T-010 2418-004-2 143-1"-C-KEO N2 Supply to Safety Injection Tank T-008 2418-004-2 144-1"-C-KEO N2 Supply to Safety Injection Tank T-007 1204-061-1 057-12"-C-HEO Safety Injection Tank T-009 Outlet Line 1204-061-1 061-12"-C-FEO Safety Injection Tank T-009 Outlet Line 2-1204-046-1 058-12"-C-HEO Safety Injection Tank T-010 Outlet Line 2-1204-046-1 062-12"-C-FEO Safety Injection Tank T-010 Outlet Line 1204-059-1 055-12"-C-HEO Safety Injection Tank T-008 Outlet Line 1204-059-1 059-12"-C-FEO Safety Injection Tank T-008 Outlet Line 1204-044-1 056-12"-C-HEO Safety Injection Tank T-007 Outlet Line 1204-044-1 060-12"-C-FEO Safety Injection Tank T-007 Outlet Line (Later) 109-24"-C-LLO Safety Injection System Suction Supply from Refueling Water Tank T-004 1204-004-1 004-24"-C-LLO Safety Injection System Suction 1204-004-2 Supply for Pumps P-016, P-018 and P-019

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 5 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-004-1, 008-10"-C-LLO HPSI Pumps P-018 and P-019 Suction 1204-008-1 Supply 1204-008-1 008-8"-C-LLO HPSI Pump P-019 Suction Supply 1204-008-1 008-6"-C-LLO HPSI Pump P-019 Suction Supply 1204-014-1, 014-4"-C-GEO HPSI Pump P-019 Discharge to the 1204-014-2, Reactor Coolant System 1204-021-1 1204-021-1, 021-4"-C-GEO HPSI No. 2 High Pressure Discharge 1204-021-2, Header 1204-021-3, 1204-021-4 1204-021-4, 021-2"-C-GEO HPSI No. 2 High Pressure Header to 1204-021-5 Reactor Coolant Loop 2B 1204-021-5, 021-3"-C-GEO HPSI Common Discharge Header to 1204-046-2 Reactor Coolant Loop 2B 1204-014-1, 048-2"-C-GEO HPSI Pump P-019 Minimum Recirc. Line 1204-053-1 1204-053-1, 048-4"-C-GEO HPSI Pumps Minimum Recirc. Line 1204-132-1, 1204-151-1 1204-151-1 131-4"-D-LLO HPSI Pumps Minimum Recirc. Line 1204-002-1, 002-24-C-LLO Safety Injection System Supply from 1204-002-2, Refueling Tank T-004 1204-004-1 1204-019-1 019-2"-C-LLO HPSI No. 2 High Pressure Discharge Header to Reactor Coolant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 6 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-019-1 019-3"-C-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-012-1, 012-2"-C-FEO HPSI No. 2 High Pressure Discharge 1204-012-2 Header to Reactor Coolant Loop lB 1204-012-1 012-3"-C-FEO HPSI Common Discharge Header to Reactor .Coolant Loop lB 1204-017-1, 017-2"-C-FEO HPSI No. 2 High Pressure Discharge 1204-017-2 Header to Reactor Coolant Loop 2A 1204-017-2 017-3"-C-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2A 1204-163-1 163-3"-C-FEO HPSI No. 1 High Pressure Discharge Header to Reactor Coolant Hot Leg Injection 1204-167-1 087-3"-C-FEO HPSI Discharge Header to Reactor Coolant Hot Leg Injection for Loop 2 1204-167-1 167-3"-A-FEO HPSI Discharge Header to Reactor Coolant Hot Leg Injection for Loop 2 1204-164-1 164-4"-C-FEO HPSI No. 2 High Pressure Header Discharge to Reactor Coolant Hot Leg Injection 1204-164-1 164-3"-C-FEO HPSI No. 2 High Pressure Header Discharge to Reactor Coolant Hot Leg Injection 1204-165-1 089-3"-C-FEO HPSI Discharge Header to Reactor Coolant Loop 1 1204-165-1 165-3"-A-FEO HPSI Discharge Header to Reactor Coolant Loop 1 1204-009-1 009-8"-C-LLO HPSI Pump P-018 Suction Line 1204-011-1 013-4"-C-GEO HPSI Pump P-018 Discharge Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 7 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-049-1, 049-2"-C-GEO HPSI Pump P-018 Minimum Recirc. Line 1204-052-2 1204-053-1 053-2"-C-GEO HPSI Pump P-018 Minimum Recirc. Line Cross Connect to Line 048-4"-C-GEO 1204-008-1, 010-8"-C-LLO HPSI Pump P-018 Suction Line 1204-009-1 1204-011-1 011-4"-C-GEO HPSI Pump P-018 Discharge to No. 2 High Pressure Header 1204-003-1, 003-24"-C-LLO LPSI Pump P-015 and Containment 1204-003-2, Spray Pump P-012 Suction Supply Line 1204-003-3 1204-032-1 032-16"-C-KEO LPSI Pump P-015 Suction Supply Line 1204-032-1 022-14"-C-KEO LPSI Pump P-015 Suction Supply Line 1204-034-1 034-10"-C-KEO LPSI Pump P-015 Discharge Line 1204-038-2 038-14"-C-KEO Low Pressure Header 1204-036-1, 036-8"-C-KE1 Low Pressure Header Discharge to 1204-036-2 Reactor Coolant Loop 2A 1204-036-2 041-8"-C-FEO Low Pressure Header Discharge to Reactor Coolant Loop 2A 1204-045-1 045-8"-C-FEO Common Discharge Header to Reactor Coolant Loop 2A 1204-145-1 145-8"-C-KE1 Low Pressure Header Discharge to Reactor Coolant Loop lB 1204-145-1 040-8"-C-FEO Low Pressure Header Discharge to Reactor Coolant Loop lB 1204-044-1 044-8"-A-FEO Common Discharge Header to Reactor Coolant Loop 1B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 8 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-1 037-8"-C-KE1 Low Pressure Header Discharge to Reactor Coolant Loop lA 1204-037-1, 039-8"-C-FEO Low Pressure Discharge to Reactor 1204-043-1 Coolant Loop 1A 1204-043-1 043-8"-C-FEO Common Discharge to Reactor Coolant Loop lA 1204-037-2, 038-8"-C-KE1 Low Pressure Header Discharge to 1204-037-3 Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Discharge to Reactor 2-1204-026-1 Coolant Loop 2B 2-1204-046-1 046-8"-A-FEO Common Discharge to Reactor Coolant Loop 2B 2-1204-052-1 050-2"-C-KE1 LPSI Pump P-015 Minimum Recirc. Line 2-1204-052-1 052-2"-C-GEO LPSI Pump P-015 Minimum Recirc. Line 1204-004-1 004-24"-C-LLO LPSI Pump P-016 and Containment Spray Pump P-013 Suction Supply 3-1204-033-1 033-16"-C-KEO LPSI Pump P-016 Suction Supply 3-1204-033-1 033-14"-C-KEO LPSI Pump P-016 Suction Supply 1204-038-1 038-10"-C-KE1 LPSI Pump P-016 Discharge Header 1204-038-1, 038-14"-C-KE1 LPSI Low Pressure Header 1204-038-2 1201-050-1 031-16"-C-LLO LPSI Pump P-016 Suction Header 1204-063-1 071-2"-C-HEO Safety Injection Tank T-008 Fill/

Drain Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 9 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1204-075-1 075-2"-C-KEO Safety Injection Tank T-008 and T-007 Common Fill/Drain Line (Later) 075-1"-H-KEO Common Drain Line to the Reactor Drain Tank from the Safety Injection Tanks 1204-063-1, 063-1"-A-FEO Safety Injection Tank T-008 Fill Line 1204-063-2 1204-063-1 067-1"-A-FEO Safety Injection Tank T-008 Fill Line 1204-064-1 072-2"-C-HEO Safety Injection Tank T-007 Fill/

Drain Line 1204-076-1 076-2"-H-KEO Safety Injection Tank2T-007 Fill/

Drain Line (Later) 136-2"-H-KEO Safety Injection Tanks Common Drain to Refueling Tank T-005 1204-111-1, 111-2"-C-KEO Safety Injection Tanks Common Drain (Later) to Refueling Tank T-005 1204-064-1, 064-1"-A-FEO Safety Injection Tank T-007 Fill 2-1204-064-2 Line 1204-064-1 068-1"-A-FEO Safety Injection Tank T-007 Fill Line 1204-074-1 074-2"-C-HEO Safety Injection Tank T-010 Fill/

Drain Line 1204-074-1, 078-2"-H-KEO Safety Injection Tank T-009 and 1204-077-2 Tank T-010 Fill/Drain Line 2-1204-066-1 066-1"-A-FEO Safety Injection Tank T-010 Fill/

Drain Line 1204-074-1 070-1"-H-KEO Safety Injection Tank T-010 Fill Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Safety Injection System SHEET 10 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-077-1 073-2"-C-HEO Safety Injection Tank T-009 Fill/

Drain Line 1204-077-1, 077-2"-H-KEO Safety Injection Tanks T-009 and 1204-077-2 Tank T-010 Common Drain/Fill Line 2-1204-065-1 065-1"-A-FEO Safety Injection Tank T-009 Fill/

Drain Line 2-1204-065-1 069-1"-A-FEO Safety Injection Tank T-009 Fill/

Drain

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Shutdown Cooling System SHEET 1 OF 6 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-002-1. 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat Exchanger 1206-027-1 E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-139-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"t -C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Shutdown Cooling System SHEET 2 OF 6 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1B 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Shutdown Cooling System SHEET 3 OF 6 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-045-1, 045-8"-A-FEO Safety Injection System Common Header 1204-045-2 to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection System 1204-038-2, Common Header 1204-038-3, 1204-038-4, 1204-038-5 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 12016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 12016-2 Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Shutdown Cooling System SHEET 4 OF 6 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-002-1. 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat Exchanger 1206-027-1 E-004 1206-027-1 027-12"-C-KE1 Outlet from Shtudown Heat Exchanger E-004'to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-139-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A.

STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Shutdown Cooling System SHEET 5 OF 6 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-FE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Shutdown Cooling System SHEET 6 OF 6 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-045-1, 045-8"-A-FEO Safety Injection System Common Header 1204-045-2 to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection 1204-038-2, System Common Header 1204-038-3, 1204-038-4, 1204-038-5 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot 1201-016-3 Leg to LPSI Pumps Suction 12016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot 1201-016-3 Leg to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 12016-2 Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2 1201-025-1 025-8"-C-KE1 Shutdown Cooling System Warmup Bypass Line 1201-017-4 017-18"-C-KE1 Shutdown Cooling System Warmup Bypass Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Aux. Feedwater . SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-047-1, 047-8"-D-LLO Condensate Storage TK T121 Supply to 1305-047-2, F.W..Pump P-141

.1305-047-3 1305-048-1 048-2"-D-GEO Aux. F.P. P-141 Mini Flow Line to Storage TK-T-121 to 2FO-4711 1305-048-1 078-2"-D-GKO Aux. F.P. P-141 Mini Flow Line to 2F0-4711 2-1305-099-2, 099-6"-D-GKO Aux. Feedwater Pump P-141 Discharge 1305-099-3, Header to Valves 2HV-4714 and 2HV-4730 2-1305-099-4, 2-1305-099-5 1305-222-1 222-6"-C-GK1 Aux. Feedwater Supply to S/G from 2HV-4714 & 2HV-4730 to S/G E-088 1305-189-1 189-18"-C-CK1 Feedwater Inlet to Steam Generator E-089 1305-100-1 100-6"-D-GKO Aux. Feedwater Pump P-141 Discharge Header to S/G E-089 up to Line 098-6"-D-GKO 1305-098-1, 098-6"-D-GKO Aux. Feedwater Supply to S/G E-089 1305-098-2, 1305-098-3, 1305-098-4 1305-098-4, 223-6"-C-GK1 Aux. Feedwater Supply to S/G from 1305-223-1 2HV-4715 and 2HV-4731 to S/G E-089 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Generator E-089 1305-048-1 078-2"-D-GKO Aux. Feedwater Pump P-141 Mini Flow Recirc Line from Pump P-141 1305-048-1 048-2"-D-GEO Aux. Feedwater Pump P-141 Mini Flow Recirc Line to Condensate Storage Tank T-121

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Aux. Feedwater SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1305-049-1, 049-8"-D-LLO Aux. F.W. Pump P-140 Suction Line 1305-049-2 from Storage Tank T-121 1305-098-3, 098-6"-D-GKO Aux. F.P. discharge to S/G E-089 2-1305-101-1 from Pump P-140 2-1305-101-1 101-6"-D-GKO Aux. F.P. discharge to S/G E-088 from Pump P-140 1305-050-1 079-2"-D-GKO Aux. F.P. P-140 Mini Flow Recirc 1305-050-1 050-2"-D-GEO Mini Flow Line to Storage TK T-121 2-1305-099-2, 099-6"-D-GKO P-141 discharge line downstream 1305-099-3, 2HV-4712 to 2HV-4714 & 2HV-4730 2-1305-099-4, 2-1305-099-5 1305-098-1, 098-6"-D-GKO P-140 discharge line downstream 1305-098-2, 2HV-4713 to 2HV-4715 & 2HV-4731 1305-098-3, 1305-098-4 1305-222-1 222-6"-C-GK1 Aux. F.W. line to S/G E-088 from 2HV-4714 & 2HV-2HV-4730 1305-223-1 223-6"-C-GK1 Aux F.W. line to S/G E,089 from 2HV-4715 & 2HV-4731 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Generator E-089 1305-189-1 189-18"-C-GK1 Feedwater Inlet to Steam Generator E-088 0I

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Main Steam System SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-001-5. 001-2"-C-HK1 Main Steam Isolation Valve 2HV-8205 Bypass Line 1301-002-5 002-2"-C-HK1 Main Steam Isolation Valve 2HV-8204 Bypass Line 1301-001-1 001-42"-C-HK1 Main Steam Outlet from Steam Generator E-088 1301-001-1, 001-40"-C-HK1 Main Steam Header through the 1301-001-2 Containment from Steam Generator E-088 1301-001-4 363-34"-C-HK1 Main Steam Supply to Main Steam Dump Valve and Main Steam Relief Valves from S/G E-088 1301-595-1 595-8"-C-HK1 Main Steam Supply to Main Steam Dump Valve 2HV-8419 from S/G E-088 1301-017-1 578-6"-C-HK1 Main Steam Supply to Auxiliary Feedwater Pump Turbine K-007 from S/G E-088 1301-017-1 578-4"-C-HK1 Main Steam Supply to Auxiliary Feedwater Pump Turbine K-007 from S/G E-088 1301-017-1, 017-4"-D-HKO Main Steam Supply to Auxiliary 1301-577-1 Feedwater Pump Turbine K-007 1301-577-1, 017-6"-D-HKO Main Steam Supply to Auxiliary 1301-017-2 Feedwater Pump Turbine K-007 1301-017-2 017-3"-D-HKO Main Steam Supply to Auxiliary Feedwater Pump Turbine K-007 1301-001-4 580-26"-C-HK1 Main Steam Supply to Main Steam Reliefs from S/G E-088 1301-002-1 002-42"-C-HKI Main Steam Outlet from Steam Generator E-089

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A STEADY STATE VIBRATIONS LINE DESIGNATION/HOT FUNCTIONAL TABLE 3 SYSTEM: Main Steam System SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-002-1, 002-40"-C-HK1 Main Steam Header through the 1301-002-2 Containment from Steam Generator E-089 1301-002-4 309-34"-C-HK1 Main Steam Supply to Main Steam Dump Valve 2HV-8421 and Main Steam Relief Valves from S/G E-089.

1301-582-1 582-8"-C-HK1 Main Steam Supply to Main Steam Dump Valve 2HV-8421 from S/G E-089 1301-002-4 583-26"-C-HK1 Main Steam Supply to Main Steam Reliefs and Aux. Feedwater Pump Turbine K-007 1301-004-1 004-6"-C-HK1 Main Steam Supply to Auxiliary Feedwater Pump Turbine K-007 from S/G E-088 1301-577-1, 577-4"-C-HK1 Main Steam Supply to Auxiliary 1301-577-2 Feedwater Pump Turbine K-007 from S/G E-88 1301-557-2 577-6"-C-HK1 Main Steam Supply to Auxiliary Feedwater Pump Turbine K-007 from S/G E-88

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Saltwater Cooling System SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1413-001-1, 001-30"-D-NS1 Saltwater Cooling Pump P-112(A) 1403-004-1 Discharge Header 1413-004-1, . 004-30"-D-NSI Saltwater Outlet From CCW Heat 1403-003-2 Exchanger EOO1(A) 1413-004-2 004-36"-D-NS1 Saltwater Common Discharge Header to Box Culvert Circ. Water Return Line 1413-002-1 002-30"-D-NSI Saltwater Cooling Pump P-113(B)

Discharge Header 1413-003-1, 003-30"-D-NS1 Saltwater Cooling Pump P-113(B) and 1413-005-1 P-114(B) Common Discharge Header 1413-005-1, 005-30"-D-NS1 Saltwater Outlet From CCW Heat 1413-005-2 Exchanger E-002(B) 1413-001-1 025-30"-D-NS1 Saltwater Cooling Pump P-307(A)

Discharge Header 1413-003-1 003-30"-D-NS1 Saltwater Cooling Pump P-114(B)

Discharge Header 1413-004-2, 020-30"-D-NS1 Saltwater Outlet From CCW Heat 1413-005-2 Exchangers E-001(A) and E-002(B) to Seawall Over flow Header 1413-005-2 019-36"-D-NS1 Saltwater Outlet From CCW Heat Exchangers E-001(A) and E-002(B) Seawall Overflow Header 1413-005-2 020-30"-D-NSI Saltwater Outlet From CCW Heat Exchangers E-001(A) and E-002(B) to Seawall Overflow Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Saltwater Cooling System SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1413-001-1, 001-30"-D-NS1 Saltwater Cooling Pump P-112(A) 1403-004-1 Discharge Header 1413-004-1, 004-30"-D-NSI Saltwater Outlet From CCW Heat 1403-003-2 Exchanger E001(A) 1413-004-2 004-36"-D-NS1 Saltwater Common Discharge Header to Box Culvert Circ. Water Return.Line 1413-002-1 002-30"-D-NS1 Saltwater Cooling Pump P-113(B)

Discharge Header 1413-003-1, 003-30"-D-NS1 Saltwater Cooling Pump P-113(B) and 1413-005-1 P-114(B) Common Dishcarge Header 1413-005-1, 005-30"-D-NS1 Saltwater Outlet From CCW Heat 1413-005-2 Exchanger E-002(B) 1413-001-1 025-30"-D-NSI Saltwater Cooling Pump P-307(A)

Discharge Header 1413-003-1 003-30"-D-NSI Saltwater Cooling Pump P-114(B)

Discharge Header 1413-004-2, 020-30"-D-NS1 Saltwater Outlet From CCW Heat 1413-005-2, Exchangers E-001(A) and E-002(B) to Seawall Overflow Header' 1413-005-2 019-36"-D-NSI Saltwater Outlet From CCW Heat Exchangers E-001(A) and E-002(B) Seawall Overflow Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A

'DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 1 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-145-1 145-28"-D-LL1 CCW Pump Discharge Header to CCW Heat Exchanger E-001(A) 1203-005-4 005-28"-D-LL1 CCW Heat Exchanger E-001(A) Discharge to Critical & Non Critical Loops 1203-005-3 005-18"-D-LL1 CCW Loop A Supply to Shutdown Heat Exchanger E-004 1203-318-1 318-6"-D-LL1 CCW Loop A Critical Loop Supply to HPSI Pump P-017, LPSI Pump P-015. Containment Spray Pump P-012, HPSI Pump P-018 (Loop A) 1203-032-1 023-2"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-032-1 023-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-032-1 032-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-032-1 384-3/4"-D-LL1 CCW Loop A Supply to HPSI Pump P-017 1203-020-1 020-1-1/2"-D-LL1 CCW Loop A Supply to LPSI Pump.P-015 1203-020-1 098-1-1/2"-D-LL1 CCW Loop A Supply to LPSI Pump P-015 1203-020-1 388-3/4"-D-LL1 CCW Loop A Supply to LPSI.

Pump P-015 1203-043-1 043-1-1/2"-D-LL1 CCW Loop A Supply to Containment Spray Pump P-012 1203-043-1 110-1-1/2"-D-LL1 CCW Loop A Supply to Containment Spray Pump P-012 1203-043-01 377-3/4"-D-LL1 CCW Loop A Supply to Containment

. Spray Pump P-012

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 2 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-246-01 246-8"-D-LL1 CCW Loop A Supply to Control Rm Emergency Chiller E-336 2-1203-246-1 305-8"-D-LL1 CCW Loop A Supply to Control Rm Emergency Chiller E-336 1203-243-1 243-8"-D-LL1 CCW Loop A Supply to Letdown Heat Exch. E-062 1203-243-3 228-8"-D-LL1 CCW Supply to Letdown Heat Exch.

E-062 1203-092-01 & 092-3"-D-LL1 CCW Loop A Supply to Post Accident 02 Cleanup Unit E-370 1203-005-03 009-28"-D-LL1 CCW Non Critical Loop Supply Line 1203-009-01 & -009-24"-D-LL1 CCW Non Critical Loop Supply Line 02 1203-231-01 231-10"-O-LL1 CCW Non Critical Loop CEDM and RCP Supply Line 1203-231-01 200-10"-D-LL1 CCW Non Critical Loop CEDM and 1203-247-02 RCP Supply Line 1203-247-01, 247-10"-D-LL1 CCW Non Critical Loop CEDM and 1203-247-02, RCP Supply Line 1203-247-03 1203-247-01, 247-8"-D-LL1 CCW Non Critical Loop CEDM and 1203-247-02, RCP Supply Line 1203-247-03 1203-247-03 247-6"-D-LL1 CCW Non Critical Loop CEDM and RCP Supply Line 1203-008-01, 008-4"-D-LL1 CCW Non Critical Loop Supply to RCP 1203-008-02 Pumps P-001 and P-003 (Seals)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 3 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-247-2 074-6"-D-LL1 CCW Non Critical Loop Supply to RCP Pumps, P-0O1.& P-003 Motor Coolers 1203-008-01, 008-2-1/2"-D-LL1 CCW Non Critical Loop Supply to 1203-008-02 RCP Pump P-001 (Seal) 1203-008-01, 014-2-1/2"-D-LL1 CCW Non Critical Loop Supply to 1203-008-02 RCP Pump P-003 (Seal) 1203-070-1 070-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-003 Motor Cooler 1203-074-01, 074-4"-D-LL1 CCW Non Critical Loop Supply to RCP 1203-247-2 Pump P-001 Motor Cooler 1203-078-01 078-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-002 Motor Cooler 1203-082-01 082-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-004 Motor Cooler 1203-013-01 013-4"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-002 and P-004 (Seals) 1203-012-01 012-2-1/2"-D-LL1 CCW Non Critical Loop Supply to RCP Pump P-004 (Seals) 1203-013-01, 013-2-1/2"-D-LL1 CCW Non Critical Loop Supply to 1203-013-02 RCP Pump P-002 (Seals) 1203-012-01 375-1-1/2"-D-FEO CCW Critical Loop Supply to RCP Pump P-004 (Seals)

.1203-013-01, 373-1-1/2"-D-FEO CCW Non Critical Loop Supply to 1203-013-02 RCP Pump P-002 (Seals) 1203-008-02 372-1-1/2"-D-FEO CCW Non Critical Loop Supply to RCP Pump P-001 (Seals)

0 PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 4 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-374-01 374-1-1/2"-L1 CCW Non Critical Loop Supply to RCP Pump P-003 (Seal) 1203-064-01 064-3"-D-LL1 CCW Non Critical Loop Supply to CEDM Unit E-403(A) 1203-011-01 011-12"-D-LL1 CCW Unit 2/Unit 3 Gross Connect Supply Header Non Critical Loop 1203LO11-03, 130-8"-D-LL1 CCW Non Critical Loop Supply to Misc.

1203-130-01 Waste Evaporators W081 & W082 (Later) 361-1-1/2"-D-LL1 CCW Non Critical Loop Supply to RCR Sample Cooler AX7546 1203-011-01,. 125-8"-D-LL1 CCW Non Critical Loop Supply to Broic 1203-125-1 Acid Concentrator 1203-108-01 108-6"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-354 1203-108-01 108-3"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-354 1203-328-01 328-6"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-355 1203-328-01 328-3"-D-LL1 CCW Non Critical Loop Supply to Gas Stripper E-355 1203-102-01, 102-16"-D-LL1 CCW Non Critical Loop Supply to 1203-102-02 Spend Fuel Pool Heat Exchangers E-005 & E-006 1203-102-02 102-12"-D-LL1 CCW Non Critical Loop Supply to Spent Fuel Pool Heat Exchanger E-005 1203-102-02 293-12"-D-LL1 CCW Non Critical Loop Supply to Spent Fuel Pool Heat Exchanger E-006

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 5 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-117-01 117-2"-D-LL1 CCW Non Critical Loop Supply to Waste Gas Compressors C010 & CO11 2-1203-038-1, 024-2"-D-LL1 CCW Return From HPSI Pump P-017.

2-1203-038-2 2-1203-038-1 024-1-1/2"-D-LL1 CCW Return From HPSI Pump P-017 2-1203-038-1 038-1-1/2"-D-LL1 CCW Return From HPSI Pump P-017 2-1203-038-1 385-3/4"-DLL1CCW Return From HPSI Pump P-017 2-1203-021-1 021-1-1/2"-DLL1 CCW Return From LPSI Pump P-015 2-1203-021-1 101-1-1/2"-D-LL1 CCW Return From LPSI Pump P-015 2-1203-021-1 389-3/4"-D-LL1 CCW Return From LPSI Pump P-015 2-1203-044-1 044-1-1/2"-D-LL1 CCW Return From Containment Spray Pump P-012 2-1203-044-1 111-1-1/2"-D-LL1 CCW Return From Containment Spray Pump P-012 2-1203-044-1 378-3/4"-D-LL1 CCW Return From Containment Spray Pump P-012 2-1203-306-1 307-8"-D-LL1 CCW Return From Control Rm Emergency Chiller Unit E-336 2-1203-306-1 306-8"-D-LL1 CCW Return From Control Rm Emergency Chiller Unit E-336 2-1203-229-1 229-10"-D-LL1 CCW Return From Letdown Heat Exchanger E-062 2-1203-100-1, 210-10"-D-LL1 CCW Return From Letdown Heat 2-1203-210-2, Exchanger E-062 2-1203-210-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 6 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-094-01 094-3 1'-D-LL1 CCW Return From Post Accident Cleanup Unit E-370 1203-151-01 151-10"-D-LL1 CCW Minimum Flow Line for Pump P-024 1203-265-1, 265-6"-D-LL1 CCW Return Header for HPSI Pumps 1203-265-2 P-017 & P-018 LPSI Pump P-015, and Containment Spray Pump P-012 1203-265-1 158-6"-D-LL1 CCW Surge Tank T-003(A) Supply Header 2-1203-015-2 265-18"-D-LL1 CCW Return Header for Shutdown Heat Exchanger E-004 1203-142-01 265-24"-D-LL1 CCW Critical Loop Common Return Header 1203-142-01 142-24"-D-LL1 CCW Critical Loop Common Return Header 1203-142-01, 265-18"-D-LL1 CCW Return Header From Control Rm 1203-142-02 Emergency Chiller Unit E-336, Letdown. Heat Exchanger E-062 and Post Accident Cleanup Unit E-370.

1203-140-1, 209-28"-D-LL1 CCW Pump P-024 Suction Piping 1203-209-01 1203-139-1, 139-24-D-LL1 CCW Non Critical Loop Common Return 1203-139-2, Header 1203-140-1 1203-106-1 106-16"-D-LL1 CCW Non Critical Loop Return From Spent Fuel Pool Heat Exchangers E-005 and E-006 1203-106-2 106-12"-D-LL1 CCW Non Critical Loop Return From Spent Fuel Pool Heat Exchanger E-005 1203-106-2 103-12"-D-LL1 CCW Non Critical Loop Return From Spent Fuel Pool Heat Exchanger E-006

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 7 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-161-1, 161-12"-D-LL1 CCW Unit 2/Unit 3 Cross Connect 3-1203-161-2 Return Header.Non Critical Loop 3-1203-329-1 329-6"-D-LL1 CCW Non Critical Loop Return From Gas Stripper E-355 3-1203-112-1 112-6"-D-LL1 CCW Non Critical Loop Return From Gas Stripper E-354 3-1203-118-1 118-2"-D-LL1 CCW Non Critical Loop Return From Waste Gas Compressors C010 and CO11 1203-132-1, 132-8"-D-LL1 CCW Non Critical Loop Return From 1203-132-2 Misc. Waste Evaporator W081 & W082 1203-127-1, 127-8"-D-LL1 CCW Non Critical Loop Return From 1203-127-2 Boric Acid Concentrator W080 & W079 1203-252-1 252-10"-D-LL1 CCW Non-Critical Loop Return Header 1203-139-2, 162-10"-D-LL1 CCW Non Critical Loop Return Header 1203-252-1 1203-252-1, 252-8"-D-LL1 CCW Non Critical Loop Return Header 1203-252-2.

1203-252-2 252-6"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-002 & P-004 Motor Coolers 1203-010-1 010-4"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-002 & P-004 (Seals) 1203-010-2 010-2-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-002 (Seals) 1203-010-2 365-1-1/2"-D-FEO CCW Non Critical Loop Return from RC Pump P-002 (Seals) 1203-010-1 004-2-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-004 (Seals)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 8 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-010-1 367-1-1/2"-D-FEO CCW Non Critical Loop Return from RC Pump P-004 (Seals) 2-1203-084-1 084-4"-D-LL1 CCW Non Critical Loop Return from 1203-084-2 RC Pump P-004 Motor Cooler 1203-080-1, 080-4"-D-LL1 CCW Non Critical Loop Return from 1203-252-2 RC Pump P-002 Motor Cooler 1203-091-1 091-3"-D-LL1 CCW Non Critical Loop Return from CEDM Cooling Unit E-403(A) 1203-091-1 076-6"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-001 & P-003 Motor Coolers 1203-076-1 076-4"-D-LL1 CCW Non Critical Loop Return from RC Pump P-001 Motor Cooler 1203-072-1 072-4"-D-LL1 CCW Non Critical Loop Return from 1203-091-1 RC Pump P-003 Motor Cooler 2-1203-006-2 006-4"-D-LL1 CCW Non Critical Loop Common Return from RC Pumps P-001 & P-003 (Seals) 2-1203-006-2 001-2-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-003 (Seals) 1203-366-1 366-1-1/2"-D-LL1 Non Critical Loop Return from RC Pump P-003 (Seals) 1203-006-1, 006-2-1/2"-D-LL1 CCW Non Critical Loop Return RC 2-1203-006-2 Pump P-001 (Seals) 2-1203-368-1 364-1-1/2"-D-LL1 CCW Non Critical Loop Return from RC Pump P-001 (Seals) 1203-148-1 148-28"-D-LL1 CCW Pump P-025 Suction Header 1203-147-1 147-28"-D-LL1 CCW Pump P-025 Suction Piping

PIPING VERIFICATION .PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 9 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-149-1 149-28"-D-LL1 CCW Pump P-025 Discharge Header to CCW "Loop A" 1203-157-1 153-10"-D-LL1 CCW Pump P-025 Minimum Flow Line 1203-249-1, 249-3"-D-LL1 CCW Pumps P-024 and P-025 Cooling 1203-249-2, Water Supply Line 1203-290-1 1203-247-2 090-3"-D-LL1 CCW Non Critical Loop Supply to CEDM Cooling Unit E-404(B)

(Later) 081-2"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 (Later) 081-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 (Later) 039-1-1/2"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 (Later) 382-3/4"-D-LL1 CCW Loop A Supply to HPSI Pump P-018 1203-252-2 065-3"-D-LL1 CCW Non Critical Loop Return from CEDM Cooling Unit E-404(B)

(Later). 319-2"-D-LL1 CCW Loop A Return from HPSI Pump P-018 (Later) 319-1-1/2"-D-LL1 CCW Loop A Return from HPSI Pump P-018 (Later) 062-1-1/2"-D-LL1 CCW Loop A Return from HPSI Pump P-018 (Later) 383-3/4"-D-LL1 CCW Loop A Return from HPSI Pump P-018 1203-148-1 148-28"-D-LL1 CCW Pump P-025 Suction Header

PIPING VERIFICATION PROGRAM SONGS .2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 10 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-150-1 150-28"-D-LL1 CCW Pump P-025 Discharge Header to CCW "Loop B" 1203-290-1 290-3"-D-LL1 CCW Pumps P-025 and P-026 Cooling Water Supply Line (Later) 017-2"-D-LL1 CCW Loop B Supply to HPSI Pump P-018 (Later) 053-2"-D-LL1 CCW Loop B Return from HPSI Pump P-018 1203-005-1, 005-18"-D-LL1 CCW Loop A Supply to Shutdown Heat 1203-005-2 Exchanger E-004 1203-007-1, 007-18"-D-LL1 CCW Loop B Supply to Shutdown Heat 1203-007-2 Exchanger E-003 2-1203-015-1, 015-18"-D-LL1 CCW Loop A Return from Shutdown Heat 2-1203-015-2 Exchanger E-004 1203-041-1, 041-18"-D-LL1 CCW Loop B Return from Shutdown Heat 1203-041-2 Exchanger E-003 1203-146-01, 146-28"-D-LL1 CCW Pump P-026 Discharge Header 1203-150-01 1203-164-01, 164-28"-D-LL1 CCW Heat Exchanger E-002(B) Discharge 1203-007-02, Header to Critical and Noncritical .Loops 1203-005-03 1203-007-01, 007-18"-D-LL1 CCW Loop B Supply to the Shutdown 1203-007-02 Heat Exchanger E-003 1203-017-1 017-6"-D-LL1 CCW Loop B Critical Loop Supply to HPSI Pumps P-019 & P-018, LPSI Pump P-016 and Containment Spray Pump P-013 1203-292-01, 292-18"-D-LL1 CCW Loop B Critical Loop Supply to 1203-292-02, CCW Pumps, Letdown Heat Exch. E-062 and Containment 1203-292-03 Emergency Cooler E-402.

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 11 OF 16 ISOMETRIC DRAWING. LINE NUMBER & DESCRIPTION 1203-052-01 052-1-1/2"-D-LL1 CCW Loop B Supply to Containment Spray Pump P-013 1203-052-01 109-1-1/2"-D-LL1 CCW Loop B Supply to Containment Spray Pump P-013 1203-052-01 379-1-1/2"-D-LL1 CCW Loop B Supply to Containment Spray Pump P-013 2-1203-046-1 046-1-1/2"-D-LL1 CCW Loop B Supply to LPSI Pump P-016 2-1203-046-1 105-1-1/2"-D-LL1 CCW Loop B Supply to LPSI Pump P-016 2-1203-046-1 390-3/4"-D-LL1 CCW Loop B Supply to.LPSI Pump P-016 1203-049-1 049-2"-D-LL1 CCW Loop B Supply to HPSI Pump P-019 1203-049-1 049-1-1/2"-D-LL1 CCW.Loop B Supply to HPSI Pump P-019 1203-049-1 033-1-1/2"-D-LL1 CCW Loop B Supply to HPSI Pump P-019 1203-049-1 386-3/4"-D-LL1 CCW Loop B Supply to HPSI Pump P-019 2-1203-289-2 289-8"-D-LL1 CCW Loop B Supply to Control Rm 1203-292-1 Emergency Chiller Unit E-335 2-1203-289-2 301-8"-D-LL1 CCW Loop B Supply to Control Rm Emergency Chiller Unit E-335 2-1203-099-1, 099-8"-D-LL1 CCW Loop B Supply.to Letdown Heat 1203-292-1 Exchanger E-062 1203-093-1, 093-3"-D-LL1 CCW Loop B Supply to Post Accident 1203-093-2 Cleanup E-371 2-1203-018-1 018-1-1/2"-D-LL1 CCW Loop B Return from Containment Spray Pump P-013

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 12 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1203-018-1 107-1-1/2"-D-LL1 CCW Loop B Return from Containment Spray Pump P-013 2-1203-018-1 380-3/4"-D-LL1 CCW Loop B Return from Containment Spray Pump P-013 2-1203-047-1 047-1-1/2"-D-LL1 CCW Loop B Return from Containment LPSI Pump P-016 2-1203-047-1 104-1-1/2"-D-LL1 CCW Loop B Return from LPSI Pump P-016 2-1203-047-1 391-1-1/2"-D-LL1 CCW Loop B Return from LPSI Pump P-016 1203-050-1 050-2"-D-LL1 CCW Loop B Return from.HPSI Pump P-019 1203-050-1 050-1-1/2"-D-LL1 CCW Loop B Return from HPSI Pump P-019 1203-050-1 036-1-1/2"-D-LL1 CCW Loop B Return from HPSI Pump P-019 1203-050-1 387-3/4"-D-LL1 CCW Loop B Return from HPSI Pump P-019 2-1203-302-1, 302-8"-D-LL1 CCW Loop B Return from Control Rm 2-1203-302-2 Emergency Chiller Unit E-335 2-1203-100-1 100-8"-D-LL1 CCW Loop B Return from Letdown Heat Exchanger Unit E-062 2-1203-095-1, 095-3"-D-LL1 CCW Loop B Return from Post Accident 1203-095-2 Cleanup Unit E-371 1203-216-1 216-10"-D-LL1 CCW Loop B Return from Post Accident Cleanup Unit E-371 and Containment Emergency Cooling Unit E-402

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 13 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1203-217-1, 266-18"-D-LL1 CCW Loop B Return from Letdown Heat 2-1203-217-2, Exchanger E-062 and Containment Emergency Cooling 2-1203-217-3 Unit E-402 2-1203-217-1 .266-24"-D-LL1 CCW Loop B Common Return Header 1203-140-1 144-24"-D-LL1 CCW Loop B Common Return Header Suction Side of CCW Pumps 1203-140-1, 140-28"-D-LL1 CCW Loop B Suction Piping for CCW 1203-147-1, Pumps P-026 & P-25 1203-148-1 1203-266-1, 266-6"-D-LL1 Loop B Common Return from HPSI 1203-266-2 Pumps P-019 & P-018 LPSI Pump P-016 and Contain ment Spray Pump P-013.

1203-159-1 159-6"-LL1 CCW Surge Tank T-003(A) Supply Header 1203-157-2 155-10"-D-LL1 CCW Minimum Flow Line for Pump P-026 1203-205-1 205-10"-D-LL1 CCW Loop A Supply to Containment Emergency Cooling Unit E-399 1203-205-1, 277-10"-C-LL1 CCW Loop A Supply to Containment 1203-277-1 Emergency Cooling Unit E-399 1203-244-1 204-I0"-D-LL1 CCW Loop A Supply to Containment Emergency Cooling Unit E-401 1203-244-1, 281-10"-D-LL1 CCW Loop A Supply to Containment 1203-281-1 Emergency Cooling Unit E-401 1203-203-1 203-10"-D-LL1 CCW Loop B Supply to Containment Emergency Cooling Unit E-400 1203-285-1, 283-10"-C-LL1 CCW Loop B Supply to Containment 1203-203-1 Emergency Cooling Unit E-400 1203-202-1 202-10"-D-LLI CCW Loop B Supply to Containment Emergency Cooling Unit E-402

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 14 OF 16 ISOMETRIC DRAWING LINE NUMBER &.DESCRIPTION 1203-202-1, 273-10"-C-LL1 CCW Loop B Supply to Containment 1203-273-1 Emergency Cooling Unit E-402 1203-142-2, 283-10"-D-LL1 CCW Loop A Return from Containment 1203-283-1 Emergency Cooling Unit E-401 1203-142-2 211-10"-D-LL1 CCW Loop A Return from Containment Emergency Cooling Unit E-401 1203-213-1, 279-10"-C-LL1 CCW Loop A Return from Containment 1203-279-1 . Emergency Cooling Unit E-399 1203-213-1 213-10"-D-LLI CCW Loop A Return from Containment Emergency Cooling Unit E-399 1203--217-3, 287-10"-D-LL1 CCW Loop B Return from Containment 1203-287-1 Emergency Cooling Unit E-400 1203-217-3 215-10"-D-LL1 CCW Loop B Return from Containment Emergency Cooling Unit E-400 1203-216-1, 275-10"-C-LL1 CCW Loop B Return from Containment 1203-275-1. Emergency Cooling Unit E-402 1203-216-1 216-10"-D-LL1 CCW Loop B Return from Containment Emergency Cooling Unit E-402 2-1203-015-2 265-18"-D-LL1 CCW Return Header for Shutdown Heat Exchanger E-004 2-1203-015-1, 015-18"-D-LL1 CCW Loop A Return from Shutdown Heat 2-1203-015-2 Exchanger E-004 1203-142-01, 265-18"-D-LL1 CCW Return Header from Control Rm 1203-142-02 Emergency Chiller Unit E-336, Letdown. Heat Exchanger E-062 and Post Accident Cleanup Unit E-370.

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 15 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1203-100-1, 210-10"-D-LL1 CCW Return from Letdown Heat 2-1203-210-2, Exchanger E-062 2-1203-210-2 1203-243-1 243-8"-D-LL1 CCW Loop A Supply to Letdown.. Heat Exchanger E-062 1203-005-3 244-18"-D-LL1 CCW Loop A Supply 1203-244-1 1203-252-1 252-10"-D-LL1 CCW Non-Critical Loop Return Header 1203-139-2, 162-10"-D-LL1 CCW Non-Critical Loop Return Header 1203-252-1 1203-252-1 162-10"-D-LL1 CCW Non-Critical Loop Return Header 1203-139-2 1203-139-2 137-10"-D-LL1 CCW Non-Critical Loop Return Header 1203-140-1, 209-28"-D-LL1 CCW Pump P-024 Suction Piping 1203-209-01 1203-139-1, 139-24"-D-LL1 CCW Non-Critical Loop Common Return 1203-139-2, Header 1203-140-1 1203-005-03 009-28"-D-LL1 CCW Non-Critical Loop Supply Line 1203-005-4 005-28"-D-LL1 CCW Heat Exch. E-001(A) Discharge to Critical & Non-Critical Loops 1203-009-01 & 009-24"-D-LL1 CCW Non-Critical.Loop Supply Line 02 1203-231-01 231-10"-O-LL1 CCW Non-Critical Loop CEDM and RCP Supply Line 1203-231-01 200-10"-D-LL1 CCW Non-Critical Loop CEDM and RCP 1203-247-02 Supply Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Component Cooling Water System SHEET 16 OF 16 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1203-247-01, 247-10"-D-LL1 CCW Non-Critical Loop CEDM and RCP 1203-247-02, Supply Line 1203-247-03 2-1203-100-1 100-8"-D-LL1 CCW Loop B Return from Letdown Heat Exchanger Unit E-062 2-1203-217-1, 266-18"-D-LL1 CCW Loop B Return from Letdown Heat 2-1203-217-2, Exchanger E-062 and Containment Emergency Cooling 2-1203-217-3 Unit E-402 1203-292-01, 292-18"-D-LL1 CCW Loop B Critical Loop Supply to 1203-292-02, CCW Pumps, Letdown Heat Exch. E-062 and Containment 1.203-292-03 Emergency Cooler E-402.

2-1203-099-1, 099-8"-D-LL1 CCW Loop B Supply to Letdown Heat 1203-292-1 Exchanger E-062 2-1203-217-1 266-24"-D-LL1 CCW Loop B Common Return Header 1203-041-1, 041-18"-D-LL1 CCW Loop B Return from Shutdown 1203-041-2 Heat Exchanger E-003 1203-140-1 140-28"-D-LL1 CCW Loop B Suction Piping for CCW Pumps P-026 & P-025 1203-005-03 009-28"-D-LL1 CCW Non-Critical Loop Supply Line 1203-164-01, 164-28"-D-LL1 CCW Heat Exchanger E-002(B) Discharge 1203-007-02, Header to Critical and Non-Critical Loops 1203-005-03 1203-231-01 200-10"-D-LL1 CCW Non-Critical Loop CEDM and RCP 1203-247-02 Supply Line 1203-247-01, 247-10"-D-LL1 CCW Non-Critical Loop CEDM and RCP 1203-247-02, Supply Line 1203-247-03

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Diesel Generator System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-065-1 065-2-1/2"-D-LL1 Air Line from Starting Air Package C012 to the 20 cyl Diesel Engine 2420-067-1 067-2-1/2"-D-LL1 Air Line from Starting Air Package C012 to the 20 cyl Diesel Engine 2420-036-1, 036-3"-D-LL1 .from Diesel Generator G-002 Expansion 2420-036-2 Tank T-190 to Engine Auxiliary Systems.

2420-041-1 041-8"-D-LL1 from Engine Auxiliary Systems to Radiator E-550 on Diesel Generator G-002 16 cyl Diesel Engine 2420-042-1 042-8"-D-LL1 from Radiator E-550 to Auxiliary Systems on Diesel Generator G-002, 16 cyl Diesel Engine.

2420-042-1 042-6"-D-LL1 from Radiator, E-550 to Auxiliary Systems on Diesel Generator G-002 16 cyl Diesel Engine.

2420-043-1 043-2"-D-LL1 from Fuel Oil Day Tank T-133 to Diesel Generator G-002 16 cyl. Diesel Engine 2420-044-1 044-2"-D-LL1 from Diesel Generator G-002 16 cyl Diesel Engine to Fuel Oil Day Tank T-133 2420-045-1 045-24"-D-LL1 from.Air Intake Filter F-440 to.

Diesel Generator G-002 16 cyl Diesel Engine 2420-046-1 046-22"-D-LL1 from Diesel Generator G-002 16 cyl Diesel Engine to Exhaust Silencer F-438 2420-047-1 047-22"-D-LL1 from Exhaust Silence F-438 to Atmosphere.

2420-049-1 049-3"-D-LL1 from Diesel Generator G-002 Expansion Tank T-162 to Engine Auxiliary Systems

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Diesel Generator System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-054-1 054-8"-D-LL1 from Engine Auxiliary Systems to Radiator E-546 on Diesel Generator G-002 20 cyl Diesel Engine 2420-055-1 055-8"-D-LL1 from Radiator E-546 to Auxiliary Systems on Diesel Generator G-002, 20 cyl Diesel Engine.

2420-055-1 055-6"-D-LL1 from Diesel Radiator E-546 to Auxiliary Systems on Diesel Generator G-002, 20 cyl Diesel Engine.

2420-056-1 056-2"-D-LL1 from Fuel Oil Day Tank T-133 to Diesel Generator G-002 20 cyl Diesel Engine 2420-057-1 057-2"-D-LL1 from Diesel Generator G-002 20 cyl Diesel Engine to Fuel Oil Day Tank T-133 2420-058-1 058-24"-D-LL1 from Air Intake Filter F-436 to Diesel Generator G-002, 20 cyl Diesel Engine 2420-059-1 059-22"-D-LL1 from Diesel Generator G-002 20 cyl Diesel Engine to Exhaust Silencer F-442 2420-060-1 060-24"-D-LL1 from Exhaust Silencer F-442 to atmosphere.

2420-032-1 032-2-1/2"-D-LL1 Air Line From Starting Air Package CO-13 to Diesel Generator G-003 20 cyl Diesel Engine 2420-034-1 034-2-1/2"-D-LL1 Air Line from Start Air Package C013 to Diesel Generator G-003 20 cyl Diesel Engine 2420-002-1 002-3"-D-LL1 from Diesel Generator G-003 Expansion Tnak T-189 to Engine Auxiliary Systems 2420-007-1 007-8"-D-LL1 from Diesel Generator G-003 Engine Auxiliary Systems to Radiator E-549

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Diesel Generator System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-008-1 008-8"-D-LL1 from Radiator E-549 to Diesel Generator G-003 Engine Auxiliary Systems 2420-008-1 008-6"-D-LL1 from Radiator E-549 to Diesel Generator G-003 Engineer Auxiliary Systems 2420-009-1 009-2"-D-LL1 from Fuel Oil Day Tank T-134 to Diesel Generator G-003 16 cyl Diesel Engine 2420-010-1 010-2"-D-LL1 from Diesel Generator E-003 16.cyl Diesel Engine to Fuel Oil Day Tank T-134 2420-011-1 011-24"-D-LL1 from Air Intake Filter F-441 to Diesel Generator G-003 16 cyl Diesel Engine.

2420-012-1 012-22"-D-LL1 from Diesel Generator G-003 16 cyl Diesel Engine to Exhaust Silencer F-439 2420-013-1 013-22"-D-LL1 from Exhaust Silencer F-439 to Atmosphere.

2420-016-1 016-3"-D-LL1 From Diesel Generator G-003 Expansion Tnak T-161 to Engine Auxiliary Systems 2420-021-1 021-8"-D-LL1 from Diesel Generator G-003 Engine Auxiliary Systems to Radiator E-547 2420-022-1 022-8"-D-LL1 from Radiator E-547 to Diesel Generator G-003 Engine Auxiliary Systems 2420-022-1 022-6"-D-LL1 from Radiator E-547 to Diesel Generator G-003 Engine Auxiliary Systems 2420-025-1 025-2"-D-LL1 from Fuel Oil Day Tank T-134 to Diesel Generator G-003 20 cyl Diesel Engine 2420-026-1 026-2"-D-LL1 from Diesel Generator G-003 20 cyl Diesel Engine to Fuel Oil Day Tank T-134

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Diesel Generator System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2420-027-1 027-24"-D-LL1 from Air Intake Filter F-437 to Diesel Generator G-003 20 cyl Diesel Engine 2420-028-1 028-24"-D-LL1 from Diesel Generator G-003 20 cyl Diesel Engine to Exhaust Silencer F-443 2420-029-1 029-24"-D-LL1 from Exhaust Silencer F-443 to Atmosphere

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Diesel Fuel Storage System SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2421-018-1 018-2"-D-LL1 Discharge from Fuel Transfer 2-2421-018-2 Pump P-096 to Fuel Oil Day Tank T-133 2-2421-018-3 2421-018-3 018-3"-D-LL1 Diesel Fuel Oil Transfer Pumps P-098 and P-093 Common Discharge Cross Connect Line 2421-023-1 023-3"-D-LL1 Diesel Fuel Storage Tank T-035 Vent Line 2421-018-2 019-2"-D-LL1 Fuel Oil Filter F-135 Line.

2421-018-3 020-2"-D-LL1 Fuel Oil Transfer Pump P-093 Discharge Line.

2421-068-1 068-3"-D-LL1 Fuel Oil Day Tank (T-133) Overflow 2-2421-068-2 Line to Diesel Fuel Storage Tank (T-035) 2-2421-022-1 022-3"-D-LL1 Diesel Fuel Oil T-035 Recirc Line 2-2421-017-1 017-4"-D-LL1 Diesel Fuel Storage Tank T-035 Fill Line.

2421-027-1, 027-2"-D-LL1 Discharge from Fuel Transfer 2421-027-2 Pump P-095 to Fuel Oil Day Tank T-134 2421-027-3 027-3"-D-LL1 Diesel Fuel Oil Transfer Pumps P-095 &

P-094 Common Discharge Cross Connect Line.

2421-032-1 032-3"-D-LL1 Diesel Fuel Storage Tank T-036 Vent Line.

2-2421-018-2 028-2"-D-LL1 Fuel Oil Filter F-135 Line.

2-2421-018-3 029-2"-D-LL1 Fuel Oil Transfer Pump P-094 Discharge Line.

2-2421-066-1 066-3"-D-LL1 Fuel Oil Day Tank (T-134) Overflow Line to Diesel Fuel Storage Tank (T-036).

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Diesel Fuel Storage System SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-2421-066-2 085-3"-D-LL1 Fuel Oil Day Tanks T-133 and T-134 Overflow Lines Cross Connect Line.

2421-027-3 031-3"-D-LL1 Diesel Fuel Oil Storage Tank T-036 Recirc Line 2421-026-1 026-4"-D-LL1 Diesel Fuel Oil Storage Tank T-036 Fill Line.

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Spent Fuel Pool Cooling System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1219-010-1, 010-14"-D-LL1 Spent Fuel Pumps Suction Header from 1219-010-2 Spent Fuel Pool 1219-007-2 009-10"-D-LLO Refueling Cavity Drain Line Cross Connect with Spent Fuel System.

1219-010-1 010-10"-D-LLO Spent Fuel Pump P-010 Suction Line.

1219-011-1 011-10"-D-LLO Spent Fuel Pump P-010 Discharge Line to Spent Fuel Pool Heat Exchanger E-005, 1219-025-1, 025-10"-D-LLO Spent Fuel Pool Heat Exchanger E-005 1219-025-2 Outlet.

1219-025-1, 025-12"-D-LLO Spent Fuel Pool Heat Exchangers E-005 1219-025-2 & E-006 Common Outlet Header.

1219-025-3 031-10"-D-LLO Spent Fuel Pool Return Line from Common Outlet Header 025-12"-D-LLO.

1219-025-3 063-8"-D-LLO Spent Fuel Pool Distribution Header.

1219-025-3 064-8"-D-LLO Spent Fuel Pool Distribution Header.

1219-025-4 025-4"-D-LLO Spent Fuel Pool Skimmer Line.

1219-024-1 023-3"-D-LLO Spent Fuel Pump P-010 Recirc Line.

1219-024-1 024-4"-D-LLO Spent Fuel Pumps P-010 & P-009 Common Recirc Line.

1219-025-5 063-3"-D-LLO Spent Fuel Pool Distribution Branch 1219-025-5 133-4"-D-LLO Spent Fuel Pool Distribution Branch 1219-025-5 132-4"-D-LLO 1219-025-5 131-4"-D-LLO 1219-025-5 130-4"-D-LLO

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Spent Fuel Pool Cooling System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1219-025-5 129-4"-D-LLO 1219-025-5 134-4"-D-LLO 1219-025-5 135-4"-D-LLO 1219-025-5 136-4"-D-LLO 1219-025-5 137-4"-D-LLO 1219-025-5 138-4"-D-LLO 1219-025-5 064-3"-D-LLO 1219-010-1 012-10"-D-LLO Spent Fuel Pool Cooling Pump P-009 Suction Line 1219-011-1 013-10"-D-LLO P009 Discharge Line 1219-024-1 024-3"-D-LLO P009 Mini - Recirc Line 1219-011-1 014-10"-D-LLO Heat Exchanger Inlet X-Connect Line 1219-025-4 025-4"-D-LLO Spent Fuel Pool (Transfer) Skimmer 1219-019-1 019-4"-D-LLO Spent Fuel Pool (Transfer) Drain Line 1219-007-1 007-10"-D-LLO Spent Fuel Pool and Refueling Cavity Drain Suction X-Connect 1219-025-2 030-4"'-D-LLO Supply to Spent Fuel Cask Storage Pool 1219-011-1 014-10"-D-LLO Heat Exchanger Inlet X-Connect 1219-011-1 011-10"-D-LLO Common Discharge Line to Heat Exchanger E-005 1219-025-1 025-10"-D-LLO Heat Exchanger E-005 Outlet 1219-025-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Spent Fuel Pool Cooling System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1219-025-1 025-12"-D-LLO Heat Exchanger Outlet Header 1219-025-2 1219-025-3 031-10"-D-LLO Supply to Spent Fuel Pool Distribution Header 1219-025-3 063-8"-D-LLO Spent Fuel Pool Distribution Header 1219-025-3 064-8"-D-LLO Spent Fuel Pool Distribution Header 1219-025-5 063-3"-D-LLO Spent Fuel Pool Distribution Branch 1219-025-5 133-4"-D-LLO Spent Fuel Pool Distribution Branch 1219-025-5 132-4"-D-LLO 1219-025-5 131-4"-D-LLO 1219-025-5 130-4"-D-LLO 1219-025-5 129-4"-D-LLO 1219-025-5 134-4"-D-LLO 1219-025-5 135-4"-D-LLO 1219-025-5 136-4"-D-LLO 1219-025-5 137-4"-D-LLO 1219-025-5 138-4"-D-LLO 1219-025-5 064-3"-D-LLO 1219-010-1 010-14"-D-LLO Common Suction Header for Spent 1219-010-2 Fuel Pool Pumps 1219-011-1 014-102-D-LLO Inlet to Heat Exchanger E-006 1219-025-1 026-102-D-LLO Outlet of Heat Exchanger E-006

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Spent Fuel Pool Cooling System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1219-025-2 030-4"-D-LLO Supply to Spent Fuel Cask Storage Pool 1219-024-1 024-4"-D-LLO Common Mini - Recirc Line 1219-025-4 025-4"-D-LLO Supply Spent Fuel Pool (Transfer) 1219-019-1 019-4"-D-LLO Spent Fuel Pool (Transfer) Drain Line 1219-007-1 007-10"-D-LLO Spent Fuel Pool and Refueling Cavity Drain Suction X-Connect 1219-007-2 009-10"-D-LLO Refueling Cavity Drain Line Cross Connect with Spent Fuel System

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 1 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-242-1 242-8"-D-LL1 Discharge Line from Pump P-162 to Chiller Unit E-336.

1513-244-1, 244-8"-D-LL1 Discharge Line from Chiller E-336 to 1513-244-2 the Aux. Bldg., Safety Equip. Bldg. and Fuel Handling Bldg.

1513-252-1 252-6"-D-LL1 Supply to Aux. Bldg. ESF Switch Gear Rm and Control Rm Unit 2 & Unit 3 1513-242-1 263-1-1/2"-D-LL1 Supply to Chiller E-336 Oil Cooler.

1513-244-2 264-1-1/2"-D-LL1 Return from Chiller E-336 Oil Cooler.

1513-244-1 253-4"-D-LL1 Cross Connect to Unit 3 Safety Equipment Building.

1513-252-2, 325-3"-D-LL1 Common Supply to Aux. Bldg. ESF 1513-325-1 Switch Gear Rm. E-255 (Unit 2) & E-255 (Unit 3).

1513-252-2, 325-2-1/2"-D-LL1 Supply to Aux. Bldg. Control Rm 1513-325-1 Cabinet Area E-424 Unit 2 1513-325-1 367-2-1/2"-D-LL1 Supply to Aux. Bldg. Control Rm Cabinet Area E-427 Unit 3.

1513-252-2 373-3"-D-LL1 Common Supply to Aux. Bldg. ESF Switchgear Rm. E-255 (Unit 2) and E-255 (Unit 3).

1513-252-2 373-2-1/2"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm. E-255 Unit 1513-252-2 373-3"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm E-255 Unit 1513-252-2, 331-2-1/2"-D-LL1 Supply to Aux. Bldg. ESF 1513-331-1 Switchgear Rm E-255 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 2 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-331-1 331-3"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm. E-255 Unit 2 1513-252-1 385-4"-D-LL1 Supply to Aux. Bldg. Control Rm E-418 Units 2 & 3 1513-372-1 372-2-1/2"-D-LL1 Return from Aux. Bldg. Control Rm. Cabinet Area E-427 Unit 3 1513-330-1, 330-2-1/2"-D-LL1 Return from Aux. Bldg. Control 1513-330-2, Rm. Cabinet Area E-424 Unit 2 1513-330-3 1513-330-3 330-3"-D-LL1 Common Return from Aux. Bldg. Control Rm. Cabinet Areas E-424 & E-427 Units 2 & 3.

1513-336-2 336-3"-D-LL1 Return from Aux. Bldg. ESF Switch gear Rm. E-255 Unit 2 1513-336-1, 336-2-1/2"-D-LL1 Return from Aux. Bldg..ESF 1513-336-2 Switchgear Rm. E-255 Unit 2 1513-378-1 378-3"-D-LL1 Return from Aux. Bldg. ESF Switchgear Rm E-255 Unit 3 1513-378-1, 378-2-1/2"-D-LL1 Return from Aux. Bldg.

1513-378-2 Switchgear Rm. E-255 Unit 3 1513-378-1, 378-3"-D-LL1 Common Return from Aux. Bldg. ESF 1513-378-2 Switchgear Rms E-255 Unit 2 & E-255 Unit 3 1513-260-1, 260-6"-D-LL1 Common Return From Aux. Bldg. Control 1513-378-2 Rm. Cabinet Area Units 2 & 3, Aux. Bldg. ESF Switchgear Rm. Units 2 & 3, and Control Rm Units 2 & 3.

3-1513-390-1, 390-4"-D-LL1 Return from Aux. Bldg. Control Rm.

1513-390-2 E-418 Units 2 & 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 3 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-244-1, 251-2"-D-LL1 Common Supply to Aux. Bldg. Charging 1513(Later) Pump Rms (Unit. 2), Boric Acid Makeup Pump Rms, -.

(Unit 2) and Fuel Handling Bldg. Pump Rm (Unit 2)

(Later) 283-1-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-437 Unit 2 (Later) 283-2-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump R E-437 Unit 2 (Later) 289-1-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rn E-438 Unit 2 (Later) 289-2-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-438 Unit 2 (Later) 277-1-1/2"-D-LL1 Common Supply to Aux. Bldg Boric Acid Makeup Pump Rms E-439 & E-440 Unit 2 (Later) 277-3/4"-D-LL1 Supply to Aux. Bldg Boric Acid Makeup Pump Rm E-439 Unit 2 (Later) 277-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 2 (Later) 087-3/4"-D-LL1 Supply to Aux. Bldg Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 087-2-1/2"-D-LL1 Supply to Aux. Bldg Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 271-1-1/2"-D-LL1 Supply to Fuel Handling Bldg Pump Rm E-441 Unit 2 (Later) 271-2-1/2"-D-LL1 Supply to Fuel Handling Bldg Pump Rm E-441 Unit 2 (Later) 276-2-1/2"-D-LL1 Return from Fuel Handling Bldg Pump Rm E-441 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 4 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 276-1-1/2"-D-LL1 Return from Fuel Handling Bldg Pump Rm E-441 Unit 2 1513-259-1, 257-2"-D-LL1 Common Return from Aux. Bldg.

1513-(Later) Charging Pump Rms Units 2 & 3, Boric Acid Makeup Pump Rms Unit 2 & 3, and Fuel Handling Bldg Pump Rms Units 2 & 3 (Later) 092-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 092-3/4"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 2 (Later) 282-2-1/2'-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm. E-439 Unit 2 (Later) 282-3/4"-D-LL1 Return from Aux. Bldg Boric Acid Makeup Pump Rm E-439 Unit 2 (Later) 282-1-1/2"-D-LL1 Common Return from Aux. Bldg Boric Acid Makeup Pump Rms E-440 & E-439 Unit 2 (Later) 294-2-1/2"-D-LL1 Return from Aux. Bldg Charging Pump Rm E-438 Unit 2 (Later) 294-1-1/2"-D-LL1 Return from Aux. Bldg Charging Pump Rm E-438 Unit 2 (Later) 288-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-437 Unit 2 (Later) 288-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-437 Unit 2 (Later) 256-2"-D-LL1 Common Supply to Aux. Bldg. Charging Pump Rms. Boric Acid Makeup Pump Rms, and Fuel Handling Bldg. Pump Rm Unit 3 (Later) 301-1-1/2"-D-LL1 Supply to Aux. Bldg Charging Pump Rm E-437 Unit 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 5 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 301-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-437 Unit 3 (Later) 307-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-438 Unit 2 (Later) 307-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-438 Unit 3 (Later) 295-1-1/2"-D-LL1 Common Supply to Aux. Bldg. Boric Acid Makeup Pump Rms E-439 & E-440 Unit 3 (Later) 295-3/4"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 3 (Later) 295-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm. E-439 Unit 3 (Later) 114-3/4"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 3 (Later) 114-2-1/2"-D-LL1 Supply to Aux. Bldg. Boric Acid Makeup Pump Rm. E-440 Unit 3 (Later) 256-1-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-441 Unit 3 (Later) 324-1-1/2"-D-LL1 Return From Fuel Handling Bldg.

Pump Rm.E-441 Unit 3 (Later) 324-2"-D-LL1 Common Return from Aux. Bldg.

Charging Pump Rms, Boric Acid Makeup Pump Rms and Fuel Handling Bldg. Pump Rm. Unit 3 (Later) 119-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-440 Unit 3 (Later) 119-3/4"-D-LL1 Return from Aux. Bldg, Boric Acid Makeup Pump Rm. E-440 Unit 3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 6 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 300-2-1/2"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump Rm E-439 Unit 3 (Later) 300-3/4"-D-LL1 Return from Aux. Bldg. Boric Acid Makeup Pump.Rm E-439 Unit 3 (Later) 300-1-1/2"-D-LL1 Common Return from Aux. Bldg.

Boric Acid Makeup Pump Rms. E-449 & E-440 Unit 3 (Later) 312-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm. E-438 Unit 3 (Later) 312-1-1/2"-D-LL1 Return From Aux. Bldg. Charging Pump Rm. E-438 Unit 3 (Later) 306-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-437 Unit 3 (Later) 306-1-1/2"-D-LL1 Return from Aux. Bldg..Charging Pump Rm E-437 Unit 3 1513-244-1, 255-4"-D-LL1 Common Supply to Safety Equipment 1513-255-2 Bldg. Pump Rms Unit 2 11513-349-1. 349-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-454 Unit 2 (Later) 349-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-454 Unit 2 1513-255-2, 255-3"-D-LL1 Common Supply to Safety Equipment 2-1513-265-1 Bldg. Pump Rms Unit 2 1513-355-1 355-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 008 Unit 2 1513-355-1 355-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 008 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 7 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-265-1 265-2"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 015, E-517 Unit 2 1513-265-1 265-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015, E-517 Unit 2 1513-343-1 343-2"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 005 E-417 Unit 2 1513-343-1 343-3"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 005 E-417 Unit 2 1513-348-1 348-3"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 005 E-417 Unit 2 1513-348-1 348-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 005 E-417 Unit 2 1513-259-3, 259-3"-D-LL1 Common Return from Safety Equipment 1513-259-4 Bldg. Pump Rms Unit 2 1513-270-1 270-2-1/2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 015 E-517 Unit 2 1513-270-1 270-2"-D-LL1 Return Safety Equipment Bldg. Pump Rm 015, E-517 Unit 2 1513-360-1 360-2-1/2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 008, E-453 Unit 2 1513-360-1 360-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Em 008 E-453 Unit 2 1513-259-3 259-4"-D-LL1 Common Return from Safety Equipment Bldg. Pump Rms Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 8 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-354-1 354-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 007 Unit 2 1513-354-1 354-2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 007 Unit 2 1513-259-1, 239-8"-D-LL1 Common Return/P-162 Suction from 1513-260-1 Aux. Bldg. Charging Pump Rm Boric Acid Makeup Pump Rms fuel handling Bldg. Pump Rm for Unit 2 1513-259-1 262-4"-D-LL1 Cross Connect Return from Unit 3 Safety Equipment Bldg.

(Later) 245-1"-D-LL1 Compression Tank Tie-In Line (Later) 247-1"-D-LL1 Compression Tank Drain Line (Later) 248-1/2"-D-LL1 Compression Tank Vent Line 1513-252-1 389-3"-D-LL1 Aux. Bldg. Control Room E-418 Units 2&3 Bypass Line 1513-073-1 073-8"-D-LL1 Discharge Line from Pump P-162 to Chiller Unit 335 1513-150-1, 277-8"-D-LL1 Discharge Header from Chiller 1513-180-1 E-335 to the Aux. Bldg. Safety Equip. Bldg.,

& Fuel Handling Bldg.

1513-132-1, 132-6"-D-LL1 Supply to Aux. Bldg. ESF Switch 1513-180-1 Gear Rm and Control Rm Unit 2 & Unit 3 1513-150-1 074-8"-D-LL1 Supply to Aux. Bldg Unit 2 & 3, Fuel Handling Bldg. and Safety -Equip. Bldg.

Unit 2 (Later) 425-1-1/2"-D-LL1 Supply to E-335 Oil Cooler

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 9 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 426-1-1/2"-D-LL1 Return from E-335 Oil Cooler 1513-150-1 227-4"-D-LL1 Cross Connect to Unit 3 Safety Equipment Building 1513-132-1 132-3"-D-LL1 Common Supply to Aux. Bldg. Control Rm Cabinet Area E-423 (Unit 2) & E-426 (Unit 3) 1513-132-3, 132-2-1/2"-D-LL1 Supply to Aux. Bldg Control Rm 1513-132-4 Area E-423 (Unit 2) 3-1513-076-1 076-2-1/2"-D-LL1 Supply to Aux. Bldg Control Rm Area E-426 (Unit 3) 1513-132-1 192-3"-D-LL1 Common Supply to Aux. Bldg. ESF Switchgear Rm E-257 (Unit 2) and E-257 (Unit 3) 1513-192-1 192-2-1/2"-D-LL1 Supply to Aux. Bldg. ESF Switch gear Rm E-257 Unit 3 1513-192-1 192-3"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm E-257 (Unit 3) 1513-144-1, 144-2-1/2"-D-LL1 Supply to Aux. Bldg. ESF Switch 1513-192-1 gear Rm E-257 (Unit 2) 1513-144-1 144-3"-D-LL1 Supply to Aux. Bldg. ESF Switchgear Rm E-257 (Unit 2)

(Later) 098-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-436 Unit 2 (Later) 081-1-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 081-2-1/2"-D-LL1 Supply to Fuel Handling Bldg.

Pump Rm E-442 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 10 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 086-2-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 086-1-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-442 Unit 2 (Later) 078-2"-D-LL1 Common Return from Aux. Bldg. Charg ing Pump Rms Unit 2 and Fuel Handling Bldg. Pump Unit 2 (Later) 102-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-436 Unit 2 (Later) 102-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-436 Unit 2 (Later) 097-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 Unit 2 (Later) 097-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 (Later) 108-2"-D-LL1 Common Supply to Aux. Bldg. Charging Pump Rm Unit 3 and Fuel Handling Pump Rm Unit 3 (Later) 108-1-1/2"-D-LL1 Supply to Fuel Handling Pump Rm Unit 3 (Later) 126-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-436 Unit 3 (Later) 126-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-436 Unit 3 15513-180-1, 180-4"-D-LL1 Supply to. Aux. Bldg. Control Rm 1513-180-2 Complex E-419 Units 2&3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 11 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 3-1513-077-1 077-2-1/2"-D-LL1 Return from Aux. Bldg. Control Rm Cabinet Area E-426 Unit 3 1513-137-1 137-2-1/2"-D-LL1 Return from Aux. Bldg. Control Rm Cabinet Area E-423 1513-137-2, 137-3"-D-LL1 Common Return from Bldg. Control 1513-137-3 Rm Cabinet Area E-423 (Unit 2) and E-426 (Unit 3) 1513-149-1 149-3"-D-LL1 Return from Aux. Bldg. ESF Switch gear Rm E-257 Unit 2 1513-149-1, 149-2-1/2"-D-LL1 Return from Aux. Bldg. ESF 1513-197-1 Switchgear Rm E-257 Unit 2 1513-197-1 197-3"-D-LL1 Return from Aux. Bldg. ESF Switch gear Rm E-257 Unit 3 1513-197-1 197-2-1/2"-D-LL1 Return from Aux. Bldg. ESF Switchgear Rm E-257 Unit 3 1513-197-2 197-3"-D-LL1 Common Return from Aux. Bldg. ESF Switchgear Rms E-257 Unit 2 & E-257 Unit 3 3-1513-137-2 137-6"-D-LL1 Common Return from Aux. Bldg. ESF Switchgear and Control Rm Cabinet Area Units 2&3 1513-185-1 185-4"-D-LL1 Return from Aux. Bldg. Control Rm Complex E-419 Units 2&3 1513-150-1, 074-2"-D-LL1 Common Supply to Aux. Bldg. Charg 1513 (Later) ing Pump Rm Unit 2 & Fuel Handling Bldg. Pump Rm Unit 2 (Later) 093-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-435 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 12 OF 14 ISOMETRIC DRAWING LINE NUMBER & DES.CRIPTION (Later) 093-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-435 Unit 2 (Later) 098-1-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-436 Unit 2 (Later) 120-1-1/2.-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-435 Unit 3 (Later) 120-2-1/2"-D-LL1 Supply to Aux. Bldg. Charging Pump Rm E-435 Unit 3 (Later) 131-2-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-436 Unit 3 (Later) 131-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-436 Unit 3 (Later) 125-2-1/2'-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 Unit 3 (Later) 125-1-1/2"-D-LL1 Return from Aux. Bldg. Charging Pump Rm E-435 Unit 3 (Later) 113-2"-D-LL1 Common Return from Aux. Bldg. Charg ing Pump Rms Unit 3 and Fuel Handling Bldg. Pump Rm Unit 3 (Later) 113-1-1/2"-D-LL1 Return from Fuel Handling Bldg.

Pump Rm E-442 Unit 3 1513-150-1, 150-4"-D-LL1 Common Supply to Safety Equipment 1513-150-2, Bldg. Pump Rms Unit 2 1513-150-3 1513-162-1 162-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-518 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS.LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 13 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1513-162-1 162-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 007 E-518 Unit 2 1513-168-1 168-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 006 E-455 Unit 2 1513-168-1 168-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 006 E-455 Unit 1513-150-4, 150-3"-D-LL1 Common Supply to Safety Equipment 1513-150-5 Bldg. Pump Rms Unit 2 1513-156-1 156-2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015 E-445 Unit 2 1513-156-1 156-2-1/2"-D-LL1 Supply to Safety Equipment Bldg.

Pump Rm 015 E-445 .Unit 2 1513-150-5 150-2"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 002 E-416 Unit 2 1513-150-5 150-3"-D-LL1 Supply to Safety Equipment Bldg. Pump Rm 002 E-416 Unit 2 1513-155-5 155-3"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 002 E-416 Unit 2 1513-155-4, 155-2"-D-LL1 Return from Safety Equipment Bldg.

1513-155-5 Pump Rm 002 E-416 Unit 2 1513-155-3, 155-3"-D-LL1 Common Return from Safety Equipment 1513-155-4 Bldg. Pump Rms Unit 2 2-1513-161-1 161-2-1/2"-D-LL1 Return from Safety Equipment Bldg. Pump Rm 015 E-445 Unit 2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Emergency Chilled Water System SHEET 14 OF 14 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1513-161-1 161-2-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 015 E-445 Unit 2 1513-155-1, 155-4"-D-LL1 Common Return from Safety Equipment 1513-155-2, Bldg. Pump Rms Unit 2 1513-155-3 1513-173-1 173-2-1/2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm,006 E-455 Unit 2 1513-173-1 173-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 006 E-455 Unit 2 2-1513-167-1 167-2-1/2"-D-LL1 Return from Safety-Equipment Bldg.

Pump Rm 007 E-518 Unit 2 2-1513-167-1 167-2"-D-LL1 Return from Safety Equipment Bldg.

Pump Rm 007 E-518 Unit 2 1513-155-1 078-8"-D-LL1 Common Return from Safety Equipment Bldg. Unit 2, Aux. Bldg. Units 2 & 3 and Fuel Handling Bldg. Unit 2 1513-155-1, 070-4"-D-LL1 Cross Connect Return from Unit 3 3-1513-155-3 Safety Equipment Bldg.

3-1513-070-1, 070-8"-D-LL1 Common Return/P-160 Suction Line from 1513-155-1 Aux. Bldg. Units 2 & 3 Safety Equipment Bldg.

Unit 2, and Fuel Handling Bldg. Unit 2 (Later) 069-1"-D-LL1 Compression Tank t-122 Tie-In Line (Later) 222-1"-D-LL1 Compression Tank Drain Line (Later) 232-1/2"-D-LL1 Compression Tank Vent Line 1513-180-2, 184-4"-D-LL1 Aux. Bldg. Control Rm E-419 1513-185-1 Unit 2 &.3 Bypass Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Boric Acid Makeup System SHEET 1 OF 3 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1218-022-3 006-4"-D-LLO Boric Acid Makeup Tank T-072 Outlet 2-1218-003-1 003-3"-D-LLO Boric Acid Makeup Pump P-175 Suc tion Line 1218-025-1, 025-3"-D-LLO Boric Acid Makeup Pump P-175 Dis 2-1218-031-1 charge Line 1218-028-1, 028-2"-D-LLO Boric Acid Makeup Tank T-072 Recirc 1218-028-2, Line 2-1218-031-1 1218-029-1 029-1/2"-D-LLO Boric Acid Makeup Tank T-072 Relief Valve Discharge & Recirc Line (Later) 025-1"-D-LLO BoricAcid Normal Supply to Volume Control Tank (Later) 068-1"-C-LLO Boric Acid Normal Supply to Volume Control Tank 2-1218-037-1, 037-3"-C-LLO Boric Acid Normal Supply to Volume 1218-037-2 Control Tank 2-1218-037-2 036-3"-C-LLO Boric Acid Normal Supply to Volume Control Tank 2-1218-037-2 099-3"-E-LLO Boric Acid Normal Supply to Volume Control Tank (Later).. 034-I"-D-LLO Boric Acid Makeup System Valve 2HV-9247 Bypass Line 2-1218-022-1 007-4"-D-LLO Boric Acid Makeup Tank T-071 Outlet 2-1218-004-1 023-3"-D-LLO Boric Acid Makeup Pump Suction Cross Connect Line (Later) 062-1"-D-LLO Control Boric Acid to Charging Pump Suction

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Boric Acid Makeup System SHEET 2 OF 3 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 3-1218-030-1 030-2"-D-LLO Boric Acid Makeup Tank Recirc Cross Connect 2-1218-004-1, 004-3"-D-LLO Boric Acid Makeup Pump P-174 Suc 2-1218-022-1 tion Line 1218-025-1, 024-3"-D-LLO Boric Acid Makeup Pump P-174 Dis 2-1218-031-1 charge Line 2-1218-026-1, 026-2"-D-LLO Boric Acid Makeup Tank T-071 Recirc 2-1218-031-1 Line 2-1218-027-1 027-1/2"-D-LLO Boric Acid Makeup Tank T-071 Relief Valve Discharge & Recirc Line 2-1218-031-1 031-3"-D-LLO Boric Acid Makeup System Valve 2-1218-031-2 2HV-9247 Line 2-1218-037-1, 037-3"-C-LLO Boric Acid Diluted to Charging Pump 1218-037-2 Suction Header 070-3"-C-LLO (1219) Boric Acid Diluted to Charg ing Pump Suction Header 057-6"-C-LLO (1219) Boric Acid Diluted to Charg ing Pump Suction Header 2-1218-022-1 007-4"-D-LLO Boric Acid Makeup Tank T-071 Outlet 2-1218-004-1 023-3"-D-LLO Boric Acid Makeup Pump Suction Header 1218-025-1 025-3"-D-LLO Boric Acid Pump Common Discharge 2-1218-031-1 (Later) 024-1"-D-LLO Boric Acid Normal Supply to the Volume Control Tank

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Boric Acid Makeup System SHEET 3 OF 3 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 068-1"-C-LLO Boric Acid Normal Supply to the Volume Control Tank 2-1218-037-1 037-3"-C-LLO Boric Acid Normal Supply to Volume 1218-037-2 Control Tank 2-1218-037-2 036-3"-C-LLO Boric Acid Normal Supply to Volume Control Tank 2-1218-037-2 099-3"-C-LLO Boric Acid Normal Supply to Volume Control Tank 2-1218-022-3 006-4"-D-LLO Boric Acid Makeup Tank T-072 Outlet 2-1218-003-1 003-3"-D-LLO Boric Acid Makeup Pump Suction Line (Later) 062-1"-D-LLO Control Boric Acid to Charging Pump Suction 2-1218-031-1 031-3"-D-LLO Boric Acid Makeup Valve 2HV-9247 2-1218-031-2 Line 2-1218-031-1, 031-3"-D-LLO Boric Acid Emergency Boron Supply 2-1218-031-2 Line 2-1218-031-2 086-3"-C-LLO Boric Acid Emergency Boron Supply Line 2-1281-022-1, 023-3"-D-LLO Boric Acid Makeup Gravity Feed Line 2-1218-022-2 from Tank T-071 to,Line 022-3"-D-LL1 2-1218-022-1, 022-3"-D-LLO Boric Acid Makeup Gravity Feed Line 2-1218-022-2, to Chem. & Vol. Control Charging Pump Leader 2-1218-022-3 0 _ _ __ _ _ __ __I

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Nuclear Sampling System SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1212-167-2 023-3/4"-A-FEO Reactor Coolant Hot Leg No. 1 Outlet from Reactor Coolant Loop 2-1212-167-1 030-3/4"-C-FEO Reactor Coolant Hot Leg No. 1 2-1212-167-2 Sample Line 2-1212-167-1 031-3/4"-C-FEO Reactor Coolant Hot Leg No. 1 Sample Line 2-1212-167-1 065-3/4"-A-FEO Reactor Coolant Hot Leg No. 2 Outlet from Reactor Coolant Loop 2-1212-167-2, 167-3/4"-C-FEO Reactor Coolant Hot Leg No. 1 2-1212-167-3, Sample Line 2-1212-167-4, 2-1212-167-5 2-1212-167-5 168-3/4"-C-FEO Reactor Coolant Hot Leg No. 2 Sample Line 1212-037-2 034-3/4"-A-EEO Reactor Coolant Pressurizer Vapor Space Outlet Line 1212-037-1, 036-3/4"-C-EEO Reactor Coolant Pressurizer Vapor 1212-037-2 Space Sample Line 1212-037-2, 037-3/4"-C-EEO Reactor Coolant Pressurizer Vapor 1212-037-3 Space Sample Line (Later) 049-3/4"-A-EEO REactor Coolant Pressurizer Surge Line Outlet Sample Line (Later) 042-3/4"-C-EEO Reactor Coolant Pressurizer Surge Line Sample Line (Later), 043-3/4"-C-EEO Reactor Coolant Pressurizer Surge 1212-043-1 Line Sample Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE.DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Nuclear Sampling System SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 074-3/4"-C-LLO Reactor Coolant Sample Line Between Containment Isolation Valves 2HV-0516 and 2HV-0515 1212-072-1, 072-3/4"-C-LLO Reactor Coolant Sample LinefBetween Containment Isolation Valves 2HV-0514 and 2HV-0515 (Later) 075-3/4"-D-KEO Tank No. 1 (T-083) Sampling Line (Later) 034-3/4"-D-KEO Tank No. 2 (T-084) Sampling Outlet Line (Later) 076-3/4"-D-KEO Tank No. 2 (T-084) Sampling Line (Later) 077-3/4"-D-KEO Tank No. 3 (T-085) Sampling Line (Later) 036-3/4"-D-KEO Tank No. 4 (T-086) Sampling Outlet Line (Later) 078-3/4"-D-KEO Tank No. 4 (T-086) Sampling Line (Later) 079-3/4"-D-KEO Tank No. 5 (T-087) Sampling Line (Later) 080-3/4"-D-KEO Tank No. 6 (T-088) Sampling Line (Later) 082-3/4"-D-LLO Waste Gas Surge Tank (T-082)

Sampling.Line (Later) 045-1"-C-KEO Shutdown Cooling Line Nuclear Sampl ing Line (Later) 172-1"-C-KEO Shutdown Cooling Line Nuclear Sampl ing Line (Later) 004-1"-C-GEO Injection Pumps P-018 and P-019 Minimum Recirc. Sampling Line (Later) 177-1"-C-GEO Safety Injection Pumps P-017 and P-018 Minimum Recirc. Sampling Line.

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Nuclear Sampling System SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION (Later) 160-1"-C-GEO Safety Injection Pumps P-017 and P-018 Minimum Recirc. Sampling Line (Later) 008-3/4"-H-LLO Letdown Strainer Outlet Sampling Line (Later) 008-1/2"-H-LLO Letdown Strainer Outlet Sampling Line (Later) 012-3/4"-H-LLO Purification Filter Inlet Sampling Line (Later) 012-1/2"-H-LLO Purification Filter Inlet Sampling Line (Later) 171-3/4"-H-LLO Purification Ion Exchanger Inlet Sampling Line (Later) 013-1/2"-H-LLO Purification Ion Inlet Sampling Line (Later) 001-3/4"-C-KE1 Shutdown Heat Exchanger Outlet Sampling Line (Later) 136-3/4"-E-LLO Volume Control Tank Liquid Sample Line (Later) 052-1"-E-LLO Volume Control Tank Liquid Sample Line (Later) 166-3/4"-E-LLO Volume Control Tank (T-077) Gaseous Sample Line (Later) 082-3/4"-E-LLO Volume Control Tank (T-077) Gaseous Sample Line 1212-117-1, 117-1"-C-LLO Post Accident Monitor Sample Line (Later)

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Nuclear Sampling System SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1212-118-1, 118-1"-C-LLO Post Accident Monitor Sample Line (Later)

(Later) 124-1"-C-LLO Post Accident Monitor Sample Line (Later) 125-1"-C-LLO Post Accident Monitor Sample Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Steam Generator Blowdown System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-015-1 015-3"-C-HK1 Steam Generator E-088 Blowdown Piping 1301-015-1, 015-6"-C-HK1 Steam Generator E-088 Blowdown 2-1301-553-1 Piping 1301-016-2 016-3"-C-HKO Steam Generator E-089 Blowdown Piping 1301-016-1, 016-6"-C-HKO Steam Generator E-089 Blowdown 1301-016-2, Piping 1301-554-1 1301-553-1 553-6"-R-HKO Steam Generator E-088 Blowdown Piping to Main Stm. Flash Tank T-176 1301-553-1, 553-4"-R-HKO Steam Gendrator E-088 Blowdown 2-1301-553-2, Piping to Main Stm. Flash Tank T-196 1301-553-3 1301-553-3 664-4"-R-ZZO Steam Generator E-088 Blowdown Piping to Main Stm. Flash Tank T-176 1301-554-1 554-6"-R-HKO Steam Generator E-089 Blowdown Piping to Main Stm. Flash Tank T-176 1301-554-1, 554-4"-R-HKO Steam Generator E-089 Blowdown 2-1301-554-2, Piping to Main Stm. Flash Tank T-176 1301-554-3 1301-554-3 663-4"-R-HKO Steam Generator E-089 Blowdown Piping to Main Stm. Flash Tank T-176

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 1 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pump Suction Header 2-1208-055-1 055-4"-C-LL1 CCW Charging Pump P-190 Suction Header 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 Discharge to Reactor Coolant Systems 2-1208-008-2, 008-2"-C-FEO Charging Pumps Common Discharge 1208-008-3 Header to the Regenerative Heat Exchanger 1208-008-3 008-2-1/2"-C-FEO Charging Pumps Common Discharge Header to the Regenerative Heat Exchanger 1208-008-3, 104-2"-C-FEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-2"-A-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-FEO Charging Header to Reactor Coolant Loop 1A 2-1208-055-1 056-4"-C-LLO Charging P-191 Suction Line 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharge Header 2-1208-010-1 010-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-A-FEO Charging Header to Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 2 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet-to Charg ing Pump P-192 2-1208-008-1 008-2"-C-FEO Charging Pump P-192 Discharge Header 2-1208-008-2 058-2"-C-FEO Charging to High Pressure. Safety Injection Supply Header 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pump Suction Header 2-1208-055-1 055-4"-C-LLO Charging Pump P-190 Suction Line 2-1208-055-1 056-4"-C-LLO Charging Pump P-191 Suction Line 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 Discharge to Reactor Coolant System 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharger Header 2-1208-008-1, 008-2"-C-EEO Charging Pumps Common Discharge 2-1208-008-2, Header to the Regenerative Heat Exchanger 2-1208-008-3 2-1208-008-3 008-2-1/2"-C-EEO Charging Pump Common Discharge Header to Regenerative Heat Exchanger 2-1208-008-3, 104-2"-C-EEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 3 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-2"-C-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-EEO Charging Header to Reactor Coolant Loop 1A 2-1208-008-2 058-2"-C-FEO Charging to High Pressure Safety Injection Supply Header 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pump 2-1208-055-1 055-4"-C-LLO Charging Pump P-190 Suction Header 2-1208-055-1 056-4"-C-LLO Charging Pump P-191 Suction Header 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 to Reactor Coolant Systems 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharge Header 2-1208-008-1, 008-2"-C-FEO Charging Pumps Common Discharge 2-1208-008-2, Header to Regenerative Heat Exchanger 1208-008-3

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 4 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-008-3 008-2-1/2"-C-FEO Charging Pumps Common Discharge Header to Regenerative Heat Exchanger 1208-008-3, 104-2"-C-FEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-22"-C-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-FEO Charging Header to Reactor Coolant Loop 1A 2-1208-010-1 010-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-C-FEO Charging Header to Reactor Coolant Loop 2A 2-1208-008-2 058-2"-C-FEO Charging to High Pressure Safety Injection Supply Header 2-1208-010-1 011-2" 7 C-EEO Regenerative Heat Exchanger Outlet to.the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pump Suction Header 2-1208-055-1 055-4"-C-LL1 CCw Charging Pump P-190 Suction Header 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 5 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 Discharge to Reactor Coolant Systems 2-1208-008-2, 008-2"-C-FEO Charging Pumps Common Discharge 1208-008-3 Header to the Regenerative Heat Exchanger 1208-008-3 008-2-1/2"-C-FEO Charging Pumps Common Discharge Header to the Regenerative Heat Exchanger 1208-008-3, 104-2"-C-FEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-2"-A-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-FEO Charging Header to Reactor Coolant Loop 1A 2-1208-055-1 056-4"-C-LLO Charging P-191 Suction Line 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharge Header 2-1208-010-1 101-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-A-FEO Charging Header to Reactor Coolant Loop 2A 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pump P-192 2-1208-008-1 008-2"-C-FEO Charging Pump P-192 Discharge Header 2-1208-008-2 058-2"-C-FEO Charging to High Pressure Safety Injection Supply Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 6 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pump Suction Header 2-1208-055-1 055-4"-C-LLO Charging Pump P-190 Suction Line 2-1208-055-1 056-4"-C-LLO Charging Pump P-191 Suction Line 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 Discharge to Reactor Coolant System 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharger Header 2-1208-008-1, 008-2"-C-EEO Charging Pumps Common Discharge 2-1208-008-2, Header to the Regenerative Heat Exchanger 2-1208-008-3 2-1208-008-3 008-2-1/2"-C-EEO Charging Pump Common Discharge Header to Regenerative Heat Exchanger 2-1208-008-3, 104-2"-C-EEO Regenerative Heat Exchanger Inlet 1208-014-1 Piping 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-2"-C-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 7 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-062-1 062-2"-A-EEO Charging Header to Reactor Coolant Loop lA 2-1208-008-2 058-2"-C-FEO Charging to High Pressure Safety Injection Supply Header 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header 2-1208-007-1 007-4"-C-LLO Volume Control Tank Outlet to Charg ing Pumps 2-1208-055-1 055-4"-C-LLO Charging Pump P-190 Suction Header 2-1208-055-1 056-4"-C-LLO Charging Pump P-191 Suction Header 2-1208-008-2 058-2"-C-FEO Charging Pump P-190 Discharge Header 2-1208-008-2 057-2"-C-FEO Charging Pump P-190 to Reactor Coolant Systems 2-1208-008-1 059-2"-C-FEO Charging Pump P-191 Discharge Header 2-1208-008-1, 008-2"-C-FEO Charging Pumps Common Discharge 2-1208-008-2, Header to Regenerative Heat Exchanger 1208-008-3 2-1208-008-3 008-2-1/2"-C-FEO Charging Pumps Common Discharge Header to Regenerative Heat Exchanger 1208-008-3, 104-2"-C-FEO Regenerative Heat Exchanger Inlet 1208-104-1 Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Charging System SHEET 8 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-010-1 009-3"-C-EEO Regenerative Heat Exchanger Outlet Piping 2-1208-010-1, 009-22-C-EEO Regenerative Heat Exchanger Outlet 1201-062-1 Piping 1201-062-1 062-2"-A-FEO Charging Header to Reactor Coolant Loop lA 2-1208-010-1 010-2"-C-EEO Regenerative Heat Exchanger Outlet to Reactor Coolant Loop 2A 2-1201-061-1 061-2"-C-FEO Charging Header to Reactor Coolant Loop 2A 2-1208-008-2 058-2"-C-FEO Charging to High Pressure Safety Injection Supply Header 2-1208-010-1 011-2"-C-EEO Regenerative Heat Exchanger Outlet to the Pressurizer Spray Header 2-1208-010-1 060-2"-A-FEO Pressurizer Spray Header Supply from Charging System 2-1201-012-1 012-4"-A-FEO Pressurizer Spray Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 1 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1201-021-1 022-2"-A'FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 00i-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-110-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 2-1208-004-1 004-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201B Piping NC-1208-005-1 005-3"-C-LLO Letdown System Back Pressure Valve 2PV-0201B Outlet Piping NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 2 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into 1,6,7,8, & 9, Purification Ion Exchangers NC-2418-072-2 (Later) 017-1-1/2"-H-LLO Letdown System Inlet to the Boronmeter (Later) 025-1/2"-H-LLO Letdown System Outlet from the Boronmeter NC-1208-066-1,7,9 006-3"-H-LLO Letdown System Outlet from NC-1901-112-5 Purification Ion Exchangers to Volume Control Tank 1208-093-1 093-3"-E-LLO Letdown System Return to Volume Control Tank 2-1201-021-1 002-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1201-021-1 002-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-O11OA 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 3 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-2 012-2"-C-FEO Letdown System Flow Control Valve 2LV-0110B Inlet Piping 2-1208-110-2 012-1"-C-FEO Letdown System Flow Control Valve 2LV-0110B Piping 2-1208-110-2 014-2"-C-HEO Letdown System Flow Control Valve 2LV-0110B Outlet Piping 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-O11OA 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A Containment Isolation Valve 2HV-9204

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 4 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping to 003-1"-C-FEO 2-1208-110-2 012-2"-C-FEO Letdown System Flow Control Valve 2LV-0110B Inlet Piping 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-110-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 2-1208-004-1 004-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201B Piping 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 5 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into 2-1208-110-2 Letdown Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 2-1208-004-1 004-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201B Piping 2-1208-005-1 005-3"-C-LLO Letdown System Back Pressure Valve 2PV-0201B NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into 1,6,7,8, & 9, Purification Ion Exchangers NC-2418-072-2 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 6 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-110-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 1208-015-1 015-2"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Inlet Piping 1208-015-1 015-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Piping 1208-015-1 015-3"-H-LLO Letdown System Back.Pressure Valve 2PV-0201A Outlet Piping NC-1208-016-2 016-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 7 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into 1,6,7,8, & 9, Purification Ion Exchangers NC-2418-072-2 2-1201-021-1 022-2"-A-FEO Outlet from the Reactor Coolant Loop to Letdown System 2-1208-001-1 001-2"-C-FEO Reactor Coolant Inlet to the Regenerative Heat Exchanger 2-1208-001-1, 002-2"-C-FEO Outlet from the Regenerative Heat 2-1208-003-1 Exchanger to Flow Control Valve 2LV-0110A 1208-003-1 003-2"-C-FEO Regenerative Heat Exchanger Outlet Piping 2-1208-110-1 003-1"-C-FEO Letdown System Flow Control Valve 2LV-0110A Piping 2-1208-110-1, 110-2"-C-HEO Letdown System Piping into Letdown 2-1208-1.10-2 Heat Exchanger E-062 2-1208-110-2 110-2-1/2"-C-HEO Letdown System Piping into Letdown Heat Exchanger E-062 2-1208-004-1 004-2"-C-HEO Letdown System Outlet from Heat Exchanger E-062 Piping 1208-015-1 015-2"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Inlet Piping 1208-015-1 015-1"-C-HEO Letdown System Back Pressure Valve 2PV-0201A Piping 1208-015-1 015-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Letdown System SHEET 8 OF 8 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION NC-1208-016-2 016-3"-H-LLO Letdown System Back Pressure Valve 2PV-0201A Outlet Piping NC-2418-072-2 111-3"-H-KEO Letdown System Filter Isolation Valve Upstream Piping NC-2418-072-2 111-4"-H-KEO Letdown System Filter Inlet Piping NC-2418-072-2 114-3"-H-LLO Letdown System Filter Outlet Piping NC-1208-089-1, 089-3"-H-LLO Letdown System Piping into 1,6,7,8, & 9, Purification Ion Exchangers NC-2418-072-2 NC-2418-072-2 021-2"-H-LLO Letdown System Filter Bypass Line NC-1208-092-1 092-3"-H-LLO Purification Ion Exchangers E-075, E-074 and E-078 Bypass Line NC-1208-092-1, 098-3"-H-LLO Letdown System Tie into the Safety NC-1208-098-3, Injection System NC-1208-098-2, NC-1201-027-1 NC-1201-027-1 027-3"-C-KEO Safety Injection System Tie-In with the Letdown System

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 1 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-001-1 108-24"-C-LLO Safety Injection System Suction Supply from Refueling Water Tank T-005 1204-003-2 007-10"-C-LLO HPSI Pumps P-017 and P-018 Common Suction Supply 1204-003-2 007-8"-C-LLO HPSI Pump P-017 Suction Supply 1204-002-2 007-6"-C-LLO HPSI Pump P-017 Suction Supply 1204-020-1, 020-4"-C-GEO HPSI No. 1 High Pressure Discharge 1204-020-2, Header 1204-020-3, 1204-020-4, 1204-020-5 1204-020-6, 020-2"-C-GEO HPSI No. 1 High Pressure Header 1204-021-5 Discharge to Reactor Coolant Loop 2B 1204-021-5 025-2"-C-FEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 2B 1204-021-5, 021-3"-C-FEO HPSI Common Discharge Header to 1204-046-2 Reactor Coolant Loop 2B 2-1204-046-2 155-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2B 2-1204-046-2 046-8"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2B 1204-019-1 018-2"-C-GEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 1A 1204-019-1 022-2"-C-FEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 2 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-019-1 019-3"-C-FEO HPSI Common Discharge Header .to

- Reactor Coolant Loop 1A 1204-043-2 152-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-043-2 043-4"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop lA 1204-043-1 043-8"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-015-1 015-2"-C-GEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop lB 1204-015-1 023-2"-C-FEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop lB 1204-012-1, 012-3"-C-FEO HPSI Common Discharge Header to 1204-044-1 Reactor Coolant Loop 1B 1204-044-1 153-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop lB 1204-044-1 044-8"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop lB 1204-044-1 044-12"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1B 1204-024-1 016-2"-C-GEO HPSI No. 1 High Pressure Header Discharge to Reactor Coolant Loop 2A 1204-024-1 024-2"-C-FEO HPSI No. 1 High Pressure Header to Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 3 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-017-2, 017-3"-C-FEO HPSI Common Discharge Header to 1204-045-1 Reactor Coolant Loop 2A 1204-045-1 154-3"-A-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2A 1204-045-1, 045-8"-A-FEO HPSI System Common Discharge Header 1204-045-2 to Reactor Coolant Loop 2A 1204-045-1, 045-12"-A-FEO HPSI System Common Discharge Header 1204-045-2 to Reactor Coolant Loop 2A 1204-020-1, 047-2"-C-GEO HPSI Pump P-017 Minimum Flow Recirc.

1204-052-1 Line 1204-052-1 052-4"-C-GEO Safety Injection Pumps Common Minimum Recirc. Flow Line 1204-151-1 151-4"-D-LLO Safety Injection Pumps Common Minimum Recirc. Flow Line 1204-151-1 151-6"-D-LLO Safety Injection Pumps Common Minimum Recirc. Flow Line 1204-080-1, 080-6"-D-LLO Safety Injection Pumps Recirc. Line 1204-080-2, to Refueling Water Tank T-005 1204-080-3, 1204-080-4, 1204-080-5, 1204-151-1 1204-080-5 107-10"-C-LLO Refueling Water Tank Return from Safety Injection Recirc. Line 1204-001-1, 001-24"-C-LLO Safety Injection System Supply from 1204-001-2, Refueling Tank T-005 1204-001-3, 1204-001-4, 1904-001-5

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 4 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2418-004-4 141-1"-C-KEO N 2 Supply to Safety Injection Tank T-009 2418-004-4 142-1"-C-KEO N 2 Supply to Safety Injection Tank T-010 2418-004-2 143-1"-C-KEO N 2 Supply to Safety Injection Tank T-008 2418-004-2 144-1"-C-KEO N 2 Supply to Safety Injection Tank T-007 1204-061-1 057-12"-C-HEO Safety Injection Tank T-009 Outlet Line 1204-061-1 061-12"-C-FEO Safety Injection Tank T-009 Outlet Line 2-1204-046-1 058-12"-C-HEO Safety Injection Tank T-010 Outlet Line 2-1204-046-1 062-12"-C-FEO Safety Injection Tank T-010 Outlet Line 1204-059-1 055-12"-C-HEO Safety Injection Tank T-008 Outlet Line 1204-059-1 059-12"-C-FEO Safety Injection Tank T-008 Outlet Line 1204-044-1 056-12"-C-HEO Safety Injection Tank T-007 Outlet Line 1204-044-1 060-12"-C-FEO Safety Injection Tank T-007 Outlet Line (Later) 109-24"-C-LLO Safety Injection System Suction Supply from Refueling Water Tank T-004

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 5 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-004-1, 004-24"-C-LLO Safety Injection System Suction 1204-004-2 Supply for Pumps P-016, P-018.and P-019 1204-004-1, 008-10"-C-LLO HPSI Pumps P-018 and P-019 Suction 1204-008-1 Supply 1204-008-1 008-8"-C-LLO HPSI Pump P-019 Suction Supply 1204-008-1 008-6"-C-LLO HPSI Pump P-019 Suction Supply 1204-014-1, 014-4"-C-GEO HPSI Pump P-019 Discharge to the 1204-014-2, Reactor Coolant System 1204-021-1 1204-021-1, 021-4"-C-GEO HPSI No. 2 High Pressure Discharge 1204-021-2, Header 1204-021-3, 1204-021-4 1204-021-4, 021-2"-C-GEO HPSI No. 2 High Pressure Header to 1204-021-5 Reactor Coolant Loop 2B 1204-021-5, 021-3"-C-GEO HPSI Common Discharge Header to 1204-046-2 Reactor Coolant Loop 2B 1204-014-1, 048-2"-C-GEO HPSI Pump P-019 Minimum Recirc.

1204-053-1 Line 1204-053-1, 048-4"-C-GEO HPSI Pumps Minimum Recirc. Line 1204-132-1, 1204-151-1 1204-151-1 131-4"-D-LLO HPSI Pumps Minimum Recirc. Line 1204-002-1, 002-24-C-LLO Safety Injection System Supply from 1204-002-2, Refueling Tank T-004 1204-004-1

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 6 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-019-1 019-2"-C-LLO HPSI No. 2 High Pressure Discharge Header to Reactor Coolant Loop 1A 1204-019-1 019-3"-C-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1A 1204-012-1, 012-2"-C-FEO HPSI No. 2 High Pressure Discharge 1204-012-2 Header to Reactor,Coolant Loop 1B 1204-012-1 012-3"-C-FEO HPSI Common Discharge Header to Reactor Coolant Loop 1B 1204-017-1, 017-2"-C-FEO HPSI No. 2 High Pressure Discharge 1204-017-2 Header to Reactor Coolant Loop 2A 1204-017-2 017-3"-C-FEO HPSI Common Discharge Header to Reactor Coolant Loop 2A 1204-163-1 163-3"-C-FEO HPSI No. 1 High Pressure Discharge Header to Reactor Coolant Hot Leg Injection 1204-167-1 087-3"-C-FEO HPSI Discharge Header to Reactor Coolant Hot Leg Injection for Loop 2 1204-167-1 167-3"-A-FEO HPSI Discharge Header to Reactor Coolant Hot Leg Injection for Loop 2 1204-164-1 164-4"-C-FEO HPSI No. 2 High Pressure Header Discharge to Reactor Coolant Hot Leg Injection 1204-164-1 164-3"-C-FEO HPSI No. 2 High Pressure Header Discharge to Reactor Coolant Hot Leg Injection 1204-165-1 089-3"-C-FEO HPSI Discharge Header to Reactor Coolant Loop 1 1204-165-1 165-3"-A-FEO HPSI Discharge Header to Reactor Coolant Loop 1

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 7 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-009-1 009-8"-C-LLO HPSI Pump P-018 Suction Line 1204-011-1 013-4"-C-GEO HPSI Pump P-018 Discharge Header 1204-049-1, 049-2"-C-GEO HPSI Pump P-018 Minimum Recirc. Line 1204-052-2 1204-053-1 053-2"-C-GEO HPSI Pump P-018 Minimum Recirc. Line Cross Connect to Line 048-4"-C-GEO 1204-008-1, 010-8"-C-LLO HPSI Pump P-018 Suction Line 1204-009-1 1204-011-1 011-4"-C-GEO HPSI Pump P-018 Discharge to No. 2 High Pressure Header 1204-003-1, 003-24"-C-LLO LPSI Pump P-015 and Containment 1204-003-2, Spray Pump P-012 Suction Supply Line 1204-003-3 1204-032-1 032-16"-C-KEO LPSI Pump P-015 Suction Supply Line 1204-032-1 022-14"-C-KEO LPSI Pump P-015 Suction Supply Line 1204-034-1 034-10"-C-KEO LPSI Pump P-015 Discharge Line 1204-038-2 038-14"-C-KEO Low Pressure Header 1204-036-1, 036-8"-C-KE1 Low Pressure Header Discharge to 1204-036-2 Reactor Coolant Loop 2A 1204-036-2 041-8"-C-FEO Low Pressure Header Discharge to Reactor Coolant Loop 2A 1204-045-1 045-8"-C-FEO Common Discharge Header to Reactor Coolant Loop 2A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 8 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-145-1 145-8"-C-KE1 Low Pressure Header Discharge to Reactor Coolant Loop lB 1204-145-1 040-8"-C-FEO Low Pressure Header Discharge to Reactor Coolant Loop 1B 1204-044-1. 044-8"-A-FEO Common Discharge Header to Reactor Coolant Loop lB 1204-037-1 037-8"-C-KE1 Low Pressure Header Discharge to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Discharge to Reactor 1204-043-1 Coolant Loop 1A 1204-043-1 043-8"-C-FEO Common Discharge. to Reactor Coolant Loop 1A 1204-037-2, 038-8"-C-KE1 Low Pressure Header Discharge to 1204-037-3 Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Discharge to Reactor 2-1204-046-1 Coolant Loop 2B 2-1204-046-1 045-8"-A-FEO Common Discharge to Reactor Coolant Loop 2B 2-1204-052-1 050-2"-C-KE1 LPSI Pump P-015 Minimum Recirc. Line 2-1204-052-1 052-2"-C-GEO LPSI Pump P-015 Minimum Recirc. Line 1204-004-1 004-24"-C-LLO LPSI Pump P-016 and Containment Spray Pump P-013 Suction Supply 3-1204-033-1 003-16"-C-KEO LPSI Pump P-016 Suction Supply 3-1204-033-1 033-14"-C-KEO LPSI Pump P-016 Suction Supply 1204-038-1 038-10"-C-KE1 LPSI Pump P-016 Discharge Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 9 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-038-1, 038-14"-C-KE1 LPSI Low Pressure Header 1204-038-2 1201-050-1 031-16"-C-LLO LPSI Pump P-016 Suction Header 1204-038-1 051-2"-C-KE1 LPSI Pump P-016 Minimum Flow Recirc.

Line (Later) 132-2"-C-GEO LPSI Pump P-016 Minimum Flow Recirc.

Line 1204-036-1, 036-8"-C-KE1 Low Pressure Header Discharge to 1204-036-2 Reactor Coolant Loop 2A 1204-036-2 041-8"-C-FEO Low Pressure Header Discharge to Reactor Coolant Loop 2A 1204-045-1 045-8"-C-FEO Common Discharge Header to Reactor Coolant Loop 2A 1204-145-1 145-8"-C-KE1 Low Pressure Header Discharge to Reactor Coolant Loop lB 1204-145-1 040-8"-C-FEO Low Pressure Header Discharge to Reactor Coolant Loop 1B 1204-044-1 044-8"-A-FEO Common Discharge Header to Reactor Coolant Loop 1B 1204-037-1 037-8"-C-KE1 Low Pressure Header Discharge to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Discharge to Reactor 1204-043-1 Coolant Loop 1A 1204-043-1 043-8"-C-FEO Common Discharge to Reactor Coolant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Safety Injection System SHEET 10 OF 10 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-2, 038-8"-C-KE1 Low Pressure Header Discharge to 1204-037-3 Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Discharge to Reactor 2-1204-046-1 Coolant Loop 2B 2-1204-046-1 046-8"-A-FEO Common Discharge to Reactor Coolant Loop 2B 2-1204-052-1 050-2"-C-KE1 LPSI Pump P-015 Minimum Recirc. Line 2-1204-052-1 052-2"-C-GEO LPSI Pump P-015 Minimum Recirc. Line

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 1 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 2 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 3 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2,- 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common Header 1204-045-2 to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection System 1204-038-2, Common Header 1204-038-3, 1204-038-4, 1204-038-5 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 1201-016-2, Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 4 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3.

APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 5 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lA 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 6 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common 1204-045-2 Header to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection 1204-038-2, System Common Header 1204-038-3, 1204-038-4, 1204-038-5 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 1201-016-2, Supply to LPSI Pumps Suction 1201-0 17-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 7 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015' 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1.0utlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 8 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant.Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1B 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 9 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common 1204-045-2 Header to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection 1204-038-2, System Common Header 1204-038-3, 1204-038-4, 1204-038-5 1201-016-1 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 1201-016-3., Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 10 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header 1206-001-1 033-12'.'-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003.& E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 11 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lA 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1B 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 12 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line to 1204-036-2 Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common Header 1204-045-2 to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection 1204-038-2, System Common Header 1204-038-3, 1204-038-4, 1204-038-5 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 13 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant, Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 14 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8" ,A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common 1204-045-2 Header to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection 1204-038-2, System Common Header 1204-038-3, 1204-038-4, 1204-038-5

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 15 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from 1201-016-3 Hot Leg to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot 1201-016-3 Leg to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 1201-016-2, Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 16 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 17 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection 1204-043-1 Line through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop lB 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line to 1204-036-2 Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common Header 1204-045-2 to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection System 1204-038-2, Common Header 1204-038-3, 1204-038-4, 1204-038-5

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 18 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from Hot Leg 1201-016-3 to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Cooling Reactor Coolant 1201-016-2, Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015 1201-050-1 050-16"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-016 1201-050-1 050-14"-C-KEO Shutdown Coolant Reactor Coolant Supply to LPSI Pump P-016 1206-002-1 032-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-003 1206-002-1 002-12"-C-KE1 Supply to Shutdown Heat Exchanger E-003 1206-004-1 004-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 1206-004-1 028-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-003 to LPSI System Header

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 19 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-001-1 033-12"-C-KE1 Low Pressure Safety Injection Supply to Shutdown Heat Exchanger E-004 1206-001-1 001-12"-C-KE1 Supply to Shutdown Heat Exchanger E-004 1206-003-1, 003-12"-C-KE1 Outlet from Shutdown Heat 1206-027-1 Exchanger E-004 1206-027-1 027-12"-C-KE1 Outlet from Shutdown Heat Exchanger E-004 to LPSI System Header 1206-027-2 027-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-035-1 035-14"-C-KE1 Outlet from Shutdown Heat Exchangers E-003 & E-004 to LPSI System Header 1204-139-1, 139-3"-C-KE1 LPSI Supply to the Letdown Heat 1204-151-2, Exchanger 1204-139-3, 2-1204-139-4 1204-037-2, 038-8"-C-KE1 Low Pressure Safety Injection Line 1204-037-3 to Reactor Coolant Loop 2B 1204-037-3, 042-8"-C-FEO Low Pressure Safety Injection Line 2-1204-046-2 through Containment 2-1204-046-2 046-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2B 2-1204-046-1 046-12"-A-FEO Safety Injection>System Common Header to Reactor Coolant Loop 2B 1204-037-1 037-8"OC-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop 1A

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 20 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-037-1, 039-8"-C-FEO Low Pressure Safety Injection Line 1204-043-1 through Containment 1204-043-1 043-8"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1A 1204-043-1 043-12"-A-FEO Safety'Injection System Common Header to Reactor Coolant Loop 1A 1204-145-1 145-8"-C-KE1 Low Pressure Safety Injection Line to Reactor Coolant Loop lB 1204-145-1, 040-8"-C-FEO Low Pressure Safety Injection Line 1204-044-1 through Containment 1204-044-1 044-8"-A-FEO.Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-044-1 044-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 1B 1204-036-1, 036-8"-C-KE1 Low Pressure Safety Injection Line 1204-036-2 to Reactor Coolant Loop 2A 1204-036-2, 041-8"-C-FEO Low Pressure Safety Injection Line 1204-045-1 through Containment 1204-045-1, 045-8"-A-FEO Safety Injection System Common 1204-045-2 Header to Reactor Coolant Loop 2A 1204-045-2 045-12"-A-FEO Safety Injection System Common Header to Reactor Coolant Loop 2A 1204-038-1, 038-14"-C-KE1 Low Pressure Safety Injection 1204-038-2, System Common Header 1204-038-3, 1204-038-4, 1204-038-5

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Shutdown Cooling System SHEET 21 OF 21 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from 1201-016-3 Hot Leg to LPSI Pumps Suction 1201-016-3 016-18"-A-FEO Reactor Coolant Outlet from Hot Leg to LPSI Pumps Suction 1201-016-1, 016-16"-A-FEO Reactor Coolant Outlet from 1201-016-3 Hot Leg to LPSI Pumps Suction 1201-016-1, 017-16"-C-KEO Shutdown Coolant Reactor Coolant 1201-016-2, Supply to LPSI Pumps Suction 1201-017-4 1201-017-1, 017-18"-C-KEO Shutdown Cooling Reactor Coolant 1201-017-2, Supply to LPSI Pumps Suction 1201-017-3, 1201-016-2 1201-017-5 017-14"-C-KEO Shutdown Cooling Reactor Coolant Supply to LPSI Pump P-015

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Pressurizer Spray System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1201-012-1 011-3"-A-FEO Supply Line from Loop 1A to Spray Valve 2PV-O100A 1201-012-1 011-4"-A-FEO Inlet to Spray Valve 2PV-O100A 1201-012-1, 012-4"-A-FEO Pressurizer Spray Line 1201-012-2 1201-012-1 012-3/4"-A-FEO Bypass for Spray Valve 2PV-0100A 1201-012-1 013-3"-A-FEO Supply Line from Loop lB to Spray Valve 2PV-O100B 1201-012-1 013-4"-A-FEO Inlet to Spray Valve 2PV-0100B 1201-012-1 014-4"-A-FEO Outlet from Spray Valve 2PV-0100B 1201-012-1 014-3/4"-A-FEO Bypass for Spray Valve 2PV-0100B

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Containment Spray System SHEET 1 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1204-003-3 003-16"-C-LLO Supply to Containments Spray Pump P012 1206-001-3 056-8"-C-KEO Containment Spray Pump P-012 Discharge 1206-001-2 001-8"-C-KE1 Containment Spray Pump P-012 1206-001-3 Discharge 1206-001-1 001-12"-C-KE1 Shutdown Cooling Heat Exchanger.

E-004 Inlet 1201-003-1 003-12"-C-KE1 Shutdown Cooling Heat Exchanger E-004 Outlet 1206-027-1 027-12"-C-KE1 Shutdown Cooling to Low Pressure Safety Injection Header 1204-080-1 028-6"-C-KE1 Containment Spray Recirc. to Refueling Water Tank T-005 1204-080-1, 080-6"-D-LLO Return Line to Refueling Tank T-005 1204-080-2, 1204-080-3, 1204-080-4, 1204-080-5 1204-004-2 004-16"-C-LLO Supply to Containments Spray Pump P-013 1206-002-2 054-8"-C-KEO Containment Spray Pump P-013 Discharge 1206-002-1 002-8"-C-KE1 Containment Spray Pump P-013 1206-002-2 Discharge

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Containment Spray System SHEET 2 OF 2 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1206-002-1 002-12"-C-KE1 Shutdown Cooling Heat Exchanger E-003 Inlet 1206-004-1 004-12"-C-KE1 Shutdown Cooling Heat Exchanger E-003 Outlet 1206-004-1 028-12"-C-KE1 Shutdown Cooling to Refueling Water Tank T-005

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Auxiliary Feedwater SHEET 1 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-047-1, 047-8"-D-LLO Condensate Storage TK T-121 Supply 1305-047-2, to F.W. Pump P-141 1305-047-3 1305-048-1 048-2"-D-GEO Aux. F.P. P-141 Mini Flow Line to Storage TK-T-121 to 2FO-4711 1305-048-1 078-2"-D-GKO Aux. F.P. P-141 Mini Flow Line to 2FO-4711 2-1305-099-2, 099-6"-D-GKO Aux. Feedwater Pump P-141 Discharge 1305-099-3, to Valves 2HV-4714 and 2HV-4730 2-1305-099-4, 2-1305-099-5.

1305-222-1 222-6"-C-GK1 Aux. Feedwater Supply to S/G from 2HV-4714 & 2HV-4730 to S/G E-088 1305-189-1 189-18"-C-CK1 Feedwater Inlet to Steam'Generator E-089 1305-100-1 100-6"-D-GKO Aux. Feedwater Pump P-141 Discharge Header to S/G E-089 up to Line 098-6"-D-GKO 1305-098-1, 098-6"-D-GKO Aux. Feedwater Supply to S/G E-089 1305-098-2, 1305-098-3, 1305-098-4 1305-098-4, 223-6"-C-GK1 Aux. Feedwater Supply to S/G from 1305-223-1 2HV-4715 and 2HV-4731 to S/G E-089 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Generator E-089 2-1305-049-1, 049-8"-D-LLO Aux. F.W. Pump P-140 Suction Line 1305-049-2 from Storage Tank T-121

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Auxiliary Feedwater SHEET 2 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2-1305-101-1 101-6"-D-GKO Aux. F.P. Discharge to S/G E-088 from Pump P-140 1305-050-1 079-2"-D-GKO Aux. F.P. P-140 Mini Flow Recirc.

1305-050-1 050-2"-D-GEO Mini Flow Line to Storage TK T-121 2-1305-099-2, 099-6"-D-GKO P-141 Discharge Line Downstream 1305-099-3, 2HV-4712 to 2HV-4714 & 2HV-4730 2-1305-099-4, 2-1305-099-5 1305-098-1, 098-6"-D-GKO P-140 Discharge Line Downstream 1305-098-2, 2HV-4713 to 2HV-4715 & 2HV-4731 1305-098-3, 1305-098-4 1305-222-1 222-6"-C-GK1 Aux. F.W. Line to S/G E-088 from 2HV-4714 & 2HV-2HV-4730 1305-223-1 223-6"-C-GK1 Aux. F.W. Line to S/G E-089 from 2HV-4715 & 2HV-4731 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-089 1305-189-1 189-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-088 2-1305-099-2, 099-6"-D-GKO P-141 Discharge Line Downstream 1305-099-3, 2HV-4712 to 2HV-4714 & 2HV-4730 2-1305-099-4, 2-1305-099-5 1305-098-1, 098-6"-D-GKO P-140 Discharge Line Downstream 1305-098-2, 2HV-4713 to 2HV-4715 & 2HV-4731 1305-098-3, 1305-098-4

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Auxiliary Feedwater SHEET 3 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-222-1 222-6"-C-GK1 Aux. F.W. Line to S/G E-088 from 2HV-4714 & 2HV-2HV-4730 1305-223-1 223-6"-C-GK1 Aux. F.W. Line to S/G E-089 from 2HV-4715 & 2HV-4731 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-089 1305-189-1 189-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-088 2-1305-099-2, 099-6"-D-GKO P-141 Discharge Line Downstream 1305-099-3, 2HV-4712 to 2HV-4714 & 2HV-4730 2-1305-099-4, 2-1305-099-5 1305-098-1, 098-6"-D-GKO P-140 Discharge Line Downstream 1305-098-2, 2HV-4713 to 2HV-4715 & 2HV-4731 1305-098-3, 1305-098-4 1305-222-1 222-6"-C-GK1 Aux. F.W. Line to S/G E-088 from 2HV-4714 & 2HV-2HV-4730 1305-223-1 223-6"-C-GK1 Aux. F.W. Line to S/G E-089 from 2HV-4715 & 2HV-4731 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-089 1305-189-1 189-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-088 2-1305-099-2, 099-6"-D-GKO P-141 Discharge Line Downstream 1305-099-3, 2HV-4712 to 2HV-4714 & 2HV-4730 2-1305-099-4, 2-1305-099-5

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Auxiliary Feedwater SHEET 4 OF 4 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1305-098-1, 098-6"-D-GKO P-140 Discharge Line Downstream 1305-098-2, 2HV-4713 to 2HV-4715 & 2HV-4731 1305-098-3, 1305-098-4 1305-222-1 222-6"-C-GK1 Aux. F.W. Line to S/G E-088 from 2HV-4714 & 2HV-2HV-4730 1305-223-1 223-6"-C-GK1 Aux. F.W. Line to S/G E-089 from 2HV-4715 & 2HV-4731 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-089 1305-189-1 189-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-088 2-1305-099-2, 099-6"-D-GKO P-141 Discharge Line Downstream 1305-099-3, 2HV-4712 to 2HV-4714 & 2HV-4730 2-1305-099-4, 2-1305-099-5 1305-098-1, 098-6"-D-GKO P140 Discharge Line Downstream 1305-098-2, 2HV-4713 to 2HV-4715 & 2HV-4731 1305-098-3, 1305-098-4 1305-222-1 222-6"-C-GK1 Aux. F.W. Line to S/G E-088 from 2HV-4714 & 2HV-2HV-4730 1305-223-1 223-6"-C-GK1 Aux. F.W. Line to S/G E-089 from 2HV-4715 & 2HV-4731 1305-190-1 190-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-089 1305-189-1 189-18"-C-GK1 Feedwater Inlet to Steam Gener ator E-088

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Nuclear Service Water System SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1415-153-1 153-3"-C-LLO 2HV-7911 and Nuclear Service Water Piping Into the Containment 1415-174-1 174-3"-R-LL4 Inlet Piping to 2HV-7911

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/HOT FUNCTIONAL TABLE 4 SYSTEM: Containment Sump and Drain SHEET 1 OF 1 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 2426-492-1 492-3"-D-LLO 2HV-5803 and Containment Sump Piping into the Containment 2426-462-1 462-3"-D-LLO Piping Supply from Containment Sump Pumps to Inlet of 2HV-5803

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/POWER ASCENSION TABLE 4 SYSTEM: Main Steam SHEET 1 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-001-1 001-42"-C-HK1 Main Steam Outlet From Steam Generator E-088 1301-001-1, 001-40"-C-HK1 Main Steam Line From Steam Generator

.1301-001-2 E-088 Through the Containment 1301-001-3 003-40"-R-HKO Main Steam Line From Steam Generator E-088 1301-001-3 003-12"-R-HKO Main Steam Line From Steam Generator E-088 to High Pressure Drain Lines 1301-500-1, 297-14"-R-HKO Main Steam Supply to Reheater E-113 1301-297-1 Live Steam Coils 1301-152-1 152-12"-C-KK2 Reheater E-112 Steam Supply to Feedwater.Pump Turbine K005 2-1301-151-1 151-12"-R-KK2 Reheater E-113 Steam Supply to Feedwater Pump Turbine K006 1301-001-3 006-28"-R-HKO Main Steam Line Supply High Pressure Turbine Center KOO1 1301-001-3 007-28"-R-HKO Main Steam Line Supply to High Pressure Turbine KOO1 1301-001-4 363-34"-C-HK1 Main Steam Supply to Main Steam Dump Valve and Main Steam Safety Valves 1301-001-4 580-26"-C-HK1 Main Steam Supply to Main Steam Safety Valve 1301-001-3 367-24"-R-HK2 Main Steam Cross-Connect Between Steam Generators E-088 and E-089

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/POWER ASCENSION TABLE 4 SYSTEM: Main Steam SHEET 2 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-002-1 002-42"-C-HK1 Main Steam Outlet From Main Steam Generator E-089 1301-002-1, 002-40"-C-HK1 Main Steam Line From Steam Generator 1301-002-2 E-089 Through the Containment 1301-002-3 364-40"-R-HKO Main Steam Line From Steam Generator E-089 1301-002-3 364-12"-R-HKO Main Steam Line From Steam Generator E-088 to High Pressure Drain Line 1301-002-3 008-28"-R-HKO Main Steam Line Supply High Pressure Turbine East K001 1301-002-3 009-28"-R-HKO Main Steam Line Supply to High Pressure Turbine Central East K001 1301-002-4 309-34"-C-HK1 Main Steam Line Supply to Main Steam Dump Valve and Main Steam Safety Valves 1301-002-4 583-26"-C-HK1 Main Steam Supply to Main Steam Safety Valves 1301-010-1, 010-18"-R-HKO Main Steam Supply to Main Steam 1301-010-4 Dump Bypass System 1301-010-1 010-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8424 1301-010-2 010-18"-R-HKO Steam Bypass to Main Condenser From Valve 2HV-8424 1301-010-2 634-18"-R-KK2 Steam Bypass From Line 010-18"-R-KK2 to the Common Bypass Header 1301-010-2 421-18"-R-KK2 Steam Bypass to Main Condenser From Valve 2HV-8423

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/POWER ASCENSION TABLE 4 SYSTEM: Main Steam SHEET 3 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-010-1 421-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8423 1301-010-2 633-18"-R-KK2 Steam Bypass From Line 421-18"-R-HKO to the Common Bypass Header 13011-010-2 544-18"-R-KK2 Steam Common Bypass Header 1301-010-3 634-18"-R-KK2 Steam Inlet to the Main Condenser From Common Bypass Header 1301-010-3 420-18"-R-KK2 Steam Inlet to Main Condenser From Common Bypass Header 1301-010-3 633-16"-R-KK2 Steam Inlet to Main Condenser From Common Bypass Header 1301-010-3 420-16"-R-KK1 Steam Inlet to Main Condenser From Common Bypass Header 1301-010-3 634-16"-R-KK1 Steam Inlet to Main Condenser From Common Bypass Header 2-1301-011-1, 011-6"-R-HKO Main Feedwater Pump Turbine K006 2-1301-011-2 Steam Supply 1301-370-1, 370-18"-R-HKO Main Steam Supply to Main Steam 1301-370-2 Dump Bypass Steam and Air Ejectors 1301-370-3 370-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8426 1301-370-2 370-18"-R-HKO Steam Bypass to the Main Condenser From Valve 2HV-8426

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/POWER ASCENSION TABLE 4 SYSTEM: Main Steam SHEET 4 OF 5 ISOMETRIC DRAWING LINE NUMBER & DESCRIPTION 1301-370-2 635-18"-R-KK2 Steam Bypass Line From Line 370-18"-R-KK2 to Common Bypass Valve 1301-370-2 419-12"-R-HKO Main Steam Supply to Main Steam Dump Bypass Valve 2HV-8425 1301-370-2 419-18"-R-HKO Steam Bypass to the Main Condenser From Valve 2HV-8425 1301-370-2 636-18"-R-KK2 Steam Bypass Line From Line 419-18"-R-KK2 to Common Bypass Header 1301-370-2 546-18"-R-KK2 Common Bypass Header 1301-370-2 635-16"-R-KK2 Steam Inlet to the Main Condenser From Common Bypass Header 1301-370-2 418-16"-R-KK2 Steam Inlet to the Main Condenser From the Common Header 1301-370-2 636-16"-R-KK2 Steam Inlet to the Main Condenser From the Common Header 1301-017-1 578-4"-C-HK1 Inlet Line to 2HV-8201 Auxiliary Feed Pump Supply Valve 1301-017-1 578-6"-C-HK1 Inlet Line to 2HV-8200 Auxiliary Feed Pump Supply Valve 1301-017-1 017-4"-D-HRO Outlet Line From 2HV-8201 Auxiliary Feedwater Pump Supply Valve 1301-577-1, 017-6"-D-HKO Common Steam Supply to Auxiliary 2-1301-017-2 Feedwater Pump Turbine K007

PIPING VERIFICATION PROGRAM SONGS 2&3 APPENDIX A DYNAMIC EFFECTS LINE DESIGNATION/POWER ASCENSION TABLE 4 SYSTEM: Main Steam SHEET 5 OF 5 ISOMETRIC DRAWING LINE NIJBER & DESCRIPTION 2-1301-017-2 017-3"-D-HKO Supply Line to block Valve 2HV-4716 Auxiliary Feedwater Pump Turbine K007 1301-004-1 004-6"-C-HK1 Inlet Line to 2HV-8200 1301-004-1 004-4"-C-HK1 Inlet Line to 2HV-8200 Auxiliary Feedwater Pump Supply Valve '

1301-577-2 577-4"-D-HKO Outlet Line From 2HV-8200 Auxiliary Feedwater Pump Supply Valve 1301-288-1 142-24"-R-KK1 Extraction Outlet Line to Heaters on LP End 1301-288-1 041-24"-R-KK1 Extraction Outlet Line to Heaters on Free End 1301-288-1 041-36"-R-KK1 Extraction Outlet Header 1301-041-1 041-18"-R-KK1 Supply to 1st Point Heater E-037 1301-042-1 042-18"-R-KK1 Supply to 1st Point Heater E-036 1301-287-1, 287-12"-R-KK1 Supply to Moisture Separator 1301-287-3 Reheater Bled Steam Tube Bundle E-113 1301-288-1 287-20"-R-KK1 Extraction Steam Header Supply to Reheaters 1301-288-1, 288-12"-R-KK1 Supply to Reheat Bled Steam Tube 1301-288-2 Bundle E-112 1301-043-1, 043-20"-R-KK1 Cold Reheat Steam Cross Connect 1301-043-2 Line and Supply to 2nd Point Heater E-038 1301-044-1 044-20"-R-KK1 Cold Reheat Steam Cross Connect Line and Supply to 2nd Point Heater E-039

MEMORY 32K HIGH SPEED ACOUISITICN UNIVERSAL I NOVA 3/12

- -DATA APL, PM ACQUISITION HW M/D 10MB DISK Analog SIGNAL (UDAM)

INTIERFCE Input UNIT Signal ADC

  • 45 1PS, 9T

. PROG. GAIN co AMP (PGA)

CRT, K/B Jw REMOMUNIVERSAL

)TEST T/C & DATA Lanyards UIT ACQUISITION (RIU) # 0 MODULE Tc_ ___LINK S IU (OPTION) a #1 n .DISCRETE 16

a. an1/0 16 r

d #2 T/c RIU 1/0 LanyIas- BUS

  1. 3 ILOW SPEED ACOUISITION