Issue date | Title | Topic | |
---|---|---|---|
ML072340113 | 27 August 2007 | TSTF-495 Denial Letter and Safety Evaluation | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
ML090640441 | 1 December 2005 | Enclosure 7: Case Study 3: Rejection of TSTF-495, Bases Change to Address GE Part 21 SC05-03 - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
ML100221648 | 4 March 2010 | Option a - Proposed Model Application and SE for NOA of TSTF-493, Rev 4, Clarify Application of Setpoint Methodology for LSSS Functions. | Reactor Vessel Water Level Anticipated operational occurrence Incorporated by reference Scram Discharge Volume |
ML100221653 | 4 March 2010 | Option B - Proposed Model Application and SE for NOA of TSTF-493, Rev 4, Clarify Application of Setpoint Methodology for LSSS Functions. | Reactor Vessel Water Level Anticipated operational occurrence Incorporated by reference Scram Discharge Volume |
ML102300729 | 7 December 2010 | Model Application and Model Safety Evaluation for Plant-Specific Adoption of TSTF-514, Revision 2 | Grab sample Pressure Boundary Leakage |
ML102310365 | 23 November 2010 | Model Application and Model Safety Evaluation for Plant-Specific Adoption of TSTF-431, Revision 3 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Probabilistic Risk Assessment Large early release frequency |
ML103190284 | 8 December 2010 | Meeting Handout - Draft of Model SE of Plant - Specific Adoption of TSTF Traveler-501, Rev 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control. | |
ML103270197 | 22 March 2011 | Model SE of TSTF-422, Rev 2, Change in Technical Specifications End States, (CE NPSD-1186), for CE PWRs Using the CLIIP | Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Large early release frequency Offsite Circuit |
ML112101513 | 19 October 2011 | NOA Model SE of TSTF-510, Rev 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the CLIIP | |
ML112101661 | 19 October 2011 | Disposition of Comments TSTF-510, Revision 2 | |
ML112991526 | 17 January 2012 | Model SE of TSTF-432 for Nfc | Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Probabilistic Risk Assessment Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit |
ML113540250 | 15 March 2012 | Proposed Model Safety Evaluation of TSTF-522 | |
ML12097A596 | 7 January 2013 | TSTF-426 Nfc Model Safey Evaluation | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Large early release frequency |
ML12158A464 | 13 September 2012 | TSTF-522 Model SE for NOA | |
ML12219A145 | 2 November 2012 | TSTF-535 Proposed Model SE for Nfc | Shutdown Margin Anticipated operational occurrence |
ML12355A772 | 19 February 2013 | Model Safety Evaluation for Plant-Specific Adoption of Tech Spec Task Force Traveler TSTF-535, Rev. 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs, Using the Consolidated Line Item Improvement Process | Shutdown Margin Anticipated operational occurrence |
ML13113A181 | 9 July 2013 | Proposed Model Safety Evaluation for PLANT-SPECIFIC Adoption of Technical Specifications Task Force Traveler TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
ML15181A037 | 9 September 2015 | Proposed Model Se for Plant-Specific Adoption of Traveler TSTF-545, Revision 2, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the CLIIP | Safe Shutdown Incorporated by reference |
ML15314A305 | 11 December 2015 | TSTF-545 Final Model SE | Safe Shutdown Incorporated by reference |
ML15328A350 | 4 March 2016 | Final Safety Evaluation (SE) of TSTF-547, Rev. 1, Clarification of Rod Position Requirements | Shutdown Margin Surveillance Frequency Control Program |
ML16343B008 | 20 December 2016 | Final Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (Tac No. MF3487) | Reactor Vessel Water Level Water Inventory Control Hydrostatic Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML16343B065 | 20 December 2016 | Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML17080A414 | 3 July 2017 | Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements | Water Inventory Control |
ML17341A326 | 26 March 2018 | Draft Model Safety Evaluation of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. | |
ML18226A256 | 20 September 2018 | Draft SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 1 | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18226A318 | 20 September 2018 | Draft Model SE of Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (SFCP) - Enclosure 2 | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18267A259 | 21 November 2018 | Final Revised Model Safety Evaluation of Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Large early release frequency Offsite Circuit Backfit |
ML18299A069 | 16 November 2018 | Final Traveler SE of TSTF-564, Revision 2, Safety Limit MCPR | Anticipated operational occurrence Fuel cladding |
ML18299A076 | 16 November 2018 | Final Model SE of TSTF-564, Revision 2, Safety Limit MCPR | Anticipated operational occurrence Fuel cladding |
ML18299A083 | 16 November 2018 | NRC Disposition of TSTF Comments on the Draft Safety Evaluation of TSTF-564, Safety Limit MCPR | |
ML18333A144 | 4 December 2018 | Final SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML18333A147 | 4 December 2018 | Final Model SE of Traveler TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program (Enclosure 2) | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
ML19007A226 | 15 January 2019 | Final SE of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. | |
ML19007A227 | 15 January 2019 | Final Model SE of Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. | |
ML19017A217 | 29 May 2019 | Draft Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition (Enclosure 2) | Anticipated operational occurrence |
ML19028A286 | 21 February 2019 | Final Model SE of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 2) | |
ML19028A287 | 21 February 2019 | Final SE of Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (Enclosure 1) | |
ML19176A190 | 14 August 2019 | Final Model Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 2) | Anticipated operational occurrence |
ML19176A191 | 14 August 2019 | Final Safety Evaluation of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2018-PMP-0002) (Enclosure 1) | Anticipated operational occurrence |
ML19248C823 | 25 February 2020 | Revised Final Model Safety Evaluation of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process | Anticipated operational occurrence Fuel cladding |
ML19325C434 | 17 December 2019 | Final Safety Evaluation of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | |
ML20132A260 | 13 May 2020 | Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process | Anticipated operational occurrence Fuel cladding |
ML20154K606 | 30 October 2020 | Draft Safety Evaluation of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Boric Acid Pressure Boundary Leakage |
ML20248H537 | 9 October 2020 | Model Safety Evaluation of TSTF-582, RPV WIC Enhancements with Optional TSTF-583-T Variation | Water Inventory Control Fuel cladding Offsite Circuit |
ML20311A664 | 21 December 2020 | Draft Model Safety Evaluation of TSTF-554 Revise Reactor Coolant Leakage Requirements | Pressure Boundary Leakage |
ML20322A024 | 18 December 2020 | Final SE of Traveler TSTF-554, Revise Reactor Coolant Leakage Requirements | Boric Acid Pressure Boundary Leakage |
ML20353A209 | 21 December 2020 | Cover Letter Transmitting Draft Model TSTF-554, Revise Reactor Coolant Leakage Requirements | |
ML21053A388 | 26 May 2021 | Draft Traveler SE of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown | |
ML21053A396 | 26 May 2021 | Draft Model SE of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown | |
ML21096A274 | 14 April 2021 | Final Model SE of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination |