Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
IR 05000243/19850027 June 1985Forwards Safeguards Insp Rept 50-243/85-02 on 850520-22.No Noncompliance Noted.Major Areas Inspected:Physical Protection,Including Procedures & Interviews W/Personnel. Rept Withheld (Ref 10CFR2.790 & 73.21)
ML20054L38816 June 1982Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl
ML20054L65822 June 1982Forwards IE Insp Rept 50-243/82-02 on 820524-26,0606 & 14. No Noncompliance Noted
ML20056E1883 August 1993Requests Response to Request for Addl Info Re 930201 Application for Amend to License R-106 within 30 Days of Ltr Date
ML20058C26717 October 1990Forwards Operator License Certificate for AD Hall
ML20058P0333 August 1990Forwards Exam Rept 50-243/OL-90-01 on 900625.W/o Exam & non-power Reactor Exam Results Summary Sheet
ML20058P54313 December 1993Ack Receipt of 930805 Rev to Physical Security Plan.Rev Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan
ML20059J1313 November 1993Requests That Listed Ref Matl Be Forwarded Prior to Administration of Requalification Exams Scheduled for Wk of 940131
ML20059J2553 November 1993Discusses Telcon Arrangements Made for Administration of Operator Licensing Exams.Written & Operating Exams Scheduled for Wk of 940131
ML20059L94412 November 1993Concludes That 930827 Changes to Oregon State Univ Triga Reactor Emergency Response Plan Maintains Compliance W/ 10CFR50,app E & Acceptable
ML20125C55818 December 1979Forwards Amend 4 to License R-106 & Safety Evaluation
ML20127B3444 January 1993Advises That 920904 Rev Denoted 09/92,to OSTR Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan
ML20128D10829 January 1993Concludes That 921013 Changes to Oregon State Univ Triga Reactor Emergency Response Plan Maintains Compliance w/10CFR50,app E & Acceptable
ML20128H0086 May 1985Forwards Insp Rept 50-243/85-01 on 850325-26.No Violations Noted
ML20132A4424 December 1996Advises That 960829 Rev 0 to Physical Security Plan Does Not Require Formal Review Per 10CFR50.54(p)
ML20132A96014 August 1979Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required
ML20132C30316 December 1996Discusses Transmittal of Reactor Operator License Certificate to SA Crail.W/O Enclosures
ML20134G0257 November 1996Informs That During Week of 961021,NRC Administered Initial Examination to Employee of Oregon State University to Operate Reactor.Initial Exam Rept 50-243/OL-96-01 Encl
ML20134G4656 November 1996Forwards Results of 961021 Operator Initial Exam at Oregan State Univ.W/O Encl
ML20135E2294 December 1996Ack Receipt of Re self-identified Event Associated W/Failure to Post & Control Access to High Radiation Area.Corrective Actions Will Be Reviewed During Future InspHigh Radiation Area
ML20136C54110 September 1979Forwards IE Info Notice 79-21, Transportation & Commercial Burial of Radioactive Matl. No Action Required
ML20137G47223 June 1971Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form
ML20137R56821 November 1985Ack Receipt of Consent to Enter 850927 Order to Show Cause Why All Excess Unirradiated High Enriched U Fuel Should Not Be Removed to Secure Facility Away from Reactor Site & for Advising of Compliance W/Section III(1)
ML20137V46021 January 1986Forwards Exam Rept 50-243/OL-86-01 of Exams Administered on 860106
ML20138H5982 May 1997Forwards Insp Rept 50-243/97-01 on 970317-20.No Violations NotedHigh Radiation Area
ML20147H97222 November 1978Forwards IE Inspec Rept 50-243/78-03 on 781024-26 During Which No Items of Noncompliance Were Noted
ML20149E82410 July 1997Ack Receipt of Transmitting Changes to OSTR Emergency Response Plan Submitted Under 10CFR50.54(q).NRC Approval Not Required
ML20149K1917 May 1980Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility
ML20149M66911 February 1988Forwards Amend 9 to License R-106 & Safety Evaluation. Amend Changes Organizational Structure of Oregon State Univ Triga Reactor & Surveillance Requirements Time Intervals to Agree W/Current Practice of non-power Reactors
ML20150D97218 March 1988Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager
ML20151P72425 July 1988Forwards Exam Rept 50-243/OL-88-01 Administered on 880621-22
ML20151W10911 August 1988Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator & Senior Operator Status.Notification Required in Event That Operator Is Permanently Reassigned from Licensed to non-licensed Position
ML20151X95715 September 1998Forwards RAI Re Amend Request for Amended License R-106 for Oregon State Univ Triga Research Reactor,Submitted on 980727.Response Requested within 30 Days of Ltr Date
ML20153C54218 September 1998Ack Receipt of ,Which Transmitted Changes to Oregon State Univ Triga Reactor Physical Security Plan Submitted Under Provisions of 10CFR50.54(p)
ML20154B3103 May 1988Advises That Review & Evaluation of Oregon State Univ Requalification Program for Licensed Operators Submitted on 880315 Completed & Acceptable.Request That Licensee Begin to Implement Approved Program Immediately
ML20154B6441 October 1998Ack Receipt of Ltr Dtd 980807,which Transmitted Changes to Oregon State Univ Triga Reactor Physical Security Plan Submitted Under Provisions of 10CFR50.54(p).NRC Approval Not Required in Accordance with 10CFR50.54(p)
ML20155G12220 September 1988Forwards Operator License Certificate for Presentation to Jf Higginbotham.Certificate Not License But Recognition of Achievement.W/O Encl
ML20155J66419 May 1986Forwards Matl Control & Accounting Safeguards Insp Repts 50-243/86-01 & 70-0971/86-01 on 860416-17 & 30.No Violations Noted
ML20195B64710 November 1998Forwards Amend 17 to License R-106 & Safety Evaluation. Amend Clarifies TS 3.8.e Requirements on Quantity & Type of Radioactive Matl Allowed in Experiments
ML20197K01110 December 1997Forwards RAI Re Amend Request for License R-106 for Oregon State Univ Research Reactor,Submitted on 971125
ML20198G37524 December 1997Informs That Written & Operating Exams Are Scheduled for 980223.Matls Listed in Encl Requested to Be Furnished in Order to Meet Schedule
ML20198Q8124 January 1999Forwards Insp Rept 50-243/98-202 on 981130-1203.No Violations Noted.Various Aspects of Safety Program Were Inspected Including Selective Exams of Procedures & Representative Records & Interview with Personnel
ML20199A56521 January 1998Forwards Original & 3 Copies of Summary of Paper Regulatory View of Non-Power Reactor License Renewal, to Be Presented at 1998 ANS Annual Meeting.W/O Encl
ML20199F96728 January 1998Forwards Amend 16 to License R-106 & Safety Evaluation. Amend Removes gender-specific Wording from TS 6.1a,updates Organizational Titles in TS 6.1 & Removes References to Region V from TS Reporting Requirements
ML20205D79730 March 1999Ack Receipt of ,Which Transmitted Changes to Oregon State Univ Triga Reactor Emergency Response Plan Submitted Under Provisions of 10CFR50.54(q).Based on Info Provided,Nrc Approval Not Required
ML20205Q66716 April 1999Informs That Written & Operating Exams Scheduled for Wk of 990628.Matls Listed in Encl 1 Requested in Order to Meet Schedule
ML20205T7333 November 1988Notifies of 890110 Meeting in San Fransicso,Ca to Discuss Policies & Procedures for Operator Licensing Activity in Region V.Agenda Encl
ML20206R6878 January 1999Ack Receipt of ,Which Transmitted Changes to Oregan State Univ Triga Reactor Emergency Response Plan. NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness of EP
ML20206R77827 June 1986Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in
ML20206R96020 January 1999Ack Receipt of Which Transmitted Changes to Osu Triga Reactor Physical Security Plan,Per Provisions of 10CFR50.54(p).No NRC Approval Is Required Since Changes Do Not Decrease Effectiveness of Plan