Text
r
a
'
51
.
. .
'"
MAY 0619E
Docket-No. 50-243
' Oregon State University
Corvallis, Oregon 97331
- Attention: Dr. T. D. Parsons
Vice President for Administration
Gentlemen:
Subject:.NRC Inspection of TRIGA Mark II Reactor
This refers'to the routine inspection conducted by Mr. M. Cillis of this
office on March 25-26, 1985, of activities authorized by NRC License
No.'R-106, and to the discussion 'f our findings held by Mr. Cillis with
o
Mr. A. -G. Johnson, and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with-
. personnel,'and observations by Oe inspector.
- No violations with NRC requirements wcre identified within the scope of this
- inspection.
-In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be gla'd to
discuss them with you.
Sincerely,
/SI
F. A. Wenslawski, Chief
Radiological Protection Branch
. Enclosure:
Inspection Report No. 50-243/85-01
cc:
Dr. C. V. Smith, Jr., Director of Radiation Center
<
.Dr. Robert Maevicar, President
State of Oregon (W. Dixon)
,
bec: 'RSB/ Document Control Desk (RIDS)
- Mr. J. Martin
RV - AQ,h
gI
k
MCillis:d
GYuhas.
FWenslawski
5/ 2. /85
5/3 /85
5/g /85
L
85053OO30Te 850506
ADOCK 05000243
0
hd
n\\
c