Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
05000289/LER-2017-001 | 3 February 2017 | Low Temperature Over-Pressurization (LTOP) Technical Specification Requirements Were Not Met LER 17-001-00 for Three Mile Island Unit 1 Regarding Low Temperature Over-Pressurization (LTOP) Technical Specification Requirements Were Not Met | |
05000289/LER-2017-002 | 6 February 2017 | 1 OF 5 LER 17-002-00 for Three Mile Island, Unit 1 Regarding Leak at High Pressure Connection on Reactor Coolant Pump "A" Thermal Barrier | Safe Shutdown Time of Discovery VT-2 Finite Element Analysis |
05000289/LER-2017-003 | 6 November 2017 | Primary Containment Declared Inoperable Due to Both Airlock Doors Open Simultaneously LER 17-003-00 for Three Mile Island, Unit 1 Regarding Primary Containment Declared Inoperable Due to Both Airlock Doors Open Simultaneously | |
05000289/LER-2017-004 | 5 February 2018 | Items Nonconforming to Design for Tornado Missile Protection LER 17-004-00 for Three Mile Island, Unit 1, Regarding Items Nonconforming to Design for Tornado Missile Protection | Safe Shutdown Unanalyzed Condition Enforcement Discretion Tornado Generated Missile Tornado Missile Protection |
CNL-15-213, Compliance with Three Mile Island (TMI) Action Plan Requirements for an Operating License | 7 October 2015 | Compliance with Three Mile Island (TMI) Action Plan Requirements for an Operating License | |
CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | 14 July 2011 | G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 | Fukushima Dai-Ichi Significance Determination Process Earthquake Backfit |
IR 05000219/2012012 | 1 May 2014 | Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC | |
IR 05000219/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000237/2012012 | 1 May 2014 | Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC | |
IR 05000237/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000254/2012012 | 1 May 2014 | Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC | |
IR 05000254/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000272/2012012 | 1 May 2014 | Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC | |
IR 05000272/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000277/2012012 | 1 May 2014 | Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC | |
IR 05000277/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000289/2001008 | 28 January 2002 | IR 05000289-01-008, on 11/11 - 12/29/2001, Amergen Energy Company, LLC, Three Mile Island Unit 1, Integrated Resident Inspector Report, Operability Evaluations | Past operability Significance Determination Process Pressure Boundary Leakage Siren |
IR 05000289/2002001 | 4 March 2002 | 2002 Annual Assessment Letter - Three Mile Island Station, Unit 1 (Report 50-289/02-01) | |
IR 05000289/2002003 | 16 April 2002 | IR 05000289/2002-003, on 03/04-22/2002; Amergen Energy Company, LLC; Three Mile Island (TMI) Unit 1; Biennial Baseline Inspection of Identification and Resolution of Problems. One Green Finding Was Identified Regarding Problem Evaluation | |
IR 05000289/2002005 | 25 July 2002 | IR 05000289-02-005, on 05/12/2002 - 06/29/2002, Amergen Energy Company, LLC, Three Mile Island Unit 1, Integrated Resident Inspector Report | High Radiation Area Locked High Radiation Area Significance Determination Process Deep Dose Equivalent Substantial potential for an overexposure Overexposure |
IR 05000289/2002006 | 7 November 2002 | IR 05000289-02-006; Amergen Energy Company, LLC; on 6/30-9/28/2002; Three Mile Island, Unit 1; Maintenance Rule Implementation; Surveillance Testing | Offsite Dose Calculation Manual Internal Flooding Hydrostatic Past operability Temporary Modification Condition Adverse to Quality Significance Determination Process Unidentified leakage Unidentified leak |
IR 05000289/2002007 | 28 January 2003 | IR 05000289-02-007, on 09/29/2002 - 12/28/2002 for Amergen Energy Company, LLC; Three Mile Island Unit 1; Event Followup | |
IR 05000289/2002011 | 13 November 2002 | IR 05000289-02-011, on 10/07 - 10/25/2002, Three Mile Island Unit 1, Triennial Fire Protection Inspection Report | Safe Shutdown Fire Barrier Fire impairment Emergency Lighting Significance Determination Process Operability Determination Exemption Request Fire Protection Program |
IR 05000289/2003001 | 4 March 2003 | 2003-Annual Assessment Letter - Three Mile Island, Unit 1 (Report No. 50-289/2003-001) | Operability Assessment |
IR 05000289/2003002 | 28 April 2003 | IR 05000289-03-002, on 12/29/2002-03/29/2003; for Amergen Energy Company, LLC; Three Mile Island, Unit 1; Routine Report | Boric Acid |
IR 05000289/2003003 | 23 July 2003 | IR 05000289-03-003; 3/30/2003-6/28/2003; Amergen Energy Company, LLC; Three Mile Island, Unit 1, Temporary Modifications, Identification and Resolution of Problems | High Radiation Area Offsite Dose Calculation Manual Internal Flooding Temporary Modification Locked High Radiation Area Significance Determination Process Operability Determination Power change |
IR 05000289/2003004 | 10 November 2003 | IR 05000289-03-004, on 06/29/03 - 09/27/2003, for Amergen Energy Company, LLC; Three Mile Island, Unit 1; Identification and Resolution of Problems | High winds High Radiation Area Offsite Dose Calculation Manual Temporary Modification Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Fire Protection Program |
IR 05000289/2003005 | 23 January 2004 | IR 05000289-03-005; 09/28/2003 - 12/31/2003; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Refueling and Outage Activities and Other Activities (Reactor Containment Sump Blockage - NRC Bulletin 2003-01) | Boric Acid High Radiation Area Offsite Dose Calculation Manual Stroke time Safe Shutdown Earthquake Weld Overlay Internal Flooding Coatings Nondestructive Examination Temporary Modification VT-2 Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Operability Determination Moisture barrier Code Reconciliation Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Scaffolding |
IR 05000289/2003006 | 2 June 2003 | IR 05000289-03-006; on 04/21-24/2003; Three Mile Island Station, Unit 1. Emergency Preparedness Exercise Report. No Violations Noted | |
IR 05000289/2003007 | 25 August 2003 | IR 05000289-03-007; on 06/23/03 - 07/11/03, Three Mile Island Station, Unit 1; Engineering Team Report | Safe Shutdown Fire Barrier Temporary Modification Significance Determination Process Operability Determination Battery sizing |
IR 05000289/2003008 | 6 May 2003 | IR 05000289-03-008, Dtd 03/24-03/26/2003; Three Mile Island Station Unit 1; Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. Warrenville, Il | |
IR 05000289/2003009 | 10 March 2004 | IR 05000289-03-009, on 12/8/2003 - 01/30/2004; Three Mile Island; Emergency Preparedness Report for Multi-site Drill | Met Tower Operability Determination Siren |
IR 05000289/2004002 | 11 May 2004 | IR 05000289-04-002 on 01/01/2004 - 03/31/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Equipment Alignment and Licensed Operator Requalification | High Radiation Area Mission time Weld Overlay Internal Flooding Past operability Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Maintenance Rule Program Pressure Boundary Leakage Scaffolding Operability Assessment |
IR 05000289/2004003 | 29 July 2004 | IR 05000289-04-003, on 04/01/2004 - 06/30/2004; Amergen Energy Co, LLC; Three Mile Island, Unit 1; Surveillance Testing | Mission time Past operability Temporary Modification Condition Adverse to Quality Significance Determination Process Operability Determination Hourly Fire Watch |
IR 05000289/2004004 | 8 November 2004 | IR 05000289-04-004; 07/01/2004 - 09/30/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Surveillance Testing and Operability Evaluations | Safe Shutdown Boric Acid High winds Offsite Dose Calculation Manual Stroke time Internal Flooding Probabilistic Risk Assessment Temporary Modification Zebra Mussel Significance Determination Process Operability Determination Continuous fire watch |
IR 05000289/2004005 | 14 February 2005 | IR 05000289-04-005; 10/01/2004 - 12/31/2004; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Personnel Performance During Non-routine Plant Evolutions, Performance Indicator Verification, Identification and Resolution of Problems, E | High Radiation Area Past operability Enforcement Discretion Fire impairment Temporary Modification Significance Determination Process Operability Determination Earthquake Maintenance Rule Program Fuel cladding Power change Downpower Siren |
IR 05000289/2004006 | 10 May 2004 | IR 05000289-04-006, on 03/08-04 Through 03/12/04 & 03/22/04 Through 03/26/04, for Three Mile Island Station Unit 1; Biennial Baseline Inspection of Identification and Resolution of Problems | Operability Determination |
IR 05000289/2005003 | 20 June 2005 | IR 05000289-05-003; on 05/03/2005-06/06/2005; for Three Mile Island Station Unit 1; Emergency Preparedness Exercise; Emergency Preparedness Performance Indicators | |
IR 05000289/2005004 | 28 July 2005 | IR 05000289-05-004; 04/01/2005 - 06/30/2005; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Maintenance Implementation, Post Maintenance Testing, and Radioactive Material Processing and Transportation | Boric Acid High Radiation Area Mission time Fire Barrier Stroke time Hydrostatic Temporary Modification Significance Determination Process Annual Radioactive Effluent Release Report Process Control Program Operability Determination Maintenance Rule Program Preliminary White Finding |
IR 05000289/2005005 | 4 November 2005 | IR 05000289-05-005; 7/01/2005 - 9/30/2005; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Heat Sink, Maintenance Implementation | Boric Acid Non-Destructive Examination Mission time Stroke time Internal Flooding Probabilistic Risk Assessment Temporary Modification Significance Determination Process Operability Determination |
IR 05000289/2005006 | 29 July 2005 | IR 05000289-05-006; on 05/19/05, Three Mile Island, Unit 1, Final Significance Determination for a White Finding (NRC Emergency Preparedness Program Inspection Report) | Significance Determination Process Preliminary White Finding |
IR 05000289/2005007 | 8 September 2005 | IR 05000289-05-007, on 07/11-29/2005, Amergen Energy Company, LLC, Engineering Team Inspection | Boric Acid |
IR 05000289/2005009 | 30 January 2006 | IR 05000289-05-009; 10/1/2005 - 12/31/2005; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Refueling and Other Outage Activities, Problem Identification and Resolution Sample, and Other Activities | Safe Shutdown Boric Acid High Radiation Area Coatings Nondestructive Examination Temporary Modification VT-2 Significance Determination Process Operability Determination Maintenance Rule Program Liquid penetrant Fire Protection Program Fire Watch Scaffolding Exclusive Use |
IR 05000289/2005012 | 13 January 2006 | IR 05000289-05-012 on 11/28/2005 - 12/15/2005 for Three Mile Island (TMI) Station, Unit 1; Triennial Fire Protection Team Inspection, Fire Protection | Hot Short Safe Shutdown Fire Barrier Emergency Lighting Significance Determination Process Fire Protection Program Fire Watch |
IR 05000289/2005301 | 28 July 2005 | IR 05000289-05-301 on 05/9-16/05 for Three Mile Island; Initial Operator Licensing Examination | |
IR 05000289/2006003 | 4 May 2006 | IR 05000289-06-003; 1/1/2006 - 3/31/2006; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Identification and Resolution of Problems | Safe Shutdown Offsite Dose Calculation Manual Internal Flooding Probabilistic Risk Assessment Temporary Modification Significance Determination Process Operability Determination |
IR 05000289/2006005 | 2 November 2006 | IR 05000289-06-005; on 7/01/2006 - 9/30/2006; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Post Maintenance Testing | High winds Offsite Dose Calculation Manual Probabilistic Risk Assessment Temporary Modification Significance Determination Process Job Performance Measure Operability Determination Siren |
IR 05000289/2006006 | 31 January 2007 | IR 05000289-06-006; 10/1/2006 - 12/31/2006; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Other Activities | Hot Short Safe Shutdown Unanalyzed Condition Time of Discovery Fitness for Duty High winds High Radiation Area Non-Destructive Examination Mission time Internal Flooding Past operability Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program Fire Watch Scaffolding Inattentive |
IR 05000289/2006007 | 15 May 2006 | IR 05000289-06-007; 03/13/2006 - 03/31/2006; Amergen Energy Company, LLC; Three Mile Island, Unit 1; Biennial Baseline Inspection of the Identification & Resolution of Problems. Violations Were Identified in the Areas of Problem Identificat | Mission time Condition Adverse to Quality Significance Determination Process Operability Determination |
IR 05000289/2006010 | 24 April 2006 | IR 05000289-06-010 on 02/28/2006 - 03/14/2006 for Amergen Energy Company, LLC (Amergen); Three Mile Island Station, Unit 1; Supplemental Inspection |