Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
Information Notice 2010-12, Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notic17 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner CorTime of Discovery
Moisture barrier
Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Con17 August 2012Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner CorMoisture barrier
Information Notice 2010-12, Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Contain17 August 2012Intervenors' Fifth Motion to Amend and/or Supplement Proposed Contention No. 5 (Shield Building Cracking). Appendix VI: NRC FOIA Responses (B-51 Through B-53); Turkey Point Event Report; NRC Information Notice 2010-12: Containment Liner CorMoisture barrier
L-01-001, Steven Moffitt - Motion to Withdraw Request for Expedited Hearing11 October 2006Steven Moffitt - Motion to Withdraw Request for Expedited Hearing
ML04121025823 April 2004Firstenergy Nuclear Operating Company'S Answer to Objections to Confirmatory Order and Request for HearingBoric Acid
Fire Barrier
Operator Manual Action
VT-2
Significance Determination Process
ML04155019629 April 2004Petitioners' Motion for Extension of Time to Reply to FENOC and Staff Responses to Objections
ML04161005323 April 2004NRC Staff Response to Objections to Confirmatory Order Modifying LicenseBoric Acid
ML05264002112 September 2005Joint Motion to Lodge of American Municipal Power-Ohio, Inc., and the City of Cleveland, Ohio
ML0601900289 January 2006Request for Clarification by American Municipal Power-Ohio, Inc., and the City of Cleveland, Ohio
ML06228044215 August 2006Dale L. Miller/Steven P. Moffitt - NRC Staff'S Opposition to Motion to Quash Subpoena Issued to (Rodney Cook)
ML06235015715 August 2006Dale Miller/Steven Moffitt - Motion to Quash Subpoena
ML06241029228 August 2006Dale L. Miller/Steven P. Moffitt - NRC Staff Opposition to Motion to Quash Subpoena Issued to David Geisen
ML06268025622 September 2006Dale L. Miller - Joint Motion to Issue an Order and Dismiss the Proceeding; Settlement Agreement; Order
ML08319037012 November 2008Davis-Besse (Geisen) David Geisen - Unopposed NRC Staff Motion for a Page Limit Extension
ML0916302014 November 2008Opposition of David Geisen to the NRC Staff'S Motion to Compel DiscoveryBoric Acid
Probabilistic Risk Assessment
VT-2
Condition Adverse to Quality
ML09265009021 September 2009Geisen - NRC Staff'S Application for a Stay of the Effectiveness of LBP-09-24 Pending Commission Review
ML09293124513 October 2009David Geisen'S Answer Opposing the NRC Staff'S Petition for Commission Review of the Board'S Initial Decision Regarding the Enforcement Order Against HimBoric Acid
ML1103805167 February 2011Firstenergy'S Motion to Strike Portions of Petitioners' Combined ReplyBoric Acid
Probabilistic Risk Assessment
Chernobyl
Pressure Boundary Leakage
ML11083091624 March 2011Firstenergy'S Proposed Corrections to the Transcript of the Oral Argument Held on March 1, 2011
ML11083095824 March 2011NRC Staff'S Unopposed Motion to Correct the Transcript of the Oral Argument Held on March 1, 2011
ML11083103324 March 2011Petitioners' Proposed Changes to March 1, 2011 ASLB Prehearing Conference Transcript
ML11111091621 April 2011Amendment and Errata to Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions Pending Investigation of Lessons Learned from Fukushima Daiichi Nuclear Power Station AccidentBoric Acid
Aging Management
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Earthquake
Environmental Justice
ML1112605726 May 2011Firstenergy'S Unopposed Motion to Defer Initial Disclosures
ML1112608136 May 2011Petitioners' Motion for Modification of the Commission'S April 19, 2011 Order to Permit a Consolidated Reply
ML11223A48311 August 2011Motion to Admit New Contention Regarding Safety & Environmental Implications of Nuclear Regulatory Commission Task Force Report on Fukushima Dai-ichi AccidentFukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Earthquake
Hardened vent
Chernobyl
Backfit
ML11224A00012 August 2011Contention in Support of Motion to Admit New Contention Regarding the Safety and Environmental Implications of the Nuclear Regulatory Commission Task Force Report on the Fukushima Dai-Ichi AccidentProbabilistic Risk Assessment
Aging Management
Fukushima Dai-Ichi
License Renewal
Hardened vent
ML11256A35313 September 2011Intervenors' Reply Memorandum to Staff and Applicant Oppositions to Admission of New ContentionFukushima Dai-Ichi
License Renewal
Earthquake
ML11266A04323 September 2011NRC Staff'S Motion to Strike Portions of Intervenor'S Reply Memorandum to Staff and Applicant Oppositions to Admission of New ContentionFukushima Dai-Ichi
License Renewal
Earthquake
ML11266A07923 September 2011Corrected NRC Staff'S Motion to Strike Portions of Intervenor'S Reply Memorandum to Staff and Applicant Oppositions to Admission of New Contention (Contains Previously Omitted References in Footnote 23)Fukushima Dai-Ichi
License Renewal
Earthquake
ML11266A14523 September 2011Firstenergy'S Motion to Strike Portions of Interveners' ReplyIncorporated by reference
Fukushima Dai-Ichi
Earthquake
ML11279A2716 October 2011Intervenors' Opposition to FENOC and NRC Motions to Strike Portions of Intervenors' Reply in Support of Admitting Contention Concerning Fukushima Dai-Ichi AccidentIncorporated by reference
Fukushima Dai-Ichi
Earthquake
ML11285A00012 October 2011Refiled Motion for Leave for Intervenors' Opposition to FENOC and NRC Staff Motions to Strike Portions of Intervenors' Reply in Support of Admitting Contention Concerning Fukushima Dai-ichi Accident to Be Deemed Filed InstanterFukushima Dai-Ichi
ML11285A0117 October 2011Motion for Leave for Intervenors' Opposition to FENOC and NRC Staff Motions to Strike Portions of Intervenors' Reply in Support of Admitting Contention Concerning Fukushima Dai-ichi Accident to Be Deemed Filed InstanterFukushima Dai-Ichi
ML11301A36628 October 2011Motion for Leave to Supplement Basis of Contention Regarding NEPA Requirement to Address Safety and Environmental Implications of the Fukushima Task Force Report
ML11305A0831 November 2011Fenoc'S Unopposed Motion for Modification of Paragraph A.2 of the Board'S Initial Scheduling Order
ML11311A3007 November 2011NRC Staff'S Answer to Motion for Leave to Supplement Basis of Contention Regarding NEPA Requirement to Address Safety and Environmental Implications of the Fukushima Task Force ReportFukushima Dai-Ichi
ML11353A26419 December 2011Firstenergy Nuclear Operating Company'S Motion to Dismiss Contention 1
ML11353A39319 December 2011Firstenergy Nuclear Operating Company'S Motion to Dismiss Contention One
ML12009A1539 January 2012Intervenors' Memorandum in Opposition to Motion to Dismiss' (Opposition to Summary Disposition of Contention 1)
ML12010A17210 January 2012Motion for Admission of Contention No. 5 on Shield Building CrackingSafe Shutdown
Boric Acid
Nondestructive Examination
Aging Management
License Renewal
Earthquake
Affidavit
ML12013A39013 January 2012Fenoc'S Motion for Leave to File a Motion for Reconsideration of the Board'S January 10 Order
ML12013A39113 January 2012Firstenergy'S Motion for Extension of Time to File a Motion to Strike
ML12040A1709 February 2012Fenoc'S Unopposed Motion for Leave to Respond to the NRC Staff'S Answer to Proposed Contention 5 on Shield Building Cracking
ML12044A36113 February 2012Intervenors' Combined Reply in Support of Motion for Admission of Contention No. 5Safe Shutdown
Boric Acid
Packing leak
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Stroke time
Water Inventory Control
Weld Overlay
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Aging Management
Significance Determination Process
Annual Radiological Environmental Operating Report
Moisture barrier
Earthquake
Maintenance Rule Program
Liquid penetrant
Through-Wall Leak
Fire Protection Program
Scaffolding
ML12054A75523 February 2012Fenoc'S Motion to Strike Portions of Intervenors' Reply for the Proposed Contention 5 on Shield Building Cracking
ML12058A24927 February 2012Intervenors' Motion to Amend 'Motion for Admission of Contention No. 5.'Safe Shutdown
Boric Acid
Packing leak
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Offsite Dose Calculation Manual
Stroke time
Water Inventory Control
Weld Overlay
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Significance Determination Process
Annual Radiological Environmental Operating Report
Moisture barrier
Earthquake
Maintenance Rule Program
Liquid penetrant
Through-Wall Leak
Fire Protection Program
Scaffolding
ML12058A26027 February 2012Intervenors' Answer to FENOC 'Motion to Strike.'
ML12107A48516 April 2012Fenoc'S Unopposed Motion for Leave to Supplement Its Answer to the Proposed Shield Building Cracking ContentionAging Management
ML12135A40514 May 2012Intervenors' Unopposed Motion to Vacate and Reschedule Oral Argument on Proposed Contention No. 5Aging Management
ML12156A41025 May 2012FENOC Violating Federal Regulations (Again)