Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02240078118 January 2002E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report
ML0318204416 March 2003Email Dated March 6, 2003, from Dr. Ed Siegel to A. Hiser, W. Bateman, and T. Chan, Fwd: Fyi: Questions? Comments?Boric Acid
Weld Overlay
Coatings
Earthquake
ML04009023425 April 2003E-mail from Charles Casto Regarding Current Events Notes
ML0403501969 April 2003E-mail from Christensen to DRS Branch Chiefs, Open Item StatusHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Hemyc
Fire Protection Program
ML04035020630 April 2003E-mail from Ogle to Christensen, Open Items/Sdp Tracking SheetSafe Shutdown
Boric Acid
Fire Barrier
Hemyc
ML04035020919 May 2003E-mail from Ogle to Fillion Etc. All Regarding Open Item StatusSafe Shutdown
Boric Acid
Hemyc
ML04142021629 April 2004Email from SQN Responding to RAI Re 50.68 Exemption (MC1871/72)
ML0423802229 August 2004TVA Email, Withdrawal of Amendment Request WBN-TS-03-16Ultimate heat sink
ML05118009825 February 2004E-mail from Lois to Brown, Some Info
ML0511802012 March 2004E-mail from Brown to Gallucci, Sequoyah App R Stuff
ML0511802741 March 2004E-mail from Gallucci to Lois, Sequoyah App R Stuff
ML05332047017 August 2004E-Mail from Kim to Prible, Ranking of Plans for Openness Survey
ML0703103906 December 2006E-mail from: E. Vigluicci to C. Evans Pugh Decision and Order
ML08346042810 December 2008NRC Acceptance Review of LAR TS-08-06Operating Basis Earthquake
ML09133022913 May 2009Acceptance Review of TSC 07-05, Emergency Core Cooling System
ML09173007222 June 2009License Amendment Review (W* Distance for Cold Legs) Acceptance Review
ML09271008124 September 2009LAR - Revise TSs to Allow ST Tubing ARC (W*)
ML0928100898 October 2009SG Tube ISI Conference Call for Fall 2009 RFO
ML09322098310 November 2009E-mail Sequoyah 2 Cycle 16 (Fall 2009) RFO SG Tubing ISI Clarifications and Discussion
ML09327053223 November 2009Scheduler Exemption Request of 10 CFR 73.55Exemption Request
ML09328013319 November 2009Security Schedular Exemption Request Acceptance Review by NSIRExemption Request
ML0933800953 December 2009TSTF-511 LAR Acceptance Review
ML09365021823 December 2009GL 2004-02 Final RAI Responses Due Date
ML1006211843 March 2010E-mail Sequoyah 1 & 2 La (IR Neutron Flux Channel Operability Acceptance Review
ML1019304613 March 2010E-mail from Young, Cale to Lingam, Siva Sequoyah - Supplement Briefing Book for TVA Drop-InAnnual Radioactive Effluent Release Report
ML1022905322 August 2010SG Tube ISI RAIs
ML10243044631 August 2010SQN 2 SG ISI Report Clarification
ML11019002919 January 2011Acceptance Review for Sequoyah-2 RR
ML1109506405 April 2011Memorandum Regarding Sequoyah, Unit 2 - Spring 2011 RFO Steam Generator RFO Conference Call
ML11124A0002 May 2011NRR E-mail Capture - Sequoyah 1 and 2 - Acceptance Review of Relief Request RP-01, Revision 1
ML11203A11321 July 2011NRR E-mail Capture - Sequoyah 1 & 2 - LAR Regarding Areva Advanced W17 Htp Fuel (ME6538/6539)Fuel cladding
ML11230B31717 August 2011NRR E-mail Capture - Sequoyah 2 - Acceptance Review of LAR Requesting to Revise TS for RSG Tube ISI Reflecting Inspection Requirements of TSTF-449, Rev. 4
ML11245A23022 January 2008Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Subject: Fwd: Video Teleconference W/Regions on Soarca
ML11245A2315 February 2008Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Information
ML11245A2325 February 2008Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Visit
ML11245A23325 February 2008Email from R. Guzman, NRR/DORL/LPLI-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: While I Am Out.
ML11255A28827 May 2008Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Subject: PM Sequoyah
ML11256A2706 February 2008Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Information
ML11285A00411 October 2011NRR E-mail Capture - Sequoyah 2 - Acceptance Review of LAR Requesting to Allow Use of One of the SB Dome Penetrations
ML11285A20312 October 2011NRR E-mail Capture - FW: Restriction Regarding Tpbars Implementation at Sequoyah Nuclear Plant, Units 1 and 2
ML11307A36931 October 2011NRR E-mail Capture - Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP
ML12019A26413 January 2012NRR E-mail Capture - Sequoyah, Unit 1 LAR - Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP
ML12034A2272 February 2012NRR E-mail Capture - Sequoyah, Unit 1 LAR - Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP
ML12038A2497 February 2012NRR E-mail Capture - Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 Through 4Control of Heavy Loads
ML12125A0282 May 2012NRR E-mail Capture - Sequoyah, Units 1 & 2 - Areva Advanced W17 Htp Fuel Transition
ML12128A3657 May 2012NRR E-mail Capture - Sequoyah Nuclear Plant, Unit 2 - Cycle 17 180-Day Steam Generator Inspection Report
ML12177A00022 June 2012NRR E-mail Capture - Sequoyah 1 and 2 - Revise TSs in Support of Unit Station Service Transformer ModificationOffsite Circuit
ML12213A03530 July 2012NRR E-mail Capture - Sequoyah 1 - Heavy Loads LAR
ML12261A02714 September 2012NRR E-mail Capture - Sequoyah 1 and 2 - Revise UFSAR Regarding Changes to Hydrologic Analysis
ML12366A25731 December 2012NRR E-mail Capture - Sequoyah 1 & 2 - RR 1,2-PDI-4 to Allow Use of Appendix Viii & EPRI PDI for Volumetric Exam of RPV Shell-to-Flange Welds