Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML022400781 | 18 January 2002 | E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report | |
ML031820441 | 6 March 2003 | Email Dated March 6, 2003, from Dr. Ed Siegel to A. Hiser, W. Bateman, and T. Chan, Fwd: Fyi: Questions? Comments? | Boric Acid Weld Overlay Coatings Earthquake |
ML040090234 | 25 April 2003 | E-mail from Charles Casto Regarding Current Events Notes | |
ML040350196 | 9 April 2003 | E-mail from Christensen to DRS Branch Chiefs, Open Item Status | Hot Short Safe Shutdown Boric Acid Fire Barrier Hemyc Fire Protection Program |
ML040350206 | 30 April 2003 | E-mail from Ogle to Christensen, Open Items/Sdp Tracking Sheet | Safe Shutdown Boric Acid Fire Barrier Hemyc |
ML040350209 | 19 May 2003 | E-mail from Ogle to Fillion Etc. All Regarding Open Item Status | Safe Shutdown Boric Acid Hemyc |
ML041420216 | 29 April 2004 | Email from SQN Responding to RAI Re 50.68 Exemption (MC1871/72) | |
ML042380222 | 9 August 2004 | TVA Email, Withdrawal of Amendment Request WBN-TS-03-16 | Ultimate heat sink |
ML051180098 | 25 February 2004 | E-mail from Lois to Brown, Some Info | |
ML051180201 | 2 March 2004 | E-mail from Brown to Gallucci, Sequoyah App R Stuff | |
ML051180274 | 1 March 2004 | E-mail from Gallucci to Lois, Sequoyah App R Stuff | |
ML053320470 | 17 August 2004 | E-Mail from Kim to Prible, Ranking of Plans for Openness Survey | |
ML070310390 | 6 December 2006 | E-mail from: E. Vigluicci to C. Evans Pugh Decision and Order | |
ML083460428 | 10 December 2008 | NRC Acceptance Review of LAR TS-08-06 | Operating Basis Earthquake |
ML091330229 | 13 May 2009 | Acceptance Review of TSC 07-05, Emergency Core Cooling System | |
ML091730072 | 22 June 2009 | License Amendment Review (W* Distance for Cold Legs) Acceptance Review | |
ML092710081 | 24 September 2009 | LAR - Revise TSs to Allow ST Tubing ARC (W*) | |
ML092810089 | 8 October 2009 | SG Tube ISI Conference Call for Fall 2009 RFO | |
ML093220983 | 10 November 2009 | E-mail Sequoyah 2 Cycle 16 (Fall 2009) RFO SG Tubing ISI Clarifications and Discussion | |
ML093270532 | 23 November 2009 | Scheduler Exemption Request of 10 CFR 73.55 | Exemption Request |
ML093280133 | 19 November 2009 | Security Schedular Exemption Request Acceptance Review by NSIR | Exemption Request |
ML093380095 | 3 December 2009 | TSTF-511 LAR Acceptance Review | |
ML093650218 | 23 December 2009 | GL 2004-02 Final RAI Responses Due Date | |
ML100621184 | 3 March 2010 | E-mail Sequoyah 1 & 2 La (IR Neutron Flux Channel Operability Acceptance Review | |
ML101930461 | 3 March 2010 | E-mail from Young, Cale to Lingam, Siva Sequoyah - Supplement Briefing Book for TVA Drop-In | Annual Radioactive Effluent Release Report |
ML102290532 | 2 August 2010 | SG Tube ISI RAIs | |
ML102430446 | 31 August 2010 | SQN 2 SG ISI Report Clarification | |
ML110190029 | 19 January 2011 | Acceptance Review for Sequoyah-2 RR | |
ML110950640 | 5 April 2011 | Memorandum Regarding Sequoyah, Unit 2 - Spring 2011 RFO Steam Generator RFO Conference Call | |
ML11124A000 | 2 May 2011 | NRR E-mail Capture - Sequoyah 1 and 2 - Acceptance Review of Relief Request RP-01, Revision 1 | |
ML11203A113 | 21 July 2011 | NRR E-mail Capture - Sequoyah 1 & 2 - LAR Regarding Areva Advanced W17 Htp Fuel (ME6538/6539) | Fuel cladding |
ML11230B317 | 17 August 2011 | NRR E-mail Capture - Sequoyah 2 - Acceptance Review of LAR Requesting to Revise TS for RSG Tube ISI Reflecting Inspection Requirements of TSTF-449, Rev. 4 | |
ML11245A230 | 22 January 2008 | Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Subject: Fwd: Video Teleconference W/Regions on Soarca | |
ML11245A231 | 5 February 2008 | Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Information | |
ML11245A232 | 5 February 2008 | Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Visit | |
ML11245A233 | 25 February 2008 | Email from R. Guzman, NRR/DORL/LPLI-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: While I Am Out. | |
ML11255A288 | 27 May 2008 | Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Subject: PM Sequoyah | |
ML11256A270 | 6 February 2008 | Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Et. Al., Subject: Sequoyah Information | |
ML11285A004 | 11 October 2011 | NRR E-mail Capture - Sequoyah 2 - Acceptance Review of LAR Requesting to Allow Use of One of the SB Dome Penetrations | |
ML11285A203 | 12 October 2011 | NRR E-mail Capture - FW: Restriction Regarding Tpbars Implementation at Sequoyah Nuclear Plant, Units 1 and 2 | |
ML11307A369 | 31 October 2011 | NRR E-mail Capture - Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP | |
ML12019A264 | 13 January 2012 | NRR E-mail Capture - Sequoyah, Unit 1 LAR - Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP | |
ML12034A227 | 2 February 2012 | NRR E-mail Capture - Sequoyah, Unit 1 LAR - Heavy Load Lifts and UHS One Time Change in Support of Unit 2 SGRP | |
ML12038A249 | 7 February 2012 | NRR E-mail Capture - Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 Through 4 | Control of Heavy Loads |
ML12125A028 | 2 May 2012 | NRR E-mail Capture - Sequoyah, Units 1 & 2 - Areva Advanced W17 Htp Fuel Transition | |
ML12128A365 | 7 May 2012 | NRR E-mail Capture - Sequoyah Nuclear Plant, Unit 2 - Cycle 17 180-Day Steam Generator Inspection Report | |
ML12177A000 | 22 June 2012 | NRR E-mail Capture - Sequoyah 1 and 2 - Revise TSs in Support of Unit Station Service Transformer Modification | Offsite Circuit |
ML12213A035 | 30 July 2012 | NRR E-mail Capture - Sequoyah 1 - Heavy Loads LAR | |
ML12261A027 | 14 September 2012 | NRR E-mail Capture - Sequoyah 1 and 2 - Revise UFSAR Regarding Changes to Hydrologic Analysis | |
ML12366A257 | 31 December 2012 | NRR E-mail Capture - Sequoyah 1 & 2 - RR 1,2-PDI-4 to Allow Use of Appendix Viii & EPRI PDI for Volumetric Exam of RPV Shell-to-Flange Welds |