NRR E-mail Capture - Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 Through 4
ML12038A249
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/07/2012
From: Siva Lingam
Plant Licensing Branch II
To: Mackaman C
Tennessee Valley Authority
References
TAC ME7026
Download: ML12038A249 (2)


Text

1 NRR-PMDAPEm Resource From:

Lingam, Siva Sent:

Tuesday, February 07, 2012 2:28 PM To:

Mackaman, Clyde Douglas Cc:

Broaddus, Doug; Shoop, Undine; Lapinsky, George

Subject:

Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 through 4 (TAC NO. ME7026)

Please note the following official additional RAIs from our Health Physics and Human Performance Branch (AHPB), and provide your response within 30 days.

1. Given the relatively high rate of injury and death from rigging and crane operations, what precautions have been taken to prevent human errors in the rigging and crane operations proposed in this license amendment request?
2. Will the crane operator be qualified per American National Standard Institute [ANSI] B30.2-1976 (Chapter 2-3), Overhead and Gantry Cranes? If not, what qualifications will be required of the crane operator?
3. Will specific rigging procedures be used by the dedicated team?
4. Will specific rigging training be given to the steam generator replacement project (SGRP) team?
5. Will the controlling procedure or training include the actions of the crane operator?
6. What kind of communication will the crane operator and the SGRP team use?
7. Were any relevant insights applied from Sequoyah Nuclear Plants operating experience (OE) with slipped or dropped loads, NUREG-0612, Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36, or other industry OE regarding rigging and crane operations?

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)

Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov

Hearing Identifier:

NRR_PMDA Email Number:

259 Mail Envelope Properties (Siva.Lingam@nrc.gov20120207142800)

Subject:

Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 through 4 (TAC NO. ME7026)

Sent Date:

2/7/2012 2:28:14 PM Received Date:

2/7/2012 2:28:00 PM From:

Lingam, Siva Created By:

Siva.Lingam@nrc.gov Recipients:

"Broaddus, Doug" <Doug.Broaddus@nrc.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>

Tracking Status: None "Lapinsky, George" <George.Lapinsky@nrc.gov>

Tracking Status: None "Mackaman, Clyde Douglas" <cdmackaman@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1589 2/7/2012 2:28:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: