Letter Sequence Other |
|---|
|
|
MONTHYEARML11249A0612011-08-31031 August 2011 Application for Temporary Change to TS to Allow Use of Penetrations in Shield Building Dome During Modes 1 Through 4;and Request for Specific Usage of Alternate Source Term Methodology for Calculating Radiation Doses Associated Project stage: Request ML11249A0462011-08-31031 August 2011 Organization Topical Report, TVA-NPOD89-A Project stage: Request ML11273A1692011-09-29029 September 2011 Application to Revise Sequoyah Nuclear Plant, Unit 1, Operating License and Technical Specification 3.7.5, Ultimate Heat Sink, to Support Steam Generator Replacement Project (TS-SQN-2011-05) Project stage: Request ML11285A0042011-10-11011 October 2011 NRR E-mail Capture - Sequoyah 2 - Acceptance Review of LAR Requesting to Allow Use of One of the SB Dome Penetrations Project stage: Acceptance Review ML11334A0542011-11-28028 November 2011 Request for Expedited Review of a Licensing Amendment Request Supporting the Unit 2, Steam Generator Replacement Project Project stage: Request ML11356A2262011-12-29029 December 2011 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: RAI ML12032A2702012-01-27027 January 2012 Response to NRC Request for Additional Information Regarding Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Response to RAI ML12011A0272012-01-30030 January 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Used of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: RAI ML12038A2492012-02-0707 February 2012 NRR E-mail Capture - Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 Through 4 Project stage: Other ML12074A0362012-02-29029 February 2012 Response to NRC Second Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Request ML12072A2362012-03-0808 March 2012 Response to NRC Third Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Request ML12121A3442012-05-15015 May 2012 Request for Additional Information Regarding the Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1-4 Project stage: RAI ML12160A3572012-06-0707 June 2012 Response to Request for Additional Information on License Amendment Regarding Proposed Technical Specification Changes to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4; Withdrawal of Request Project stage: Withdrawal ML12165A6932012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment Project stage: Withdrawal ML12165A6912012-06-27027 June 2012 Letter - Withdrawal of an Amendment Request to Allow Use of Shield Building Dome Penetrations During Modes 1 Through 4 Project stage: Withdrawal NRC-2012-0160, Federal Register Notice - Notice of Withdrawal of an Amendment2012-06-27027 June 2012 Federal Register Notice - Notice of Withdrawal of an Amendment Project stage: Withdrawal 2012-01-30
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Lingam, Siva Sent:
Tuesday, February 07, 2012 2:28 PM To:
Mackaman, Clyde Douglas Cc:
Broaddus, Doug; Shoop, Undine; Lapinsky, George
Subject:
Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 through 4 (TAC NO. ME7026)
Please note the following official additional RAIs from our Health Physics and Human Performance Branch (AHPB), and provide your response within 30 days.
- 1. Given the relatively high rate of injury and death from rigging and crane operations, what precautions have been taken to prevent human errors in the rigging and crane operations proposed in this license amendment request?
- 2. Will the crane operator be qualified per American National Standard Institute [ANSI] B30.2-1976 (Chapter 2-3), Overhead and Gantry Cranes? If not, what qualifications will be required of the crane operator?
- 3. Will specific rigging procedures be used by the dedicated team?
- 4. Will specific rigging training be given to the steam generator replacement project (SGRP) team?
- 5. Will the controlling procedure or training include the actions of the crane operator?
- 6. What kind of communication will the crane operator and the SGRP team use?
- 7. Were any relevant insights applied from Sequoyah Nuclear Plants operating experience (OE) with slipped or dropped loads, NUREG-0612, Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36, or other industry OE regarding rigging and crane operations?
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)
Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
Hearing Identifier:
NRR_PMDA Email Number:
259 Mail Envelope Properties (Siva.Lingam@nrc.gov20120207142800)
Subject:
Sequoyah, Unit 2 - Allow Use of Penetrations in SB Dome During Modes 1 through 4 (TAC NO. ME7026)
Sent Date:
2/7/2012 2:28:14 PM Received Date:
2/7/2012 2:28:00 PM From:
Lingam, Siva Created By:
Siva.Lingam@nrc.gov Recipients:
"Broaddus, Doug" <Doug.Broaddus@nrc.gov>
Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>
Tracking Status: None "Lapinsky, George" <George.Lapinsky@nrc.gov>
Tracking Status: None "Mackaman, Clyde Douglas" <cdmackaman@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1589 2/7/2012 2:28:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: