Category:E-Mail
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23355A2202023-12-21021 December 2023 Radiation Protection Inspection - Inspection Report 2024-01 ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23332A0042023-11-27027 November 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Revised Alternative 0-ISI-47 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23243A9892023-08-29029 August 2023 Inspection Information Request ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23208A0872023-07-26026 July 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry 1, 2, and 3, Alternative Request 0-ISI-47 to Use an Alternative to ASME Code, Section XI, Examination Requirements for Examination Categories B-N-1 and B-N-2 ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23165A2862023-06-14014 June 2023 Tennessee Multi-Sector Permit (Tmsp), 2023 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, SW-17, SW-18, SW-19, and SW-21 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23124A0082023-05-0303 May 2023 NRR E-mail Capture - Request for Additional Information Related to Proposed Alternative Requests for the 5th 10-Year Inservice Testing Interval for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML23117A0702023-04-26026 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, 1, 2, and 3, License Amendment Request to Revise Tech Specs Surveillance Requirements 3.4.3.2 and 3.5.1.11 Safety Relief Valves (BFN TS-540) ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23097A0172023-04-0606 April 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Adopt TSTF-566-A and TSTF-580-A, Revision 1 ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23075A0502023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message and TVA Intentions on EA-22-122 - Choice Letter Response Email Message -- NRC Acknowledgement ML23073A2082023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message ML23073A2072023-03-10010 March 2023 TVA Intentions on EA-22-122 - Choice Letter Response Email Message - NRC Acknowledgement ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23058A1312023-02-27027 February 2023 FW: TVA Intentions on EA-22-129 ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML23052A0792023-02-21021 February 2023 NRR E-mail Capture - Acceptance Review for Browns Ferry and Sequoyah License Amendment Request to Adopt TSTF-541 ML23046A3552023-02-15015 February 2023 Annual Water Withdrawal Report 2022 ML23041A0022023-02-0909 February 2023 NRR E-mail Capture - Request for Additional Information Related to TVA Alternative Request BFN-0-ISI-32 (CNL-22-025) ML23019A3442023-01-19019 January 2023 Tennessee Multi-Sector Permit (Tmsp), 2022 Annual Discharge Monitoring Report for Outfalls SW-1, SW-16, and SW-19 ML23013A1512023-01-13013 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Request to Use Later ASME OM Code Edition and Alternative Requests BFN-IST-01 Through BFN-IST-05 ML23026A0282023-01-12012 January 2023 001 Radiation Safety Baseline Inspection Information Request ML23017A0062023-01-12012 January 2023 Initial Information Request Inspection Report: 2023001 ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23004A0352023-01-0404 January 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry, Units 1, 2, and 3, License Amendment Request to Delete TS 3.6.3.1 by Adopting TSTF-478 ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22348A0432022-11-28028 November 2022 NRR E-mail Capture - State Consultation - Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request to Modify the Approved 10 CFR 50.69 Categorization Process (L-2022-LLA-0033) 2024-01-31
[Table view] |
Text
L- va;Bibwn - Re: Some info Page 1 From: Erasmia Lois To: Eva Brown Date: Wed, Feb 25, 2004 4:30 PM
Subject:
Re: Some info Plant visit that would allow us to look at the shutdown procedures and possibly do a walk-down or two!
Brown's Ferry would be OK too.
>>> Eva Brown 02/25/04 04:26PM >>>
I'm not sure that there is an inspection ongoing at Sequoyah. If it's just about a site visit, I can take you guys with me to Brown's Ferry.
I/> Erasmia Lois Wednesday, February 25, 2004 4:24:06 PM>>> PIS The target date is March 29.
During today's meeting Mark recommended that Sequoyah will be a better plant to go than Watts Bar; would it be possible to arrange a couple of days visit to Sequoyah instead? Otherwise will do Watts Bar.
Yes I am working on having Ron Laughery in the panel. Dennis Bley is another person that I hope will be there. I am not quite sure who (Alan, or John, or Dennis) will hold the seession and who will participate as an expert. Gareth may be able to be there but he is not quite sure. It would be good if we could have a couple of inspectors or other real fire-people.
Age> Ray Gallucci 02/25/04 03:49PM>>>>>
Eva and I discussed getting some of the input that John and Alan requested. As Erasmia pointed out this AM (from a suggestion by Eva), she, John and Alan might participate in a tri-ennial inspection in the very near future to get some first-hand exposure to a licensee's OpManAx. Eva will check with NEI during the monthly conference call to see if they might supply some utility OpManAx procedures (that would make them officially usable by John and Alan for the workshop). She will also check with Ril to see if Charlie Payne might be available as our inspector panelist. If not, or if there is not another Regional inspector available, either Peter or herself could serve the role (or Phil?). Peter - do you concur?
Erasmia - I assume you will be contacting Ron Laughery regarding his joining the panel; Gareth also? Is there anyone in RES with fire and PSA experience who might serve on the panel (I can do this if no one else can be found, although my preference would be to have someone "fresh" if possible)? Eva thought See-Meng Wong could also perform this role, but he may be too busy with his current assignment (off-site) to fit it in.
John/Alan - Will either of you be on the panel in addition to running the elicitation itself?
A/
i _nes.ongarra - RE: Some info Page 1 From: "Forester, John Am <jafores~sandia.gov>
To: "'Ray Gallucci'" <RHG~nrc.gov>, "Eva Brown" <EAB1 @nrc.gov>, "Erasmia Lois"
<EXL1 @nrc.gov>, "Peter Koltay" <PSK@nrc.gov>
Date: 2/26/04 10:49AM
Subject:
RE: Some info Ray, The current plan is for Alan to be the main facilitator for the expert elicitation, with me supporting him and taking notes etc. I believe this would allow Alan and I to help get all of the relevant information on the table, but also allow us to help control for various biases among the panel etc. However, we might still change our minds about this. Depends to some extent on who agrees to be on the panel etc.
John
Original Message----- "Ja4-Vrom: Ray Gallucci @ nrc.gov
Sent: Wednesday, February 25, 2004 1:50 PM To: Eva Brown; Erasmia Lois; Peter Koltay Cc: James Bongarra; Sunil Weerakkody; ALAN.M.KOLACZKOWSKI @saic.com; jafores @sandia.gov
Subject:
Some info Eva and I discussed getting some of the input that John and Alan requested.
As Erasmia pointed out this AM (from a suggestion by Eva), she, John and Alan might participate in a tri-ennial inspection in the very near future to get some first-hand exposure to a licensee's OpManAx. Eva will check with NEI during the monthly conference call to see if they might supply some utility OpManAx procedures (that would make them officially usable by John and Alan for the workshop). She will also check with Rll to see if Charlie Payne might be available as our inspector panelist. If not, or if there is not another Regional inspector available, either Peter or herself could serve the role (or Phil?). Peter - do you concur?
Erasmia - I assume you will be contacting Ron Laughery regarding his joining the panel; Gareth also? Is there anyone in RES with fire and PSA experience who might serve on the panel (I can do this if no one else can be found, although my preference would be to have someone Nfresh" if possible)? Eva thought See-Meng Wong could also perform this role, but he may be too busy with his current assignment (off-site) to fit it in.
John/Alan - Will either of you be on the panel in addition to running the elicitation itself?
CC: "James Bongarra" <JXB~nrc.gov>, "Sunil Weerakkody" <SDW1 @nrc.gov>,
<ALAN.M.KOLACZKOWSKI@saic.com>, "Forester, John A" <jafores@sandia.gov>