Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML02240078118 January 2002E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report
ML03111026925 July 2002E-mail from J. Starefos to H. Hackett, Regarding DB LLRT ListBoric Acid
VT-2
Aging Management
Pressure Boundary Leakage
ML03111027725 July 2002E-mail from J. Starefos to A. Howell, Regarding DB LLRT ListBoric Acid
VT-2
Aging Management
Pressure Boundary Leakage
ML0318204416 March 2003Email Dated March 6, 2003, from Dr. Ed Siegel to A. Hiser, W. Bateman, and T. Chan, Fwd: Fyi: Questions? Comments?Boric Acid
Weld Overlay
Coatings
Earthquake
ML04009023425 April 2003E-mail from Charles Casto Regarding Current Events Notes
ML0403501969 April 2003E-mail from Christensen to DRS Branch Chiefs, Open Item StatusHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Hemyc
Fire Protection Program
ML04035020630 April 2003E-mail from Ogle to Christensen, Open Items/Sdp Tracking SheetSafe Shutdown
Boric Acid
Fire Barrier
Hemyc
ML04035020919 May 2003E-mail from Ogle to Fillion Etc. All Regarding Open Item StatusSafe Shutdown
Boric Acid
Hemyc
ML04142021629 April 2004Email from SQN Responding to RAI Re 50.68 Exemption (MC1871/72)
ML04184031811 May 2004Summary of Staff Meeting on Appendix F of Browns Ferry Nuclear LRA
ML04232056418 March 2004TVA Browns Ferry Nuclear Plant, Probabilistic Safety Assessment Unit 2 Summary Report Rev. 1, January 2003Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML04233056318 March 2004TVA Systems and Analysis Browns Ferry Nuclear Plant, Probabilistic Safety Assessment Unit 3.Summary Report Rev. 1, January 2003Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML0423802229 August 2004TVA Email, Withdrawal of Amendment Request WBN-TS-03-16Ultimate heat sink
ML04238029519 December 2003E-mail, C. Ogle to Stephen Cahill, Minor Revision to Charlie'S Writeup to Close Bf URISafe Shutdown
ML0423802981 December 2003E-mail, C. Ogle to Gerald Wiseman, My Review of Your Bf InputSafe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Fire Protection Program
Fire Watch
ML0423803021 December 2003E-mail, C. Ogle to Charlie Payne, My New Comments on Bf IR 03-07Hot Short
Safe Shutdown
Packing leak
Fire Barrier
Operator Manual Action
Emergency Lighting
Significance Determination Process
Fire Protection Program
Fire Watch
ML0425201432 September 2004E-mail Re Emailing: BFN Lines and Sensitive Elements
ML0425301008 September 2004Transmission Line Corridor Maps Figure 2-4 for the EIS September 2004
ML04279039824 November 2003Personal Communication Regarding non-indigenous Plankton Been Recorded in Wheeler Reservoir, Particularly Around Browns Ferry Nuclear Plant
ML04279048124 November 2003Email from Kenny D. Gardner, TVA to Ginger Seeber Regarding Wheeler Reservoir Commercial Fish Species
ML04279049624 November 2003Email from K D Gardner Dated 11/24/2003, Noting Personal Communication on 06/10/2002 with Jeffrey Garner, State Malacologist, Alabama Division of Wildlife and Freshwater Fisheries Regarding Commercial Mussel Harvest 2001
ML04279049824 November 2003Email from K D Gardner Dated 11/24/2003, Noting Personal Communication on 07/18/2003 with State Malacologist, Alabama Division of Wildlife and Freshwater Fisheries, Decatur, Alabama, Commercial Mussel Harvest 2001
ML04279050416 December 2003Near-Field Modeling of Thermal Discharge from Browns Ferry Nuclear Plant, Email of Model Results to John M. Higgins, Tennessee Valley Authority, Reservoir System Operations and Environment, River Operations, December 2003
ML04280005824 November 2003Record of Personal Communications, e-mails on 05/16/2002 & 05/29/2004 Regarding Alabama Division of Wildlife and Freshwater Fisheries Stocking Programs
ML04301009723 October 2004Comment (473) of Corey E. Olsen on Draft Criteria on Manual Actions to Achieve Post-fire Safe ShutdownSafe Shutdown
ML04351009313 December 2004Tennessee Valley Authority, Email to Tim Abney, EPU Review Standard and Associated Topical Reports
ML05004004731 March 2004E-mail E. Brown, NRR, to S. Weerakkody, NRR, Reply Requested: NEI Questions
ML0507002961 March 2005Questions Raised at the Browns Ferry Dseis Public Meeting (Jan. 25, 2005) with Responses Provided by TVA
ML05118009825 February 2004E-mail from Lois to Brown, Some Info
ML0511802012 March 2004E-mail from Brown to Gallucci, Sequoyah App R Stuff
ML0511802741 March 2004E-mail from Gallucci to Lois, Sequoyah App R Stuff
ML05137033229 April 2005E-mail from NRC to TVA Transferring Question Related to Reference Documents U2 Ipe/Pra References for Browns Ferry License Renewal
ML05137039011 May 2005E-mail from TVA to NRC Transferring Reference Documents Probabilistic Risk Assessment IPE - Revision 1 and Revision 1A for Browns Ferry License Renewal,Probabilistic Risk Assessment
ML05332047017 August 2004E-Mail from Kim to Prible, Ranking of Plans for Openness Survey
ML0703103906 December 2006E-mail from: E. Vigluicci to C. Evans Pugh Decision and Order
ML08172027720 June 2008Special Inspection Report Questions - Transmittal E-mail
ML08252048829 August 2008G20080593/LTR-08-0456/LTR-08-0457/EDATS: SECY-2008-0512 - Katy Love, Jeremy Thompson Emails Enforcement of Critical Fire Protection Regulations
ML08346042810 December 2008NRC Acceptance Review of LAR TS-08-06Operating Basis Earthquake
ML09022022816 January 2009G20080593/LTR-08-0456 - Email Matthew Pintar Enforcement of Critical Fire Protection Regulations
ML09133022913 May 2009Acceptance Review of TSC 07-05, Emergency Core Cooling System
ML0915404168 May 2009Draft COP Position Paper Submitted by E-mailProbabilistic Risk Assessment
ML0915405308 May 2009Bertram Morris, E-mail Chart Table of COP That Have Been Granted to Other BWRs for EPU
ML09173007222 June 2009License Amendment Review (W* Distance for Cold Legs) Acceptance Review
ML09271008124 September 2009LAR - Revise TSs to Allow ST Tubing ARC (W*)
ML0928100898 October 2009SG Tube ISI Conference Call for Fall 2009 RFO
ML09322098310 November 2009E-mail Sequoyah 2 Cycle 16 (Fall 2009) RFO SG Tubing ISI Clarifications and Discussion
ML09327053223 November 2009Scheduler Exemption Request of 10 CFR 73.55Exemption Request
ML09328013319 November 2009Security Schedular Exemption Request Acceptance Review by NSIRExemption Request
ML0933604221 December 2009Security Scheduler Exemption Acceptance ReviewExemption Request
ML0933702762 December 2009Security Schedular Exemption Request AcceptanceExemption Request