ML20070K72619 July 1994Proposed TS SR 4.7.6.k,ensuring That Each Control Room Ventilation Sys Has Capability to Remove Required Heat LoadEarthquake
ML20070P39620 March 1991Proposed Tech Specs to Permit Use of Continuous Pressure Testing of Containment Airlock Door Seal Gaskets in Lieu of Manual Testing
ML20070U08031 January 1991Proposed Tech Specs Reducing RHR Min Flow Rate,Removing RHR Autoclosure Interlock on RHR Sys Suction Isolation Valves & Allowing Operation of Safety Injection Pump to Mitigate Effects of Loss of DHRSafe Shutdown
Unanalyzed Condition
Shutdown Margin
Stroke time
Fuel cladding
ML20071G3776 July 1994Proposed Tech Specs Re Steam Generator Tube Sleeving Methodology
ML20071K97326 July 1994Proposed Tech Specs Adding Unit & Cycle Specific Footnotes Relative to Positive Moderator Temp Coefficient & Reduced Thermal Design FlowShutdown Margin
Fuel cladding
ML20071L4871 August 1994Proposed Tech Specs Incorporating 1.0 V SG Tube Interim Plugging Criteria Beginning W/Unit Cycle 7
ML20071P0302 August 1994Proposed TS 3.3.3.5, Remote Shutdown InstrumentationSafe Shutdown
Enforcement Discretion
ML20072U2567 September 1994Proposed Tech Specs for Consistency W/Model TS in Draft GL, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion CrackingSafe Shutdown Earthquake
Operating Basis Earthquake
ML20072U4378 April 1991Revised Tech Specs Re Use of Continuous Pressure Testing of Containment Airlock Door Seal Gaskets in Lieu of Manual Testing
ML20073B92519 April 1991Proposed Tech Specs Re Operability Requirements for Radiation Monitoring Instrumentation Channels
ML20073C04217 September 1994Proposed TS 3/4.4.5, Steam Generators, Allowing EC Bobbin Coil Probe voltage-based SG Tube Support Plate Interim Plugging Criteria to Be Applied for Byron Unit 1 Beginning W/Cycle 7Safe Shutdown Earthquake
Operating Basis Earthquake
ML20073C31816 September 1994Proposed Tech Specs 4.3.1.2, RTS Response Time & 4.3.2.2, ESF Response Time, Eliminating Periodic Response Time Testing & Indicating That Sys Response Time Shall Be Verified Using Sensor Response Time
ML20073D34517 September 1994Proposed Tech Spec Section 3/4.4.5, Steam Generators, Attachment F,Page 2
ML20073K7617 October 1994Proposed TS 6.3.1,defining Who Is Designated as Radiation Protection Manager
ML20073S03210 February 1994Proposed Tech Specs 4.8.2.1.2.e & 4.8.2.1.2.f Re Dc Sources
ML20078H9782 February 1995Proposed Tech Specs,Requesting Approval of Amend to Permit Use of Alternate Tuge Repair Criteria,F*,For SG at FacilitiesBoric Acid
Operating Basis Earthquake
ML20078Q53915 February 1995Proposed Tech Specs Re Positive Moderator Temp CoefficientBoric Acid
Shutdown Margin
Probabilistic Risk Assessment
Annual Radiological Environmental Operating Report
ML20080H35113 February 1995Proposed Tech Specs,Increasing Interim Plugging Criteria Value for Plants SGNon-Destructive Examination
Safe Shutdown Earthquake
Operating Basis Earthquake
ML20080J41721 February 1995Proposed Tech Specs Re RTD Bypass Elimination Mod That Will Remove Bypass Piping & Valves & Be Replaced W/Fast Response RTDs Mounted in Thermowells Welded in RCS Loop PipingShutdown Margin
ML20082A23628 June 1991Proposed Tech Specs Tables 2.2-1 & 3.3-4 Re Reactor Trip Sys Instrumentation Trip Setpoints & ESF Actuation Sys Instrumentation Trip Setpoints
ML20082A28428 June 1991Proposed Tech Specs 3/4.4.4 & 3/4.4.9.3,addressing Concerns of Generic Ltr 90-06 Re PORVs & LTOPStroke time
Pressure Boundary Leakage
ML20082G57810 June 1991Proposed Tech Specs Deleting Radioactive Liquid Effluent Monitoring Instrumentation,Radioactive Gaseous Effluent Monitoring Instrumentation & Radioactive Gaseous Waste SamplingShutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Power change
ML20082U2356 September 1983Draft Tech Specs Re Containment Sys Primary Containment Leakage.Related Info Encl
ML20084A61417 May 1995Proposed Tech Specs Section 3/4.4.5,allowing SG Tubes to Be Repaired Using Tungsten Inert Gas Welded Sleeve Process Described in Abb C-E Licensing Rept CEN-621-P,Rev 0, Comm Ed...Sg Tube Repair Using Leak Tight SleevesSafe Shutdown
Operating Basis Earthquake
Earthquake
Fire Protection Program
ML20084D27530 January 1974Proposed Tech Spec 15.4.11 Re Hydraulic Shock Suppressors
ML20084U3078 June 1995Proposed Tech Specs Re Revised SRs & Administrative Requirements Associated W/EdgsSafe Shutdown
Offsite Circuit
ML20085F86817 October 1991Proposed Tech Spec Pages 3/4 3-57 & 3/4 3-59 Re Relocating Procedural Details of Current Radioactive Effluent Program, Radiological Environ Monitoring Program & Solid Radwaste Program
ML20086D9997 July 1995Proposed Tech Specs,Implementing 3.0 Volt Bobbin Coil Probe, Voltage Based,Sg TSP Alternative Plugging Criteria Limit for Outside Diameter Stress Corrosion Cracking Indications at hot-leg TSP IntersectionsSafe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Power change
ML20086E18018 November 1991Revised Tech Spec Tables 2.2-1 & 3.3-4 Re Reactor Trip Instrumentation Trip Setpoints & ESFAS Instrumentation Trip Setpoints,Respectively,Reducing Setpoint for lo-lo Steam Generator Level Reactor Trip from 40.8% to 34.8%
ML20087D83813 January 1992Proposed Tech Specs Table 3.3-6 & 4.3-3 Re Radiation Monitors Assigned to Each Train of Control Room Ventilation
ML20090A25427 February 1992Revised TS Pages 3/4 2-9 Re Measurement of RCS Total Flow Rate
ML20090G3904 March 1992Proposed Tech Specs Bases Pages 3/4 3-3 & 3/4 3-4
ML20092B0551 September 1995Proposed Tech Specs Re Increase in Interim Plugging CriteriaNon-Destructive Examination
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Power change
ML20092C8386 February 1992Proposed Tech Specs Tables 3.3-6 & 4.3-3 Re Radiation Monitoring Instrumentation
ML20092H32614 September 1995Proposed Tech Specs 5.3.1, Fuel Assemblies, Allowing Use of Alternate Zirconium Based Fuel Cladding,Zirlo & 5.4.1.a, Referring to UFSAR Rather than FSARFuel cladding
ML20092P3331 February 1984Proposed Deleted Tech Spec 7.2.2.1, Sensor Time Response Testing, License Condition 20.Deletion Requested on Basis of Prohibitive Limitations of Process Noise Methodology. Methodology Will Be Used as Backup
ML20094P16731 March 1992Proposed Tech Specs 3/4.7.5 & Bases Section 3/4.7.5 for Ultimate Heat SinkUltimate heat sink
ML20095B39515 April 1992Proposed TSs 2.2.1,Table 2.2-1 & 3.3.2,Table 3.3-4 & Associated Bases in Ref to Setpoint Reconciliation Program
ML20095D6276 December 1995Proposed Tech Specs,Revising TS Section 3/4.6.1, Primary Containment, to Incorporate Requirements of Revised 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Effective on 951026Packing leak
Offsite Dose Calculation Manual
Pressure Boundary Leakage
ML20095J51221 December 1995Proposed Tech Specs,Expanding Plants Operating Limits Rept to Include Limits Suggested by GL 88-16, Removal of Cycle- Specific Parameter Limits from Ts
ML20096C02611 January 1996Proposed Tech Specs,Revising TS 3.3.1, Rt Sys Instrumentation, Table 3.3-1,Functional Unit 6, Source Range,Neutron Flux, Consistent W/Improved STSShutdown Margin
ML20098C7093 October 1995Proposed Tech Specs Re line-item Improvements to Reduce Surveillance Requirements for Testing During Power Operation,Per GL 93-05
ML20099E0705 August 1992Proposed Tech Specs 3/4.3.1 & 3/4.3.2 Re Quarterly Testing of ESFsShutdown Margin
ML20099K1721 March 1976Proposed Tech Specs Changing Rod Block Monitor/Rod Block Setpoint During Single Loop Operation
ML20099K26819 March 1976Proposed Tech Specs Re Boron Concentration in Moderator Water for Standby Liquid Control SysShutdown Margin
ML20099K5127 September 1976Proposed Tech Specs Allowing Operation at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve ClosedAbnormal operational transient
ML20099K55912 January 1977Proposed Tech Spec Change RTS-74,allowing Single Loop Operation W/Bypass Flow Holes PluggedHigh Radiation Area
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
Fuel cladding
ML20100L23427 February 1996Proposed Tech Specs,Implementing 10CFR50,App J,Option B Which Allows Use of Performance Based Surveillance Frequencies for Type A,B & C Tests,Rather than Predetermined Fixed IntervalsPacking leak
Offsite Dose Calculation Manual
Pressure Boundary Leakage
ML20101K01328 March 1996Proposed Tech Specs SR 4.6.1.2,reflecting Exception to Min 24 Month Interval Between Type a Tests Specified in Section 9.2.3 of NEI 94-01,using Nominal 18 Month Interval Instead, to Correspond W/Plants Refueling Interval
ML20101M7582 April 1996Proposed TS Page 3/4 5-2 Re GL 93-05 Line Item Improvements