Issue date | Title | Topic | |
---|---|---|---|
ML061280527 | 25 May 2006 | License Amendments, Issuance of Amendments Containment Area High-Range Radiation Monitors | Reactor Vessel Water Level Post Accident Monitoring |
ML062140500 | 31 August 2006 | Issuance of Amendments Changes to Technical Specifications for Containment Isolation Valves | Stroke time |
ML062570544 | 28 September 2006 | Issuance of Amendment Changes to Technical Specifications for Steam Generator Tube Inspections | Non-Destructive Examination Finite Element Analysis |
ML062690480 | 13 October 2006 | License Amendment, Issuance of Amendments Refueling Operations and Special Test Exceptions (TAC Nos. MC9337 & MC9338) | Anticipated operational occurrence |
ML062790398 | 27 October 2006 | Units, 1 and 2, Issuance of License Amendments 276 and 258 Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process | Safe Shutdown Probabilistic Risk Assessment Missed surveillance Significance Determination Process Large early release frequency Power change |
ML070170268 | 7 March 2007 | Issuance of License Amendment 259 Maximum Allowable Power with Inoperable Main Steam Safety Valves | Anticipated operational occurrence Abnormal operational transient Fuel cladding |
ML070520606 | 19 March 2007 | Issuance of Amendments Power Range Neutron Flux High Negative Rate Trip and Editorial Changes (Tac Nos. MD1490 and MD1491) | Anticipated operational occurrence Probabilistic Risk Assessment Negative Flux Rate Trip |
ML070710178 | 19 March 2007 | License Amendment, Containment Purge System | Earthquake |
ML070710265 | 29 March 2007 | License Amendment, Steam Generator Tube Integrity | Operational leakage |
ML070790070 | 27 March 2007 | License Amendment, Issuance of Amendment Steam Generator Alternate Repair Criteria | |
ML070920317 | 19 April 2007 | Issuance of Amendments 280 and 263 Accident Monitoring Instrumentation and Source Check Definition | Post Accident Monitoring |
ML070930287 | 19 April 2007 | Issuance of Amendments Elimination of Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process | Probabilistic Risk Assessment Fuel cladding |
ML071020210 | 23 April 2007 | Review of Steam Generator Tube Inspection Reports for 2005, Salem Nuclear Generating Station, Unit No. 2 | |
ML071200393 | 6 June 2007 | Units, 1 and 2, Issuance of License Amendments 282 and 265 Relocation of Technical Specification Requirements for the Movable Incore Detectors and Radioactive Gaseous Effluent Oxygen Monitoring Instrumentation | Grab sample Offsite Dose Calculation Manual Probabilistic Risk Assessment Process Control Program Overspeed trip |
ML071300532 | 19 June 2007 | License Amendment, Issuance of Amendments Relocation of Response Time Testing Limits (TAC Nos. MD2804 & MD2805) | Probabilistic Risk Assessment |
ML072150289 | 9 August 2007 | Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac Nos. MD4548 and MD4549) | B.5.b Severe Accident Management Guideline B.5.b Mitigating Strategies |
ML072210499 | 23 August 2007 | Issuance of Amendments Topical Report References in Technical Specification for Core Operating Limits Report (Tac Nos. MD3171 and MD3172) | |
ML072841247 | 15 November 2007 | License Amendments Revision to Licensing Basis - Net Positive Suction Head Methodology for Emergency Core Cooling System Pumps | |
ML080670052 | 13 March 2008 | Units, 1 and 2, Issuance of License Amendments 288 and 272, Surveillance Requirements for Containment Building Penetrations | |
ML081260365 | 2 June 2008 | Evaluation of Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 | VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML081690552 | 26 June 2008 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Emergency Plan Changes | Severe Accident Management Guideline |
ML081970092 | 22 July 2008 | Review of Steam Generator Tube Inspection Report for Spring 2007 | |
ML082340922 | 24 September 2008 | Issuance of Amendments Refueling Operations - Decay Time | |
ML082550218 | 10 October 2008 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Stroke time Incorporated by reference Power Operated Valves |
ML090020079 | 27 January 2009 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Authorization to Use Respiratory Protection Equipment | Mururoa |
ML090690802 | 2 June 2009 | Issuance of Amendments Elimination of Unnecessary Reporting Requirements | Safe Shutdown Fire Protection Program |
ML090850066 | 2 April 2009 | Evaluation of Relief Request V-07 | Incorporated by reference |
ML090860966 | 14 May 2009 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Deletion of Technical Specification Requirements Related to Plant Staff Working Hours | Safe Shutdown Fitness for Duty Fire Protection Program |
ML092030464 | 11 August 2009 | Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03 | Stroke time Incorporated by reference Power-Operated Valves |
ML093630818 | 12 January 2010 | License Amendment, Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies | Safe Shutdown Shutdown Margin Packing leak Anticipated operational occurrence Fire Protection Program Power change Flow Induced Vibration |
ML093650086 | 7 January 2010 | Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Hydrostatic VT-2 Incorporated by reference Intergranular Stress Corrosion Cracking Stress corrosion cracking Operational leakage Thermal fatigue |
ML100491550 | 22 February 2010 | Safety Evaluation of Relief Requests to Extend the Inservice Inspection Interval for Reactor Vessel Examinations for Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Incorporated by reference |
ML100570452 | 29 March 2010 | Issuance of Amendment Steam Generator Inspection Scope and Repair Requirements | Safe Shutdown Probabilistic Risk Assessment Finite Element Analysis Fire Protection Program |
ML101300307 | 15 June 2010 | Issuance of Amendments 295 and 278 Miscellaneous Administrative and Editorial Changes | Safe Shutdown Shutdown Margin Probabilistic Risk Assessment Fire Protection Program |
ML102000445 | 16 August 2010 | Issuance of Amendment 296 One-Time Extension of the Type a Integrated Leakage Rate Test Interval | |
ML102080501 | 20 August 2010 | License Amendment, Issuance of Amendments Surveillance Requirements for Inservice Inspection and Inservice Testing | Safe Shutdown Time of Discovery Shutdown Margin Offsite Dose Calculation Manual Incorporated by reference Process Control Program Fire Protection Program |
ML102150499 | 1 September 2010 | Issuance of Amendment 280 One-Time Battery Replacement | Safe Shutdown Fire Barrier Temporary Modification Fire Protection Program |
ML103010285 | 15 December 2010 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements (TAC Nos. ME3577, ME357 | Safe Shutdown Hydrostatic Probabilistic Risk Assessment Fire Protection Program Coast down Overspeed trip Operational leakage |
ML110410691 | 21 March 2011 | License Amendment, Issuance of Amendments Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Mission time Grab sample Hydrostatic Probabilistic Risk Assessment Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Large early release frequency Pressure Boundary Leakage Fire Protection Program Power change Unidentified leakage Overspeed trip Operational leakage |
ML111861560 | 28 July 2011 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan | Cyber Security Excess Flow Check Valve Safeguards Contingency Plan License Renewal Cyber attack |
ML112020359 | 25 August 2011 | Issuance of Amendments Technical Specification Requirements for Snubbers | Incorporated by reference Surveillance Frequency Control Program Fire Protection Program |
ML112140424 | 17 August 2011 | Safety Evaluation of Relief Request to Continue Using a Risk-Informed Inservice Inspection Program for Salem Nuclear Generating Station, Unit No. 1 | Probabilistic Risk Assessment Incorporated by reference |
ML112420175 | 19 September 2011 | Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2 | VT-2 Incorporated by reference Through-Wall Leak |
ML112560428 | 23 September 2011 | and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Approval of Emergency Action Level Scheme Change | Internal Flooding Fuel cladding |
ML12185A162 | 11 July 2012 | Safety Evaluation of Relief Request Regarding Inservice Pump Testing - Salem Nuclear Generating Station, Unit Nos. 1 and 2 | Boric Acid Incorporated by reference |
ML12335A221 | 10 December 2012 | and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security Plan | Cyber Security Fire Protection Program |
ML13071A215 | 22 April 2013 | Safety Evaluation of Relief Request No. S1l3R-114 Regarding Third 10-Year Interval Inservice Inspection | Boric Acid Nondestructive Examination Incorporated by reference Intergranular Stress Corrosion Cracking Dissimilar Metal Weld Thermal fatigue |
ML13072A105 | 28 March 2013 | Issuance of Amendments Revision to Technical Specification 6.8.4.i, Steam Generator Program, and Technical Specifications 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate | Probabilistic Risk Assessment Finite Element Analysis Fire Protection Program |
ML13088A219 | 18 April 2013 | Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code Edition | Incorporated by reference |
ML13109A439 | 10 May 2013 | Correction to Issuance of Amendment 303 |