 Issue dateTitleTopic
ML06128052725 May 2006License Amendments, Issuance of Amendments Containment Area High-Range Radiation MonitorsReactor Vessel Water Level
Post Accident Monitoring
ML06214050031 August 2006Issuance of Amendments Changes to Technical Specifications for Containment Isolation ValvesStroke time
ML06257054428 September 2006Issuance of Amendment Changes to Technical Specifications for Steam Generator Tube InspectionsNon-Destructive Examination
Finite Element Analysis
ML06269048013 October 2006License Amendment, Issuance of Amendments Refueling Operations and Special Test Exceptions (TAC Nos. MC9337 & MC9338)Anticipated operational occurrence
ML06279039827 October 2006Units, 1 and 2, Issuance of License Amendments 276 and 258 Regarding Mode Change Limitations Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Probabilistic Risk Assessment
Missed surveillance
Significance Determination Process
Large early release frequency
Power change
ML0701702687 March 2007Issuance of License Amendment 259 Maximum Allowable Power with Inoperable Main Steam Safety ValvesAnticipated operational occurrence
Abnormal operational transient
Fuel cladding
ML07052060619 March 2007Issuance of Amendments Power Range Neutron Flux High Negative Rate Trip and Editorial Changes (Tac Nos. MD1490 and MD1491)Anticipated operational occurrence
Probabilistic Risk Assessment
ML07071017819 March 2007License Amendment, Containment Purge SystemEarthquake
ML07071026529 March 2007License Amendment, Steam Generator Tube Integrity
ML07079007027 March 2007License Amendment, Issuance of Amendment Steam Generator Alternate Repair Criteria
ML07092031719 April 2007Issuance of Amendments 280 and 263 Accident Monitoring Instrumentation and Source Check DefinitionPost Accident Monitoring
ML07093028719 April 2007Issuance of Amendments Elimination of Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement ProcessProbabilistic Risk Assessment
Fuel cladding
ML07102021023 April 2007Review of Steam Generator Tube Inspection Reports for 2005, Salem Nuclear Generating Station, Unit No. 2
ML0712003936 June 2007Units, 1 and 2, Issuance of License Amendments 282 and 265 Relocation of Technical Specification Requirements for the Movable Incore Detectors and Radioactive Gaseous Effluent Oxygen Monitoring InstrumentationGrab sample
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Process Control Program
ML07130053219 June 2007License Amendment, Issuance of Amendments Relocation of Response Time Testing Limits (TAC Nos. MD2804 & MD2805)Probabilistic Risk Assessment
ML0721502899 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac Nos. MD4548 and MD4549)B.5.b
Severe Accident Management Guideline
B.5.b Mitigating Strategies
ML07221049923 August 2007Issuance of Amendments Topical Report References in Technical Specification for Core Operating Limits Report (Tac Nos. MD3171 and MD3172)
ML07284124715 November 2007License Amendments Revision to Licensing Basis - Net Positive Suction Head Methodology for Emergency Core Cooling System Pumps
ML08067005213 March 2008Units, 1 and 2, Issuance of License Amendments 288 and 272, Surveillance Requirements for Containment Building Penetrations
ML0812603652 June 2008Evaluation of Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML08169055226 June 2008and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Emergency Plan ChangesSevere Accident Management Guideline
ML08197009222 July 2008Review of Steam Generator Tube Inspection Report for Spring 2007
ML08234092224 September 2008Issuance of Amendments Refueling Operations - Decay Time
ML08255021810 October 2008Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2Stroke time
Incorporated by reference
Power Operated Valves
ML09002007927 January 2009and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request for Authorization to Use Respiratory Protection EquipmentMururoa
ML0906908022 June 2009Issuance of Amendments Elimination of Unnecessary Reporting RequirementsSafe Shutdown
Fire Protection Program
ML0908500662 April 2009Evaluation of Relief Request V-07Incorporated by reference
ML09086096614 May 2009and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Deletion of Technical Specification Requirements Related to Plant Staff Working HoursSafe Shutdown
Fitness for Duty
Fire Protection Program
ML09203046411 August 2009Safety Evaluation of Relief Requests for the Fourth 10-Year Interval of the Inservice Testing Program for Salem Nuclear Generating Station, Unit 1 & 2 (TAC ME0322, ME0323, ME0324, ME0325, ME0326, ME0327, ME0328, ME0329, ME0330, ME0331, ME03Stroke time
Incorporated by reference
Power-Operated Valves
ML09363081812 January 2010License Amendment, Revise the Definition of Fully Withdrawn for the Rod Cluster Control AssembliesSafe Shutdown
Shutdown Margin
Packing leak
Anticipated operational occurrence
Fire Protection Program
Power change
Flow Induced Vibration
ML0936500867 January 2010Safety Evaluation of Relief Requests for the Third 10-Year Interval of the Inservice Inspection Program for Salem Nuclear Generating Station, Unit Nos. 1 and 2Hydrostatic
VT-2
Incorporated by reference
ML10049155022 February 2010Safety Evaluation of Relief Requests to Extend the Inservice Inspection Interval for Reactor Vessel Examinations for Salem Nuclear Generating Station, Unit Nos. 1 and 2Incorporated by reference
ML10057045229 March 2010Issuance of Amendment Steam Generator Inspection Scope and Repair RequirementsSafe Shutdown
Probabilistic Risk Assessment
Finite Element Analysis
Fire Protection Program
ML10130030715 June 2010Issuance of Amendments 295 and 278 Miscellaneous Administrative and Editorial ChangesSafe Shutdown
Shutdown Margin
Probabilistic Risk Assessment
Fire Protection Program
ML10200044516 August 2010Issuance of Amendment 296 One-Time Extension of the Type a Integrated Leakage Rate Test Interval
ML10208050120 August 2010License Amendment, Issuance of Amendments Surveillance Requirements for Inservice Inspection and Inservice TestingSafe Shutdown
Time of Discovery
Shutdown Margin
Offsite Dose Calculation Manual
Incorporated by reference
Process Control Program
Fire Protection Program
ML1021504991 September 2010Issuance of Amendment 280 One-Time Battery ReplacementSafe Shutdown
Fire Barrier
Temporary Modification
Fire Protection Program
ML10301028515 December 2010and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Proposed Revision to Technical Specifications - Removal of Reactor Coolant System Structural Integrity Requirements (TAC Nos. ME3577, ME357Safe Shutdown
Hydrostatic
Probabilistic Risk Assessment
Fire Protection Program
Coast down
ML11041069121 March 2011License Amendment, Issuance of Amendments Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program Based on Technical Specification Task Force (TSTF) Change TSTF-425Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Mission time
Grab sample
Hydrostatic
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Large early release frequency
Pressure Boundary Leakage
Fire Protection Program
Power change
ML11186156028 July 2011and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security PlanCyber Security
ML11202035925 August 2011Issuance of Amendments Technical Specification Requirements for SnubbersIncorporated by reference
Surveillance Frequency Control Program
Fire Protection Program
ML11214042417 August 2011Safety Evaluation of Relief Request to Continue Using a Risk-Informed Inservice Inspection Program for Salem Nuclear Generating Station, Unit No. 1Probabilistic Risk Assessment
Incorporated by reference
ML11242017519 September 2011Safety Evaluation of Relief Requests Regarding Pressure Testing of Service Water System Buried Piping - Salem Nuclear Generating Station, Unit Nos. 1 and 2VT-2
Incorporated by reference
Through-Wall Leak
ML11256042823 September 2011and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Approval of Emergency Action Level Scheme ChangeInternal Flooding
Fuel cladding
ML12185A16211 July 2012Safety Evaluation of Relief Request Regarding Inservice Pump Testing - Salem Nuclear Generating Station, Unit Nos. 1 and 2Boric Acid
Incorporated by reference
ML12335A22110 December 2012and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security PlanCyber Security
Fire Protection Program
ML13071A21522 April 2013Safety Evaluation of Relief Request No. S1l3R-114 Regarding Third 10-Year Interval Inservice InspectionBoric Acid
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML13072A10528 March 2013Issuance of Amendments Revision to Technical Specification 6.8.4.i, Steam Generator Program, and Technical Specifications 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent AlternateProbabilistic Risk Assessment
Finite Element Analysis
Fire Protection Program
ML13088A21918 April 2013Safety Evaluation of Relief Request No. S2-14R-123 Regarding the Fourth Ten-Year Inservice Inspection Interval Code EditionIncorporated by reference
ML13109A43910 May 2013Correction to Issuance of Amendment 303