Issue date | Title | Topic | |
---|---|---|---|
ML20084B612 | 22 June 1972 | Rept of Preliminary Investigation Failure of Hanger Bolts on Suppression Chamber Suction Header at Quad Cities Nuclear Station,Unit 2 | |
ML20084L930 | 8 May 1984 | Const Insps at Midland & Zimmer Nuclear Power Plants, Monthly Progress Rept for Apr 1984 | |
ML20085F252 | 19 May 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Interim Technical Evaluation Rept | |
ML20085K488 | 19 September 1983 | QA Case Study Working Paper Case C, Revised Draft Working Paper | Earthquake |
ML20086S620 | 30 April 1981 | Systems Interaction Evaluation Procedure for Application to Indian POINT-3 | Boric Acid Ultimate heat sink Scram Discharge Volume Earthquake |
ML20086S648 | 15 June 1981 | Review of PASNY Sys Interaction Study | Safe Shutdown Ultimate heat sink |
ML20086S661 | 1 March 1982 | Review of PASNY Sys Interaction Study | |
ML20086T882 | 2 March 1984 | Control of Heavy Loads (C-10) Wisconsin Electric Power Co Point Beach Nuclear Plant Units 1 & 2 | Control of Heavy Loads |
ML20087Q085 | 13 July 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept | |
ML20093C533 | 30 March 1984 | Audit of Susquehanna Unit 2 Tech Specs, Technical Evaluation Rept | Reactor Vessel Water Level Half scram Stroke time Hydrostatic Anchor Darling Backfit |
ML20097A828 | 6 April 1992 | Technical Evaluation Rept Pump & Valve Inservice Testing Program Point Beach Nuclear Power Plant,Units 1 & 2 Wepc, Per 10CFR50.55a(g) | Boric Acid Stroke time Anchor Darling Incorporated by reference Cold shutdown justification Power Operated Valves |
ML20097F020 | 31 August 1984 | Technical Assistance in Conduct of Insp Program at Various Region III Nuclear Power Plants, Monthly Progress Rept for Aug 1984 | |
ML20105C435 | 18 November 1983 | Evaluation of Diesel Generator Failure at Shoreham Unit 1, Interim Rept on Phase 1,Failure Cause Evaluation, Interim Technical Evaluation Rept | |
ML20107K934 | 10 July 1984 | Draft Control of Heavy Loads - Phase Ii,Indian Point Nuclear Power Plant Unit 2, Technical Evaluation Rept | Safe Shutdown Control of Heavy Loads Fuel cladding |
ML20108E007 | 31 December 1984 | Conformance to Reg Guide 1.97,Point Beach Nuclear Plant, Units 1 & 2 | Safe Shutdown Boric Acid High Radiation Area Grab sample Fuel cladding Overexposure |
ML20108F350 | 7 November 1984 | Evaluation of Detailed Control Room Design Review Program Plan | |
ML20112G245 | 31 October 1984 | Northwest Us Subduction Zone Seismic Risk Assessment, Rept for Oct 1983 - Oct 1984 | Earthquake |
ML20112G277 | 7 February 1975 | Topical Rept on Exams of Portions of Reactor Bldg Spray Sys Piping from Arkansas Nuclear Plant 1 | |
ML20112J145 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Byron Units 1 & 2 & Braidwood Units 1 & 2 | Boric Acid Anchor Darling |
ML20112J410 | 31 March 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Waterford Steam Electric Station,Unit 3 | |
ML20112J431 | 31 March 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Midland Nuclear Plant (Units 1 & 2) | |
ML20112J439 | 30 April 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at WPPSS Nuclear Project 2 | |
ML20112J453 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Wh Zimmer Nuclear Power Station | |
ML20112J477 | 30 September 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment at Palo Verde Nuclear Generating Station Unit 1 | Anchor Darling |
ML20112J489 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment for Snupps | Anchor Darling |
ML20126D376 | 24 July 1984 | Assessment of Diesel Engine Reliability/Operability, Monthly Progress Rept for June 1984 | |
ML20126D380 | 19 September 1984 | Assessment of Diesel Engine Reliability/Operability, Monthly Progress Rept for Jul & Aug 1984.Related Info Encl | High Radiation Area Nondestructive Examination Scram Discharge Volume |
ML20126E654 | 31 July 1984 | Draft Containment Event Analysis & Estimation of Source Term Frequencies,App to NUREG-0956 | Probabilistic Risk Assessment Failure to Scram |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20126F615 | 28 February 1983 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Feb 1983.Incomplete Progress Rept for Mar 1983 Encl | Hydrostatic Exemption Request |
ML20126F659 | 30 June 1983 | Containment Leak Rate Testing, Monthly Progress Rept for June 1983 | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20127B927 | 31 July 1984 | Review & Evaluation of Tdi Diesel Engine Reliability & Operability - Grand Gulf Nuclear Station,Unit 1 | Breakaway torque Liquid penetrant |
ML20127E755 | 28 February 1985 | Shutdown DHR Analysis,Point Beach Case Study, Draft Rept | Safe Shutdown Boric Acid High winds Ultimate heat sink Fire Barrier Tornado Missile Internal Flooding Hydrostatic Probabilistic Risk Assessment Earthquake |
ML20127L899 | 30 April 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Apr 1983 | |
ML20127L963 | 31 May 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for May 1983 | |
ML20127M008 | 30 June 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for June 1983 | |
ML20127M034 | 31 July 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Jul 1983 | |
ML20127M040 | 31 August 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Aug 1983 | |
ML20127M046 | 30 September 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Sept 1983 | |
ML20127M068 | 17 November 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Oct 1983 | |
ML20127M095 | 16 December 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Nov 1983 | |
ML20127M113 | 31 December 1983 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Dec 1983 | |
ML20127M126 | 13 February 1984 | Safety Evaluation of Core-Melt Accidents:CESSAR-FDA, Westinghouse Std Plant-FDA, Monthly Highlights for Jan 1984 | |
ML20127M823 | 13 February 1984 | Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Jan 1984 | Earthquake |
ML20127N276 | 31 January 1983 | Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Jan 1983 | |
ML20127N400 | 28 February 1983 | Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Feb 1983 | |
ML20127N483 | 31 March 1983 | Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Monthly Highlights for Mar 1983 |