Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000395/199400211 January 1994Advises of Special Initiative Being Performed at Operating Reactors to Be Performed at Station,Beginning 940103,per Insp Rept 50-395/94-02
IR 05000395/199600729 November 1996Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/96-07 on 960701
IR 05000395/199600813 September 1996Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/96-08
IR 05000395/199600931 October 1996Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/96-09
IR 05000395/199601411 March 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/96-14 Issued on 970127.Implementation of Corrective Actions Will Be Examined During Future Inspections
IR 05000395/199609925 June 1997Refers to 961216 Meeting Re NRC SALP Rept 50-395/96-99,dtd 961206,for Plant.List of Attendees & SALP Presentation EnclHigh winds
Systematic Assessment of Licensee Performance
Fire Protection Program
Siren
Power Uprate
IR 05000395/19970021 August 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/97-02
IR 05000395/199700319 December 1997Discusses Insp Rept 50-395/97-03 on 970602.NRC Exercising Enforcement Discretion for Lack of Safety Significance of Need for Exemption During Licensing ProcessEnforcement Discretion
IR 05000395/199700515 October 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/97-05
IR 05000395/199700729 September 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/97-07 on 970821
IR 05000395/199701419 March 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/97-14 on 980209
IR 05000395/19980014 May 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/98-01. Response Meets Requirements of 10CFR2.201
IR 05000395/199800217 June 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-395/98-02
IR 05000801/20090066 January 1986Discusses Insp on 850801-0906 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000. Violations I & II Represent Breakdown in Mgt Sys to Ensure Compliance W/Tech Specs
ML20054E8354 June 1982Advises That Util 820208 Commitments Re Svc Water Pond Structures (SER Item 1.8.20) Acceptable Except for Interpretation of Insp Schedule.Addl Discussion of NRC Bases for Conclusions in Suppl 3 to SER Encl
ML20054E8934 June 1982Forwards Draft Technical Evaluation Rept Control of Heavy Loads at Nuclear Power Plants,Virgil C Summer Nuclear Station,Unit 1Control of Heavy Loads
ML20054G96525 May 1982Forwards IE Insp Rept 50-395/82-32 on 820506-07.No Noncompliance Noted
ML20054G98621 May 1982Forwards IE Insp Rept 50-395/82-33 on 820504-06.No Noncompliance Noted
ML20054H04011 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in IE Insp Rept 50-395/82-26
ML20054H05726 April 1982Forwards IE Insp Rept 50-395/82-26 on 820330-0402 & Notice of Deviation
ML20054M86828 June 1982Forwards marked-up Pages of Proof & Review Copy of Tech Spec App A.List of Specs That Remain Open & List of Specs Under Review Encl
ML20054M94518 June 1982Forwards IE Insp Rept 50-395/82-37 on 820607-09.No Noncompliance Noted
ML20055A16418 June 1982Forwards IE Insp Rept 50-395/82-31 on 820501-31.No Noncompliance Noted
ML20055A75812 July 1982Forwards IE Safeguards Insp Rept 50-395/82-30 on 820628-30. No Noncompliance Noted
ML20055C7341 June 1990Advises of EOP Insp to Be Performed at Plant on 900820-24. Insp Will Verify That Human Factors Considerations Adequately Addressed in EOPs & Review Adequacy of Technical Changes to EOPs in Response to Previous Insps
ML20055H37512 July 1990Forwards Insp Rept 50-395/90-18 on 900601-30 & Notice of Violation
ML20055H6026 July 1990Forwards Insp Rept 50-395/90-19 on 900611-15.Violations Noted
ML20056A7916 August 1990Forwards Safety Evaluation Re Capability of Plant to Meet Requirements of Branch Technical Position Rsb 5-1, Design Requirements of RHR Sys
ML20056B45515 August 1990Forwards Insp Rept 50-395/90-21 on 900701-31 & Notice of Violation
ML20056D2317 July 1993Forwards Insp Rept 50-395/93-17 on 930511-0615 & Nov. Violation of Concern Because First Example of Violations a & B Appear to Be Addl Examples Where Reliance on Skill of Craft in Lieu of Written Instructions Inappropriate
ML20056E30212 August 1993Forwards Insp Rept 50-395/93-21 on 930719-23.No Violations or Deviations Noted
ML20056E96911 August 1993Forwards Insp Rept 50-395/93-20 on 930712-16.Attention Directed to Resolution of Exercise Weaknesses
ML20056F59712 August 1993Forwards Insp Rept 50-395/93-19 on 930716-31 & Notice of Violation
ML20056G65420 August 1993Confirms Arrangements Made Between RM Fowlkes & Fs Cantrell Re 930908 Mgt Meeting to Be Conducted in Region II Ofc to Discuss self-assessment of Performance for First Six Months of Present SALP Period.Meeting Agenda Encl
ML20057D56229 September 1993Forwards Insp Rept 50-395/93-23 on 930830-0903.No Violations or Deviations Noted.Rept Partially Withheld,Per 10CFR73.21
ML20057E2134 October 1993Forwards Revised TS Bases 3/4.7.1.2 Re Emergency Feedwater Sys
ML20057E2364 October 1993Forwards Corrected TS Bases 3/4.5.4 & 3/4.6.2.2 Re Emergency Core Cooling & Containment Sys.Changes Reduce Low End of Predicted Ph Range of Water in Reactor Bldg Sump Following LOCA from 7.8 to 7.5
ML20057E41921 September 1993Forwards Insp Rept 50-395/93-22 on 930801-0903.Activities That Violated NRC Requirements That Will Not Be Subject to EA Noted
ML20058A06916 November 1993Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld
ML20058A59619 October 1990Forwards Insp Rept 50-395/90-26 on 900918-19.Violations Noted But Not Cited