ML20054G965
| ML20054G965 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 05/25/1982 |
| From: | Dance H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML20054G966 | List: |
| References | |
| NUDOCS 8206220453 | |
| Download: ML20054G965 (2) | |
See also: IR 05000395/1982032
Text
c fifoul
,
,
NAY 25 1982
South Carolina Electric and Gas Company
ATIN:
Mr. T. C. Nichols, Jr. , Vice President
Power Production and System Operations
P. O. Box 764
Columbia, SC 29218
Gentlemen:
Subject:
Report No. 50-395/82-32
This refers to the routine safety inspection conducted by Mr. J. J. Lenahan of
this office on May 6-7, 1982, of activities authorized by NRC Construction Permit
No. CPPR-94 for the V. C. Summer facility and to the discussion of our findings
held with Mr. W. A. Williams, Jr. , General Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or. deviations were disclosed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
M
H. C. Dance, Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
See Page 2
8206220453 820525
PDR ADOCK 05000395
[{Qf
G
-
.
.
.
.
South Carolina Electric and
2
MAY 25 1982
Gas Company
Enclosure:
Inspection Report No. 50-395/82-32
cc w/ encl:
J. B. Knotts, Jr.
O. S. Bradham, Station Manager
J. P. Harrison, Manager Nuclear
Security
C. A. Price, Manager, Nuclear
Engineering
A. A. Smith, Site QA Coordinator
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
.
!
,%.enahan:ht
TEConlon
ARH rdt
JRigge
HCDance
54t/82
5
f/82
5/, 82
5/qj/82
5/ /82