B12358, Application for Amend to License DPR-21,changing Tech Spec 5.1 Re Site Design Features Exclusion Area Boundary.Revised Wording Will Enhance Tech Spec Consistency W/Design Basis Plume Pathway Calculations.Fee Paid | 26 May 1987 | Application for Amend to License DPR-21,changing Tech Spec 5.1 Re Site Design Features Exclusion Area Boundary.Revised Wording Will Enhance Tech Spec Consistency W/Design Basis Plume Pathway Calculations.Fee Paid | |
B12359, Application for Amend to License NPF-49,changing Tech Spec Sections 3.4.1.3 & 3/4.4.1 Re Limiting Condition for Operation for Number of Reactor Coolant Loops in Operation During Hot Shutdown Conditions.Fee Paid | 5 January 1987 | Application for Amend to License NPF-49,changing Tech Spec Sections 3.4.1.3 & 3/4.4.1 Re Limiting Condition for Operation for Number of Reactor Coolant Loops in Operation During Hot Shutdown Conditions.Fee Paid | |
B12394, Application to Amend License DPR-21,revising Tech Specs to Delete Ref to Switchyard Batteries.Fee Paid | 21 January 1987 | Application to Amend License DPR-21,revising Tech Specs to Delete Ref to Switchyard Batteries.Fee Paid | |
B12401, Application for Amend to License DPR-21,revising Tech Specs by Lowering RWCU Sys Isolation Setpoint from Reactor Low Water Level to lo-lo Water Level.Fee Paid | 13 February 1987 | Application for Amend to License DPR-21,revising Tech Specs by Lowering RWCU Sys Isolation Setpoint from Reactor Low Water Level to lo-lo Water Level.Fee Paid | Fuel cladding |
B12414, Application for Amend to License NPF-49,extending 18-month Surveillance Testing Requirements for Diesel Generator Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2,on one-time Basis | 30 January 1987 | Application for Amend to License NPF-49,extending 18-month Surveillance Testing Requirements for Diesel Generator Up to 4 Months Beyond Max Allowed by Tech Spec Section 4.0.2,on one-time Basis | |
B12421, Application for Amend to License DPR-65,authorizing Tech Spec Change Re CRD Mechanism Operability to Correct Inconsistency W/Safety Analysis.Fee Paid | 6 February 1987 | Application for Amend to License DPR-65,authorizing Tech Spec Change Re CRD Mechanism Operability to Correct Inconsistency W/Safety Analysis.Fee Paid | |
B12443, Application for Amend to License NPF-49,changing Tech Spec 3.6.1.4 to Allow Plant Operation Above Limit of Figure 3.6-1 for Containment Sys Air Partial Pressure.Safety Evaluation Encl.Fee Paid | 24 March 1987 | Application for Amend to License NPF-49,changing Tech Spec 3.6.1.4 to Allow Plant Operation Above Limit of Figure 3.6-1 for Containment Sys Air Partial Pressure.Safety Evaluation Encl.Fee Paid | Grab sample Probabilistic Risk Assessment |
B12468, Application for Amend to License DPR-21,changing Bases Section 3.5E, Isolation Condensor Sys of Tech Specs by Deleting Ref to Current off-normal &/Or Emergency Operating Procedures.Fee Paid | 1 June 1987 | Application for Amend to License DPR-21,changing Bases Section 3.5E, Isolation Condensor Sys of Tech Specs by Deleting Ref to Current off-normal &/Or Emergency Operating Procedures.Fee Paid | |
B12493, Application for Amend to License NPF-49,changing Tech Specs to Increase ESF Response Time for Low Steam Line Pressure to 27 W/Offsite Power & 37 W/O Offsite Power.Fee Paid | 6 April 1987 | Application for Amend to License NPF-49,changing Tech Specs to Increase ESF Response Time for Low Steam Line Pressure to 27 W/Offsite Power & 37 W/O Offsite Power.Fee Paid | Stroke time |
B12500, Application for Amend to License NPF-49,changing License Condition 2.C.(6), Instrumentation for Monitoring Post- Accident Conditions Reg Guide 1.97,Rev 2... Re Schedule for Installation of Instrumentation.Fee Paid | 1 May 1987 | Application for Amend to License NPF-49,changing License Condition 2.C.(6), Instrumentation for Monitoring Post- Accident Conditions Reg Guide 1.97,Rev 2... Re Schedule for Installation of Instrumentation.Fee Paid | |
B12530, Application for Amend to License DPR-21,revising Tech Specs 3.4,4.4 & Associated Bases to Comply W/Atws Rule (10CFR50.62) That Requires All BWRs to Have Standby Liquid Control Sys W/Min Flow Capacity.Fee Paid | 22 May 1987 | Application for Amend to License DPR-21,revising Tech Specs 3.4,4.4 & Associated Bases to Comply W/Atws Rule (10CFR50.62) That Requires All BWRs to Have Standby Liquid Control Sys W/Min Flow Capacity.Fee Paid | |
B12535, Application for Amend to License DPR-21,revising Tech Specs to Change Reactor Protection Sys Trip Level Settings.Amend Will Delete Electrical Power Ref & Change Both Scram Bypass Setpoints & APRM Flux Scram Trip Setting.Fee Paid | 17 August 1987 | Application for Amend to License DPR-21,revising Tech Specs to Change Reactor Protection Sys Trip Level Settings.Amend Will Delete Electrical Power Ref & Change Both Scram Bypass Setpoints & APRM Flux Scram Trip Setting.Fee Paid | Feedwater Controller Failure |
B12568, Application for Amend to License DPR-65,adding Requirement That Annual Rept Submitted to NRC Must Include Documentation of All Failures & Challenges to Pressurizer PORV or Safety Valve.Application Submitted Per 870615 Commitment.Fee Paid | 14 July 1987 | Application for Amend to License DPR-65,adding Requirement That Annual Rept Submitted to NRC Must Include Documentation of All Failures & Challenges to Pressurizer PORV or Safety Valve.Application Submitted Per 870615 Commitment.Fee Paid | Safe Shutdown Earthquake Flow Induced Vibration |
B12603, Application for Amend to License DPR-21,revising Tech Specs to Reflect Installation of Control Room Halon Sys.Fee Paid | 29 September 1987 | Application for Amend to License DPR-21,revising Tech Specs to Reflect Installation of Control Room Halon Sys.Fee Paid | Safe Shutdown Exemption Request |
B12609, Application for Amend to License DPR-21,changing Tech Specs to Allow Startup of Facility W/Flow Indication from 19 Jet Pumps & Revising Jet Pump Surveillance Provisions.Fee Paid | 23 July 1987 | Application for Amend to License DPR-21,changing Tech Specs to Allow Startup of Facility W/Flow Indication from 19 Jet Pumps & Revising Jet Pump Surveillance Provisions.Fee Paid | Hydrostatic Enforcement Discretion Liquid penetrant |
B12626, Application for Amend to License DPR-21,revising Tech Spec Section 3.5.C Re Core & Containment Cooling Sys & Feedwater Coolant Injection Subsystem.Fee Paid | 17 August 1987 | Application for Amend to License DPR-21,revising Tech Spec Section 3.5.C Re Core & Containment Cooling Sys & Feedwater Coolant Injection Subsystem.Fee Paid | |
B12652, Application for Amend to License DPR-65,per NRC 861208 SER Supporting Amend 113 to License,Changing Tech Specs to Provide Temporary Restrictions to Support Coastdown Operations.Fee Paid | 28 August 1987 | Application for Amend to License DPR-65,per NRC 861208 SER Supporting Amend 113 to License,Changing Tech Specs to Provide Temporary Restrictions to Support Coastdown Operations.Fee Paid | Fuel cladding |
B12677, Application for Amends to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,adding Sentence to Clarify Administrative Controls Re Nuclear Review Board Records.Fee Paid | 24 September 1987 | Application for Amends to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,adding Sentence to Clarify Administrative Controls Re Nuclear Review Board Records.Fee Paid | |
B12714, Application for Amend to License DPR-21,revising Tech Specs to Reflect Deletion of Low Reactor Pressure Permissive Switches from ECCS Pump Start Logic.Fee Paid | 20 October 1987 | Application for Amend to License DPR-21,revising Tech Specs to Reflect Deletion of Low Reactor Pressure Permissive Switches from ECCS Pump Start Logic.Fee Paid | |
B12719, Application for Amend to License DPR-65,revising Tech Specs to Include Installation of Personnel Door in Spent Fuel Pool Area of Auxiliary Bldg.Fee Paid | 23 December 1987 | Application for Amend to License DPR-65,revising Tech Specs to Include Installation of Personnel Door in Spent Fuel Pool Area of Auxiliary Bldg.Fee Paid | Fire Barrier |
B12723, Application for Amend to License DPR-65,eliminating Tech Spec Requirements for Control Bldg Chlorine Detectors Based on Elimination of Onsite Chlorine Bulk Storage & Verification of Low Chlorine Rail Frequency.Fee Paid | 3 February 1988 | Application for Amend to License DPR-65,eliminating Tech Spec Requirements for Control Bldg Chlorine Detectors Based on Elimination of Onsite Chlorine Bulk Storage & Verification of Low Chlorine Rail Frequency.Fee Paid | Biofouling |
B12733, Application for Amend to License DPR-65,revising Tech Specs to Allow Reduction of Concentration of Boric Acid in Boric Acid Storage Tanks & Piping to Level Where Heat Tracing No Longer Required to Prevent Boron Precipitation.Fee Paid | 29 April 1988 | Application for Amend to License DPR-65,revising Tech Specs to Allow Reduction of Concentration of Boric Acid in Boric Acid Storage Tanks & Piping to Level Where Heat Tracing No Longer Required to Prevent Boron Precipitation.Fee Paid | Boric Acid Shutdown Margin |
B12750, Application for Amend to License NPF-49,changing Tech Specs to Clarify Surveillance Testing Requirements for Molded Case Circuit Breakers & Unitized Starters.Fee Paid | 19 November 1987 | Application for Amend to License NPF-49,changing Tech Specs to Clarify Surveillance Testing Requirements for Molded Case Circuit Breakers & Unitized Starters.Fee Paid | |
B12809, Application for Amend to License DPR-21,adding License Condition Re Integrated Implementation Schedule. Millstone Nuclear Power Station,Unit 1,Integrated Implementation Schedule Program Plan Encl.Fee Paid | 24 March 1988 | Application for Amend to License DPR-21,adding License Condition Re Integrated Implementation Schedule. Millstone Nuclear Power Station,Unit 1,Integrated Implementation Schedule Program Plan Encl.Fee Paid | |
B12817, Application for Amend to License NPF-49,revising Tech Specs to Decrease Reactor Trip Setpoint & ESF Actuation Sys Instrumentation Trip Setpoint for Steam Generator Water Level Lo Lo Trip Setpoint from 23.5% to 20.73%.Fee Paid | 25 February 1988 | Application for Amend to License NPF-49,revising Tech Specs to Decrease Reactor Trip Setpoint & ESF Actuation Sys Instrumentation Trip Setpoint for Steam Generator Water Level Lo Lo Trip Setpoint from 23.5% to 20.73%.Fee Paid | |
B12821, Application for Amend to License NPF-49,changing Tech Spec Section 3.3.3.9 & 3.3.3.10 to Revise Applicability of Limiting Condition for Operation to Allow Removal of Liquid & Gaseous Effluent Monitors from Svc.Fee Paid | 24 February 1988 | Application for Amend to License NPF-49,changing Tech Spec Section 3.3.3.9 & 3.3.3.10 to Revise Applicability of Limiting Condition for Operation to Allow Removal of Liquid & Gaseous Effluent Monitors from Svc.Fee Paid | |
B12834, Application for Amend to License NPF-49,changing Tech Specs Re Administrative Controls.Fee Paid | 1 March 1988 | Application for Amend to License NPF-49,changing Tech Specs Re Administrative Controls.Fee Paid | |
B12856, Application for Amend to License NPF-49,revising Tech Spec Table 3.7-6 to Add Two New Environ Zones.Fee Paid | 21 June 1988 | Application for Amend to License NPF-49,revising Tech Spec Table 3.7-6 to Add Two New Environ Zones.Fee Paid | |
B12859, Application for Amends to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,revising Tech Specs Re Administrative Controls, Nuclear Review Board.Fee Paid | 29 April 1988 | Application for Amends to Licenses DPR-61,DPR-21,DPR-65 & NPF-49,revising Tech Specs Re Administrative Controls, Nuclear Review Board.Fee Paid | |
B12881, Application for Amend to License DPR-65,changing Tech Spec 3.4.4.b to Read, at Least Two Groups of Pressurizer Heaters Each Having Capacity of at Least 130 Kw Capable of Being Supplied by Emergency Power. Fee Paid | 25 April 1988 | Application for Amend to License DPR-65,changing Tech Spec 3.4.4.b to Read, at Least Two Groups of Pressurizer Heaters Each Having Capacity of at Least 130 Kw Capable of Being Supplied by Emergency Power. Fee Paid | |
B12896, Application for Amend to License NPF-49,changing Tech Spec Section 4.6.1.3 by Incorporating Addl Methods of Surveillance for Assessing Containment Leak Tightness.Fee Paid | 19 May 1988 | Application for Amend to License NPF-49,changing Tech Spec Section 4.6.1.3 by Incorporating Addl Methods of Surveillance for Assessing Containment Leak Tightness.Fee Paid | |
B12942, Application for Amend to License DPR-21,revising Tech Specs to Reduce MAPLHGR Limit by 2%.Change Necessary to Compensate for Potentially Degraded ECCS Flow Due to debris-induced Strainer Plugging Following Loca.Fee Paid | 3 June 1988 | Application for Amend to License DPR-21,revising Tech Specs to Reduce MAPLHGR Limit by 2%.Change Necessary to Compensate for Potentially Degraded ECCS Flow Due to debris-induced Strainer Plugging Following Loca.Fee Paid | |
B12945, Application for Amend to License NPF-49,decreasing Reactor Trip Setpoint & ESFAS Instrumentation Setpoint for Steam Generator Water Level Low Low Trip Setpoint from 23.5% to 20.73% of Narrow Range Instrument Span.Fee Paid | 15 June 1988 | Application for Amend to License NPF-49,decreasing Reactor Trip Setpoint & ESFAS Instrumentation Setpoint for Steam Generator Water Level Low Low Trip Setpoint from 23.5% to 20.73% of Narrow Range Instrument Span.Fee Paid | |
B12957, Application for Amend to License DPR-65,incorporating Changes Re Present Snubber Test Resampling Plan to Provide Consistency Among Snubber Sampling Plans for All Four Plants Operated by Northeast Utils.Fee Paid | 2 August 1988 | Application for Amend to License DPR-65,incorporating Changes Re Present Snubber Test Resampling Plan to Provide Consistency Among Snubber Sampling Plans for All Four Plants Operated by Northeast Utils.Fee Paid | |
B12958, Revised Application for Amends to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,changing Tech Specs Number of Members & Time as Member of Nuclear Review Board | 21 July 1988 | Revised Application for Amends to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,changing Tech Specs Number of Members & Time as Member of Nuclear Review Board | |
B12960, Application for Amend to License DPR-21,revising Tech Specs Re Criteria for Snubbers That May Be Counted as Inoperable. Fee Paid | 13 October 1988 | Application for Amend to License DPR-21,revising Tech Specs Re Criteria for Snubbers That May Be Counted as Inoperable. Fee Paid | |
B13051, Application for Amend to License NPF-49,revising Limit for More Negative end-of-life Moderator Temp Coefficient.Fee Paid | 5 October 1988 | Application for Amend to License NPF-49,revising Limit for More Negative end-of-life Moderator Temp Coefficient.Fee Paid | |
B13067, Application for Amend to License DPR-65,revising Tech Specs Re Cycle 10 Reload Operation & Entry Into Mode 4 After Feb 1989 Refueling Outage | 15 November 1988 | Application for Amend to License DPR-65,revising Tech Specs Re Cycle 10 Reload Operation & Entry Into Mode 4 After Feb 1989 Refueling Outage | |
B13154, Application for Amend to License NPF-49,replacing Surveillance Requirements of Section 4.3.4.2 W/More Comprehensive Turbine Overspeed Protection Maint & Testing Program | 14 March 1989 | Application for Amend to License NPF-49,replacing Surveillance Requirements of Section 4.3.4.2 W/More Comprehensive Turbine Overspeed Protection Maint & Testing Program | Turbine Missile |
B13155, Application for Amends to Licenses DPR-61,DPR-21 & DPR-65, Revising Tech Spec Re Admin Controls in High Radiation Area | 25 April 1989 | Application for Amends to Licenses DPR-61,DPR-21 & DPR-65, Revising Tech Spec Re Admin Controls in High Radiation Area | High Radiation Area Locked High Radiation Area |
B13159, Application for Amend to License DPR-65,revising Tech Spec 3.9.3.2 Re Spent Fuel Pool Cooling to Add Footnote to Limiting Condition for Operation for Cycle 9 Refueling Only. W/O Proposed Tech Specs | 22 February 1989 | Application for Amend to License DPR-65,revising Tech Spec 3.9.3.2 Re Spent Fuel Pool Cooling to Add Footnote to Limiting Condition for Operation for Cycle 9 Refueling Only. W/O Proposed Tech Specs | Enforcement Discretion |
B13162, Application for Amend to License NPF-49,deleting Name of City of Burlington,Vt as Owner of Facility.City Ownership Transferred to Connecticut Municipal Electric Energy Cooperative | 10 March 1989 | Application for Amend to License NPF-49,deleting Name of City of Burlington,Vt as Owner of Facility.City Ownership Transferred to Connecticut Municipal Electric Energy Cooperative | |
B13209, Application for Amend to License NPF-49,changing Tech Spec Section 4.2.2.2.2 by Revising Fxy Formula for three-loop Operation | 20 July 1989 | Application for Amend to License NPF-49,changing Tech Spec Section 4.2.2.2.2 by Revising Fxy Formula for three-loop Operation | |
B13238, Application for Amend to License NPF-49,revising Tech Spec Re Containment Integrated Leak Rate Test | 9 May 1989 | Application for Amend to License NPF-49,revising Tech Spec Re Containment Integrated Leak Rate Test | Hot Short Grab sample |
B13296, Application for Amend to License NPF-49,deleting License Conditions Re Containment Average temp,N-1 Loop Operation, Instrumentation for Monitoring post-accident Conditions,Per Rev 2 to Reg Guide 1.97 & Moisture in Air Start Sys | 14 August 1989 | Application for Amend to License NPF-49,deleting License Conditions Re Containment Average temp,N-1 Loop Operation, Instrumentation for Monitoring post-accident Conditions,Per Rev 2 to Reg Guide 1.97 & Moisture in Air Start Sys | |
B13297, Application for Amend to License DPR-21,revising Tech Specs, Per TMI Items II.F.1.3 Re Containment high-range Radiation Monitors & II.F.1.4 Re Containment Pressure Monitors & Generic Ltr 83-36 | 1 August 1989 | Application for Amend to License DPR-21,revising Tech Specs, Per TMI Items II.F.1.3 Re Containment high-range Radiation Monitors & II.F.1.4 Re Containment Pressure Monitors & Generic Ltr 83-36 | Safe Shutdown |
B13303, Application for Amend to License DPR-21,revising Tech Specs to Address Generic Ltr 83-36 & TMI Item II.B.3, Post-Accident Sampling & Item II.F.1.2, Sampling & Analysis of Plant Effluents | 1 August 1989 | Application for Amend to License DPR-21,revising Tech Specs to Address Generic Ltr 83-36 & TMI Item II.B.3, Post-Accident Sampling & Item II.F.1.2, Sampling & Analysis of Plant Effluents | |
B13304, Application for Amend to License DPR-21,adding Four Valves to Tech Spec Table 3.7.1 & Minimizing Purging Operations Needed to Maintain Required Differential Pressure Between Drywell & Torus | 31 July 1989 | Application for Amend to License DPR-21,adding Four Valves to Tech Spec Table 3.7.1 & Minimizing Purging Operations Needed to Maintain Required Differential Pressure Between Drywell & Torus | |
B13313, Application for Amend to License DPR-21,adding New Spec on UHS for Reactor & Containment Cooling Sys to Assure Adequate Cooling Capability for Heat Removal in Event of LOCA or Isolation from Normal Reactor Heat Sink | 8 August 1989 | Application for Amend to License DPR-21,adding New Spec on UHS for Reactor & Containment Cooling Sys to Assure Adequate Cooling Capability for Heat Removal in Event of LOCA or Isolation from Normal Reactor Heat Sink | Ultimate heat sink |
B13320, Application for Amend to License NPF-49,revising Tech Specs to Correct Discrepancies Between Fire Detectors Monitored in Surveillance Procedures & Quantities of Detectors Specified in Table 3.3-11 of Tech Specs | 22 August 1989 | Application for Amend to License NPF-49,revising Tech Specs to Correct Discrepancies Between Fire Detectors Monitored in Surveillance Procedures & Quantities of Detectors Specified in Table 3.3-11 of Tech Specs | |