Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20151V582 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,000.Noncompliance Noted:Control Room Operator Sleeping at Station | Inattentive |
ML20151V590 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Violations Noted:Operator Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V613 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | Inattentive |
ML20151V630 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Control Room Operators Sleeping at Station | Inattentive |
ML20151V638 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Violation Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | Inattentive |
ML20151V650 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | Inattentive |
ML20151V673 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Noncompliance Noted:On Various Shifts Implementation of Procedure A.7, Shift Operations, Per Tech Specs 6.8 Violated | Inattentive |
ML20151V680 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls on Various Shifts | Inattentive |
ML20151V687 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | Inattentive |
ML20151V711 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | Inattentive |
ML20151V723 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | |
ML20151V738 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Violation Noted:Senior Operator Inattentive to Instrumentations & Controls & Allowed Personnel to Be Distracted During Period Prior to 870324 | Inattentive |
ML20151V742 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Control Room Operator Sleeping at Station | Inattentive |
ML20151V759 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Operator Inattentive to Instrumentation & Controls & Reading non-job-related Matls While on Duty | Inattentive |
ML20151V763 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Reactor Operator Found Inattentive to Instrumentations & Controls & Found Reading nonjob-related Matls During Period Prior to 870324 | |
ML20151V823 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Noncompliance Noted:Operator Inattentive to Instrumentation & Controls,Reading Matls Not Job Related & Sleeping While on Duty | |
ML20151V845 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Violations Noted:Operator Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | Inattentive |
ML20151V881 | 9 August 1988 | Notice of Violation from Enforcement Conference Conducted on 880210.Violation Noted:Inattentiveness to Instrumentation & Controls | |
ML20153C129 | 28 April 1988 | Notice of Violation from Insp on 880314-18.Violation Noted: Inspector Identified Emergency Svc Water Piping Being Fabricated to Sketches Not in Drawing Control Sys & Showed No Indication of Approval Prior to Release | |
ML20153D069 | 26 August 1988 | Notice of Violation from Insp on 880815-19.Violations Noted: Out of Sample of 47 Concrete Expansion anchors,22 Failed to Indicate Specified Min Torque Value for Size of Anchor Bolts Tested | |
ML20155D414 | 28 October 1998 | Notice of Violation from Insp on 980811-0921.Violation Noted:Prior to 980912,PECO Failed to Properly Maintain Sys Operation Procedure 12.1.A-3,rev 19,resulting in Two RWCU Sys Events in August 1998 | |
ML20197H043 | 16 December 1997 | Notice of Violation from Insp on 970921-1122.Violation Noted:Peco Did Not Properly Implement Written Procedures on Three Separate Occasions.Specifically,Between July 1997 & 0922,personnel Did Not Follow Instructions for Work Order | |
ML20198C264 | 5 November 1985 | Notice of Violation from Insp on 850909-13 | |
ML20202J536 | 29 January 1999 | Notice of Violation from Insp on 980309-1222.Violation Noted:Three Licensee Operators Failed to Successfully Complete Requalification Program for Facility for Which License Being Sought | |
ML20202J824 | 1 February 1999 | Notice of Violation from Insp on 981116-1204.Violation Noted:On 981204 There Were Two Instances Where PECO Had Failed to Properly Translate Design Info Into Procedures Used for safety-related Activities | Stroke time |
ML20203E341 | 17 July 1986 | Notice of Violation from Insp on 860216-0404 | |
ML20203E360 | 20 February 1998 | Notice of Violation from Insp on 971123-980117.Violation Noted:In Nov 1997,operations Personnel Did Not Fully Adhere to Routine Test Procedure RT-O-040-620-2,Rev 4, Outstanding HVAC & Outer Screen Insp for Winter Operation | |
ML20203F412 | 25 July 1986 | Notice of Violation from Insp on 860510-0617 | |
ML20204H719 | 25 October 1984 | Sanitized Notice of Violation from Insp on 840625-29 & 0711. Violation Noted:Failure to Record Details of 840626 Alarm Response in Security Computer File,Secutiry Force Log & Operators Log | Systematic Assessment of Licensee Performance |
ML20205R938 | 28 May 1986 | Notice of Violation from Insp on 860322-0509 | |
ML20205T196 | 9 June 1986 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $200,000.Violations Noted:Reactor Operator Withdrew Control Rod 10-23 Rather than Rod 02-23 During Reactor Startup | |
ML20206G126 | 15 November 1988 | Partially Withheld Notice of Violation & Proposed Imposition of Civil Penalties (Ref 10CFR73.21) | |
ML20206K449 | 21 February 1975 | Notice of Violation from Insp on 750116-17 | |
ML20206L418 | 21 November 1988 | Notice of Violation from Insp on 880926-30.Violation Noted: Wire Crimps Inside Limitorque Valve Actuator Housings Not Grounded & Qualification of Raychem Splices,Ideal Wire Nuts Amp Butt Splices Not Established | |
ML20206N682 | 11 December 1998 | Notice of Violation from Insp on 980922-1109.Violation Noted:On 980810,chemistry Technicians Failed to Properly Perform Required Actions of Step 4.4.3 When D Detector, RIS-2-17-458D Went Downscale During Test | |
ML20207F546 | 9 August 1988 | Notice of Violation from Enforcement Conference on 880210 & Violation of Reactor Operator License.Violation Noted: Inattentive to Instrumentation & Control,Reading Non Job Related Matls & Resting W/Eyes Closed | Inattentive |
ML20207F558 | 9 August 1988 | Notice of Violation from Enforcement Conference on 880218. Violation Noted:Gl Swayne Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | Inattentive |
ML20207F570 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Noncompliance Noted:Inattentiveness to Instrumentation & Controls | |
ML20207F593 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentation & Control | Inattentive |
ML20207L386 | 11 October 1988 | Notice of Violation from Insp on 880711-22.Violations Noted: Required Preparatory Work for Hydrostatic Testing of E-2 Emergency Diesel Generator Water Jacket,Such as Removal of Heat Shields,Performed W/O Written Procedures | Hydrostatic |
ML20207S357 | 11 March 1987 | Notice of Violation from Insp on 861208-19 | Continuous fire watch |
ML20210S626 | 9 February 1987 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Termination of Ga Field Due to Concerns Raised Re Receiving Radiation Exposure in Excess of Regulatory Limit | |
ML20210V494 | 1 October 1986 | Notice of Violation from Insp on 860908-12 | |
ML20212A154 | 22 July 1986 | Notice of Violation from Insp on 860324-27.Violation Noted: on 860305,licensed Matl Delivered to Carrier for Transport in Package W/Radiation Level of 3.0 M/H at 1 Meter from Surface | Process Control Program |
ML20212A174 | 22 July 1986 | Notice of Violation from Insp on 860310-14.Violation Noted: Prior to 860314,procedures Used to Verify Identity & Activity of Radionuclides in Radwaste Shipments Did Not Provide Appropriate Acceptance Criteria | |
ML20212F551 | 24 December 1986 | Notice of Violation from Insp on 861103-12 | Annual Radiological Environmental Operating Report |
ML20213G293 | 12 May 1987 | Notice of Violation from Insp on 870324-0409 | |
ML20213G563 | 12 May 1987 | Notice of Violation from Insp on 870201-0313 | High Radiation Area |
ML20214K926 | 20 November 1986 | Notice of Violation from Insp on 861020-24 | |
ML20214L444 | 2 September 1986 | Notice of Violation from Insp on 860618-0703 | Grace period |