Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML12166A134 | 27 June 2012 | Closeout of Bulletin 2011-01, Mitigating Strategies. | B.5.b Mitigating Strategies |
ML12166A519 | 14 June 2012 | Transmittal of Final Accident Sequence Precursor (ASP) Analysis | Mission time Reserve Station Service Transformer Significance Determination Process |
ML12257A086 | 20 September 2012 | Review of the 2011 Refueling Outage System Generator Tube Inservice Inspection Report | |
ML12293A451 | 22 October 2012 | ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012 | Probabilistic Risk Assessment Design basis earthquake Earthquake |
ML13172A009 | 1 July 2013 | Nd 2, Closure Evaluation for Report Pursuant to 10 CFR 50.46(a)(3) Concerning Significant Emergency Core Cooling System Evaluation Model Error Related to Nuclear Fuel Thermal Conductivity Degradation | Fuel cladding |
ML14015A314 | 8 January 2014 | Submittal of Owner'S Activity Report Refueling Outage N1R23 (Form OAR-1) | Boric Acid |
ML14024A602 | 10 January 2014 | Post Accident Monitoring (PAM) Report | Post Accident Monitoring |
ML14084A212 | 27 March 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14084A327 | 27 March 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14086A194 | 9 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14092A414 | 31 March 2014 | Response to March 12, 2012 Information Seismic Hazard and Screening Report (CEUS Sites) for Recommendation 2.1 | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Design basis earthquake Earthquake |
ML14251A035 | 28 August 2014 | Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation |
ML15057A249 | 20 April 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML15058A034 | 23 February 2015 | Summary of Facility Changes, Tests and Experiments | Grab sample Surveillance Frequency Control Program |
ML15072A299 | 16 March 2015 | Review of the Fall 2013 Steam Generator Tube Inservice Inspection Report Regarding Surry Power Station, Unit 1 Refueling Outage 25 | |
ML15078A287 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 1 Through 2-114 | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML15078A288 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-115 Through 2-218 | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML15078A289 | 12 March 2015 | Engineering Evaluation 14-E15, Dominion Flooding Hazard Reevaluation Report, in Response to 50.54(F) Information Request Regarding Near-Term Task Force Recommendation 2.1: Flooding, Revision 1, Pp. 2-219 Through the End | Safe Shutdown Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake FLEX Earthquake |
ML15097A078 | 7 April 2015 | Soarca Surry 2005 Site File | |
ML15175A190 | 17 June 2015 | Owner'S Activity Report | Through-Wall Leak |
ML15232A811 | 24 August 2015 | Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 | Earthquake |
ML15238A844 | 25 September 2015 | Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Earthquake |
ML15238B592 | 17 August 2015 | Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 | Probabilistic Risk Assessment Operating Basis Earthquake Earthquake |
ML15253A410 | 11 March 2016 | Enclosure 2 Screening Analysis Report | Ultimate heat sink Tornado Missile Fukushima Dai-Ichi Earthquake Generic Issues Program |
ML15259A342 | 24 August 2015 | 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al | |
ML15335A093 | 15 December 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation2.1 of the Near-Term Task Force Review | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML16187A323 | 24 June 2016 | Submittal of Owner'S Activity Report (Form OAR-1), for Refueling Outage N2R24 | |
ML17186A084 | 29 June 2017 | Flooding Focused Evaluation Summary | FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
ML17325A779 | 22 November 2017 | Review of Steam Generator Tube Report for the Fall 2016 Inspections During Refueling Outage 27 (CAC No. MF9683; EPID L-2017-LRO-0009) | |
ML18108A123 | 11 April 2018 | Proposed Alternative Requests S1-15-ISl-04 and S2-15-ISl-04 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55a(z)(1) | Nondestructive Examination Dissimilar Metal Weld |
ML19094A246 | 4 November 1971 | Transmittal of Final Report Concerning the Operating License Review | Safe Shutdown Operating Basis Earthquake Design basis earthquake Earthquake |
ML19140A276 | 20 May 2019 | Essential Fish Habitat Mapper Results for Surry Power Station | |
ML19163A154 | 6 June 2019 | SLRA - Attachment 4D Letter - Draft to Dominion | Packing leak Aging Management |
ML19347A421 | 26 November 2019 | Owner'S Activity Report | |
ML20076A576 | 28 May 2020 | Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment | Safe Shutdown High winds Internal Flooding FLEX Fukushima Dai-Ichi Earthquake Minimum staff Backfit |
ML20091L983 | 4 May 2021 | SLR License | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Fire Protection Program GOTHIC |
ML20091L985 | 4 May 2021 | Record of Decision | Incorporated by reference License Renewal Subsequent License Renewal Environmental Justice |
ML20247J616 | 3 September 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20254A347 | 8 September 2020 | Supplement to Operator License Examination Comments | |
ML21036A077 | 23 February 2021 | Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage | |
ML21333A284 | 29 November 2021 | Requal Notification Letter | Job Performance Measure |
ML22255A010 | 28 June 2022 | Owner'S Activity Report | Through Wall Leak |
ML22353A620 | 19 December 2022 | Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code | |
ML23054A192 | 22 February 2023 | ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information | |
ML24032A111 | 1 February 2024 | Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval |