Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000482/198405111 December 1984Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl
IR 05000528/198501225 September 1985Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986
IR 05000529/198504427 November 1985Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable
ML0823201704 October 1985Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC ResponseBackfit
ML0823808437 November 1985Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item ClosedBackfit
ML08289091318 March 1985Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329
ML17278A70916 April 1986Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend
ML18046B2894 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML20054E92310 June 1982Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant
ML20056E51412 August 1993Submits SALP Schedule for FY94 Per Mgt Directive 8.6
ML20058B3786 July 1982Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA
ML20058K6043 July 1986Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection
ML20062C14620 October 1978Notification of 781026 Meeting W/Util in Bethesda,Md Re Program for Chemically Cleaning Secondary Side of Steam Generators
ML20062C7121 November 1978Summarizes 781019 Meeting W/Mark 2 Owners Group to Discuss Staff'S Mark 2 Containment Acceptance Criteria,W/Attendees List,Meeting Handouts,Summary of Owner'S Position & Final Disposition of Criteria for Addl Review by Staff
ML20062D32929 July 1982Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA
ML20062D74014 November 1978Notification of 781116 Meeting in West Lebanon,Nh W/Wppss Re Proposed Analysis of WNP-2 Post-LOCA Chugging Loads
ML20062E07929 July 1982Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEAReserve Station Service Transformer
ML20062E16220 July 1982Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments
ML20062E8346 December 1978Notice of 781213 Meeting to Discuss Staff Policies on Review of Pending OL Appls & Criteria for Establishing Priorities for Review
ML20062F12811 December 1978Informs That Ja Norris Will Not Be Able to Meet W/Potential Intervenors in Portland,Or,On 781219 Due to Holiday Traffic
ML20062F86516 November 1978Discusses Div of Proj Management Procedures Re Meetings W/ Applicants,Licensees,Acrs & Intervenors.Reflects New Comm Policy of Increased Pub Participation in staff-applicant & staff-licensee Meetings
ML20062P04410 January 1980Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results EnclCoast down
ML20071F1929 June 1981Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl
ML20072L69927 September 1982Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl
ML20072T3503 June 1982Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan EnclNondestructive Examination
Liquid penetrant
ML20072T36016 April 1982Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info EnclNondestructive Examination
Liquid penetrant
ML20079E06921 February 1980Forwards Final Agenda for NRC Caseload Forecast Panel 800122-24 Site Visit