Issue date | Title | Topic | |
---|---|---|---|
IR 05000482/1984051 | 11 December 1984 | Forwards Special Const Verification Insp Rept 50-482/84-51 of Voluntary Const self-assessment on 841023-1102,per 840924 Request,For Transmittal to Applicant.Transmittal Ltr, Potential Enforcement Actions & Unresolved Items Also Encl | |
IR 05000528/1985012 | 25 September 1985 | Forwards 850806 & 0730 Ltrs & Insp Rept 50-528/85-12 Per ACRS 811215 Request for Info Re Startup Experience on Unit 1 Prior to Loading on Unit 2.Unit 2 Fuel Load Scheduled for Nov.Initial Criticality Expected by Jan 1986 | |
IR 05000529/1985044 | 27 November 1985 | Comments on Comparison of as-built Plant W/Facility Tech Specs.Details of Review to Be Reflected in Insp Rept 50-529/85-44 & IE Insp Procedure 71301, Tech Spec Review, Dtd 850322.Proposed Tech Specs Clear & Enforceable | |
ML082320170 | 4 October 1985 | Responds to 850828 Concerns That Procedures in Draft Manual Chapter 0514 Not Followed in Addressing Util 850604 Backfit Claim.Nrr Completed Actions within Stipulated 3-wk Time Frame.Ie Concurrence Delayed NRC Response | Backfit |
ML082380843 | 7 November 1985 | Discusses Util 850531 Response to NRC Request for Addl Info Re Item 2.2.2 of Generic Ltr 83-28 Contending That Request Violated plant-specific Backfit Manual.Appeal Not Planned. Item Closed | Backfit |
ML082890913 | 18 March 1985 | Forwards Monthly Status Rept on plant-specific Backfitting Activities Current Through 850308.Nine of 15 SER Open Items Resolved Prior to Appeal Meetings.Ser Scheduled for Completion on 850329 | |
ML17278A709 | 16 April 1986 | Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend | |
ML18046B289 | 4 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML18046B290 | 10 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML20054E923 | 10 June 1982 | Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054J579 | 24 June 1982 | Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use | |
ML20054J856 | 23 June 1982 | Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures | |
ML20054K369 | 26 January 1982 | Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201 | Scram Discharge Volume |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20055A262 | 21 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A269 | 27 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline | |
ML20055A270 | 28 January 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055A277 | 12 February 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline | Exemption Request |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20056E457 | 5 August 1993 | Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant | |
ML20056E514 | 12 August 1993 | Submits SALP Schedule for FY94 Per Mgt Directive 8.6 | |
ML20058B378 | 6 July 1982 | Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA | |
ML20058K604 | 3 July 1986 | Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection | |
ML20062C146 | 20 October 1978 | Notification of 781026 Meeting W/Util in Bethesda,Md Re Program for Chemically Cleaning Secondary Side of Steam Generators | |
ML20062C712 | 1 November 1978 | Summarizes 781019 Meeting W/Mark 2 Owners Group to Discuss Staff'S Mark 2 Containment Acceptance Criteria,W/Attendees List,Meeting Handouts,Summary of Owner'S Position & Final Disposition of Criteria for Addl Review by Staff | |
ML20062D329 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA | |
ML20062D740 | 14 November 1978 | Notification of 781116 Meeting in West Lebanon,Nh W/Wppss Re Proposed Analysis of WNP-2 Post-LOCA Chugging Loads | |
ML20062E079 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA | Reserve Station Service Transformer |
ML20062E162 | 20 July 1982 | Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments | |
ML20062E834 | 6 December 1978 | Notice of 781213 Meeting to Discuss Staff Policies on Review of Pending OL Appls & Criteria for Establishing Priorities for Review | |
ML20062F128 | 11 December 1978 | Informs That Ja Norris Will Not Be Able to Meet W/Potential Intervenors in Portland,Or,On 781219 Due to Holiday Traffic | |
ML20062F865 | 16 November 1978 | Discusses Div of Proj Management Procedures Re Meetings W/ Applicants,Licensees,Acrs & Intervenors.Reflects New Comm Policy of Increased Pub Participation in staff-applicant & staff-licensee Meetings | |
ML20062P044 | 10 January 1980 | Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results Encl | Coast down |
ML20071F192 | 9 June 1981 | Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl | |
ML20072L699 | 27 September 1982 | Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl | |
ML20072T350 | 3 June 1982 | Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan Encl | Nondestructive Examination Liquid penetrant |
ML20072T360 | 16 April 1982 | Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info Encl | Nondestructive Examination Liquid penetrant |
ML20079E069 | 21 February 1980 | Forwards Final Agenda for NRC Caseload Forecast Panel 800122-24 Site Visit |