Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20057F798 | 14 October 1993 | Forwards Design Calculation Re Resolution of Fermi-2 GL 89-10 Concerns Identified During 930913 Meeting | |
ML20058A653 | 21 June 1982 | Submits Notes from 820615 Meeting W/Util Discussing Proposed Changes to Composition of Independent Safety Engineering Group.New Concept Acceptable & Meets Onsite Requirements | |
ML20058G605 | 13 July 1982 | Forwards Draft Ltr Clarifying Confusion During LANL 820706-09 Site Visit to Collect Data for Vital Area Analysis Program.Concerns Re Releasing of Data Resolved.Future Visits Will Be Endowed W/Official Imprimatur | |
ML20058K639 | 22 January 1975 | Forwards Notification of Discovery of Pipe Failures in Loops a & B 4-inch Bypass Piping | |
ML20058L190 | 24 April 1970 | Forwards Statement on Environ Considerations Re Proposed Operation by Northern States Power Co of Monticello Nuclear Generating Plant,Unit 1 | |
ML20058L376 | 7 February 1972 | Forwards Correspondence Received from Minnesota Congressional Delegation Urging Commission to Accelerate Review of Environ Statement for Facility | |
ML20058N481 | 15 December 1993 | Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately | |
ML20059D134 | 30 August 1990 | Notification of 900913 Meeting W/Util in Rockville,Md to Discuss Util Proposal to Upgrade Emergency Diesel Generators at Facility | |
ML20059H589 | 24 January 1994 | Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Plans for Implementation of Rwl Mod as Required by NRC Bulletin 93-003 | |
ML20059J147 | 10 January 1994 | Summary of Operating Reactors Events Briefing 94-01 Conducted on 940105 to Inform Senior Managers of Listed Ofcs of Selected Events That Occurred Since Last Briefing on 931222.Attendees Listed in Encl 1 | Reactor Vessel Water Level |
ML20059J598 | 4 November 1993 | Forwards Human Performance Study Rept, Spurious Reactor Scram W/Loss of Condenser Vacuum. Study Relates to 930813 Event | |
ML20062B801 | 2 August 1982 | Forwards FEMA & Interim Findings Rept on Adequacy of Radiological Emergency Response Preparedness of State & Local Govts Near Plant | |
ML20062C167 | 27 July 1982 | Notification of 820824-26 Meetings W/Util at Site to Observe Const & Obtain Info Re Completion of Const & Preoperational Tests for NRC Caseload Forecast Panel | |
ML20062C187 | 23 July 1982 | Releases Sanitized Version of Overexposure Rept 10CFR20.405 | |
ML20062D131 | 9 November 1978 | Status of IE Outstanding Review Request:Waiting for Addl Info Re Requirements for Pressurization of Air Lock Door Seals That Support a Proposed Change to Subj Facil Tech Specs | |
ML20062E077 | 26 July 1982 | Board Notification 82-77:provides Info Re QA During Const & Emergency Preparedness | |
ML20062E079 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA | Reserve Station Service Transformer |
ML20062E162 | 20 July 1982 | Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments | |
ML20062H533 | 28 November 1990 | Notification of 901121 Monthly Mgt Meeting W/Util in Rockville MD | |
ML20082A814 | 7 March 1995 | Informs That on 950306 Upgrade Made to Arms Distribution Process in Response to Customers Requests & QA Audit 93-0117 Observation Number 2.Changes to Arms Distribution Process Listed | |
ML20087A831 | 5 March 1984 | Forwards Monticello Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Evaluation & Monticello Nuclear Power Plant Full-Scale Joint Emergency Exercise on 830223, Final Rept | |
ML20125A405 | 1 September 1978 | Responds to Bajwa 780831 Request for Review of Nonradiological Ets.Several Critical Inconsistencies Still Exist Between Fes Findings & ETS | |
ML20125A441 | 22 August 1973 | Requests Invoices for Annual Fees to Listed Plants | |
ML20125A444 | 30 September 1975 | Forwards Safety Evaluation of Plant Conformance to Requirements of App K to 10CFR50 & Acceptability of Proposed GETAB-based TS | |
ML20125A469 | 3 July 1975 | Summarizes Info Obtained to Date Re Fuel Rod Failures in Plant Fuel Assemblies | |
ML20125A477 | 1 August 1975 | Informs That Addl Info Needed in Order to Continue Review of NEDO-20846 Concerning ATWS Submittal.Applicant Should Submit Description of Mods & Schedule for Implementation | |
ML20125A483 | 1 August 1975 | Requests Response to Encl Concerns on NEDO-20846,plant ATWS Submittal | |
ML20125A490 | 31 July 1975 | Advisess That Review & Evaluation of Licensee 750701 Submittal Should Address Listed Topics,Including Proposed RCS Pressure Temp Limitations & off-gass Sys TS | |
ML20125A493 | 8 August 1975 | Informs That Rev to Radioiodine Release Rate in Plant TS Submission Reviewed by F Congel.Dispersion Factors & Methodology Acceptable as Presented | |
ML20125A499 | 4 December 1969 | Discusses Telcon Review of Monticello Plant SGTS Schematic Drawings | |
ML20125A502 | 15 August 1975 | Discusses Review of Proposed Revs to TS | |
ML20125A506 | 19 August 1975 | Responds to Technical Assistance Request for Review of Proposed Change in Plant pressure-temp Limitations for Operation | |
ML20125A508 | 12 March 1973 | Forwards Util Answering Questions Re Rod Drop Accident Analysis for Plant | |
ML20125A510 | 25 August 1975 | Requests Written Testimony on Minnesota Pollution Control Agency ATWS Contention on Facility Which Licensing Board Formally Admitted on 750805.Order Encl | |
ML20125A513 | 8 March 1973 | Forwards Util Transmitting Change 5 to License DPR-22 for Plant | |
ML20125A515 | 2 September 1975 | Requests Assistance in Review of Licensees Submittals on Pressure Suppression Containment Concept & Provide Written Evaluation of Adequacy of Justification for Continued Operation of Plants W/Mark I Containments | |
ML20125A517 | 5 March 1973 | Forwards Util Reporting Failure of No 1 TIP Ball Valve to Isolate at Plant | |
ML20125A523 | 28 February 1973 | Forwards Util Submitting Supplementary Info Supporting TS Change Request for Plant.W/O Encl | |
ML20125A530 | 26 September 1975 | Discusses Review of GE Technical Justification of Hydrodynamic Loads for Mark I Containments.No Sufficient Info to Indicate That Functional Operability of Piping Required for Emergency Core Cooling Will Not Be Impaired | |
ML20125A533 | 26 February 1973 | Forwards Util Transmitting Amend 3 to OL for Plant.W/O Encl | |
ML20125A536 | 26 February 1973 | Forwards Util Requesting Authorization for Operation of Plant W/Reload Fuel in Core.W/O Encl | |
ML20125A543 | 26 February 1973 | Forwards Util ,Transmitting Amend 2 to License DPR-22 to Increase Quantity of U-235 Contained in Fission Chambers from 1 G to 50 G for Plant.W/O Encl | |
ML20125A546 | 2 March 1973 | Discusses Proposed Changes That Do Not Present Significant Hazards Considerations Not Described or Implicit in Monticello Safety Analysis Rept | |
ML20125A549 | 6 October 1975 | Discusses Preliminary Notification of Event or Unusual Occurrence Re Feedwater Spargers | |
ML20125A551 | 21 February 1973 | Forwards Util Transmitting Rept Evaluating Application for Full Term OL for Plant.W/O Encl | |
ML20125A558 | 8 February 1973 | Forwards Util Reporting PCIV Leakage Greater than TS Limit.W/O Encl | |
ML20125A563 | 8 February 1973 | Forwards Util ,Furnishing Info Re Rod Drop Accident Analysis.W/O Encl | |
ML20125A566 | 14 November 1969 | Discusses Second Review of Instrumentation Schematics for Monticello Nuclear Generating Plant | |
ML20125A573 | 22 May 1970 | Informs That Licensee Will Replace All Sensitized Stainless Steel safe-ends Except for Recirculation Outlet Nozzles | |
ML20125A576 | 20 February 1973 | Concludes That Proposed Amend Does Not Involve Significant Hazard Considerations Not Previously Evaluated & That There Is Reasonable Assurance That Health & Safety of Public Will Not Be Endangered by Proposed Activities | Shutdown Margin |