Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML20054E92310 June 1982Board Notification:Notifying of Drywell to Wetwell Vacuum Breakers Which Can Be Subj to air-clearing Load Resulting from Pool Swell Following Postulated Loca.Components Can Be Overstressed by Impact Load
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055B71321 July 1982Advises That NRC Takes No Position on J Reed 820701 Motion to Compel Discovery from State of Mo & Callaway County
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20056G43420 October 1992Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events
ML20056H00631 August 1993Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload
ML20058B3786 July 1982Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA
ML20058F43926 November 1993Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports
ML20058G0392 August 1982Advises That NRC Adheres to Positions in NRC to ASLB & Will Not Respond to Judge RG Wright 820707 Objections to J Reed Motion to Compel Discovery or Reed 820708 Motion to Overrule Objections
ML20058G54430 November 1993Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co
ML20062B46422 July 1982Notification of 820915 Meeting W/Util in Mokane,Mo & Caseload Forecast Panel 820916 Site Visit to Review Const Progress for Assessing Projected Fuel Load Dates.Agenda Encl
ML20062C17122 July 1982Notification of 820817 Meeting W/Utils & Nuclear Projects, Inc,In Gaithersburg,Md to Discuss Basis for Routing of Instrumentation
ML20062D32929 July 1982Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA
ML20062E07929 July 1982Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEAReserve Station Service Transformer
ML20062E16220 July 1982Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments
ML20062E8346 December 1978Notice of 781213 Meeting to Discuss Staff Policies on Review of Pending OL Appls & Criteria for Establishing Priorities for Review
ML20062P04410 January 1980Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results EnclCoast down
ML20071F1929 June 1981Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl
ML20072L69927 September 1982Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl
ML20072T3503 June 1982Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan EnclNondestructive Examination
Liquid penetrant
ML20072T36016 April 1982Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info EnclNondestructive Examination
Liquid penetrant
ML20079R08515 March 1978Forwards Feb Project Status Repts
ML20081L70822 March 1983Forwards Complete List of Snubbers in Drywell Reviewed for Removability & Accessiblity.Total of 100 Snubbers Reviewed
ML20098D1486 January 1975Informs That Applicant Has No Objection to Proposal of Financial Qualifications Considered at Radiological Health & Safety Phase.Approach Consistent W/Preconstruction Activities 10CFR50.10(e)
ML20126D34328 March 1984Notification of Change in Date,Time & Purpose of 840403 Meeting.Meeting Will Take Place on 840404 W/Util in Bethesda,Md to Discuss Results of NRR Review of Licensee Tech Spec Review Program
ML20126D35731 May 1984Discusses Ofc of General Counsel 840530 Memo Re Order Which Amended License.Plant Should Be Shut Down Until Regulations Can Be Met,Adequacy of Plant License Determined & Health & Safety of Public Assured
ML20126D8268 June 1973Forwards Position Paper Re Adequacy of Facility Site Foundation Exploration Performed by Applicant.Paper Sets Forth Recommendations for Addl Drilling,Sampling,Testing & Analyses to Complete Site Conditions Review