Notification of 820915 Meeting W/Util in Mokane,Mo & Caseload Forecast Panel 820916 Site Visit to Review Const Progress for Assessing Projected Fuel Load Dates.Agenda Encl
ML20062B464
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/22/1982
From: Edison G
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8208040507
Download: ML20062B464 (7)


Text

- e JUL 2 21982 Docket No.: 50-483 PEMORAfiDUM FOR: B. J. Youngblood, Chief, Licensing Branch No. 1, DL FROM: G. E. Edison, Project Manager, Licensing Branch No.1, DL

SUBJECT:

fiOTICE OF MEETING Arid SITE VISIT BY CASELOAD FORECAST PANEL TO ASSESS CONSTRUCTION COMPLETION SCHEDULES - CALLAWAY PLANT, UNIT 1 DATE AND TIME: September 15 and 16, 1982; 9:00 AM - 4:00 PM LOCATI0'l: September 15, 1982; Mokane Lions Club, Mokane, Missouri

  • September 16, 1982; Callaway Site, Fulton, Missouri PURPOSE: The Caseload Forecast Panel will review construction progress to collect data for assessing projected fuel load dates.

AGENDA: September 15, 1982; Meeting: Review design and e791neering, pro-

,__ ' curement and construction progress.

Review progress on preoperation pro-cedures and testing. See enclosed agenda.

  • September 16, 1982; Site Visit: The Panel will tour the site and observe construction activities for Unit 1.

PARTICIPANTS: Union Electric Company A. Passwater, R. Schukai, W. Weber NRC Staff G. E. Edison, W. Lovelace, J. Youngblood, J. Neisler Origital signed by.:

Gordon E. MiSOD G. Edison, Project Manager Licensing Branch No.1 Division of Licensing 8208040507 820722 cc w/ encl.: See next page PDR ADOCK 05000403 A PDR

  • NOTE: The meeting on September 15, 1982 is open to interested members of j3phepublictoattendasobserverspursuanttotheNRCPolicyState-

. If 3@ h nt on open meetings. For the site visit on September 16. 1932.

1ss10n to enter the construction site must be obtained from the omce) D.L:LB.#1.)..P L. g m.E.l*trie Companye-- -

sunux c > . GEED.ison/.dj.. oungb.lood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~ - . . . . - . . - - . - - . . -.- - --

om> .ZL21/82..... 1R.MB2.......... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

wac ronu ais oo.sa nacu om OFFIClAL RECORD COPY usa m usi--u m

.  :* y ,

Mr. D. F. Schnell Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 cc: Mr.' Nicholas A. Petrick Mr. Fred Luekey , '.

Executive Director - SNUPPS Presiding' Judge, Montgomery 5 Choke Cherry Road County Rockville, Maryland 20850 Rural Route Rhineland, Missouri 65069 Gerald Charnoff, Esq.

Thomas A. Baxter, Esq. Mayor Howard Steff'en Shaw, Pittman, Potts & Chamois, Missouri 65024 Trowbridge 1800 M Street, N. W.

Washington, D. C. 20036 Prcfessor William H. Miller Missouri Kansas Section, Mr. J. E. Birk American Nuclear Society Assistant to the General Counsel Department of Nuclear Union Electric Company Engineering Post Office Box 149 1026 Engineering Building

-- St.- Louis, Missouri 63166 University of Missouri Columbia, Missouri 65211 Mr. John Neisler .

U. S. Regulatory Commission Robert G. Wright Resident Inspector Office Assoc.' Judge, Eastern. District ...

~

RR#1 Steedman, Missouri 65077 Cour.ty. Court, .Calliway ' County, M0;;

Route #1 - -

Mr. Donald W. Capone, Manager Fulton, Missouri 65251 Nuclear Engineering Union Electric Company Kenneth M. Chackes . -

Post Office Box 149 Chackes and Hoare St. Louis, Missouri 63166 Attorney for Joint Intervenors A. Scott Cauger, Esq. 314 N. Broadway

< Assistant General Counsel St. Louis, Missouri 63102 l for the Missouri Public Service Commission Mr. Earl Brown Post Office Box 360 ..

,_ School District Superintendent Jefferson City, Missouri 65101 Post Office Box 9 Kingdom City,!!issouri 65262 Ms. Barbara Shull

'Ms. Lenore Loeb Mr. Samuel J. Birk League of Women Voters of flissouri R. R. #1, Box 243 2138 Woodson Road Morrison, Missouri 65061 St. Louis, Missouri 63114 l

Mr. Harold Lottman i Ms. Marjorie Reilly Presiding Judge, Dasconade County Energy Chairman of the Route 1 League of Women Voters Owensville, Missouri 65066 of University City, M0 i

7065 Pershing Avenue Eric A. Eisen, Esq.

University City, Missouri 63130 Birch, Horton, Bittner and Monroe Suite 1100 1140 Connecticut Avenue, N. W.

Washington, D. C. 20036 e

Mr. D. F. Schnell -

2-cc: Mr. John G. Reed . -

Route #1 -

Kingdom City, Missouri 65262 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment St. Louis Region 6267 Delmar Boulevard University City, Missouri 63130 -

Mr. Donald Bollinger, Member Missourians for Safe Energy 6267 Delmar Boulevard ~

Universi.ty City, Missouri 63130 Mr. James G. Keppler Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 F

'e e MM e .

0 rs,-,- --

-n -

7

- s ,

CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA

1. Overview of project construction schedule including progress .- -

and major milestones completed, current problems and any . -

anticipated problem areas that may impact the current projected fuel load date.

2. Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.
3. Detailed review and current status of procurement activities including valves, pipe, instruments, cable, major components, .

etc.

4. Actual and proposed craft work force (by major craft), craft availability,. productivity, potential labor negotiations and probl ems. -
5. Detailed review and current status of all large and small bore pipe hangers, restraints, snubbers, etc., including design, ~

rework, procurement, fabrication, delivery and installation.

6. Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any l activities with negative float, and provisions for contingencies.

The estimated project percent complete as of August 31, 1982.

7. Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for l each, actual versus forecast installation rates, in cubic yards /mo.,

linear feet /mo., or number /mo., and basis for figures.

~~

(a) Concrete (CY)

(b) Process Pipe (LF)

~

Large Bore Pipe (21/2" and larger)

Small Bore Pipe (2" and smaller)

(c) Yard Pipe (LF)

(d) Large Bore Pipe Hangers, Restraints, Snubbers (ea)

I

D . .

(e) Small Bore Pipe Hangers, Restraints (ea)

(f) Cable Tray (LF) .- .

(g) Total Conduit (LF)

(h) Total Exposed Metal Conduit (LF) "

(i) Cable ,(LF) .

Power Control

- Security .

- Instrumentation

- Plant Lighting

~

(j-) . Terminations (ea) .

^ '

Power

- Control u

- Security --

Instrumentation .

- Plant Lighting ,

t (k) Electrical Circuits (ea) ,

' ~

Power' . .

Control

- Security .-

(1) Instrumentation (ea) .

8. Detailed review and current status of preparation of preop .

and acceptance test procedures, integration of preop and ,

' acceptance test acti'vities with construction schedule, system turnover schedule, preop and acceptance tes,ts schedule, current and proposed preop and acceptance tests program manpower. ,

[ '

(a) Total number of procedures required for fuel load.

(b) 11 umber of draft procedures not started.

(c) tiumber of draft procedures being written.

(d) Number of procedures approved.

(e) Number of procedures in review.

(f) Total number of preop and acceptance tests required for fuel load.

. ( Number of preop and acceptance tests completed. '

( Humber of preop and acceptance tests currently

.in progress. .

,(i ) Numb'er of systems turned over to start-up.

l l <

, To ,

'~ ..

_- ~3 V.. .

9. Detailed discussion of potential schedular influence due to changes attributed to NUREG-0737 and other recent licensin'g requirements. ,
10. Discussion of schedular impact, if any, regarding potential deficiencies reported in accordance with 10 CFR 50.55(e).
11. Overview of current construction and startup management organization showing interfaces between the two.
12. Site tour and observation of construction activities.

OO g e

i e

, ee.

O O

4 e

4 1

i C

y ,

MEETING NOTICE

. Document Control (50-483)

NRC PDR L PDR AL 2 2 g '

  • TERA , ..

NSIC .

LB#1 Rdg. -

MRushbrook '

Project Manager c. rnann E. Case D. Eisenhut/R. Purple R. Tedesco J. Youngblood .

A. Schwencer . .

F. Miraglia E. Adensam SSPB Branch Chief G. Lainas

-. W. Russell D. Crutchfield T. Ippolito .

J. P. Knight W. Johnston D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst -

J. Kramer Attorney, OELD I

OIE Regional Administrator, Region III ACRS(16) 05D (7)

~ '-

PARTICIPANTS (NRC):

G. E.. Edison, W. Lovelace, J. Youngblood, J. Neisler .