Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20149G8571997-07-16016 July 1997 Notification of Licensee Meeting W/Util on 970815 to Discuss Failure to Perform SE IAW 10CFR50.59 Requirements Identified in Insp Rept 50-483/97-05 ML20141M0061997-05-30030 May 1997 Notification of Licensee Meeting W/Util in Steedman,Mo on 970702 to Discuss Results of Latest SALP ML20137X0131997-04-17017 April 1997 Notification of 970506-07 Meeting W/Une & Framatome Technologies in Toronto,Ontario,Canada to Discuss Destructive Exam Techniques Used at Ontario Hydro Technologies Pertaining to Installation of Electrosleeves ML20137W9811997-04-17017 April 1997 Notification of 970513-14 & 15 Meeting W/Une & Framatome Technologies in Lynchburg,Va to Witness Use of Ultrasonic Testing Equipment & Review Analysis Methods Pertaining to Framatome Electrosleeving Process ML20137Y2301997-04-16016 April 1997 Informs That Operator Licensing Exams Administered on 970224 -28 at Facility.Exam Rept Encl ML20137J6701997-04-0202 April 1997 Forwards Info Obtained Form 970402 Telcon Re GL-96-06 ML20137J6451997-04-0202 April 1997 Forwards Document on Docket 05000483 for Callaway Plant, Unit 1 ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134A8841997-01-24024 January 1997 Notification of 970220 Meeting W/Union Electric in Rockville MD to Discuss Union Preparation for 970609-12 Operational Safeguards Response Evaluation at Callaway Plant ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl ML20132E2521996-12-18018 December 1996 Notification of 970114 Meeting W/Util in Rockville,Md to Discuss Union Electric Co Plans for Reload Design to Callaway Plant ML20132E5701996-12-17017 December 1996 Notification of 970115 Meeting W/Licensee in Rockville,Md to Discuss Nondestructive Exam Qualification Efforts to Date in Support of Staff Review of Amend Request That Would Allow Use of Framatome Electrosleeving Technology ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20056H0061993-08-31031 August 1993 Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload ML20056G4341992-10-20020 October 1992 Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events ML20245L5291989-05-0303 May 1989 Summarizes NRR Insp of Noble Gas Monitors at Plant on 890412,to Obtain Understanding of Monitor Sys Improvement ML20245H8521989-04-28028 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Proposed Revs to Containment Vessel Structural Integrity Spec ML20245K2981989-03-0303 March 1989 Forwards FEMA Exercise Rept for 880606 partial-scale Exercise at Plant.Exercise Identified Six Deficiencies Which Have Been Adequately Corrected,Five Through Plan Revs & One Through Successful Remedial Exercise ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20154P3091988-09-27027 September 1988 Notification of 881005 Meeting W/Util in Rockville,Md to Discuss Licensee Presentation of Steam Generator Level Reactor Trip Mod for Plant ML20151H4281988-04-15015 April 1988 Informs of D Shepard Participation in Tabletop Review of Simulator Certification During Wk of 880425,per 880413 Telcon ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20149G8571997-07-16016 July 1997 Notification of Licensee Meeting W/Util on 970815 to Discuss Failure to Perform SE IAW 10CFR50.59 Requirements Identified in Insp Rept 50-483/97-05 ML20141M0061997-05-30030 May 1997 Notification of Licensee Meeting W/Util in Steedman,Mo on 970702 to Discuss Results of Latest SALP ML20137X0131997-04-17017 April 1997 Notification of 970506-07 Meeting W/Une & Framatome Technologies in Toronto,Ontario,Canada to Discuss Destructive Exam Techniques Used at Ontario Hydro Technologies Pertaining to Installation of Electrosleeves ML20137W9811997-04-17017 April 1997 Notification of 970513-14 & 15 Meeting W/Une & Framatome Technologies in Lynchburg,Va to Witness Use of Ultrasonic Testing Equipment & Review Analysis Methods Pertaining to Framatome Electrosleeving Process ML20137Y2301997-04-16016 April 1997 Informs That Operator Licensing Exams Administered on 970224 -28 at Facility.Exam Rept Encl ML20137J6451997-04-0202 April 1997 Forwards Document on Docket 05000483 for Callaway Plant, Unit 1 ML20137J6701997-04-0202 April 1997 Forwards Info Obtained Form 970402 Telcon Re GL-96-06 ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134A8841997-01-24024 January 1997 Notification of 970220 Meeting W/Union Electric in Rockville MD to Discuss Union Preparation for 970609-12 Operational Safeguards Response Evaluation at Callaway Plant ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl ML20132E2521996-12-18018 December 1996 Notification of 970114 Meeting W/Util in Rockville,Md to Discuss Union Electric Co Plans for Reload Design to Callaway Plant ML20132E5701996-12-17017 December 1996 Notification of 970115 Meeting W/Licensee in Rockville,Md to Discuss Nondestructive Exam Qualification Efforts to Date in Support of Staff Review of Amend Request That Would Allow Use of Framatome Electrosleeving Technology ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20056H0061993-08-31031 August 1993 Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload ML20056G4341992-10-20020 October 1992 Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events ML20245L5291989-05-0303 May 1989 Summarizes NRR Insp of Noble Gas Monitors at Plant on 890412,to Obtain Understanding of Monitor Sys Improvement ML20245H8521989-04-28028 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Proposed Revs to Containment Vessel Structural Integrity Spec ML20245K2981989-03-0303 March 1989 Forwards FEMA Exercise Rept for 880606 partial-scale Exercise at Plant.Exercise Identified Six Deficiencies Which Have Been Adequately Corrected,Five Through Plan Revs & One Through Successful Remedial Exercise ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20154P3091988-09-27027 September 1988 Notification of 881005 Meeting W/Util in Rockville,Md to Discuss Licensee Presentation of Steam Generator Level Reactor Trip Mod for Plant ML20151H4281988-04-15015 April 1988 Informs of D Shepard Participation in Tabletop Review of Simulator Certification During Wk of 880425,per 880413 Telcon ML20148G9451988-03-24024 March 1988 Advises That ACRS Review of Proposed Power Uprating for Facility Complete,Based on Evaluation of Concern Raised in 880317 Memo.License Amend Will Be Issued Shortly 1999-08-27
[Table view] |
Text
- e JUL 2 21982 Docket No.: 50-483 PEMORAfiDUM FOR: B. J. Youngblood, Chief, Licensing Branch No. 1, DL FROM: G. E. Edison, Project Manager, Licensing Branch No.1, DL
SUBJECT:
fiOTICE OF MEETING Arid SITE VISIT BY CASELOAD FORECAST PANEL TO ASSESS CONSTRUCTION COMPLETION SCHEDULES - CALLAWAY PLANT, UNIT 1 DATE AND TIME: September 15 and 16, 1982; 9:00 AM - 4:00 PM LOCATI0'l: September 15, 1982; Mokane Lions Club, Mokane, Missouri
- September 16, 1982; Callaway Site, Fulton, Missouri PURPOSE: The Caseload Forecast Panel will review construction progress to collect data for assessing projected fuel load dates.
AGENDA: September 15, 1982; Meeting: Review design and e791neering, pro-
,__ ' curement and construction progress.
Review progress on preoperation pro-cedures and testing. See enclosed agenda.
- September 16, 1982; Site Visit: The Panel will tour the site and observe construction activities for Unit 1.
PARTICIPANTS: Union Electric Company A. Passwater, R. Schukai, W. Weber NRC Staff G. E. Edison, W. Lovelace, J. Youngblood, J. Neisler Origital signed by.:
Gordon E. MiSOD G. Edison, Project Manager Licensing Branch No.1 Division of Licensing 8208040507 820722 cc w/ encl.: See next page PDR ADOCK 05000403 A PDR
- NOTE: The meeting on September 15, 1982 is open to interested members of j3phepublictoattendasobserverspursuanttotheNRCPolicyState-
. If 3@ h nt on open meetings. For the site visit on September 16. 1932.
1ss10n to enter the construction site must be obtained from the omce) D.L:LB.#1.)..P L. g m.E.l*trie Companye-- -
sunux c > . GEED.ison/.dj.. oungb.lood . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~ - . . . . - . . - - . - - . . -.- - --
om> .ZL21/82..... 1R.MB2.......... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
wac ronu ais oo.sa nacu om OFFIClAL RECORD COPY usa m usi--u m
. :* y ,
Mr. D. F. Schnell Vice President - Nuclear Union Electric Company Post Office Box 149 St. Louis, Missouri 63166 cc: Mr.' Nicholas A. Petrick Mr. Fred Luekey , '.
Executive Director - SNUPPS Presiding' Judge, Montgomery 5 Choke Cherry Road County Rockville, Maryland 20850 Rural Route Rhineland, Missouri 65069 Gerald Charnoff, Esq.
Thomas A. Baxter, Esq. Mayor Howard Steff'en Shaw, Pittman, Potts & Chamois, Missouri 65024 Trowbridge 1800 M Street, N. W.
Washington, D. C. 20036 Prcfessor William H. Miller Missouri Kansas Section, Mr. J. E. Birk American Nuclear Society Assistant to the General Counsel Department of Nuclear Union Electric Company Engineering Post Office Box 149 1026 Engineering Building
-- St.- Louis, Missouri 63166 University of Missouri Columbia, Missouri 65211 Mr. John Neisler .
U. S. Regulatory Commission Robert G. Wright Resident Inspector Office Assoc.' Judge, Eastern. District ...
~
RR#1 Steedman, Missouri 65077 Cour.ty. Court, .Calliway ' County, M0;;
Route #1 - -
Mr. Donald W. Capone, Manager Fulton, Missouri 65251 Nuclear Engineering Union Electric Company Kenneth M. Chackes . -
Post Office Box 149 Chackes and Hoare St. Louis, Missouri 63166 Attorney for Joint Intervenors A. Scott Cauger, Esq. 314 N. Broadway
< Assistant General Counsel St. Louis, Missouri 63102 l for the Missouri Public Service Commission Mr. Earl Brown Post Office Box 360 ..
,_ School District Superintendent Jefferson City, Missouri 65101 Post Office Box 9 Kingdom City,!!issouri 65262 Ms. Barbara Shull
'Ms. Lenore Loeb Mr. Samuel J. Birk League of Women Voters of flissouri R. R. #1, Box 243 2138 Woodson Road Morrison, Missouri 65061 St. Louis, Missouri 63114 l
Mr. Harold Lottman i Ms. Marjorie Reilly Presiding Judge, Dasconade County Energy Chairman of the Route 1 League of Women Voters Owensville, Missouri 65066 of University City, M0 i
7065 Pershing Avenue Eric A. Eisen, Esq.
University City, Missouri 63130 Birch, Horton, Bittner and Monroe Suite 1100 1140 Connecticut Avenue, N. W.
Washington, D. C. 20036 e
Mr. D. F. Schnell -
2-cc: Mr. John G. Reed . -
Route #1 -
Kingdom City, Missouri 65262 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment St. Louis Region 6267 Delmar Boulevard University City, Missouri 63130 -
Mr. Donald Bollinger, Member Missourians for Safe Energy 6267 Delmar Boulevard ~
Universi.ty City, Missouri 63130 Mr. James G. Keppler Nuclear Regulatory Commission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 F
'e e MM e .
0 rs,-,- --
-n -
7
- s ,
CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA
- 1. Overview of project construction schedule including progress .- -
and major milestones completed, current problems and any . -
anticipated problem areas that may impact the current projected fuel load date.
- 2. Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.
- 3. Detailed review and current status of procurement activities including valves, pipe, instruments, cable, major components, .
etc.
- 4. Actual and proposed craft work force (by major craft), craft availability,. productivity, potential labor negotiations and probl ems. -
- 5. Detailed review and current status of all large and small bore pipe hangers, restraints, snubbers, etc., including design, ~
rework, procurement, fabrication, delivery and installation.
- 6. Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any l activities with negative float, and provisions for contingencies.
The estimated project percent complete as of August 31, 1982.
- 7. Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for l each, actual versus forecast installation rates, in cubic yards /mo.,
linear feet /mo., or number /mo., and basis for figures.
~~
(a) Concrete (CY)
(b) Process Pipe (LF)
~
Large Bore Pipe (21/2" and larger)
Small Bore Pipe (2" and smaller)
(c) Yard Pipe (LF)
(d) Large Bore Pipe Hangers, Restraints, Snubbers (ea)
I
D . .
(e) Small Bore Pipe Hangers, Restraints (ea)
(f) Cable Tray (LF) .- .
(g) Total Conduit (LF)
(h) Total Exposed Metal Conduit (LF) "
(i) Cable ,(LF) .
Power Control
- Security .
- Instrumentation
- Plant Lighting
~
(j-) . Terminations (ea) .
^ '
Power
- Control u
- Security --
Instrumentation .
- Plant Lighting ,
t (k) Electrical Circuits (ea) ,
' ~
Power' . .
Control
- Security .-
(1) Instrumentation (ea) .
- 8. Detailed review and current status of preparation of preop .
and acceptance test procedures, integration of preop and ,
' acceptance test acti'vities with construction schedule, system turnover schedule, preop and acceptance tes,ts schedule, current and proposed preop and acceptance tests program manpower. ,
[ '
(a) Total number of procedures required for fuel load.
(b) 11 umber of draft procedures not started.
(c) tiumber of draft procedures being written.
(d) Number of procedures approved.
(e) Number of procedures in review.
(f) Total number of preop and acceptance tests required for fuel load.
. ( Number of preop and acceptance tests completed. '
( Humber of preop and acceptance tests currently
.in progress. .
,(i ) Numb'er of systems turned over to start-up.
l l <
, To ,
'~ ..
_- ~3 V.. .
- 9. Detailed discussion of potential schedular influence due to changes attributed to NUREG-0737 and other recent licensin'g requirements. ,
- 10. Discussion of schedular impact, if any, regarding potential deficiencies reported in accordance with 10 CFR 50.55(e).
- 11. Overview of current construction and startup management organization showing interfaces between the two.
- 12. Site tour and observation of construction activities.
OO g e
i e
, ee.
O O
4 e
4 1
i C
y ,
MEETING NOTICE
. Document Control (50-483)
NRC PDR L PDR AL 2 2 g '
NSIC .
LB#1 Rdg. -
MRushbrook '
Project Manager c. rnann E. Case D. Eisenhut/R. Purple R. Tedesco J. Youngblood .
A. Schwencer . .
F. Miraglia E. Adensam SSPB Branch Chief G. Lainas
-. W. Russell D. Crutchfield T. Ippolito .
J. P. Knight W. Johnston D. Muller T. Speis R. Houston L. Rubenstein F. Schroeder M. Ernst -
J. Kramer Attorney, OELD I
OIE Regional Administrator, Region III ACRS(16) 05D (7)
~ '-
PARTICIPANTS (NRC):
G. E.. Edison, W. Lovelace, J. Youngblood, J. Neisler .
e e WB l
l
.