Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-MT-18-009, License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note | 12 November 2018 | License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note | Water Inventory Control |
L-MT-18-010, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 28 March 2018 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown Ultimate heat sink Internal Flooding Probabilistic Risk Assessment Tornado Generated Missile Large early release frequency Turbine Missile |
L-MT-18-020, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control | 24 April 2018 | Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control | Probabilistic Risk Assessment |
L-MT-18-051, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, | 11 September 2018 | Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, | Water Inventory Control |
L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 | 12 November 2018 | License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence MELLLA Fuel cladding |
L-MT-18-073, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... | 20 November 2018 | Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... | Stroke time Water Inventory Control Operating Basis Earthquake Surveillance Frequency Control Program Scaffolding |
L-MT-20-003, License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b | 30 March 2020 | License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency B.5.b Mitigating Strategies Earthquake Turbine Missile Offsite Circuit Fire Protection Program |
L-MT-20-018, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 22 September 2020 | License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Control of Heavy Loads Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | 3 November 2020 | License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Offsite Dose Calculation Manual Anticipated operational occurrence Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
L-MT-21-043, Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 30 June 2021 | Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Probabilistic Risk Assessment Large early release frequency |
L-MT-21-067, Update to the Monticello Technical Specification Bases | 29 November 2021 | Update to the Monticello Technical Specification Bases | |
L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | 13 December 2021 | License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | Anticipated operational occurrence Qualified Offsite Circuit FLEX Aging Management Surveillance Frequency Control Program Offsite Circuit Fire Protection Program |
L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency | 18 March 2022 | License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency | Ultimate heat sink Foreign Material Exclusion Power Operated Valves |
L-MT-23-010, Subsequent License Renewal Application Supplement 1 | 3 April 2023 | Subsequent License Renewal Application Supplement 1 | |
L-MT-23-025, Subsequent License Renewal Application Supplement 2 | 26 June 2023 | Subsequent License Renewal Application Supplement 2 | High Radiation Area Fire Barrier Coatings Nondestructive Examination Aging Management Moisture barrier License Renewal Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld |
L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | 18 July 2023 | Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | Fire Barrier Hydrostatic Coatings Operating Basis Earthquake Aging Management License Renewal Subsequent License Renewal Power Uprate |
L-MT-23-035, Subsequent License Renewal Application Supplement 5 | 28 August 2023 | Subsequent License Renewal Application Supplement 5 | Finite Element Analysis Aging Management Scram Discharge Volume License Renewal Pressure Boundary Leakage |
L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | 10 November 2023 | License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | Safe Shutdown Surveillance Frequency Control Program |
L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | 29 December 2023 | License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | Safe Shutdown Shutdown Margin Fire Barrier Anticipated operational occurrence Hydrostatic Coatings Emergency Lighting Pressure and Temperature Limits Report License Renewal Subsequent License Renewal Fire Protection Program |
L-MT-23-054, Subsequent License Renewal Application Supplement 8 | 11 January 2024 | Subsequent License Renewal Application Supplement 8 | Non-Destructive Examination Coatings Aging Management License Renewal |
ML020650115 | 12 February 2002 | License Amendment Request, Missed Surveillance Requirement Technical Specification Changes | Time of Discovery Incorporated by reference Missed surveillance |
ML021280397 | 22 April 2002 | License Amendment Request Revised Pressure and Temperature Curves | Hydrostatic Exemption Request |
ML021280504 | 25 April 2002 | License Amendment Request, Conversion to Option B for Containment Leak Rate Testing | Hydrostatic |
ML021280602 | 22 April 2002 | License Amendment Request for Risk-Informed Technical Specification Change Regarding Five Year Extension of Type a Test Interval | Probabilistic Risk Assessment Large early release frequency Moisture barrier Maintenance Rule Program |
ML021330329 | 26 April 2002 | Response to NRC Request for Additional Information & Supplemental License Amendment Request for Previously Submitted Containment Systems License Amendment Request | Shutdown Margin High Radiation Area |
ML021490039 | 14 May 2002 | Supplemental License Amendment Request & Response to Request for Additional Information Regarding License Amendment Request for Revision to Standby Diesel Generators Technical Specifications & Surveillance Requirements | Safe Shutdown Probabilistic Risk Assessment |
ML022750544 | 19 September 2002 | License Amendment Request for Relocation of a TS Surveillance Requirements to a Licensee Controlled Program & Implementation of Boiling Water Reactor Vessel & Internals Project Integrated Surveillance Program | Hydrostatic |
ML022900022 | 8 October 2002 | License Amendment Request for Drywell Leakage and Sump Monitoring System Technical Specification Changes | Packing leak Grab sample Pressure Boundary Leakage |
ML023530197 | 6 December 2002 | License Amendment Request Dated December 6, 2002, Revised Analyses of Long-Term Containment Response and Overpressure Required for Adequate NPSH for Low Pressure ECCS Pumps | Ultimate heat sink |
ML040330467 | 30 January 2004 | Nuclear Management Company, LLC, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process | Post Accident Monitoring Incorporated by reference |
ML040420424 | 30 January 2004 | Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process | Reactor Vessel Water Level Post Accident Monitoring Hydrostatic Incorporated by reference Pressure and Temperature Limits Report |
ML042040169 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Methodology Summary and Compliance with Generic Letter 91-04 | Safe Shutdown |
ML042040174 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Nmc'S Interpretation of the NRC Comments on the Staff Review of EPRI Technical Report 103335, Guidelines for Instrument Calibration Extension/Reduction.... | |
ML042040175 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Drift Study Cross Reference | |
ML042040177 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Drift Analysis (Instrumentation and Controls) | |
ML042040182 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Bases for Change Request for Technical Specifications and Surveillance Requirements Interval Extensions | Safe Shutdown Reactor Vessel Water Level High Radiation Area Scram Discharge Volume Fuel cladding Grace period |
ML042040184 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Current Monticello Technical Specification Pages Marked Up with Proposed Changes | Time of Discovery Shutdown Margin Hydrostatic |
ML042040187 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Revised Monticello TS Pages | Time of Discovery Shutdown Margin Hydrostatic |
ML042040190 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, Current Monticello TS Bases Pages Marked Up with Proposed Changes | High Radiation Area |
ML042040195 | 30 June 2004 | License Amendment Request to Support 24-month Fuel Cycles, (Provided for Information Only) Revised Monticello TS Bases Pages | High Radiation Area |
ML062620407 | 19 September 2006 | Final Supplement 26 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Monticello Nuclear Generating Plant | License Renewal |
ML081010193 | 31 March 2008 | Monticello, License Amendment Request: Extended Power Uprate | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Squib Scram Discharge Volume Feedwater Controller Failure Flow Induced Vibration |
ML082730528 | 19 November 2008 | Issuance of Amendment 158 Regarding Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example | Anticipated operational occurrence Overtravel Fuel cladding Grace period |
ML091050619 | 15 April 2009 | License Amendment Request for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 | Safe Shutdown |
ML091410120 | 13 May 2009 | Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 | |
ML100280558 | 21 January 2010 | Monticello - License Amendment Request: Maximum Extended Load Line Limit Analysis Plus | Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Minimum Critical Power Ratio Large early release frequency MELLLA Fuel cladding |
ML102020164 | 20 July 2010 | License Amendment Request for Approval of the Northern States Power Company - Minnesota Cyber Security Plan | Safe Shutdown Cyber Security Incorporated by reference Safeguards Contingency Plan Fuel cladding Fire Protection Program |
ML11186A992 | 29 July 2011 | Issuance of Amendment No. 166 Regarding Cyber Security Plan | Safe Shutdown Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML13333B674 | 27 November 2013 | License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension | Cyber Security |
ML14072A390 | 13 March 2014 | License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification | Aging Management |