Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LIC-08-0078, License Amendment Request, Administrative Revisions to Fort Calhoun Station, Unit No. 1, Technical Specifications2 July 2008License Amendment Request, Administrative Revisions to Fort Calhoun Station, Unit No. 1, Technical SpecificationsAnnual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
LIC-09-0004, License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements30 January 2009License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing RequirementsTime of Discovery
LIC-09-0008, License Amendment Request for Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.30 January 2009License Amendment Request for Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26.Safe Shutdown
Fire Protection Program
LIC-09-0036, License Amendment Request 09-03,Revision to Technical Specifications Sections 2.0.1 & 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source & Deletion of Diesel Generator Surveillance Requirements 3.7(1)e29 May 2009License Amendment Request 09-03,Revision to Technical Specifications Sections 2.0.1 & 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source & Deletion of Diesel Generator Surveillance Requirements 3.7(1)eTime of Discovery
Offsite Circuit
LIC-09-0092, License Amendment Request (Lar), Request for Approval of the Fcs/Oppd Cyber Security Plan16 November 2009License Amendment Request (Lar), Request for Approval of the Fcs/Oppd Cyber Security PlanCyber Security
Incorporated by reference
LIC-10-0034, License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c.12 July 2010License Amendment Request (LAR) Revision to Technical Specification (TS) 2.15, Table 2-5, Item 1 and TS 3.1, Table 3-3, Items 1, 2 and 4 Control Element Assembly Position Indication and Correction of TS 2.10.2(7)c.Boric Acid
Shutdown Margin
LIC-10-0053, License Amendment Request (LAR) 10-04, Proposed Changes to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve and Safety Valve Position and Tail Pipe Temperature Instrumentation16 August 2010License Amendment Request (LAR) 10-04, Proposed Changes to Relocate Operating and Surveillance Requirements for the Power Operated Relief Valve and Safety Valve Position and Tail Pipe Temperature InstrumentationProbabilistic Risk Assessment
LIC-11-0036, (Fcs), Unit No.1, FCS / OPPD Cyber Security Plan, License Amendment Request (Revised)8 April 2011(Fcs), Unit No.1, FCS / OPPD Cyber Security Plan, License Amendment Request (Revised)Cyber Security
Incorporated by reference
LIC-12-0006, License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO)10 February 2012License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO)Time of Discovery
Anticipated operational occurrence
Probabilistic Risk Assessment
LIC-12-0027, License Amendment Request (LAR) 12-02, Proposed Change to Relocate Operating and Surveillance Requirements for Technical Specifications 217 and 3.13 Concerning Miscellaneous Radioactive Material Sources9 March 2012License Amendment Request (LAR) 12-02, Proposed Change to Relocate Operating and Surveillance Requirements for Technical Specifications 217 and 3.13 Concerning Miscellaneous Radioactive Material SourcesGrab sample
Post Accident Monitoring
Probabilistic Risk Assessment
LIC-13-0001, License Amendment Request 13-01, Revision to Technical Specifications Sections 2.0.1 and 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source18 February 2013License Amendment Request 13-01, Revision to Technical Specifications Sections 2.0.1 and 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power SourceTime of Discovery
Offsite Circuit
LIC-14-0036, License Amendment Request (LAR) 14-05; Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response Spectra25 April 2014License Amendment Request (LAR) 14-05; Design and Evaluation of Seismic Class I Structures Using Ascm Developed Floor Response SpectraSafe Shutdown
Design basis earthquake
Earthquake
LIC-14-0042, Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants10 April 2014Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants
LIC-14-0122, License Amendment Request (LAR) 14-09; Application to Revise Technical Specification 3.1, Table 3-3, to Correct an Administrative Error in the Surveillance Method for the Containment Wide Range Radiation Monitors7 November 2014License Amendment Request (LAR) 14-09; Application to Revise Technical Specification 3.1, Table 3-3, to Correct an Administrative Error in the Surveillance Method for the Containment Wide Range Radiation Monitors
LIC-14-0128, License Amendment Request (LAR) 14-10; One- Time Extension of Technical Specification Surveillance Requirements7 November 2014License Amendment Request (LAR) 14-10; One- Time Extension of Technical Specification Surveillance RequirementsSafe Shutdown
Hydrostatic
Scaffolding
LIC-14-0135, Supplement to License Amendment Request (LAR) 14-10; One-Time Extension of Technical Specification Surveillance Requirements10 December 2014Supplement to License Amendment Request (LAR) 14-10; One-Time Extension of Technical Specification Surveillance Requirements
LIC-15-0014, License Amendment Request (Laa) 15-01; Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using the Consolidated Line Item...24 July 2015License Amendment Request (Laa) 15-01; Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using the Consolidated Line Item...Pressure Boundary Leakage
LIC-15-0043, OPPD Response to Second Round NRC Request for Additional Information Regarding License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section Ill, 1980 Edition (No Addenda) as an Alternative to Current Code of Record27 March 2015OPPD Response to Second Round NRC Request for Additional Information Regarding License Amendment Request (LAR) 14-04, Request to Adopt ASME Code, Section Ill, 1980 Edition (No Addenda) as an Alternative to Current Code of RecordEarthquake
LIC-15-0053, License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes20 August 2015License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative ChangesTime of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Locked High Radiation Area
Annual Radioactive Effluent Release Report
Process Control Program
Fire Protection Program
LIC-15-0076, License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.11 September 2015License Amendment Request 15-06; Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control.Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Offsite Circuit
Power change
LIC-15-0077, License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements31 August 2015License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength RequirementsSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Finite Element Analysis
Aging Management
Tornado Generated Missile
Design basis earthquake
Operability Determination
License Renewal
Earthquake
Power Uprate
LIC-15-0081, License Amendment Request (LAR) 15-02, Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-201110 September 2015License Amendment Request (LAR) 15-02, Revise Current Licensing Basis to Allow Use of Equipment Classification Methodology from ANSI/ANS-58.14-2011
LIC-15-0085, License Amendment Request 15-05; Application to Revise Technical Specification to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6B & 6C, Using the Consolidated Line Item.11 September 2015License Amendment Request 15-05; Application to Revise Technical Specification to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiative 6B & 6C, Using the Consolidated Line Item.Safe Shutdown
Loop seal
LIC-15-0142, Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements23 December 2015Supplement of License Amendment Request 15-03; Revise Current Licensing Basis to Use Aci Ultimate Strength RequirementsSafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Finite Element Analysis
Aging Management
Tornado Generated Missile
Design basis earthquake
Earthquake
LIC-16-0012, License Amendment Request, Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 - Page Continue4 April 2016License Amendment Request, Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 - Page ContinueSafe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
LIC-16-0076, License Amendment Request (LAR) 16-02: Revise the Fort Calhoun Station Emergency Plan to Address the Permanently Defueled Condition2 September 2016License Amendment Request (LAR) 16-02: Revise the Fort Calhoun Station Emergency Plan to Address the Permanently Defueled ConditionSafe Shutdown
Health Physics Network
High Radiation Area
Abnormal operational transient
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Fire Protection Program
Siren
LIC-16-0092, License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning28 September 2016License Amendment Request 16-03, Technical Specifications to Align Staffing Requirements to Those Required for DecommissioningShutdown Margin
Exemption Request
Fire Protection Program
LIC-16-0093, License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength Requirements25 October 2016License Amendment Request LAR-16-04 to Revise Current Licensing Basis to Use Aci Ultimate Strength RequirementsSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Finite Element Analysis
Aging Management
Tornado Generated Missile
Design basis earthquake
Earthquake
LIC-16-0099, License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program18 November 2016License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection ProgramCyber Security
Large early release frequency
Fire Protection Program
LIC-16-0108, License Amendment Request 16-07, Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme16 December 2016License Amendment Request 16-07, Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level SchemeTime of Discovery
High winds
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Design basis earthquake
Safeguards Contingency Plan
Exemption Request
Earthquake
Fuel cladding
Minimum staff
Fire Protection Program
Grace period
Fatality
LIC-17-0001, License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning31 March 2017License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for DecommissioningSafe Shutdown
Unanalyzed Condition
Boric Acid
Time of Discovery
Shutdown Margin
Loop seal
High Radiation Area
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Hydrostatic
Nondestructive Examination
Cyber Security
Emergency Lighting
Locked High Radiation Area
Missed surveillance
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Local Leak Rate Testing
Annual Radiological Environmental Operating Report
Large early release frequency
Safeguards Contingency Plan
License Renewal
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
LIC-17-0015, License Amendment Request (LAR) 17-03; Removal of Fort Calhoun Station, Unit 1 Dry Cast Loading Limits9 June 2017License Amendment Request (LAR) 17-03; Removal of Fort Calhoun Station, Unit 1 Dry Cast Loading LimitsShutdown Margin
Hydrostatic
Backfit
LIC-17-0016, License Amendment Request 17-02; Request Extension for Milestone 8 of Cyber Security Plan Implementation Schedule24 March 2017License Amendment Request 17-02; Request Extension for Milestone 8 of Cyber Security Plan Implementation ScheduleCyber Security
Fuel cladding
LIC-17-0048, Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled Condition27 April 2017Response to Request for Additional Information Regarding the Fort Calhoun Station Request to Revise Technical Specifications to Align Staffing Requirements for Permanently Defueled ConditionShutdown Margin
Minimum staff
Fire Protection Program
LIC-17-0052, License Amendment Request 17-04; Modification of License Condition 3.C to Delete Requirement for a Commission-Approved Cyber Security Plan16 June 2017License Amendment Request 17-04; Modification of License Condition 3.C to Delete Requirement for a Commission-Approved Cyber Security PlanCyber Security
Exemption Request
LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool28 September 2018License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel PoolSafe Shutdown
Time of Discovery
High Radiation Area
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Locked High Radiation Area
Aging Management
Missed surveillance
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Minimum staff
Fire Protection Program
LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme28 February 2019License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level SchemeOffsite Dose Calculation Manual
Abnormal operational transient
B.5.b Mitigating Strategies
Earthquake
Fuel cladding
Fire Watch
LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa20 May 2019License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures AssociatedCyber Security
LIC-20-0013, License Amendment Request (LAR) 21-01, Response Re Revised Post-Shutdown Decommissioning Activities Report, Chapter 8 2 Updated Environmental Report, File No. 127690-003 (LIC-20-0013, ML 20202A654)16 July 2020License Amendment Request (LAR) 21-01, Response Re Revised Post-Shutdown Decommissioning Activities Report, Chapter 8 2 Updated Environmental Report, File No. 127690-003 (LIC-20-0013, ML 20202A654)Fitness for Duty
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
FLEX
Annual Radiological Effluent Release Report
License Renewal
Fuel cladding
Environmental Justice
Fire Watch
Scaffolding
LIC-21-0005, License Amendment Request (LAR) 21-01, Chapter 8, 15, Omaha Public Power District, Avian Protection Plan CAC5 December 2019License Amendment Request (LAR) 21-01, Chapter 8, 15, Omaha Public Power District, Avian Protection Plan CAC
ML02073067014 March 2002Application from the Omaha Public District for Renewal of the Operating License for Ft. Calhoun Station Unit 1Aging Management
ML06243040230 August 2006Revised License Amendment Request, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process and Deletion of Sleeving as a Steam Generator..Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Nondestructive Examination
Incorporated by reference
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
ML06270064027 October 2006Issuance of License Amendment 243 Changes to the Updated Safety Analysis Report Related to Radiological Consequences of 2006 Replacement of Steam Generators and PressurizerDeep Dose Equivalent
ML12333A11931 December 2012Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6)Anticipated operational occurrence
Cyber Security
Process Control Program
ML14041A40810 February 2014License Amendment Request (LAR) 14-01, One-Time Extension of Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3Grace period
ML14115A29710 April 2014Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants
ML14115A29810 April 2014Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance -Based Standard for Fire Protection for Light Water Reactor Generating Plants
ML14125A23930 April 2014License Amendment Request (LAR) 14-03, Proposed Change to Technical Specification 3.2, Table 3-5Hydrostatic
ML14143A37116 May 2014License Amendment Request 14-04, Revise Current Licensing Basis to Adopt American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Iii, 1980 Edition, (No Addenda) as an Alternative to Current Code of RecordSafe Shutdown
Code Reconciliation
ML16103A3484 April 2016Ft. Calhoun, Unit 1 - License Amendment Request (LAR) 16-01; Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program