JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 | 7 March 2019 | License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0 | Surveillance Frequency Control Program Recently irradiated fuel |
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | 27 June 2019 | Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability | Fire Barrier Tornado Missile Internal Flooding Incorporated by reference Turbine Missile |
JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | 5 September 2019 | License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | |
JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads | 12 September 2019 | License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads | |
JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers | 26 September 2019 | Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers | |
JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... | 23 January 2020 | License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line... | Surveillance Frequency Control Program Pressure Boundary Leakage |
JAFP-20-0046, License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item. | 30 June 2020 | License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item. | Incorporated by reference Surveillance Frequency Control Program |
JAFP-20-0047, License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves | 30 June 2020 | License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves | Loop seal High Radiation Area Surveillance Frequency Control Program |
JAFP-20-0080, Application to Revise Surveillance Requirement (SR) 3.5.1.6 | 11 December 2020 | Application to Revise Surveillance Requirement (SR) 3.5.1.6 | Surveillance Frequency Control Program |
JAFP-20-0083, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule | 11 December 2020 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | Stroke time |
JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | 14 May 2021 | Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs | Shutdown Margin Surveillance Frequency Control Program |
JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | 17 May 2021 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | |
JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | 12 June 2021 | Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | Safe Shutdown Mission time Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Maintenance Rule Program Fuel cladding Recently irradiated fuel |
JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | 13 June 2021 | Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | Safe Shutdown Mission time Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Maintenance Rule Program Fuel cladding Recently irradiated fuel Offsite Circuit |
JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | 14 June 2021 | Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | Safe Shutdown High Radiation Area Mission time Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Maintenance Rule Program Fuel cladding Recently irradiated fuel Offsite Circuit |
JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 30 July 2021 | Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Zebra Mussel Incorporated by reference FLEX Fukushima Dai-Ichi Large early release frequency Turbine Missile |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Surveillance Frequency Control Program Operability Determination Control of Heavy Loads Fuel cladding Recently irradiated fuel Scaffolding |
JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation | 18 October 2021 | Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation | Reactor Vessel Water Level Surveillance Frequency Control Program |
JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation | 28 June 2023 | License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation | Anticipated operational occurrence Surveillance Frequency Control Program |
JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance | 28 July 2023 | License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance | Anticipated operational occurrence |
JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | 3 August 2023 | License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | Ultimate heat sink Stroke time Qualified Offsite Circuit Time Critical Operator Action Fuel cladding Recently irradiated fuel Offsite Circuit |
JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | 31 August 2023 | Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | Recently irradiated fuel |
JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications | 14 December 2023 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications | Time of Discovery High Radiation Area Water Inventory Control Incorporated by reference Missed surveillance Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
JPN-00-015, Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations1 Inc.James A. FitzPatrick - Transfer of Facility Operating License and Proposed License Amendment | 11 May 2000 | Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations1 Inc.James A. FitzPatrick - Transfer of Facility Operating License and Proposed License Amendment | |
JPN-99-039, Proposed Change to TS (JPTS-99-006) Laboratory Testing of Nuclear-Grade Charcoal 180-Day Response to NRC Generic Letter 99-02 | 19 November 1999 | Proposed Change to TS (JPTS-99-006) Laboratory Testing of Nuclear-Grade Charcoal 180-Day Response to NRC Generic Letter 99-02 | Shutdown Margin Offsite Dose Calculation Manual Enforcement Discretion Fire Protection Program Power Uprate |
ML003743650 | 12 May 2000 | Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations, Inc, Transfer of Facility Operating License and Proposed License Amendment | Incorporated by reference |
ML021750467 | 12 June 2002 | Certification of Technical Specification & Technical Specification Bases Pages (License Amendment) as Part of Conversion to Improved Standard Technical Specifications | Time of Discovery Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Post Accident Monitoring Hydrostatic Scram Discharge Volume Overtravel Pressure Boundary Leakage |
ML021750479 | 12 June 2002 | Part 1 of 1 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications (License Amendment) as Part of Conversion to Improved Standard Technical Specifications | Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Squib Annual Radiological Environmental Operating Report Process Control Program Spiral reload Overtravel Deep Dose Equivalent Offsite Circuit Fire Protection Program |
ML021750488 | 12 June 2002 | Part 1 of 3 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications Bases (License Amendment) as Part of Conversion to Improved Standard Technical Specifications | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Post Accident Monitoring Hydrostatic Squib Missed surveillance Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Overtravel Fuel cladding Offsite Circuit Power change |
ML021750508 | 12 June 2002 | Part 2 of 3 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications Bases (License Amendment) as Part of Conversion to Improved Standard Technical Specifications | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Stroke time Hydrostatic Squib Abnormal operational transient Fuel cladding Pressure Boundary Leakage |
ML021750549 | 12 June 2002 | Part 3 of 3 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications Bases (License Amendment) as Part of Conversion to Improved Standard Technical Specifications | Safe Shutdown Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Stroke time Post Accident Monitoring Hydrostatic Reserve Station Service Transformer Qualified Offsite Circuit Residual transfer Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Frazil ice Spiral reload Battery sizing Fuel cladding Offsite Circuit |
ML023500010 | 6 December 2002 | Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002) | High Radiation Area |
ML062160494 | 31 July 2006 | James A. Fitzpatrick License Renewal Application, Cover Page Through Chapter 4 | |
ML062160553 | 31 July 2006 | James A. Fitzpatrick License Renewal Application, Appendix a, Update Final Safety Analysis Report Supplement | Loop seal Non-Destructive Examination Fire Barrier Coatings Operating Basis Earthquake Aging Management Earthquake Fire Protection Program Dissimilar Metal Weld |
ML062160556 | 31 July 2006 | James A. Fitzpatrick License Renewal Application, Appendix B Through Appendix D | Safe Shutdown Boric Acid Loop seal High Radiation Area Non-Destructive Examination Fire Barrier Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Condition Adverse to Quality Aging Management EVT-1 Liquid penetrant Fire Protection Program |
ML062160557 | 31 July 2006 | James A. Fitzpatrick License Renewal Application, Appendix E Through End | Hot Short Safe Shutdown High winds Ultimate heat sink Fish deterrent system Grab sample Offsite Dose Calculation Manual Internal Flooding Met Tower Zebra Mussel Incorporated by reference Aging Management Seismically rugged Design basis earthquake Large early release frequency Frazil ice License Renewal Earthquake Fuel cladding Biofouling Environmental Justice Fatality |
ML062500247 | 7 September 2006 | Maintenance of Reference Materials at the Oswego Public Library, Related to the Review of the James A. Fitzpatrick Nuclear Power Plant License Renewal Application | |
ML063480596 | 6 December 2006 | Attachment 1: James A. FitzPatrick Nuclear Power Plant, License Renewal Application, Amendment 1 & License Renewal Commitments List, Revision 0 | High winds Non-Destructive Examination Fish deterrent system Fire Barrier Coatings Zebra Mussel Aging Management Veliger License Renewal Fire Protection Program |
ML070440127 | 1 February 2007 | License Renewal Application, Amendment 5 | Non-Destructive Examination Fire Barrier Nondestructive Examination Aging Management Fire Protection Program |
ML081010259 | 8 September 2008 | Renewed Facility Operating License No. DPR-59 | Safe Shutdown Fire Protection Program |
ML091550723 | 3 June 2009 | Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time - (Draft) | Hot Short Safe Shutdown Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit Thermoset Large early release frequency Earthquake Offsite Circuit |
ML16035A309 | 4 February 2016 | License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition | |
ML16235A081 | 18 August 2016 | Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License Amendment | Safe Shutdown Fitness for Duty Decommissioning Funding Plan Fire Protection Program |
ML17041A196 | 1 March 2017 | LTR with Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License and Conforming Amendment | Safe Shutdown Cyber Security Decommissioning Funding Plan Preemption Authority Fire Protection Program |
ML17206A395 | 24 July 2017 | ISFSI - Application for Order Approving Transfer of Direct Ownership Under Renewed Facility Operating License and Proposed Conforming License Amendment | Safe Shutdown Cyber Security Preemption Authority Fire Protection Program |
ML18037A786 | 31 January 2018 | License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | |
ML18037A787 | 31 January 2018 | Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | |
ML18292A528 | 25 September 2018 | Technical Evaluation Input for License Amendment Request to Remove Requirements for Deicing Heaters from Technical Specification 3.7.2 | Safe Shutdown Ultimate heat sink Surveillance Frequency Control Program Frazil ice Power change |
ML19157A203 | 11 July 2019 | Issuance of Amendment No. 325 Reactivity Anomalies Surveillance | Anticipated operational occurrence |
ML19276G313 | 2 October 2019 | Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source | Safe Shutdown Ultimate heat sink Fire Barrier Anticipated operational occurrence Reserve Station Service Transformer Qualified Offsite Circuit Residual transfer Fuel cladding Through Wall Leak Offsite Circuit Grace period |