Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
JAFP-19-0033, License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 07 March 2019License Amendment Request - Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Revision 0Surveillance Frequency Control Program
Recently irradiated fuel
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability27 June 2019Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityFire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Turbine Missile
JAFP-19-0083, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation5 September 2019License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation
JAFP-19-0089, License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads12 September 2019License Amendment Request - Proposed Changes to the Technical Specifications Related to Primary Containment Hydrodynamic Loads
JAFP-19-0092, Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers26 September 2019Application to Adopt TSTF-372, Addition of LCO 3.0.8, Inoperability of Snubbers
JAFP-20-0012, License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line...23 January 2020License Amendment Request - Application to Adopt Technical Specification Task Force Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line...Surveillance Frequency Control Program
Pressure Boundary Leakage
JAFP-20-0046, License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item.30 June 2020License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item.Incorporated by reference
Surveillance Frequency Control Program
JAFP-20-0047, License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves30 June 2020License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation ValvesLoop seal
High Radiation Area
Surveillance Frequency Control Program
JAFP-20-0080, Application to Revise Surveillance Requirement (SR) 3.5.1.611 December 2020Application to Revise Surveillance Requirement (SR) 3.5.1.6Surveillance Frequency Control Program
JAFP-20-0083, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule11 December 2020Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 TestingStroke time
JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs14 May 2021Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRsShutdown Margin
Surveillance Frequency Control Program
JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing17 May 2021Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing
JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement12 June 2021Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor ReplacementSafe Shutdown
Mission time
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
FLEX
Maintenance Rule Program
Fuel cladding
Recently irradiated fuel
JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement13 June 2021Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor ReplacementSafe Shutdown
Mission time
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Maintenance Rule Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement14 June 2021Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor ReplacementSafe Shutdown
High Radiation Area
Mission time
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Maintenance Rule Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors30 July 2021Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Large early release frequency
Turbine Missile
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
Scaffolding
JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation18 October 2021Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation InstrumentationReactor Vessel Water Level
Surveillance Frequency Control Program
JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation28 June 2023License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) InstrumentationAnticipated operational occurrence
Surveillance Frequency Control Program
JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance28 July 2023License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower ToleranceAnticipated operational occurrence
JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis3 August 2023License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisUltimate heat sink
Stroke time
Qualified Offsite Circuit
Time Critical Operator Action
Fuel cladding
Recently irradiated fuel
Offsite Circuit
JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis31 August 2023Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisRecently irradiated fuel
JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications14 December 2023License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical SpecificationsTime of Discovery
High Radiation Area
Water Inventory Control
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Recently irradiated fuel
Offsite Circuit
JPN-00-015, Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations1 Inc.James A. FitzPatrick - Transfer of Facility Operating License and Proposed License Amendment11 May 2000Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations1 Inc.James A. FitzPatrick - Transfer of Facility Operating License and Proposed License Amendment
JPN-99-039, Proposed Change to TS (JPTS-99-006) Laboratory Testing of Nuclear-Grade Charcoal 180-Day Response to NRC Generic Letter 99-0219 November 1999Proposed Change to TS (JPTS-99-006) Laboratory Testing of Nuclear-Grade Charcoal 180-Day Response to NRC Generic Letter 99-02Shutdown Margin
Offsite Dose Calculation Manual
Enforcement Discretion
Fire Protection Program
Power Uprate
ML00374365012 May 2000Power Authority of the State of New York, Entergy Nuclear FitzPatrick, LLC, and Entergy Nuclear Operations, Inc, Transfer of Facility Operating License and Proposed License AmendmentIncorporated by reference
ML02175046712 June 2002Certification of Technical Specification & Technical Specification Bases Pages (License Amendment) as Part of Conversion to Improved Standard Technical SpecificationsTime of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
Overtravel
Pressure Boundary Leakage
ML02175047912 June 2002Part 1 of 1 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications (License Amendment) as Part of Conversion to Improved Standard Technical SpecificationsShutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Squib
Annual Radiological Environmental Operating Report
Process Control Program
Spiral reload
Overtravel
Deep Dose Equivalent
Offsite Circuit
Fire Protection Program
ML02175048812 June 2002Part 1 of 3 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications Bases (License Amendment) as Part of Conversion to Improved Standard Technical SpecificationsSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Squib
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Overtravel
Fuel cladding
Offsite Circuit
Power change
ML02175050812 June 2002Part 2 of 3 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications Bases (License Amendment) as Part of Conversion to Improved Standard Technical SpecificationsSafe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Hydrostatic
Squib
Abnormal operational transient
Fuel cladding
Pressure Boundary Leakage
ML02175054912 June 2002Part 3 of 3 - James A. FitzPatrick Nuclear Power Plant, Technical Specifications Bases (License Amendment) as Part of Conversion to Improved Standard Technical SpecificationsSafe Shutdown
Shutdown Margin
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Post Accident Monitoring
Hydrostatic
Reserve Station Service Transformer
Qualified Offsite Circuit
Residual transfer
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
Frazil ice
Spiral reload
Battery sizing
Fuel cladding
Offsite Circuit
ML0235000106 December 2002Proposed Change to TS Regarding Local Power Range Monitor Calibration Frequency (JPTS-02-002)High Radiation Area
ML06216049431 July 2006James A. Fitzpatrick License Renewal Application, Cover Page Through Chapter 4
ML06216055331 July 2006James A. Fitzpatrick License Renewal Application, Appendix a, Update Final Safety Analysis Report SupplementLoop seal
Non-Destructive Examination
Fire Barrier
Coatings
Operating Basis Earthquake
Aging Management
Earthquake
Fire Protection Program
Dissimilar Metal Weld
ML06216055631 July 2006James A. Fitzpatrick License Renewal Application, Appendix B Through Appendix DSafe Shutdown
Boric Acid
Loop seal
High Radiation Area
Non-Destructive Examination
Fire Barrier
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Condition Adverse to Quality
Aging Management
EVT-1
Liquid penetrant
Fire Protection Program
ML06216055731 July 2006James A. Fitzpatrick License Renewal Application, Appendix E Through EndHot Short
Safe Shutdown
High winds
Ultimate heat sink
Fish deterrent system
Grab sample
Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Zebra Mussel
Incorporated by reference
Aging Management
Seismically rugged
Design basis earthquake
Large early release frequency
Frazil ice
License Renewal
Earthquake
Fuel cladding
Biofouling
Environmental Justice
Fatality
ML0625002477 September 2006Maintenance of Reference Materials at the Oswego Public Library, Related to the Review of the James A. Fitzpatrick Nuclear Power Plant License Renewal Application
ML0634805966 December 2006Attachment 1: James A. FitzPatrick Nuclear Power Plant, License Renewal Application, Amendment 1 & License Renewal Commitments List, Revision 0High winds
Non-Destructive Examination
Fish deterrent system
Fire Barrier
Coatings
Zebra Mussel
Aging Management
Veliger
License Renewal
Fire Protection Program
ML0704401271 February 2007License Renewal Application, Amendment 5Non-Destructive Examination
Fire Barrier
Nondestructive Examination
Aging Management
Fire Protection Program
ML0810102598 September 2008Renewed Facility Operating License No. DPR-59Safe Shutdown
Fire Protection Program
ML0915507233 June 2009Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time - (Draft)Hot Short
Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Qualified Offsite Circuit
Thermoset
Large early release frequency
Earthquake
Offsite Circuit
ML16035A3094 February 2016License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition
ML16235A08118 August 2016Application for Order Approving Transfer of Renewed Facility Operating License and Proposed Conforming License AmendmentSafe Shutdown
Fitness for Duty
Decommissioning Funding Plan
Fire Protection Program
ML17041A1961 March 2017LTR with Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Installation General License and Conforming AmendmentSafe Shutdown
Cyber Security
Decommissioning Funding Plan
Preemption Authority
Fire Protection Program
ML17206A39524 July 2017ISFSI - Application for Order Approving Transfer of Direct Ownership Under Renewed Facility Operating License and Proposed Conforming License AmendmentSafe Shutdown
Cyber Security
Preemption Authority
Fire Protection Program
ML18037A78631 January 2018License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
ML18037A78731 January 2018Attachment 1: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
ML18292A52825 September 2018Technical Evaluation Input for License Amendment Request to Remove Requirements for Deicing Heaters from Technical Specification 3.7.2Safe Shutdown
Ultimate heat sink
Surveillance Frequency Control Program
Frazil ice
Power change
ML19157A20311 July 2019Issuance of Amendment No. 325 Reactivity Anomalies SurveillanceAnticipated operational occurrence
ML19276G3132 October 2019Draft Exigent License Amendment Request - One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite SourceSafe Shutdown
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Reserve Station Service Transformer
Qualified Offsite Circuit
Residual transfer
Fuel cladding
Through Wall Leak
Offsite Circuit
Grace period