 Issue dateTitleTopic
BYRON 2004-0043, 2003 Occupational Radiation Exposure Report30 April 20042003 Occupational Radiation Exposure ReportDeep Dose Equivalent
BYRON 2004-0044, 2003 Annual Radiological Environmental Operating Report15 May 20042003 Annual Radiological Environmental Operating ReportOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
BYRON 2004-0045, 2003 Annual Radioactive Effluent Release Report30 April 20042003 Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
BYRON 2004-0049, April 2004 Monthly Operating Report for Byron Station, Units 1 and 215 May 2004April 2004 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0060, Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.2 June 2004Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
Through-Wall Leak
BYRON 2004-0061, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors2 June 2004Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water ReactorsBoric Acid
BYRON 2004-0069, Addendum to 2003 Annual Radiological Environmental Operating Report10 June 2004Addendum to 2003 Annual Radiological Environmental Operating ReportAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
BYRON 2004-0077, Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)2 July 2004Day Inservice Inspection Report for Interval 2, Period 2, Outage 2 (B2R11)Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Moisture barrier
Pressure Boundary Leakage
BYRON 2004-0079, June 2004 Monthly Operating Report for Byron Station, Units 1 and 215 July 2004June 2004 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0108, September 2004 Monthly Operating Report for Byron Station Units 1 and 215 October 2004September 2004 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0113, Response to Request for Additional Information Regarding Spring 2004 Steam Generator Inspection10 November 2004Response to Request for Additional Information Regarding Spring 2004 Steam Generator Inspection
BYRON 2004-0117, October 2004 Monthly Operating Report for Byron Station, Units 1 and 215 November 2004October 2004 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0119, Report of Changes, Tests and Experiments16 December 2004Report of Changes, Tests and ExperimentsSafe Shutdown
High Radiation Area
Safe Shutdown Earthquake
Post Accident Monitoring
Temporary Modification
Pressure Boundary Leakage
Downpower
BYRON 2004-0120, Issuance of Reactor Coolant System Pressure and Temperature Limits Reports12 November 2004Issuance of Reactor Coolant System Pressure and Temperature Limits ReportsHydrostatic
Pressure and Temperature Limits Report
BYRON 2004-0128, November 2004 Monthly Operating Report Byron Station Units 1 and 215 December 2004November 2004 Monthly Operating Report Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2004-0131, Notification of Deferral of a Generic Letter (GL) 89-13 Component Cooling Heat Exchanger Inspection17 December 2004Notification of Deferral of a Generic Letter (GL) 89-13 Component Cooling Heat Exchanger InspectionGrace period
BYRON 2005-0004, December 2004 Monthly Operating Report for Byron Station, Units 1 and 214 January 2005December 2004 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2005-0011, Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.1 February 2005Letter Transmitting Byron Station, Units 1 and 2 - Revised Plant Response to NRC Regulatory Issue Summary 2004-10, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
BYRON 2005-0013, Control Room Envelope Unfiltered Air Inleakage Test Results in Response to Generic Letter 2003-01, Control Room Habitability.31 January 2005Control Room Envelope Unfiltered Air Inleakage Test Results in Response to Generic Letter 2003-01, Control Room Habitability.
BYRON 2005-0016, January 2005 Monthly Operating Report for Byron Station Units 1 and 215 February 2005January 2005 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2005-0024, Unit 2, 2004 Annual Environmental Operating Report16 April 2005Unit 2, 2004 Annual Environmental Operating Report
BYRON 2005-0030, February 2005 Monthly Operating Report for Byron Station Units 1 and 215 March 2005February 2005 Monthly Operating Report for Byron Station Units 1 and 2Offsite Dose Calculation Manual
BYRON 2005-0035, Regulatory Commitment Change Summary Report for 20041 April 2005Regulatory Commitment Change Summary Report for 2004
BYRON 2005-0036, Steam Generator Tube Repairs Completed During Refueling Outage 1328 March 2005Steam Generator Tube Repairs Completed During Refueling Outage 13
BYRON 2005-0037, Cycle 14 Core Operating Limits Report23 March 2005Cycle 14 Core Operating Limits ReportShutdown Margin
BYRON 2005-0041, March 2005 Monthly Operating Report for Byron Station, Units 1 and 215 April 2005March 2005 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2005-0049, Annual Dose Report for 200430 April 2005Annual Dose Report for 2004
BYRON 2005-0050, Occupational Radiation Exposure Report30 April 2005Occupational Radiation Exposure ReportDeep Dose Equivalent
BYRON 2005-0051, Annual Radiological Environmental Operating Report and Current Revision of the Offsite Dose Calculation Manual (ODCM)15 May 2005Annual Radiological Environmental Operating Report and Current Revision of the Offsite Dose Calculation Manual (ODCM)Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radiological Environmental Operating Report
Chernobyl
BYRON 2005-0052, Annual Radioactive Effluent Release Report and Addendum to 2003 Annual Radioactive Effluent Release Report30 April 2005Annual Radioactive Effluent Release Report and Addendum to 2003 Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
BYRON 2005-0053, Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication.29 April 2005Revision to Expected Supplemental Report Submittal Date for Licensee Event Report (LER) 454-2004-001-00, Reactor Containment Fan Coolers Flow Rates Below Technical Specification Requirements Due to Inaccurate Flow Indication.
BYRON 2005-0054, Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.20 May 2005Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.Boric Acid
VT-2
Through-Wall Leak
BYRON 2005-0063, April 2005 Monthly Operating Report for Byron Station, Units 1 and 215 May 2005April 2005 Monthly Operating Report for Byron Station, Units 1 and 2Offsite Dose Calculation Manual
BYRON 2005-0071, Steam Generator Inservice Inspection Summary Report3 June 2005Steam Generator Inservice Inspection Summary ReportNondestructive Examination
Flow Induced Vibration
BYRON 2005-0073, Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 120 June 2005Day Inservice Inspection Report for Interval 2, Period 3, Outage 1 (B1R13). Part 1Boric Acid
Nondestructive Examination
VT-2
Pressure Boundary Leakage
BYRON 2005-0077, Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.22 June 2005Day Response to First Revised NRC Order EA-03-009, Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.Boric Acid
Nondestructive Examination
BYRON 2005-0112, Lnservice Inspection Program Relief Request 12R-5222 September 2005Lnservice Inspection Program Relief Request 12R-52
BYRON 2005-0119, Cycle 13 Core Operating Limits Report7 October 2005Cycle 13 Core Operating Limits ReportShutdown Margin
BYRON 2005-0121, Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cycle 12 Refueling Outage17 October 2005Steam Generator Tube Repairs Resulting from Byron Station, Unit-2, Cycle 12 Refueling Outage
BYRON 2005-0125, 60-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.6 December 200560-Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors.Boric Acid
VT-2
Through-Wall Leak
BYRON 2005-0132, Inservice Inspection Program Relief Request I3R-018 November 2005Inservice Inspection Program Relief Request I3R-01Incorporated by reference
BYRON 2005-0135, Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.6 December 2005Sixty-Day Response to NRC Order EA-03-009, Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.Boric Acid
VT-2
BYRON 2005-0155, Requests for Relief from ASME OM Code for the Third Inservice Test Interval29 December 2005Requests for Relief from ASME OM Code for the Third Inservice Test IntervalSafe Shutdown
Stroke time
BYRON 2006-0011, Submittal of Knowledge and Abilities (K/A) Statements That Will Be Suppressed from the Random Exam Generation Process17 January 2006Submittal of Knowledge and Abilities (K/A) Statements That Will Be Suppressed from the Random Exam Generation ProcessBoric Acid
Loop seal
Power change
BYRON 2006-0013, Byron June 2006 Examination Outline Submittal6 November 2006Byron June 2006 Examination Outline SubmittalBoric Acid
Shutdown Margin
Loop seal
Power change
Downpower
BYRON 2006-0016, 2005 Regulatory Commitment Change Summary Report15 February 20062005 Regulatory Commitment Change Summary ReportUnidentified leakage
BYRON 2006-0018, Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure31 January 2006Transmittal of Corrected Page 1 of 1 of the Outage Inspection Summary Containment Structure
BYRON 2006-0022, Withdrawal of Inservice Inspection Program Relief Request 12R-521 February 2006Withdrawal of Inservice Inspection Program Relief Request 12R-52
BYRON 2006-0023, Response to Request for Additional Information Regarding the Byron Station, Unit 1 Spring 2005 Steam Generator Inspection13 February 2006Response to Request for Additional Information Regarding the Byron Station, Unit 1 Spring 2005 Steam Generator Inspection
BYRON 2006-0027, Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection Interval14 February 2006Transmittal of Inservice Inspection Program Plan for Third Ten Year Inspection IntervalBoric Acid
Weld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Finite Element Analysis
Moisture barrier
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld