Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17303A991 | 30 March 1988 | LER 88-004-00:on 880229,Mode 4 Entered W/Hpsi Injection Pumps Inoperable.Caused by Procedural Inadequacy.Procedure Revised to Include Steps to Ensure That HPSI Pumps Returned to Operable Status Prior to Entering Mode 4.W/880330 Ltr | |
ML17303B004 | 7 April 1988 | LER 87-021-01:on 871202,post-accident Sampling Sys Declared Inoperable.Caused by Personnel Error.Appropriate Functional & Surveillance Tests Completed & Sys Decalred Operable.W/ 880407 Ltr | |
ML17303B060 | 19 April 1988 | LER 88-006-00:on 880320,surveillance Interval for Incore Detector Sys Exceeded.Caused by Cognitive Personnel Error & Inadequate Programmatic Controls.Individual Involved Will Be Counseled &/Or Disciplined & Controls reviewed.W/880419 Ltr | |
ML17303B127 | 16 May 1988 | LER 88-010-00:on 880415,discovered That Surveillance Test Interval Exceeded for Plant Vent Sys Monitors.Caused by Personnel Error.Surveillance Test Completed.Surveillance Test Terminology changed.W/880516 Ltr | Post Accident Monitoring |
ML17303B166 | 31 May 1988 | LER 88-002-01:on 880109,ASME Surveillance Interval Exceeded for Containment Isolation Valve.Caused by Personnel Error. Individual Will Receive Appropriate Counseling &/Or Disciplinary action.W/880531 Ltr | Stroke time |
ML17303B169 | 3 June 1988 | LER 88-013-00:on 880325,essential Motor Driven Auxiliary Feedwater Pump Failed to Achieve Rated Pressure.Caused by Stress Corrosion Cracking/Hydrogen Embrittlement.Matl Changes Initiated.Part 21 related.W/880325 Ltr | Nondestructive Examination |
ML17304A196 | 6 June 1988 | LER 88-015-00:on 880512,automatic Actuation of Reactor Protection Sys Occurred.Power Supply Found to Be Varying in Amplitude Intermittently Which Could Cause Varying Removal & Reinstatement of Buck & Boost voltage.W/880606 Ltr | |
ML17304A226 | 22 June 1988 | LER 88-011-00:on 880522,decontamination Worker Received 2.607 Rem Whole Body Dose to Right Leg Resulting in Cumulative Whole Body Exposure for Quarter of 3.209 Rem. Caused by Incomplete decontamination.W/880622 Ltr | Scaffolding |
ML17304A242 | 27 June 1988 | LER 88-010-01:on 880415,allowable Surveillance Test (ST) Interval for Plant Vent Sys Monitors (Pvsm) Exceeded.Caused by Personnel Error.Appropriate ST on Pvsm Completed & Terminology in ST 75ST-9ZZ07 changed.W/880627 Ltr | Post Accident Monitoring |
ML17304A249 | 7 July 1988 | LER 88-016-01:on 880514,reactor Trip Occurred as Control Element Assemblies Inserted Following Attempt to Start Up Reactor.Caused by Nonconservative Operator Performance During Startup.Logkeeping Practices improved.W/880707 Ltr | Shutdown Margin Anticipated operational occurrence |
ML17304A289 | 18 July 1988 | LER 88-012-00:on 880615,Channel D Linear Power Inoperable Due to Improper Landing of Leads to Plant Protection Sys Drawer.Caused by Personnel Error.Plant Protection Sys Channel D Linear Power Density tripped.W/880718 Ltr | |
ML17304A296 | 25 July 1988 | LER 88-022-00:on 880319,bolting Which Secures Gasket Retainer Plate Fractured.Caused by Bolts Not Meeting Spec Requirements.Changes Being Implemented to Replace Matl.W/ 880725 Ltr | |
ML17304A324 | 3 August 1988 | LER 88-018-00:on 880729,determined That Deficiencies W/ Potter & Brumfield Relays Constituted Reportable Condition Per 10CFR21.Relays Located in NSSS ESFAS Cabinets.Increased Relay Exercising Will Be implemented.W/880803 Ltr | |
ML17304A359 | 15 August 1988 | LER 88-016-02:on 880514,reactor Trip Occurred.Caused by Nonconservative Operator Performance During Reactor Startup. Info Utilized for Estimated Critical Condition Will Be corrected.W/880815 Ltr | Shutdown Margin Anticipated operational occurrence |
ML17304A407 | 25 August 1988 | LER 88-006-00:on 880726,B Train Loss of Power ESF Actuation Occurred.Caused by Inadequate Plant Design & Installation of Temporary Ventilation Trunk.Ventilation Trunk Removed from Transformer Leads W/O incident.W/880825 Ltr | Temporary Modification |
ML17304A562 | 19 September 1988 | LER 88-021-00:on 880821,reactor Trip Occurred Due to High Pressurizer Pressure.Caused by Failure of Microswitch in Stator Coolant Flow Trip Circuit.Microswitch Replaced.W/ 880919 Ltr | Safe Shutdown Temporary Modification |
ML17304A624 | 29 September 1988 | LER 88-017-01:on 880529,Trains a & B Essential Chillers Discovered Inoperable Due to Shut Root Isolation Valves for Transmitter.Caused by Personnel Errors While Affixing Warning Labels Near valves.W/880929 Ltr | Unanalyzed Condition |
ML17304A633 | 12 October 1988 | LER 88-005-00:on 880908,maint Dept Technician Reported Unauthorized Entry Into Locked High Radiation Area on 880912.Caused by Personnel Error.Technician Counseled, Disciplined & Provided W/Addl training.W/881012 Ltr | High Radiation Area Locked High Radiation Area |
ML17304A721 | 31 October 1988 | LER 86-063-00:on 860920,discovered That Error in Radioactive Source Tracking Sys Resulted in Radioactive Sealed Source Not Being Leak Tested Once Per 6 Months.Caused by Personnel Error.Entries verified.W/881031 Ltr | |
ML17304A816 | 14 December 1988 | LER 88-014-00:on 881116,reactor Trip Occurred as Result of Low Steam Generator Water Level.Caused by Inadequate Feedwater Flow Due to Leakage of Packing.Procedural Changes Implemented & Evaluation Being performed.W/881214 Ltr | Boric Acid |
ML17304A858 | 5 January 1989 | LER 88-015-00:on 881203,new Fuel Area Radiation Monitor RU-19 Discovered Inoperable.Caused by Malfunction in Clock in Computer Internals to Monitor.Area Survey Conducted W/Negative Results & Night Order issued.W/890105 Ltr | |
ML17304A868 | 27 December 1988 | LER 88-002-01:on 880122,calculations Indicate That High Log Trip Setpoints Were Set Contrary to Allowable Setpoint. Caused by Inadequate Programmatic Controls to Review Design Changes from Core Reload.Setpoints reset.W/881227 Ltr | |
ML17304B005 | 2 February 1989 | LER 89-001-00:on 890103,total Loss of Offsite Power to Class 1E 4.16 Kv Busses 2E-PBA-S03 & 2E-PBB-S04 Occurred.Cause Under Investigation.Two Failed Bushings on Each Transformer Replaced & Transformers inspected/tested.W/890202 Ltr | |
ML17304B023 | 2 February 1989 | LER 88-005-01:on 880908,technician Entered Locked High Radiation Area W/O Prior Approval of Radiation Protection Personnel.Caused by Personnel Error.Technician Denied Access to Controlled Area Pending Further training.W/890202 Ltr | High Radiation Area Locked High Radiation Area |
ML17304B036 | 6 February 1989 | LER 88-025-00:on 881201,discovered Surveillance Procedure Not Completed within Tech Specs Required Frequency.Caused by Inadequate Review of Amend.Surveillance Interval Revised to Be Consistent w/amend.W/890206 Ltr | |
ML17304B037 | 6 February 1989 | LER 89-004-01:on 890104,exhaust Rocker Arm for 8L Cylinder Failed,Resulting in Emergency Diesel Generator Trip.Failure Also Reportable Per Part 21.Caused by Crack Which Existed Prior to Delivery.Rocker Arm replaced.W/890206 Ltr | Safe Shutdown Nondestructive Examination |
ML17304B061 | 2 March 1989 | LER 89-002-00:on 890203,radioactive Effluent Gaseous Monitor Valve Improperly Installed.Cause of Valve Being Installed Backwards Not Determined.Valve Properly Installed Prior to Returning Monitor to Operable status.W/890302 Ltr | Time of Discovery Offsite Dose Calculation Manual |
ML17304B071 | 9 March 1989 | LER 89-003-00:on 890218,control Room Essential Filtration Actuation Signal on Train B Actuated.Caused by Failure of Detector in RU-30.Detector & Preamplifier replaced.W/890309 Ltr | |
ML17304B076 | 22 March 1989 | LER 88-008-00:on 890220,determined That Excessive Moisture Condensation Occasionally Discovered in Unit Resulted in Invalid Sample Results.Caused by Cooling of High Humidity Sample Stream.Temporary Heat Trace installed.W/890322 Ltr | Temporary Modification |
ML17304B078 | 20 March 1989 | LER 89-003-00:on 890217,preplanned Alternate Sampling Sys for Fuel Bldg Discovered Inoperable.Caused by Temporary & Permanent Electrical Loads in Excess of Circuit Capacity. Circuit Breaker Supplying Power opened.W/890320 Ltr | |
ML17304B093 | 3 April 1989 | LER 89-001-00:on 890303,electrical Grid Disturbance Resulted in Main Generator Output Breakers Opening.Caused by Malfunction in Steam Bypass Control Sys.Operations Personnel Stabilized plant.W/890403 Ltr | Time of Discovery Coast down |
ML17304B100 | 4 April 1989 | LER 89-004-00:on 890305,reactor Trip Occurred on Dnbr.Caused by Control Element Assembly Calculator Failure.Processor Board replaced.W/890404 Ltr | Anticipated operational occurrence |
ML17304B111 | 7 April 1989 | LER 89-005-00:on 890310,loss of Power Occurred to Alternate Plant Ventilation Effluent Radiation Monitor.Circuit Breaker Opened & Deenergized Alternate Sys.Caused by Electrical Loads in Excess of Capacity.Request issued.W/890407 Ltr | |
ML17304B197 | 23 May 1989 | LER 89-011-00:on 890425,instrument & Control Technician Exited High Radiation Area W/O Using Alarm Dosimeter.Caused by Personnel Error.Technician Barred from Entry to Radiological Controlled area.W/890523 Ltr | High Radiation Area Locked High Radiation Area |
ML17304B233 | 1 June 1989 | LER 89-002-01:on 890203,discovered That Detector Bypass Valve Installed Backwards in Plant Vent Sys Low Range Radioactive Gaseous Effluent Monitor.Cause Not Determined. Valve Properly Installed & Monitors inspected.W/890601 Ltr | Time of Discovery Offsite Dose Calculation Manual |
ML17304B247 | 7 June 1989 | LER 89-008-00:on 890509,calculational Error Identified in Surveillance Test That Would Have Resulted in Boron Dilution Alarm Channel 2 Being Inoperable.Caused by Personnel Error. Technician Counseled & Procedure revised.W/890607 Ltr | |
ML17304B261 | 1 June 1989 | LER 88-008-01:on 890220,determined That Excessive Moisture Condensation Occasionally Discovered in Unit Resulting in Invalid Sample Results.Caused by Cooling of High Humidity Sample Stream.Resistance Heating installed.W/890601 Ltr | Offsite Dose Calculation Manual Temporary Modification |
ML17304B319 | 5 July 1989 | LER 89-002-00:on 890610,main Steam Safety Valve Setpoints Discovered Out of Tolerance.Caused by Setpoint Drift.Valves Readjusted.Testing Will Continue on Refueling Schedule Until Satisfactory Performance observed.W/890710 Ltr | |
ML17304B353 | 21 July 1989 | LER 89-014-00:on 890622,discovered That Seismic Monitor Had Been Disconnected & Inoperable Since 890422.Caused by Procedural Failure.Procedure for Removal of Reactor Coolant Pump Motor Being Revised to Alert personnel.W/890721 Ltr | Safe Shutdown Earthquake |
ML17304B358 | 25 July 1989 | LER 89-007-01:on 890503,deficiencies Found During Installation of Relays Constituted Reportable Condition. Caused by Inadequate Methodology of Applying Epoxy Matl to Relay Coils.Relays Replaced.Part 21 related.W/890725 Ltr | |
ML17304B364 | 28 July 1989 | LER 89-005-00:on 890628,discovered That Sample Flow Rate for Plant Vent Low Range Radioactive Effluent Monitor Below Alarm Setpoint.Caused by Loose Set Coupling Screw. Pre-planned Alternate Sampling Program begun.W/890728 Ltr | |
ML17304B366 | 27 July 1989 | LER 89-001-01:on 890103,total Loss of Offsite Power to Class 1E 4.16 Kv Busses 2E-PBA-S03 & 2E-PBB-S04 Occurred.Caused by Reduced Impulse Withstand Voltage Rating Due to Rain.Failed Bushings on Each Transformer replaced.W/890727 Ltr | |
ML17304B392 | 14 August 1989 | LER 89-008-00:on 890714,internal Audit Revealed Cooling Tower Sludge Contained Low Level Amounts of Radioactivity. Caused by Lack of Sludge Sampling Before Landfill Disposal. Approval to Dispose of Sludge requested.W/890814 Ltr | |
ML17304B393 | 14 August 1989 | LER 89-009-00:on 890712,two Reactor Coolant Pumps Load Shed from Power Supply Triggering Reactor Trip Due to Low Coolant Flow.Caused by Failed Fuse in Bus Potential Transformer.Fuse Replaced & Investigation conducted.W/890814 Ltr | Shutdown Margin |
ML17304B407 | 22 August 1989 | LER 89-009-00:on 890728,inadvertent Train a Fuel Bldg Essential Ventilation Actuation Signal Initiated on Balance of Plant ESF Actuation Sys.Caused by Personnel Error. Individual counseled.W/890822 Ltr | |
ML17304B413 | 28 August 1989 | LER 88-010-01:on 880706,ground Fault in 13.8 Kv Bus Caused Fire in Unit Auxiliary Transformer & Reactor Trip.Caused by Bullet Hole Point Faults in Phase Bus B Adjacent to Support Bar.Fire Extinguished & Bus reenergized.W/890824 Ltr | |
ML17304B420 | 30 August 1989 | LER 89-006-00:on 890731,loss of Power to Panel 1E-PNB-D26 Caused Power to Remote Indicating & Control Unit & Train B Actuation Signal.Cause for Power Loss Being Investigated. Power Restored to Distribution panel.W/890830 Ltr | |
ML17304B452 | 12 September 1989 | LER 89-005-01:on 890412,determined That Deficiencies Identified by Control Components,Inc of Atmospheric Dump Valves Constituted Reportable Part 21 Condition.Caused by Improperly Seated Piston Ring.Valve replaced.W/890912 Ltr | Safe Shutdown |
ML17304B454 | 7 September 1989 | LER 88-020-01:on 881210,control Element Assemblies Slipped. Caused by Apparent Ground on Lower Lift Coil & Design Defect in Control Element Drive Mechanism Control Sys.Part 21 related.W/890907 Ltr | Unanalyzed Condition Shutdown Margin Anticipated operational occurrence Rod Drop Event |
ML17305A245 | 21 September 1989 | LER 89-003-01:on 890218,control Room Essential Filtration Actuation Signal on Train B Actuated.Caused by Spurious Trip from Control Room Ventilation Intake Radiation Monitor RU-30 & Detector.Detector replaced.W/890921 Ltr |