Issue date | Title | Topic | |
---|---|---|---|
ML18046B289 | 4 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML18046B290 | 10 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML19308B256 | 5 February 1974 | Forwards 740123 Deposition of Fr Quis | |
ML19310F029 | 1 February 1979 | Power Sys Branch Has Reviewed Proposed Changes to Tech Spec Section 4.8.3.1.a.2,& Concurs w/10% Rotating Test Proposal for Molded Case Breakers & Recommends Change Be Incorporated Into STS | |
ML19325E344 | 6 February 1989 | Informs That Two Room Coolers Shown in Encl Have Air Flows Below Design Air Flow Previously Identified & Justified in Operational Deficiency Repts.W/O Encl | |
ML20054F452 | 16 June 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedures | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054G629 | 18 June 1982 | Forwards Facility Operating Experience Rept for Jan 1981- Jan 1982,including Info Provided by Region 2 | Eddy Current Testing Flow Induced Vibration |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054J579 | 24 June 1982 | Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use | |
ML20054J856 | 23 June 1982 | Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures | |
ML20054K369 | 26 January 1982 | Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201 | Scram Discharge Volume |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20055A262 | 21 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A269 | 27 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline | |
ML20055A270 | 28 January 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055A277 | 12 February 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline | Exemption Request |
ML20055B219 | 8 July 1982 | Notification of 820714 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Licensee Presentation of Info Re Detached Thermal Sleeve | |
ML20055B352 | 29 January 1982 | Forwards Reproduced Presentations by Swedish,Spanish & Brazilian Participants at Safety Mission Conference Held During Wk of 820117.Info Is Useful Indetermining NRC Course of Action Relative to Facility Re Steam Generators | |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20055D979 | 5 July 1990 | Notification of 900719 Meeting W/Util in Rockville,Md to Discuss Cause,Morphology & Future Plans Re Cracking Tubes at Expansion Transition Zone & at Tube Support Locations in Steam Generators.Agenda Encl | |
ML20055J361 | 31 July 1990 | Discusses Guidance for Reporting of Events Under Requirements of 10CFR50.73 at Plant,Per 900525 Request. Authors Ofc Aware That BWR Owners Group Intends to Pursue 10CFR50.73 Interpretation Issue W/Nrc | |
ML20055J363 | 12 July 1990 | Provides Summary of Licensee Position,Region II Position & Results of Review Re Reporting of Events Under Requirements of 10CFR50.73 at Plant.Actuation of ESF Logic W/O Component Operation Also Reportable,Unless Equipment Removed from Svc | |
ML20056A399 | 27 July 1990 | Forwards Petition to Intervene on Behalf of Georgians Against Nuclear Energy.Petition Filed in Response to Notice of Consideration of Issuance of Amend to Licenses NPF-68 & NPF-81,revising Tech Specs | |
ML20056C153 | 17 March 1993 | Transmits Corrected Page Nine of NRC Brief in Response to Licensee Appeal of Licensing Board Order Granting Petition to Intervene, in Matter of Gap Re License Amend Dtd 930316. Encl Corrects Signature Page | |
ML20056F798 | 24 August 1993 | Notification of 930908-09 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Issues & Safety Initiatives for Plants | |
ML20056H314 | 24 August 1993 | Forwards Safety Evaluation Accepting Critical Aspects of Proposed TS Changes Involving Increasing Min Rswt Boron Concentrations from 2,000 Ppm to 2,275 Ppm & Increasing Min Cla Boron Concentration from 1,900 Ppm to 2,000 Ppm | |
ML20057C544 | 23 September 1993 | Notification of 930929 Meeting W/Util in Rockville,Md to Discuss Results of Util Investigation of Unit 1 SG Tube Leaks & Util Actions as a Result of Findings from Investigation | |
ML20057D165 | 27 September 1993 | Notification of 930929 Meeting W/B&W in Rockville,Md to Discuss Installation Process Used for B&W Kinetic Sleeves at McGuire Nuclear Station | |
ML20057E299 | 4 October 1993 | Forwards Safety Evaluation Accepting Proposed Emergency Action Level Changes in Rev 15 of Plant Emergency Plan | |
ML20058B378 | 6 July 1982 | Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA | |
ML20058C963 | 19 November 1993 | Notification of 931201 Meeting W/Util in Rockville,Md to Update NRC on Mcguire,Units 1 & 2 & Catawba,Unit 1 Steam Generator Replacement Project | |
ML20058J491 | 24 November 1993 | Notification of Significant Licensee Meeting W/Util on 931206 to Discuss self-assessment of Plant Performance Since 930802-1130 | |
ML20058J506 | 29 November 1993 | Notification of Significant Licensee Meeting W/Util on 931203 to Discuss Licensee Intended EAL Changes for All Three Plants Relative to NUMARC Issues & Implementation of EPA-400 | |
ML20058K779 | 6 December 1993 | Forwards Ltr as Result of 931117 order,LBP-93-22 & Informs That Staff Will Answer Questions Recently Filed by Util | |
ML20058N676 | 18 October 1988 | Discusses Action Item 5 Assigned in 880406 Memo Related to Diagnostic Evaluation Team Report for Plant on Pump Damage Due to Low Flow Cavitation | |
ML20058P502 | 15 August 1990 | Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program | |
ML20059E026 | 4 January 1994 | Notification of 940105 Meeting W/Util in Rockville,Md to Conduct AIT Meeting & Discuss Results of Licensee Investigation of Recent Loss of off-site Power Event at McGuire Plant |