ML20056H314
| ML20056H314 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/24/1993 |
| From: | Rosalyn Jones Office of Nuclear Reactor Regulation |
| To: | Matthews D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20056H315 | List: |
| References | |
| TAC-M86969, TAC-M86970, NUDOCS 9309090142 | |
| Download: ML20056H314 (1) | |
Text
[
August 24, 1993 MEMORANDUM FOR:
David Matthews, Project Director Project Directorate 11-3 Division of Reactor Projects - I/II FROM:
Robert C. Jones, Chief Reactor Systems Branch Division of Systems and Safety Analysis
SUBJECT:
MCGUIRE TECHNICAL SPECIFICATION CHANGES (TAC NOS. M86969 & M86970)
Plant Name:
McGuire Units 1 and 2 Utili ty:
Duke Power Company TAC No(s).:
M86969/M86970 Docket No(s).:
50-369/50-370 Operating License:
NPF-9/NPF-17 Project Directorate:
Project Directorate II-3 Project Manager:
V. Nerses Review Branch:
SRXB/DSSA Review Status:
Complete The Reactor Systems Branch has completed its review of the proposed Technical Specifications for McGuire Units 1 and 2.
These changes involve increasing the minimum RWST boron concentration from 2000 ppm to 2275 ppm and increasing the minimum CLA boron concentration from 1900 ppm to 2000 ppm. We find the criticality aspects of the request acceptable.
Our safety evaluation is enclosed as well as the appropriate SALP input. This completes our effort on TAC Nos. M86969 and M86970.
/s/
Robert C. Jones, Chief Reactor Systems Bianch Division of Systems and Safety Analysis
Enclosure:
DISTRIBUTION As stated Docket File SRXB R/F cc w/ enclosures:
RJones A. Thandani LPhillips V. Nerses(14 B21)
Tulses R. Martin (14 H25)
Tulses R/F PEB/SALP (10 A19)
McGuire R/F PDR
Contact:
T. Ulses, SRXB/DSSA 504-1194 SRXB:DSSA RXB:DSSA XB:DSSA G:\\MCG.C0V TULSES: BAH dl..
LPHILLIPS ONES 8/w/93 8/.f4/93 B/
93 kid., hE h$bb b 9309090142 930824 PDR ADDCK 05000369 f0[
P PDR I