Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18046B2894 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML18046B29010 February 1982Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21)
ML20054G58215 June 1982Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components
ML20054G58712 May 1982Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful
ML20054H13917 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054H41218 June 1982Releases Public Version of Generating Stations Emergency Plan Telephone Directory
ML20054J02417 June 1982Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program
ML20054J57924 June 1982Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use
ML20054J81511 June 1982Releases Public Version of Revised Facility Annex to Generating Station Emergency Plan
ML20054J85623 June 1982Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures
ML20054K36926 January 1982Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201Scram Discharge Volume
ML20054K95815 June 1982Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology
ML20054M2149 November 1981Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works
ML20054M3306 July 1982Releases Public Version of Revised Emergency Plan Implementing Procedure
ML20055A26221 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl
ML20055A26321 January 1981Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A26927 January 1982Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline
ML20055A27028 January 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl
ML20055A27510 February 1982Forwards Info Re Current Status of Exemption Requests for Alert & Notification SysExemption Request
ML20055A27712 February 1982Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys DeadlineExemption Request
ML20055C0519 August 1982Forwards B Von Zellen .Nrc Already RepliedOverexposure
Affidavit
ML20055C35226 February 1990Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant
ML20057C98027 September 1993Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months
ML20057E9317 October 1993Forwards Results of Commitment Special Audit of Control Processess That Affect Current Licensing Basis Conducted at Plant on 930510-14
ML20058B3786 July 1982Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA
ML20058F9854 October 1990Forwards for Implementation,Augmented Insp Team Charter for Insp of Facility 901004 Loss of RCS Inventory.Charter Prepared Per NRC Insp Manual Chapter 0325
ML20058J1656 August 1982Informs That Time for Commission to Review ALAB-678 Expired. Commission Declined Review.Decision Became Final Agency Action on 820805
ML20059A46520 October 1993Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support
ML20062B44122 July 1982Notification of 820727 Meeting W/Westinghouse in Bethesda, MD to Discuss Krsko Water Hammer Event of Jul 1981 & Applicability to Domestic Westinghouse Type D Steam Generators
ML20062D32929 July 1982Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA
ML20062E07929 July 1982Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEAReserve Station Service Transformer
ML20062J45027 October 1993Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals
ML20062P04410 January 1980Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results EnclCoast down
ML20071F1929 June 1981Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl
ML20072L69927 September 1982Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl
ML20072T3503 June 1982Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan EnclNondestructive Examination
Liquid penetrant
ML20072T36016 April 1982Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info EnclNondestructive Examination
Liquid penetrant
ML20079R08515 March 1978Forwards Feb Project Status Repts
ML20081L70822 March 1983Forwards Complete List of Snubbers in Drywell Reviewed for Removability & Accessiblity.Total of 100 Snubbers Reviewed
ML20098D1486 January 1975Informs That Applicant Has No Objection to Proposal of Financial Qualifications Considered at Radiological Health & Safety Phase.Approach Consistent W/Preconstruction Activities 10CFR50.10(e)
ML20125D0505 December 1992Informs That Licensee Response to GL 90-06, Resolution of Generic Issue 70, 'Power-Operated Relief Valve & Block Valve Reliability' & GI 94, 'Addl Low-Temp Overpressure Protection for Lwrs,' Per 10CFR50.54(F), AcceptableBackfit
ML20126C82330 May 1985Submits Progress Rept of Ongoing Insp of Facility Const Assessment Program for 850506-17.Monthly Insp Repts to Inform NRC of Program Activities Will Be Issued
ML20126D34328 March 1984Notification of Change in Date,Time & Purpose of 840403 Meeting.Meeting Will Take Place on 840404 W/Util in Bethesda,Md to Discuss Results of NRR Review of Licensee Tech Spec Review Program
ML20126D35731 May 1984Discusses Ofc of General Counsel 840530 Memo Re Order Which Amended License.Plant Should Be Shut Down Until Regulations Can Be Met,Adequacy of Plant License Determined & Health & Safety of Public Assured
ML20126D8268 June 1973Forwards Position Paper Re Adequacy of Facility Site Foundation Exploration Performed by Applicant.Paper Sets Forth Recommendations for Addl Drilling,Sampling,Testing & Analyses to Complete Site Conditions Review