Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18046B289 | 4 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML18046B290 | 10 February 1982 | Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) | |
ML20054G582 | 15 June 1982 | Responds to 820512 Memo Re Control of Occupational Doses by Prevention of Transport & Buildup of Radioactive Crud,By Removal of Radionuclide Deposits & Minimization of Failure of Major Plant Components | |
ML20054G587 | 12 May 1982 | Discusses Inadequacy of Responses Re Prevention of Transport & Buildup of Radionuclide Concentrations within Primary Cooling Sys & Methods for Removal of Deposits If Preventive Measures Not Successful | |
ML20054H139 | 17 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054H412 | 18 June 1982 | Releases Public Version of Generating Stations Emergency Plan Telephone Directory | |
ML20054J024 | 17 June 1982 | Notification of 820720 Meeting W/B&W Owners Group in Bethesda,Md to Discuss Small Break Model Verification Program | |
ML20054J579 | 24 June 1982 | Discusses Use of Flammable Matl in Class IE Switchgear, Noted During IE Insps.Use of Mounting Bases May Void IEEE-323 & IEEE-383 Qualification Because of Flammable Nature.Licensee Plans to Justify Use | |
ML20054J815 | 11 June 1982 | Releases Public Version of Revised Facility Annex to Generating Station Emergency Plan | |
ML20054J856 | 23 June 1982 | Releases Public Version of Revised Generating Station Emergency Plan Environ Director Emergency Plan Implementing Procedures | |
ML20054K369 | 26 January 1982 | Advises That on 811208 Util Reported Discovery of Metal Filings in Scram Discharge Vol Piping During Flushing Operations on 811201 | Scram Discharge Volume |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20054M330 | 6 July 1982 | Releases Public Version of Revised Emergency Plan Implementing Procedure | |
ML20055A262 | 21 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Fr Encl | |
ML20055A263 | 21 January 1981 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A269 | 27 January 1982 | Forwards Responses Denying Licensee Requests for Exemption from 820201 Prompt Notification Sys Deadline | |
ML20055A270 | 28 January 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline.Related Info Encl | |
ML20055A275 | 10 February 1982 | Forwards Info Re Current Status of Exemption Requests for Alert & Notification Sys | Exemption Request |
ML20055A277 | 12 February 1982 | Forwards Response Denying Licensee Request for Exemption from 820201 Prompt Notification Sys Deadline | Exemption Request |
ML20055C051 | 9 August 1982 | Forwards B Von Zellen .Nrc Already Replied | Overexposure Affidavit |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20056E457 | 5 August 1993 | Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant | |
ML20057C980 | 27 September 1993 | Discusses 930927 Press Conference Re J O'Connor Announcement That Util Settled Six Rate Matters & Appeals Before Illinois Courts & Commerce Commission by Agreeing to Refund Listed Amount to Customers Over Next 12 Months | |
ML20057E931 | 7 October 1993 | Forwards Results of Commitment Special Audit of Control Processess That Affect Current Licensing Basis Conducted at Plant on 930510-14 | |
ML20058B378 | 6 July 1982 | Requests That Encl Incident Reporting Sys Repts Be Forwarded to Otsuka of NEA | |
ML20058F985 | 4 October 1990 | Forwards for Implementation,Augmented Insp Team Charter for Insp of Facility 901004 Loss of RCS Inventory.Charter Prepared Per NRC Insp Manual Chapter 0325 | |
ML20058J165 | 6 August 1982 | Informs That Time for Commission to Review ALAB-678 Expired. Commission Declined Review.Decision Became Final Agency Action on 820805 | |
ML20059A465 | 20 October 1993 | Notification of Significant Licensee Meeting W/Util in Glen Ellyn,Il on 931104 to Review Status of Util Initiatives on QA & Corporate Engineering Support | |
ML20062B441 | 22 July 1982 | Notification of 820727 Meeting W/Westinghouse in Bethesda, MD to Discuss Krsko Water Hammer Event of Jul 1981 & Applicability to Domestic Westinghouse Type D Steam Generators | |
ML20062D329 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA | |
ML20062E079 | 29 July 1982 | Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA | Reserve Station Service Transformer |
ML20062J450 | 27 October 1993 | Requests Addl Info Re Proposed EAL Changes in Util Generating Station Emergency Plan Annexes.Proposed EALs Reviewed Against Guidance in NUMARC/NESP-007,rev 2, Methodology for Development of Eals | |
ML20062P044 | 10 January 1980 | Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results Encl | Coast down |
ML20071F192 | 9 June 1981 | Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl | |
ML20072L699 | 27 September 1982 | Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl | |
ML20072T350 | 3 June 1982 | Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan Encl | Nondestructive Examination Liquid penetrant |
ML20072T360 | 16 April 1982 | Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info Encl | Nondestructive Examination Liquid penetrant |
ML20079R085 | 15 March 1978 | Forwards Feb Project Status Repts | |
ML20081L708 | 22 March 1983 | Forwards Complete List of Snubbers in Drywell Reviewed for Removability & Accessiblity.Total of 100 Snubbers Reviewed | |
ML20098D148 | 6 January 1975 | Informs That Applicant Has No Objection to Proposal of Financial Qualifications Considered at Radiological Health & Safety Phase.Approach Consistent W/Preconstruction Activities 10CFR50.10(e) | |
ML20125D050 | 5 December 1992 | Informs That Licensee Response to GL 90-06, Resolution of Generic Issue 70, 'Power-Operated Relief Valve & Block Valve Reliability' & GI 94, 'Addl Low-Temp Overpressure Protection for Lwrs,' Per 10CFR50.54(F), Acceptable | Backfit |
ML20126C823 | 30 May 1985 | Submits Progress Rept of Ongoing Insp of Facility Const Assessment Program for 850506-17.Monthly Insp Repts to Inform NRC of Program Activities Will Be Issued | |
ML20126D343 | 28 March 1984 | Notification of Change in Date,Time & Purpose of 840403 Meeting.Meeting Will Take Place on 840404 W/Util in Bethesda,Md to Discuss Results of NRR Review of Licensee Tech Spec Review Program | |
ML20126D357 | 31 May 1984 | Discusses Ofc of General Counsel 840530 Memo Re Order Which Amended License.Plant Should Be Shut Down Until Regulations Can Be Met,Adequacy of Plant License Determined & Health & Safety of Public Assured | |
ML20126D826 | 8 June 1973 | Forwards Position Paper Re Adequacy of Facility Site Foundation Exploration Performed by Applicant.Paper Sets Forth Recommendations for Addl Drilling,Sampling,Testing & Analyses to Complete Site Conditions Review |