Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20125C593 | 30 November 1979 | Auxiliary Feedwater Sys Reliability Analysis for Davis- Besse Unit 1. Revision 1 | Earthquake |
ML20125D869 | 22 December 1978 | Min Pressurizer Level for Various Reactor Trip Transients, Prepared for Toledo Edison | |
ML20126H672 | 13 May 1985 | Exam of CRD Mechanism Leaf Spring & Foreign Debris Samples Removed from Davis Besse-1 | |
ML20126L902 | 5 July 1985 | Rev 1 to Action Plans 5,6 & 7, Steam & Feedwater Rupture Control Sys Trip/Msiv Closure | |
ML20129B483 | 17 June 1985 | Action Plan Rept for NI-1 Source Range Channel | Shutdown Margin |
ML20129B518 | 17 June 1985 | NI-2 Count Rate Level Indication Failure Analysis | |
ML20129B650 | 20 June 1985 | Auxiliary Feed Pump Turbine Overspeed Trip Throttle Valve Problem | Unanalyzed Condition Safe Shutdown Earthquake Temporary Modification Systematic Assessment of Licensee Performance |
ML20129B727 | 18 June 1985 | Turbine Bypasss Valve 2-2 (SP132A) Problem Analysis | |
ML20129B803 | 20 June 1985 | Rev 0 to Auxiliary Feed Pumps Overspeed Trips | |
ML20129D365 | 31 August 1973 | General Description of once-through Steam Generator | |
ML20129D523 | 22 June 1985 | Rev 0 to Action Plans 5,6 & 7, Low Steam Generator Level Trip of Steam & Feedwater Rupture Control Sys | |
ML20129D548 | 31 December 1981 | Rev 1 to Auxiliary Feedwater Sys Reliability Analysis Final Rept | Mission time Earthquake |
ML20129D574 | 24 June 1985 | Rev 0 to Action Plan 1C, Auxiliary Feed Pump Turbine Manual/Auto-Essential Control Problem | |
ML20129D596 | 22 June 1985 | Rev 0 to Action Plan 10, Review of Operation of Porv | Boric Acid Loop seal |
ML20129D607 | 22 June 1985 | Rev 0 to Action Plan 18, Startup Feed Valve SP-7A Problem Analysis | |
ML20129D619 | 26 June 1985 | Rev 1 to Action Plan 27, Auxiliary Feed Pump Main Steam Inlet Isolation Valve (MS-106) Problem Analysis | Stroke time |
ML20129D635 | 26 June 1985 | Rev 0 to Action Plan 26, Inadvertent Auxiliary Feedwater Pump 1 Suction Supply Transfer from Condensate Storage Tank to Svc Water Supply | |
ML20129D734 | 18 June 1985 | Action Plans 9a & 9b, Turbine Bypass Valve 2-2 (SPI3A2) Problem Analysis | |
ML20129D761 | 17 June 1985 | Action Plans 15A-1 & 15A-2, Action Plan Rept for NI-1 Source Range Channel | Shutdown Margin |
ML20129E051 | 18 June 1985 | Action Plan 8, Action Plan for Mainfeed Pump Control Sys | |
ML20129E069 | 17 June 1985 | Action Plan 15B, NI-2 Count Rate Level Indication Failure Analysis | |
ML20129E096 | 24 June 1985 | Action Plans 1A & 1B, Auxiliary Feed Pumps Overspeed Trips | |
ML20129E164 | 25 June 1985 | Rev 0 to Action Plan 16, Rept on Main Steam Header Pressure | |
ML20129E178 | 22 June 1981 | Draft Engineering Summary Rept of Complete Loss of Feedwater Transient Analyses for Davis-Besse,Unit 1 | Coast down |
ML20132E447 | 17 September 1985 | Rev 9 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20133K988 | 4 October 1985 | Independent Mgt Assessment of Toledo Edison Davis-Besse QA Program | Nondestructive Examination |
ML20133K994 | 30 August 1985 | Rept of Assessment of Actions at Davis-Besse Resulting from 850609 Loss of Feedwater Event | Stroke time Earthquake |
ML20133M326 | 26 July 1985 | Rev 3 to Safety-Related Piping Sys Support & Hanger Discrepancies,Summary Rept | |
ML20133M991 | 8 October 1985 | Rev 12 to Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept | |
ML20134B837 | 9 August 1985 | Rev 4 to Safety-Related Piping Sys Support & Hangar Discrepancies, Summary Rept | |
ML20134D782 | 8 May 1996 | Rev 1 to Instrument Drift Data Analysis Methodology & Assumptions | Safe Shutdown Post Accident Monitoring Condition Adverse to Quality |
ML20134Q016 | 27 August 1985 | Rev 6 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20135D742 | 3 September 1985 | Rev 7 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20136H095 | 15 November 1985 | Revised Davis-Besse Reactor Protection Sys Single Failure Analysis | Post Accident Monitoring |
ML20137C302 | 9 September 1985 | Toledo Edison Co Davis-Besse Nuclear Power Station Course of Action Rept | |
ML20137H397 | 12 November 1985 | Rev 16 to Seismic Category I Piping Sys Support & Hanger Discrepancies Summary Rept | |
ML20137M543 | 9 September 1985 | Vols 1 & 2 of Davis-Besse Course of Action | Probabilistic Risk Assessment Temporary Modification Systematic Assessment of Licensee Performance Scaffolding |
ML20137S824 | 22 October 1985 | Rev 14 to Seismic Category I Piping Sys & Hanger Discrepancies,Summary Rept | |
ML20137S903 | 29 October 1985 | Toledo Edison Davis-Besse Nuclear Power Station Unit 1 Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept | |
ML20137U306 | 16 August 1985 | Rev 5 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20138A941 | 24 September 1985 | Rev 10 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20138H489 | 25 November 1985 | Rev 17 to Seismic Category I Piping Sys Support & Hanger Discrepancies | |
ML20138J141 | 28 February 1994 | Rev 0 to IPEEE,A-46 & Design In-Structure Response Spectra for Selected Bldgs at Dbnps | |
ML20138J481 | 15 October 1985 | Seismic Category I Piping Sys Support & Hanger Discrepancies | |
ML20141E669 | 30 November 1985 | B&W Owners Group Action Plan for Review of 850609 Davis-Besse Transient | Unanalyzed Condition High Radiation Area |
ML20147C085 | 1 December 1987 | Fifth Refueling Outage Executive Summary. Related Documents Encl | |
ML20150F296 | 20 September 1979 | Supplemental Small Break Analysis | |
ML20150F301 | 20 September 1979 | Impact Assessment of Reactor Coolant Pump Trip on Non-LOCA Events | |
ML20151Z194 | 11 August 1988 | Rept on Reactor Vessel Continuous Vent Line Performance, | |
ML20154Q653 | 28 February 1986 | Westinghouse Owners Group Position on Davis-Besse Event | Probabilistic Risk Assessment Weak link |