Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20065A75217 February 1983Forwards Assessment of Unresolved Safety Issue Task A-46 & Final Draft Responses to Selected Questions of 820825,1115 & 1231 Commission Info RequestsSafe Shutdown
Loop seal
Fire Barrier
Earthquake
Backfit
ML20065H9821 October 1982Submits GE Understanding of Major Agreements & Ground Rules Re NRC Review of Gessar Ii,In Response to NRC Request at 820915 Meeting.Concurrence Requested
ML20065Q37818 October 1982Forwards Amend 8 to Gessar Ii,Responding to NRC 811203 Acceptance Review Ltr Re Geotechnical,Radiation Sources & Failure Mode & Effects Analysis & Committing Applicant to Address NRC Acceptance Criteria
ML20066H53419 November 1982Forwards Draft Responses to Commission 821005 Request for Addl Info on Chapter 7 of Gessar II Sar.Responses Reflect Nrc/Ge Info Exchange 821014-15 Meetings in Bethesda,MdSafe Shutdown
Anticipated operational occurrence
Scram Discharge Volume
ML20066J4558 November 1982Forwards Proprietary Portion of Amend 9 to GESSAR-II, Describing Main Control Room & Control Ctrs Outside Control Room.Affidavit Encl.Info Withheld (Ref 10CFR2.790)
ML20066J49610 November 1982Forwards Final Draft Responses to Structural Engineering Branch 820825 Request for Addl Info.Responses Reflect Nrc/Ge 821007-26 Info Exchange Meeting in Bethesda.Remaining Responses Will Be Submitted in Dec 1982Safe Shutdown
High winds
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Tornado Generated Missile
Earthquake
Control of Heavy Loads
Grace period
ML20066J5078 November 1982Forwards Amend 9 to Gessar Ii.Amend Furnishes Chapter 18, Human Factors, & Clarifies Discrepancies
ML20067D27023 November 1982Forwards Proprietary Amend 10 to Gessar II Re Enhanced Level Instrumentation.Amend Withheld (Ref 10CFR2.790)
ML20067D34323 November 1982Forwards Amend 10 to Application for Review of Gessar Ii. Amend Furnishes App 1D,assessment of Reg Guide 1.97,Revision 2 Against Gessar II Design
ML20067E1513 December 1982Requests 830105 Meeting to Discuss Review Status & Schedule for SER & Final Design Approval
ML20069A1279 March 1983Reaffirms Request Re Issuance of Final Design Approval for GESSAR-II.Resolution of Technical Requirements Currently Imposed by NRC Proposed in Submittal Docketed 820222
ML20069B84215 March 1983Forwards Revised Final Draft Responses to Power Sys & Reactor Sys Branch Questions,Per 820825 & 1115 Requests.Only Mods (New or Revised) to Responses of Referenced Ltrs Provided
ML20069C51916 March 1983Forwards Final Draft Responses to Auxiliary Sys Branch Questions & Equipment Qualification Branch Discussion Items, in Response to NRC 820825 Request for Info
ML20069E65318 March 1983Forwards Revised Final Draft Responses to Selected Commission 820825 & 1005 Questions Re Fire Protection,Leak Rate Testing & ESF Sys.Proposed Resolution Discussion Items EnclSafe Shutdown
ML20070C8043 December 1982Forwards Proprietary Portion of Amend 11 to GESSAR-II Re Pra.Affidavit for Withholding Only EnclProbabilistic Risk Assessment
ML20070D1063 December 1982Forwards Nonproprietary Amend 11 to Gessar Ii,Revising App 15D,Section 3, PRA of BWR/6 Std Plant. Proprietary Version Only Encl & Withheld (Ref 10CFR2.790)Probabilistic Risk Assessment
ML20070E97915 December 1982Summarizes 821214 Meeting Discussions Between NRC & GE Re Status of GESSAR-II Final Design Approval (Fda) Review
ML20070H27517 December 1982Forwards Response to Mechanical Engineering Branch Draft SER Questions.Remaining Responses Will Be Completed by 830114. Amend Scheduled for Jan 1983 Will Formalize Responses Requiring Changes to FacilitySafe Shutdown
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Finite Element Analysis
Earthquake
ML20070H32817 December 1982Forwards Final Draft Responses to Radiation Assessment Branch,Effluent Treatment Sys Branch,Auxiliary Sys Branch & Power Sys Branch 820825 Info Request
ML20070L44827 December 1982Forwards Final Draft Responses to Reactor Sys Branch Questions Raised at Commission 821115 Info Request. Responses to Core Performance Branch Questions to Be Provided 2 Wks After Second Ge/Nrc Meeting
ML20070N72821 January 1983Forwards Draft Responses to Instrumentation & Control Sys Branch 821005 Request for Addl Info.Gessar Amend Scheduled for Feb 1983 to Formalize ResponsesSafe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Safe Shutdown Earthquake
Temporary Modification
Scram Discharge Volume
Feedwater Controller Failure
ML20070R24825 January 1983Forwards Rev to Gessar Chapter 15 Re Radiological Dose Calculations for Inside Containment Loca.Rev Demonstrates Capability of Suppression Pool to Retain Particulate Fission ProductsFuel cladding
ML20070S40019 January 1983Forwards Amend 13 to 238 GE Ssar,Amending GESSAR-II by Correcting Rev Designation of Proprietary Pages Provided Under Amend 1.Nonproprietary Version Not Included
ML20070S40819 January 1983Forwards Proprietary Portion of Amend 13,replacing Proprietary Pages of Amend 1 to Ssar.Encl Withheld (Ref 10CFR2.790)
ML20070U1208 February 1983Forwards Draft Responses to NRC 830131 Request for Addl Info Re GESSAR-II
ML20070V4259 February 1983Forwards Info Re GE Response to Gessar II Question 490.01, Re Fuel Rod Cladding & Deformation Per M Tokar Request at 830125 & 26 MeetingsFuel cladding
ML20071B64722 February 1983Commits to Review Each Human Engineering Discrepancy in Apps a & B of Gessar II SER Identified During 821211-13 Control Room Design Audit at Black Fox Simulator
ML20071C7033 March 1983Forwards Listing of Major NSSS & Balance of Plant Documents Supporting Gessar II Design,Including Equipment Vendor Independent Documents Reviewed by Mechanical & Structural Engineering Branches During AuditsFLEX
ML20071D6749 March 1983Forwards Revised Final Draft Responses to NRC 820825 & 1115 Requests & Mechanical Engineering Branch SER Meetings.Draft Revs to Reg Guides 1.31 & 1.44 EnclTornado Missile
Hydrostatic
Tornado Generated Missile
Earthquake
ML20071E2749 March 1983Documents Agreements on Credit for Suppression Pool Scrubbing in GESSAR-II,Chapter 15 Re Radiological Dose Calculations.Potential Decontamination Capability Provided by Scrubbing Will Be RecognizedFuel cladding
ML20071J69320 April 1982Clarifies Significance of Thermal Operating Limits Specified in App 6A of Gessar Ii.App 6A Transmitted on 820225 Contains Technical Basis for BWR LOCA Decay Heat Correlation Based on Ansi/Ans 5.1-1979 Revised Decay Heat Std
ML20071N53524 May 1983Forwards Amend 15 to Application for Review of Amend 15 to GESSAR-II,consisting of Proprietary & Nonproprietary Portions.Proprietary Portion Withheld (Ref 10CFR2.790) & Submitted Under Separate Cover
ML20071N69824 May 1983Forwards Proprietary Portion Amend 15 to GESSAR-II Re Human Factors Sys Analysis Emergency Procedures.Info Withheld (Ref 10CFR2.79)
ML20071P88922 December 1982Forwards Final Draft Responses to Commission 821005 Info Request Re GESSAR-II.Instrumentation & Control Sys Branch Responses Will Be Provided Following Ge/Nrc Meeting in Jan 1983
ML20071Q7267 June 1983Forwards Draft Amend 17 to GESSAR-II Re CP/multi-plant Licensing & SRP RulesProbabilistic Risk Assessment
ML20072B6613 March 1983Requests Review of Gessar Ii,Section 3.11 in Parallel W/ Current Review of NEDE-24326-1-P, GE Environ Qualification Program. Marked-up Proposed Plan Encl
ML20072D33917 March 1983Forwards Revised Draft Responses to 821005 Info Request Re GESSAR-II
ML20072F55523 March 1983Forwards Revised Draft Responses to Discussion Items & Questions from NRC Power Sys Branch,Containment Sys Branch, Instrumentation & Control Sys Branch & QA Sys Branch Re GESSAR-IIUltimate heat sink
ML20072H26425 March 1983Forwards GESSAR-II SRP Assessments,Describing Compliance w/NUREG-0800.Section-by-section Comparison of GESSAR-II Design to SRP,NUREG-0800,will Be Provided by 830915Safe Shutdown
Boric Acid
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Weld Overlay
Internal Flooding
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
Tornado Generated Missile
Abnormal operational transient
Earthquake
Turbine Missile
Liquid penetrant
Pressure Boundary Leakage
Power change
ML20072H46415 June 1983Forwards Proprietary Amend 16 to GESSAR-II,describing Design Considerations to Reduce Sabotage Risk.Amend Withheld (Ref 10CFR2.790)
ML20072H48915 June 1983Forwards Nonproprietary Amend 16 to GESSAR-II,providing Assessment of Design Features Which Reduce Sabotage Risk
ML20072H51815 June 1983Forwards Amend 17 to GESSAR-II,furnishing New App 1G & Revised Section 1.8 & Clarifying Discrepancies in Text
ML20072L40129 March 1983Forwards Supplemental Response to Instrumentation & Control Sys Branch Question on Manual Initiation of Safety Sys & Proposed Resolution of Meteorology & Effluent Treatment Branch Discussion Items
ML20073B5908 April 1983Forwards GESSAR-II Action Plan for Resolving J Humphrey Containment Design Issues for Review.Balance of Info to Be Completed by 830722
ML20073G64414 April 1983Forwards Revised Draft Responses to Power Sys Branch, Containment Sys Branch,Matls Engineering Branch & Structural & Geotechnical Engineering Branch Questions Re 238 Nuclear Island GESSAR-II
ML20073J89415 April 1983Forwards Proposed Resolutions to Selected Outstanding Issues
ML20073R06129 April 1983Provides Statement of GE Objectives for Final Design Approval in Light of Current Commission Proposed Policy Statement on Severe Accidents.Acrs Review of Gessar II SER (NUREG-0979) RecommendedProbabilistic Risk Assessment
ML20073T0715 May 1983Forwards Proposed Resolution of Containment Sys & Instrumentation & Control Sys Branches Outstanding SER Issues Re Gessar II
ML20076C81818 May 1983Forwards marked-up Revised Response to Question 460.09 of NRC 820825 Request Re GESSAR-II Std SAR
ML20076D88924 May 1983Forwards Supplemental Responses to Power Sys Branch Questions Re GESSAR-II Ac/Dc Power sys/balance-of-plant Interfaces.Responses Will Be Included W/Amend 15 to SER