Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20054K05913 May 1982Technical Evaluation Rept on Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Millstone Nuclear Power Station,Unit 1
ML20058K15931 March 1990Final Revised Technical Evaluation Rept on Response from Niagra Mohawk Power Corp to Generic Ltr 88-01 Re Nine Mile Point,Unit 2Weld Overlay
Unidentified leakage
ML20058K97318 July 1990Technical Evaluation Rept - Millstone Nuclear Power Station Unit 1,Station Blackout Evaluation, Final Rept
ML20058L04131 August 1990Technical Evaluation Rept,Pump & Valve Inservice Testing ProgramStroke time
Excess Flow Check Valve
Cold shutdown justification
Power-Operated Valves
ML20062B16030 June 1982Control of Heavy Loads at Nuclear Power PlantsSafe Shutdown
Control of Heavy Loads
ML20062G65431 July 1982Socioeconomic Impacts of Nuclear Generating Stations:Nine Mile Plant and Fitzpatrick Case Study.Docket Nos. 50-220, 50-410 & 50-333.(Niagara Mohawk Power Corporation and Power Authority of the State of New York)Earthquake
ML20063P93318 July 1990Technical Evaluation Rept Millstone Nuclear Power Station Unit 3 Station Blackout Evaluation, Final ReptSafe Shutdown
High Energy Line Break
ML20064K07830 June 1980Impure Water in Steam Generators & Isolation Generators, Informal Rept for Limited DistributionStress corrosion cracking
ML20064L5281 July 1982Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept
ML20064N73731 August 1982Reliability Analysis of Containment Strength.Sequoyah and McGuire Ice Condenser ContainmentsFinite Element Analysis
Earthquake
ML20065C35831 July 1982Control of Heavy Loads at Nuclear Power Plants,Byron Units 1 & 2 & Braidwood Units 1 & 2, Draft Technical Evaluation ReptSafe Shutdown
Overtravel
Control of Heavy Loads
ML20065D29030 September 1982Evaluation of the Prompt Alerting Systems at Four Nuclear Power StationsSiren
ML20066H28417 January 1986Technical Review Rept,Nrc Region I Insp 50-410/86-02,Review of Nine Mile Point,Unit 2 Tech Specs, of Onsite Activities Conducted on 860106-17Temporary Modification
ML20067E71631 March 1989First Interval ISI Program Millstone Nuclear Power Station Unit 3, Technical Evaluation Rept
ML20070M85331 March 1994Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1Boric Acid
Incorporated by reference
Cold shutdown justification
Thermography
ML20070Q43331 January 1989Nuclear Power Plant Sys Sourcebook,Millstone 3
ML20070Q45631 January 1989Nuclear Power Plant Sys Sourcebook,Millstone 2Safe Shutdown
Boric Acid
Ultimate heat sink
Emergency Lighting
Design basis earthquake
ML20070Q52131 December 1988Nuclear Power Plant Sys Sourcebook,Fort Calhoun
ML20070Q6808 October 1982Evaluation of Procedures Proposed by Detroit Edison Co in Emergency Plans to Consider Meteorological Conditions in Enrico Fermi Site Coastal Environ
ML20070Q6888 October 1982Evaluation of Procedures Proposed by PG&E in Emergency Plans to Consider Meteorological Conditions in Diablo Canyon Plant Coastal Environ
ML20071A63731 January 1991Trip Rept: Onsite Analysis of Human Factors of Event at Millstone 3 on 901231 (Turbine Bldg Pipe Break)Through Wall Leak
ML20071M45029 November 1982Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation ReptSafe Shutdown
Coatings
Nondestructive Examination
Control of Heavy Loads
ML20072L68130 June 1982Assessment of Postulated Degraded Core Accidents in Grand Gulf Reactor Plant, Draft Informal Rept
ML20072L68931 August 1982Analysis of Full Core Meltdown Accidents in Grand Gulf Reactor Plant, Draft Informal Rept
ML20076B58930 July 1982Inservice Insp Program, Technical Evaluation ReptHydrostatic
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20076C3265 October 1982ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept
ML20076C40327 January 1983ECCS Repts (F-47) TMI Action Plan Requirements,Millstone Nuclear Power Station,Unit 2, Technical Evaluation Rept
ML20076C45221 February 1983Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Nonproprietary Technical Evaluation Rept
ML20076F2486 April 1983Selected Operating Reactor Issues Program II RCS Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept for Nine Mile Point 1Pressure Boundary Leakage
ML20076F2632 March 1983Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation ReptSafe Shutdown Earthquake
ML20076M33518 July 1983Operating Reactor PORV Repts (F-37),TMI Action Plan Requirements,C-E Owners Group (CEN-145), Technical Evaluation Rept
ML20077J98917 September 1982Inservice Insp Program, Technical Evaluation ReptHydrostatic
VT-2
Incorporated by reference
Liquid penetrant
ML20077K78217 January 1983Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept
ML20080A04315 June 1983Adequacy of Station Electric Distribution Sys Voltages for Nine Mile Point Nuclear Station,Unit 1, Technical Evaluation ReptSafe Shutdown
Offsite Circuit
ML20080E07113 January 1984Evaluations of Detailed Control Room Design Reviews for St Lucie Units 1 & 2 & Turkey Point Units 3 & 4, Technical Evaluation ReptBackfit
ML20080E25231 March 1983Use of Joint Reinforcement in Block Masonry Walls, Technical Evaluation ReptEarthquake
ML20080H06816 September 1983Masonry Wall Design,Fort St Vrain Nuclear Plant, Technical Evaluation ReptTornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
ML20080J30917 April 1981Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power CoStress corrosion cracking
ML20080J32117 April 1981Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power CoStress corrosion cracking
ML20080J66118 August 1983Proposed Tech Spec Changes for Inservice Surveillance of Safety-Related Hydraulic & Mechanical Snubbers at Millstone Nuclear Power Station,Unit 2, Technical Evaluation Rept
ML20080S35031 January 1984Control of Heavy Loads at Nuclear Power Plants,Fort St Vrain Nuclear Generating Station,Phase I, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20081E97714 February 1991Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept
ML20081K36315 May 1991Final Technical Evaluation Rept Nine Mile Point Nuclear Power Station Unit 1 Station Blackout EvaluationSafe Shutdown
ML20082G55626 October 1983Thermal Stress Analysis of Selected Fort St Vrain Hot Spots
ML20082M41630 September 1983Radiological Effluent Tech Specs (RETS) Implementation-Fort St Vrain Nuclear Generating PlantGrab sample
Offsite Dose Calculation Manual
Process Control Program
Power change
ML20083D08530 November 1983Review of the Byron/Braidwood Units 1 and 2 Auxiliary Feedwater System Reliability Analysis
ML20083Q7114 March 1983Preliminary Investigation of Interconnected Sys Interactions for Safety Injection Sys of Indian Point 3Boric Acid
Fuel cladding
Failure to Scram
ML20084B61222 June 1972Rept of Preliminary Investigation Failure of Hanger Bolts on Suppression Chamber Suction Header at Quad Cities Nuclear Station,Unit 2
ML20084F39316 May 1995Draft Rept, Confirmatory Survey for Repower Area Fsv Platteville,Co
ML20084J0116 April 1984ORNL Assistance in Evaluating Licensing Request - Fsv Limiting Condition for Operation 4.1.9, Monthly Rept for Mar 1984