Category:CONTRACTED REPORT - RTA
MONTHYEARML20206M2861998-03-31031 March 1998 Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Fort Calhoun Station ML20134D7971996-09-0505 September 1996 Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final Rept ML20134D7941996-06-13013 June 1996 Technical Evaluation Rept on Individual Plant Examination Front End Analysis ML20134D8031996-05-31031 May 1996 Technical Evaluation Rept on Individual Plant Examination Back-End Analysis ML20099L3741995-11-30030 November 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Omaha Public Power District Fort Calhoun Station,Unit 1 ML20070M8531994-03-31031 March 1994 Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1 ML20106A9361992-09-30030 September 1992 Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant) ML20127F2701992-09-28028 September 1992 Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept ML20100Q2861991-09-30030 September 1991 Auxiliary Feedwater Sys Risk-Based Insp Guide for Fort Calhoun Nuclear Power Plant ML20081E9771991-02-14014 February 1991 Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept ML20247J9101989-06-30030 June 1989 Rev 1 to Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort Calhoun ML20070Q5211988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Fort Calhoun ML20245D1491988-01-0606 January 1988 Technical Evaluation Rept of Dcrdr for Fort Calhoun Nuclear Station ML20245D1441988-01-0606 January 1988 Final Post-Implementation Audit Rept for Omaha Public Power District Fort Calhoun Station SPDS, Technical Evaluation Rept ML20214Q8501987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Informal Rept ML20214R9581987-03-31031 March 1987 Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Fort Calhoun, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20209C2011986-11-30030 November 1986 Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20206A0231986-04-30030 April 1986 Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20138G8901985-08-28028 August 1985 Technical Evaluation of Dcrdr for Ft Calhoun Station ML20134N0391985-07-30030 July 1985 Feasibility of Detecting PWR Thermal Shield Support Degradation Using Ex-Core Neutron Noise, Informal Ltr Rept ML20113B4581985-03-0808 March 1985 In-Progress Audit of Detailed Control Room Design Review for Omaha Public Power District,Ft Calhoun Station ML20092L8571984-06-30030 June 1984 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Station, Technical Evaluation Rept ML20091L9421984-05-0101 May 1984 Revised Control of Heavy Loads (C-10),Fort Calhoun Station, Technical Evaluation Rept ML20077K7821983-01-17017 January 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20071M4501982-11-29029 November 1982 Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation Rept ML20027E7121982-11-10010 November 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Fort Calhoun Station, Vols I & Ii,Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20076C3261982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20064L5281982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20042A2331982-02-28028 February 1982 Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station. ML20040D1651981-12-16016 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Rept, Request for Addl Info ML20039A9111981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Nuclear Station Unit 1,informal Rept ML20005C0041981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Fort Calhoun Station,Unit No. 1 Environmental Appraisal Report ML20039B8101981-10-31031 October 1981 Evaluation of Emergency Response Facilities for Fort Calhoun Station - Unit 1. ML20038A7691981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations ML20003H2761980-10-24024 October 1980 Primary Coolant Sys Pressure Isolation Valves,Fort Calhoun Unit 1, Technical Evaluation Rept ML19326D7181980-01-31031 January 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Fort Calhoun Nuclear Power Plant. ML19317H1891978-07-31031 July 1978 In-Plant Source Term Measurements at Fort Calhoun Station- Unit 1. 1998-03-31
[Table view] Category:QUICK LOOK
MONTHYEARML20206M2861998-03-31031 March 1998 Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Fort Calhoun Station ML20134D7971996-09-0505 September 1996 Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final Rept ML20134D7941996-06-13013 June 1996 Technical Evaluation Rept on Individual Plant Examination Front End Analysis ML20134D8031996-05-31031 May 1996 Technical Evaluation Rept on Individual Plant Examination Back-End Analysis ML20099L3741995-11-30030 November 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Omaha Public Power District Fort Calhoun Station,Unit 1 ML20070M8531994-03-31031 March 1994 Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1 ML20106A9361992-09-30030 September 1992 Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant) ML20127F2701992-09-28028 September 1992 Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept ML20100Q2861991-09-30030 September 1991 Auxiliary Feedwater Sys Risk-Based Insp Guide for Fort Calhoun Nuclear Power Plant ML20081E9771991-02-14014 February 1991 Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept ML20247J9101989-06-30030 June 1989 Rev 1 to Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort Calhoun ML20070Q5211988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Fort Calhoun ML20245D1491988-01-0606 January 1988 Technical Evaluation Rept of Dcrdr for Fort Calhoun Nuclear Station ML20245D1441988-01-0606 January 1988 Final Post-Implementation Audit Rept for Omaha Public Power District Fort Calhoun Station SPDS, Technical Evaluation Rept ML20214Q8501987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Informal Rept ML20214R9581987-03-31031 March 1987 Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Fort Calhoun, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20209C2011986-11-30030 November 1986 Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20206A0231986-04-30030 April 1986 Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20138G8901985-08-28028 August 1985 Technical Evaluation of Dcrdr for Ft Calhoun Station ML20134N0391985-07-30030 July 1985 Feasibility of Detecting PWR Thermal Shield Support Degradation Using Ex-Core Neutron Noise, Informal Ltr Rept ML20113B4581985-03-0808 March 1985 In-Progress Audit of Detailed Control Room Design Review for Omaha Public Power District,Ft Calhoun Station ML20092L8571984-06-30030 June 1984 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Station, Technical Evaluation Rept ML20091L9421984-05-0101 May 1984 Revised Control of Heavy Loads (C-10),Fort Calhoun Station, Technical Evaluation Rept ML20077K7821983-01-17017 January 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20071M4501982-11-29029 November 1982 Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation Rept ML20027E7121982-11-10010 November 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Fort Calhoun Station, Vols I & Ii,Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20076C3261982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20064L5281982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20042A2331982-02-28028 February 1982 Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station. ML20040D1651981-12-16016 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Rept, Request for Addl Info ML20039A9111981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Nuclear Station Unit 1,informal Rept ML20005C0041981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Fort Calhoun Station,Unit No. 1 Environmental Appraisal Report ML20039B8101981-10-31031 October 1981 Evaluation of Emergency Response Facilities for Fort Calhoun Station - Unit 1. ML20038A7691981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations ML20003H2761980-10-24024 October 1980 Primary Coolant Sys Pressure Isolation Valves,Fort Calhoun Unit 1, Technical Evaluation Rept ML19326D7181980-01-31031 January 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Fort Calhoun Nuclear Power Plant. ML19317H1891978-07-31031 July 1978 In-Plant Source Term Measurements at Fort Calhoun Station- Unit 1. 1998-03-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20206M2861998-03-31031 March 1998 Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Fort Calhoun Station ML20134D7971996-09-0505 September 1996 Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final Rept ML20134D7941996-06-13013 June 1996 Technical Evaluation Rept on Individual Plant Examination Front End Analysis ML20134D8031996-05-31031 May 1996 Technical Evaluation Rept on Individual Plant Examination Back-End Analysis ML20099L3741995-11-30030 November 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Omaha Public Power District Fort Calhoun Station,Unit 1 ML20070M8531994-03-31031 March 1994 Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1 ML20106A9361992-09-30030 September 1992 Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant) ML20127F2701992-09-28028 September 1992 Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept ML20100Q2861991-09-30030 September 1991 Auxiliary Feedwater Sys Risk-Based Insp Guide for Fort Calhoun Nuclear Power Plant ML20081E9771991-02-14014 February 1991 Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept ML20247J9101989-06-30030 June 1989 Rev 1 to Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort Calhoun ML20070Q5211988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Fort Calhoun ML20245D1491988-01-0606 January 1988 Technical Evaluation Rept of Dcrdr for Fort Calhoun Nuclear Station ML20245D1441988-01-0606 January 1988 Final Post-Implementation Audit Rept for Omaha Public Power District Fort Calhoun Station SPDS, Technical Evaluation Rept ML20214Q8501987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Informal Rept ML20214R9581987-03-31031 March 1987 Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Fort Calhoun, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20209C2011986-11-30030 November 1986 Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20206A0231986-04-30030 April 1986 Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20138G8901985-08-28028 August 1985 Technical Evaluation of Dcrdr for Ft Calhoun Station ML20134N0391985-07-30030 July 1985 Feasibility of Detecting PWR Thermal Shield Support Degradation Using Ex-Core Neutron Noise, Informal Ltr Rept ML20113B4581985-03-0808 March 1985 In-Progress Audit of Detailed Control Room Design Review for Omaha Public Power District,Ft Calhoun Station ML20092L8571984-06-30030 June 1984 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Station, Technical Evaluation Rept ML20091L9421984-05-0101 May 1984 Revised Control of Heavy Loads (C-10),Fort Calhoun Station, Technical Evaluation Rept ML20077K7821983-01-17017 January 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20071M4501982-11-29029 November 1982 Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation Rept ML20027E7121982-11-10010 November 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Fort Calhoun Station, Vols I & Ii,Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20076C3261982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20064L5281982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20042A2331982-02-28028 February 1982 Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station. ML20040D1651981-12-16016 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Rept, Request for Addl Info ML20039A9111981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Nuclear Station Unit 1,informal Rept ML20005C0041981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Fort Calhoun Station,Unit No. 1 Environmental Appraisal Report ML20039B8101981-10-31031 October 1981 Evaluation of Emergency Response Facilities for Fort Calhoun Station - Unit 1. ML20038A7691981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations ML20003H2761980-10-24024 October 1980 Primary Coolant Sys Pressure Isolation Valves,Fort Calhoun Unit 1, Technical Evaluation Rept ML19326D7181980-01-31031 January 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Fort Calhoun Nuclear Power Plant. ML19317H1891978-07-31031 July 1978 In-Plant Source Term Measurements at Fort Calhoun Station- Unit 1. 1998-03-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20198A5051998-12-0808 December 1998 Ltr Contract,To Task Order 27, Fort Calhoun Safety Sys Engineering Insp, Under Contract NRC-03-98-021 ML20206M2861998-03-31031 March 1998 Final Rept, Technical Evaluation Rept on 'Submittal-Only' Review of Individual Plant Exam of External Events at Fort Calhoun Station ML20134D7971996-09-0505 September 1996 Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final Rept ML20134D7941996-06-13013 June 1996 Technical Evaluation Rept on Individual Plant Examination Front End Analysis ML20134D8031996-05-31031 May 1996 Technical Evaluation Rept on Individual Plant Examination Back-End Analysis ML20099L3741995-11-30030 November 1995 Technical Evaluation Rept on Third 10-Yr Interval ISI Program Plan:Omaha Public Power District Fort Calhoun Station,Unit 1 ML20070M8531994-03-31031 March 1994 Technical Evaluation Rept,Pump & Valve IST Program,Fort Calhoun Station Unit 1 ML20106A9361992-09-30030 September 1992 Trip Rept:Onsite Analysis of Human Factors of Event at Fort Calhoun on 920703 (Loss of Instrument Inverter & Subsequent Loss of Coolant) ML20127F2701992-09-28028 September 1992 Technical Evaluation Rept Fort Calhoun Station Emergency Diesel Generating Max Temp Operating Limits, Interim Rept ML20100Q2861991-09-30030 September 1991 Auxiliary Feedwater Sys Risk-Based Insp Guide for Fort Calhoun Nuclear Power Plant ML20081E9771991-02-14014 February 1991 Review of Seismic Analysis for Generating In-Structure Spectra for Fort Calhoun Unit 1 Soil-Structure Interaction, Technical Evaluation Rept ML20247J9101989-06-30030 June 1989 Rev 1 to Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Fort Calhoun ML20070Q5211988-12-31031 December 1988 Nuclear Power Plant Sys Sourcebook,Fort Calhoun ML20245D1491988-01-0606 January 1988 Technical Evaluation Rept of Dcrdr for Fort Calhoun Nuclear Station ML20245D1441988-01-0606 January 1988 Final Post-Implementation Audit Rept for Omaha Public Power District Fort Calhoun Station SPDS, Technical Evaluation Rept ML20214Q8501987-04-30030 April 1987 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety Related Components:Fort Calhoun-1, Final Informal Rept ML20214R9581987-03-31031 March 1987 Technical Evaluation Rept TMI Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing Fort Calhoun, Informal Rept ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20209C2011986-11-30030 November 1986 Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20205E3711986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components) Fort Calhoun,Millstone Unit 2,Nine Mile Point 2 & Fort St Vrain, Technical Evaluation Rept ML20244E1901986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1) Equipment Classification (Reactor Trip Sys Components), Fort Calhoun,Millstone Unit 2,Nine Mile Point Unit 2 & Fort St Vrain ML20206A0231986-04-30030 April 1986 Preliminary Conformance to Reg Guide 1.97,Fort Calhoun Station, Informal Rept ML20138G8901985-08-28028 August 1985 Technical Evaluation of Dcrdr for Ft Calhoun Station ML20134N0391985-07-30030 July 1985 Feasibility of Detecting PWR Thermal Shield Support Degradation Using Ex-Core Neutron Noise, Informal Ltr Rept ML20113B4581985-03-0808 March 1985 In-Progress Audit of Detailed Control Room Design Review for Omaha Public Power District,Ft Calhoun Station ML20092L8571984-06-30030 June 1984 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Station, Technical Evaluation Rept ML20091L9421984-05-0101 May 1984 Revised Control of Heavy Loads (C-10),Fort Calhoun Station, Technical Evaluation Rept ML20077K7821983-01-17017 January 1983 Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.2), Final Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20071M4501982-11-29029 November 1982 Control of Heavy Loads (C-10),Omaha Public Power District, Fort Calhoun Station, Updated Draft Technical Evaluation Rept ML20027E7121982-11-10010 November 1982 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Fort Calhoun Station, Vols I & Ii,Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20076C3261982-10-0505 October 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Fort Calhoun Station, Technical Evaluation Rept ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML20064L5281982-07-0101 July 1982 Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept ML20042A2331982-02-28028 February 1982 Technical Evaluation Rept for Containment Purging & Venting During Normal Operation of Fort Calhoun Station. ML20040D1651981-12-16016 December 1981 Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Rept, Request for Addl Info ML20039A9111981-11-30030 November 1981 Adequacy of Station Electric Distribution Sys Voltages, Fort Calhoun Nuclear Station Unit 1,informal Rept ML20005C0041981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations.Fort Calhoun Station,Unit No. 1 Environmental Appraisal Report ML20039B8101981-10-31031 October 1981 Evaluation of Emergency Response Facilities for Fort Calhoun Station - Unit 1. ML20038A7691981-10-31031 October 1981 Aquatic Impacts from Operation of Three Midwestern Nuclear Power Stations ML20003H2761980-10-24024 October 1980 Primary Coolant Sys Pressure Isolation Valves,Fort Calhoun Unit 1, Technical Evaluation Rept ML19326D7181980-01-31031 January 1980 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other Engineered Safety Feature Signals for Fort Calhoun Nuclear Power Plant. ML19317H1891978-07-31031 July 1978 In-Plant Source Term Measurements at Fort Calhoun Station- Unit 1. 1998-03-31
[Table view] |