Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000317/1989006 | 7 July 1989 | Insp Repts 50-317/89-06 & 50-318/89-06 on 890404-0515. Violation Noted.Major Areas Inspected:Facility Activities, Licensee Action on Previous Insp Findings,Operational Safety,Physical Security,Plant Operations,Maint & LERs |
IR 05000317/1993031 | 27 December 1993 | Insp Repts 50-317/93-31 & 50-318/93-31 on 931115-19. Violations Noted.Major Areas Inspected:Svc Water Sys & Component Cooling Sys |
IR 05000317/1997001 | 15 April 1997 | Insp Repts 50-317/97-01 & 50-318/97-01 on 970119-0301.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
ML060190021 | 16 January 2006 | Class 1 Piping Operability Evaluation Submittal Per Code Requirements |
ML102590423 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Site Characteristics - Page 2.8.2 |
ML102590426 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 3, Principal Design Criteria - Page 3.7.3 |
ML102590455 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 8, Accident Analyses - Page 8.4.3 |
ML102590476 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 12, Table of Contents - Pages 12-1 Thur 12.12-3 |
ML102600390 | 9 September 2010 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 19 - Chapter 2, Figure 2.6-10, Response Spectra Design Basis Earthquake. |
ML110700356 | 1 February 2011 | Independent Spent Fuel Storage Installation, ERPIP-600, Severe Accident Management. Part 6 of 13 |
ML110700381 | 1 February 2011 | Independent Spent Fuel Storage Installation, OI-35, Radiation Monitoring System, Rev. 31. Part 13 of 13 |
ML11269A077 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 2, Site Characteristics |
ML11269A078 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 3, Principal Design Criteria |
ML11269A083 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 8, Accident Analyses |
ML11269A088 | 8 September 2011 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report (Usar), Revision 20 - Chapter 12, NUHOMS-32P Dry Shielded Canister |
ML12038A135 | 29 August 2011 | Email from G. Kulesa, NRR to P. Boyle, NRR FW: Request for Assistance - Confirmation That OBE Was Not Exceeded at Surry and Calvert Cliffs |
ML12275A426 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 2, Site Characteristics |
ML12275A427 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 3, Principal Design Criteria |
ML12275A432 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 8, Accident Analyses |
ML12275A436 | 18 September 2012 | Independent Spent Fuel Storage Installation, Updated Safety Analysis Report, Revision 21, Chapter 12, NUHOMS-32P Dry Shielded Canister |
ML13066A171 | 28 February 2013 | R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13066A172 | 28 February 2013 | R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation |
ML13073A155 | 8 March 2013 | Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation |
ML13074A056 | 8 March 2013 | Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events |
ML13319B080 | 14 November 2013 | Proposed 10 CFR 50.55a Request for Repair of Saltwater Piping Leak (RR-ISI-04-09) |
ML14099A196 | 31 March 2014 | Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. |
ML14274A498 | 25 July 2014 | Redacted - Calvert Cliffs, Units 1 & 2 - Request for Supplemental Information - Amendment Request No. 11 to Materials License No. SNM-2505 for Specific Independent Spent Fuel Storage Installation- Acceptance Review |
ML14279A565 | 6 November 2014 | Relief Request RR-ISI-04-09 Regarding Saltwater System Piping Repair |
ML15026A527 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 12 - NUHOMS-32P Dry Shielded Canister |
ML15026A531 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 2 - Site Characteristics |
ML15026A532 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 3 - Principal Design Criteria |
ML15026A537 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23. Chapter 8 - Accident Analyses |
ML15026A651 | 7 January 2015 | Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 23, Figure 2.6-10, Response Spectra Design Basis Earthquake. |
ML15133A144 | 23 July 2015 | Amendment Regarding New Technical Specification 3.7.18 for Atmospheric Dump Valves |
ML19072A096 | 11 March 2019 | Information Regarding Dissimilar Metal Weld 2-CV-2005-30 Flaw Characteristic and Repair Weld Overlay |
ML19290H015 | 17 December 1980 | Application for Amend to License DPR-53 to Change Tech Specs Re Operation of Containment Spray Sys During Dbe.Summary Piping Flexibility Analysis Encl |
ML19309D300 | 7 April 1980 | Forwards Response to NRC 800225 Request for Addl Info Re Facility Containment Purge Sys Design.Includes Info Re Electrical Reset,Override & Bypass |
ML19323D741 | 20 May 1980 | Submits Response to Request for Addl Info Re Spent Fuel Pool Mod Amend.Corrects Math Error in Response to Question B.1. Discusses Waste Handling & Structural Analysis.Withdraws Request for Expansion to 1,830 Spaces |
ML20002A567 | 6 November 1980 | Provides Addl Info Re IE Bulletin 80-11.Two Temporary Walls Removed & Another Wall in Auxiliary Bldg Will Be Removed & Replaced W/Design Utilizing Different Fire Barrier Matls. Complete Rept Will Be Filed by 810109.Bechtel Comments Encl |
ML20003A264 | 12 January 1981 | Evaluation of Defective Spot Welds in Calvert Cliffs Nuclear Plant High-Density Spent Fuel Storage Racks. |
ML20009A026 | 30 June 1981 | Forwards Info Re Seismic Qualification of Facility Auxiliary Feedwater Sys,In Response to Generic Ltr 81-14 |
ML20046B154 | 26 July 1993 | Rev 0 to Electrical Engineeing Design Rept,Edg Project. |
ML20056F988 | 25 August 1993 | Instrumentation & Control Sys Design Rept, for Emergency Diesel Generator Project |
ML20063L283 | 18 February 1994 | Forwards Corrections to Erroneous Info Supplied in 930401 License Amend Request Re Onsite Power Distribution Sys,Ac Distribution - Operating |
ML20064G809 | 7 March 1994 | Forwards Info on How Alternate Ac Source Meets Criteria in NUMARC 87-00,App B,Per Commitment in 930707 Mod to SBO Response.Addl Info Re Design of Alternate Ac Source Also Encl |
ML20064G856 | 22 December 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures Erpip 3.0 Re Immediate Action Procedures & Erpip 3.1 Re Initial Actions & Emergency Action Levels |
ML20071N650 | 2 August 1994 | Forwards Response to NRC 940617 RAI Re Alternate Ac Power Design Rept.W/Five Oversize Drawings |
ML20076B412 | 2 July 1991 | Application for Amends to Licenses DPR-53 & DPR-69,revising TS 3/4.9.7, Crane Travel - Spent Fuel Storage Pool Bldg & 3/4.9.13, Spent Fuel Cask Handling Crane to Provide Single Proof Status,Per NUREG-0612 Re Control of Heavy Loads |
ML20086C822 | 21 November 1983 | Requests Exemption from Fire Protection Requirements of 10CFR50,App R Re Fire Door Assemblies,Oil Collection Sys for Reactor Coolant Pumps & Sprinkler Coverage |
ML20101S774 | 31 January 1985 | Application for Amend to Licenses DPR-53 & DPR-69,revising Tech Specs to Delete Snubbers 1-11-12,1-60-5 & 1-60-5A,to Modify Snubbers 1-63-13 & 1-63-28 & to Permit Changing Modes When Control Element Assembly Interlocks Inoperable |