Forwards Info Re Seismic Qualification of Facility Auxiliary Feedwater Sys,In Response to Generic Ltr 81-14
ML20009A026
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/30/1981
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
GL-81-14, NUDOCS 8107070385
Download: ML20009A026 (26)


Text

BALTIMO RE GAS AND ELECTRI CHARLES CENTER e.O. BOX 14?S BALTIMORE, MARYLAND 21203 June 30, 1981 l

AMTMum E. LUNDVALL, JR.

Vacc PseESIDENT

\\

sumv Office of Nuclear Peactor Regulation V

- }

q, g'g U. S. Nuclear Regulatory Commission g

j' -

Washington, D. C.

20555 JUL 0 G 1981*

3 m.

H 6~

Attn: Mr. Robert A. Clark, Chief g,,,

~

Operating Reactors Branch #3

\\g q

comuoa Division of Licensing Ng

'Q

Subject:

Calvert Cliffs Nuclear Power Plant Q

t\\

Units Nos. 1 & 2; Dockets Nos. 50-317 & 50-?1 Auxiliary Feedvater System

Reference:

Generic Letter No. 81-14, Seismic Qualification of Auxiliary Feedvater Systems, dated 10 February 1981.

Gentlemen:

The referenced letter requested information concerning the seismic qualification of the Calvert Cliffs Auxiliary Feedvater ( AW) Systems.

Enclosed please find a report discussing the design of the seitr.ic and non-seismic portions of the AW syste=s.

BALTIMORE GAS AND 5'CTRIC COMPANY 2.4],

97

.n.

f Vic'e P'res ident, Supply j

2 STATE OF MARYLAND:

TO WIT:

CITY OF BALTIMORE:

Mr. A. E. Lundvall, Jr. being duly sworn, states that he is Vice President of the Bcitimore Gas and Electric Company, a corporation of the State cc Maryland; that he executed the foregoing submittal for the purposes the.ein set forth; that the statements made in said submittal are true and cor cet to the best of his knowledge, information and belief; and that he was t, thorized to execute the sub ittal on behalf f said corporation.

WITNESS my hand and Notarial Eeal:

I

/

My Commission Expires:

% I;J

/ /h Y

I

/

h(

Y

~810707038S810630gn L Q\\

PDR ADOCK 05000317j p

PDRy J

l Mr. R. A. Citrk Paga 2 Juns 23, 1981 cc:

J. A. Biddison, Esquire G. F. Trowbridge, Esquire Messrs. E. L. Conner, Jr. - NRC J. C. Ventura - Bechtel P. W. Kruse - CE R. E. Arthitzel - Resident Inspector

t CONTENTS I.

' Introduction and Conclusions

II.

System' Description III.

General Discussion.of Seismic Methodology IV.

Non-Seismic Category I Components Attachments:

Attachment (A) Seismic Criteria Attachment (B) Auxiliary Feedvater System Schematic q

s 1

L

I.

Introduction and Conclusions The Calvert Cliffs Auxiliary Feedvater System has been addressed in responses to NRC IE Bulletins 79-02, 79-04, 79-07, 79-lk, and 80-11 and to IE Information Notice 80-21, which verified and evaluated the as-built characteristics of the system. This evaluation contains additional information requested by Generic Letter 81-1h, Seismic Qualification of Auxiliary Feedvater Systems.Section II provides a brief system description.

Section III discusses the criteria and methods used fee the qualification of Seismic Class I components in the Calvert Cliffs non-Seismic Class I and addresses specifically items listed in Table 1 of Generic Letter 81-14.

This evaluation e oncludes that the Calvert Cliffs Auxiliary Feedvater Systems exhibit a high degree of inherent seismic resistance.

The majority of the system's original design was accomplished using the seismic design criteria typical for other Calvert Cliffs Seismic Class I systems. For those few portions of the system which have been identified as non-seismic, the as-built configuration of the systems has been examined and it has been determined that the safe shutdown earthquake would not have a significant effect on the AFW syste" function as explained in Section IV.

II.

System Dercrintion Overall Design - (See Attachment B for a schematic)

In general, each units AFWS is a auto / manual operated system that includes two steam turbine-driven pumps, eac'1 of which is sized to deliver 700 gpm at 1100 psia to the steam gener;cors. The pumps' turbines can be supplied with steam from either the steam generators (SG) or the auxiliary boiler. Both pumps are located in a Seismic Class I auxiliary feedvater pump room. This room is designed as a separate, totally enclosed Class I structure located at the bottom elevation of the Turbine building.

The normal vater supply to each pump is from Condensate Storage Tank No.12 (CST No.12), via a common line feeding both units.

Each unit's suction line splits and feeds the two AFWS pumps. Flov from each pump discharges into a common line which in turn branches to each of two SG.

AFWS flow is controlled by regulating pump speed an(. by regulating flow through an air-operated throttle control valve in the feed line to each SG.

Water Supply The primary water source for both units is CST No. 12 which has a 350,000 gallon capaci+,y, 300,000 gallons of which are dedicated to the AFWS for both units. The normal supply path of AFWS vater is from CST No.

12 through two locked open manually operated valves in a common line which tranches to the two pumps. CST No.12 is designed to seismic Class I requirements and is prctected against tornado missiles.

2

The secondary water source (CST 11 and 21) feed lines each include two normally closed manually-operated valves, and are connected to the common header that feeds both auxiliary feedvater pumps. These sources of water are used for normal plant makeup and are not specifically j

dedicated to the AFWS. To supply the AFWS pumps with water from CST No.

)

11 or El would require an operator to go to the tank and open the valves.

Specific procedures are provided for this operation. CST No. 12 is filled from the demineralized water system via a line containing a check valve and a normally shut manual valve. Filling CST No.12 is performed locally by an operator at the tank, using approved procedures.

Steam Sunnly Steam to drive the AFWS pump turbines is supplied by the steam generators. Each steam generator can supply steam to either or both turbines from its main steam line through a normally closed motor operated valve (MOV) which fails as-is or a normally closed manual bypass valve into a common header.

Each AFW pump takes steam from the common header through a normally open manual valve, a check valve, a normally open stop valve (with a DC trip mechanism) and an air operated normally closed throttle valve.

An altarnative source of steam is the auxiliary boiler fired by oil. Wh(n operating, the auxiliary boiler supplies steam through a normally locked closed manual valve located between the check valve and stop valve on each turbine steam supply line.

Controls The following controls are located in the Control Room:

1.

Hand indicating controllers for:

a.

Turbine Control (throttle) Va? e Air operated fail open valve; air supply is instrument air with no back-up; control circuit power supply is vital AC.

For automatic start this valve is set to open all the way and the AFWS Regulating Valve is positioned accordingly to prevent excess flow. During normal operations the control room operator controls pump speed with this valve and repositions the AFWS Regulating valve to obtain optimum system performance.

If during operation the throttle valve were to fail open there would be no adverse effects because the AFWS Regulating valve, as stated above, can handle this conditf.cn.

b.

AFWS RegulatJng Valve Air operated fail open valve; air supply is instrument air with back-up air accumulators, electrical supply is vital AC.

To minimize the possibility of the AFWS Regulating Valve failing open, the back-up air accumulator has enough capacity to allow time for the operator to take local manual control. This valve can be bypassed by operating a normally closed manual valve.

3

2.

Motor Operated Valves - Open/Close for Each MOV The MOVs are powered from separate emergency AC buses. Only one is required to be opened for full AWS demand. The MOVs can be bypassed using manually operated full flow bypass valves in the remote event that both AC power sources are lost.

3.

Turbine Stop Valves (DC Trip)

The Turbine Stop Valves are powered from the DC buses and fail in the open position.

All controls except the matcr operated valve controls are also located at the Remote Shutdown Panel /AWS Pump Room. All control and instrumentation power is from emergency buses which can be energized from the diesel generators.

In accordance with NUREG 0578 and 0737, each AWS has been modified to include a safety-related, automatic start system (AFAS). The AFAS consists of four redundant steam generator level monitoring subsystems and two redundant actuation subsystems for the AW stert (auto start of the AWS pumps). The actuation system is qualified to the same criteria as the Engineered Safety Features Actuation System (ESFAS), as discussed in Attachment (A), and is installed in the ESFAS cabinets. The level transmitters are also seismically qualified as discussed in Attachment (A).

III.

General Discussion of Seismic Methodology Attachment A, except for loading combination, is excerpted from the Calvert Cliffs FSAR basic seistde criteria. These criteria were used to qualify the majority of both Units 1 and 2 Class I structures, equipment, and components. Specific items have been highlighted for ease of referencing. The applicable questions and ansvers from the FSAR Supplement are also included. The seismic criteria for those areas not included in Attachment A are presented below by discipline. Additional information is also presented on the criteria qualification methoda.

Mechanical equipment which was qualified to the attached criteria was analyzed by the applicable supplier. No actual or type testing was performed. The supplier's calculations determined equipment rigidity and provides assurance that no failures vill occur under the loading combinations specif!ed. All pipe / supports within Class I structures were also designed and installed to the attached criteria. For field run 2-inch and smaller Class I piping, a field installation manual was utilized by field engineers to properly design and locate pipe s'tpports.

Recent plant modifications have upgre.ded all electrical power supplies to Class 1E (seismic). Associc.ted distribution panels, inverters, chargers,' and batteries are qualified 1E as discus 2ed in Attachment (A).

Cable tray supports were originally installed to standard seir,mic installation details and guidelines and verified by engineering in the field.

h

All Class I instrumentation devices were qualified in accordance with the criteria presented in Attachment (A). Control. valves and appur-tenences were type-tested and/or analyzed to withstand a 3 0g load in any direction. Natural frequency of extended parts was designed to be greater than 20 hertz to be consistent with associated process pipe. Pump suction and discharge pressure switches initially were prototype shock tested to military standards to verify pressure integrity under impact loads. Integral pipe mounted devices are qualified with the piping. Instrument sensing lines were designed and installed to small pipe standard seismic installation details.

Instrument supports were designed and analyzed to ensure a natural frequency of greater than 33 hertz and to ensure integrity at 2g's.

The instrument air supply to AFW throttle valves has recently been upgraded to the seismic Class I criteria for both the air source and the associated piping in accordance with the requirements for 2" and smaller pipe.

+.

IV.

Non-Seismic Class I Comnonents General Upgrading of Non-Seismic Class I electrical and controls components will be accomolished under our general AFW modification which is a result of the NRC Bulletins and Orders Task Force review of the Calvert Cliffs Auxiliary Feedvater Sy.: tem. Iong term modifications are presently being engineered and have been described in previous correspondence with the NRC.

The following is a list of components which have been identified as presently being non-seismic Class I.

Each item for which there are no plans to upgrade was walked-down in the field such that its as-built configuration could be evaluated to determine the degree of seismic resistance the engineering provided. The items are arranged in the order presented in Table 1 of Generic Letter 81-14, and the additional information

-as required by Enclosure 1, section C is provided.

l 1.

Pumps / Motors-The AFW pump turbine and the associeted trip / throttle valve assembly presently does not carry a seismic certification from the manufacturer.

l However, inquiries have been made of other plants that have Terry l

turbines which are the same model of similar cenfiguration. One of l

these plants has obtained ' seismic certification for their equipment with greater loading than required at Calvert Cliffs. These facts afford a high level of confidence that the Calvert Cliffs installation vill withstand the stresses resulting from an SSE. The remainder of the pump turbine skid essembly carries a seismic certification from the l

L man facturer.

u 2.

Piping a.

_ AFW pump minimum flow recirculation piping

.5

Each pair of AW pumps has one common recirculation line routed through the non-seismic turbine building to the Condensate Storage Tank No.

12.. These lines, to a. point downstream of the second flow restriction

- orifice inside the AW pump rooms, are seismic Class I.

It has been determined that any failure of this line downstream of the first restriction orifice vill not significantly affect system function.

The minimum flow requirement for the AW pumps is not an important safety parameter with respect to other one-time system functions under emergency conditions.

b.

AW Nmp exhaust piping to atmosphere

. The exhaust lines, one 10" pipe from each pump turbine, run out of the A W pump room, through the non-seismic Class I turbine building to the roof where they are open to atmosphere. We consider these lines acceptable based on the following:

1.

Approximately 90% of the lines in the turbine ouilding are not located near or under any heavy equipment which could collapse and damage them.

2.

The lines are generally supported from heavy turbine building crane columns not

  • rom secondary steel.

3.

Those portions of the lines in the pump room are supported seismically.

h.

Failure or rupture of these lines vould not significantly affect A W pump turbine operation.

5 Upon completion of the - AWS modifications required by the Bulletins and Orders Task Force, a third auxiliary feedvater pump vill be in operation which does not require exhaust piping.

c.

Chemical addition piping to the A W system.

Each pair of AW pumps has a chemical addition line which ties in to the common pump suction piping in the AW pump room. The chemical addition equipment is located in the non-seismic turbine building.

The chemical addition piping within the AW pump room is non-seismic Class I, however, it csui be isolated from the AW system by using an existing manual valve in the pump room. We intend to change the position of this valve to normally shut. The portion of piping between the chemical addition isolation valve and the AW system is very srall, i.e., two velds. On Unit 1, an additional chemical addition line is installed by each AW containment penetration room. These lines are not in use. We plan to cut and cap these lines as part of the general AW modifications.

'3.

Valves Manual valves, with the exception of penetration and CST No.12 discharge valves, were purchased with no seismic qualification. These valves were 6

installed in seismic lines and analyzed with the system. However, we have detemined that these valves are similar in material properties and construction to other valves which are seismically qualified, and they therefore vould possess a substantial amount of inherent seismic resistance.

h.

Power Supplies All conduits required for circuits essential to the safe operation of the AFW system are installed per the standards and criteria discussed in section III and attachment (A). For certain selected conduits carrying circuits which are diagnostic only, such as AW system temper-ature, vibration monitoring, and pressure, the installation is in accordance with the National Electrical Code Table 3h6-12 for rigid metallic conduit. For the AFW modification, all conduits carrying any circuit within the system boundaries, regardless of its nature, vill be upgraded to Class 1E and vill meet the intent of IE Bulletin 79-OlB and NUREG-0588.

5 Primary Water and Supply Path No non-seismic equipment.

6.

Secondary Water Supply Fath Not applicable to Calvert Cliffs 7

Initiation and Control Systems The non-qualified pressure indicators are the Bourdon tube type which are mounted and tubed to the seismic criteria used for 2" and smaller piping as discussed in this evaluation. The remote turbine trip hand-switches are not seismically qualified. These items are presently being

. upgraded under our keneral AFW modification and vill mest the intent of IE Bulletin 79-OlB and NUREG-0588.

'Ihe' instrument air source for AFW pump turbine throttle is non-seismic plant instrument air. On failure of the air supply, the throttle valve fails to the full open position.

As discussed in Section II (under Controls), this does not affect system safety, therefore, there are no plans to upgrade this air supply.

'8.

Structures All structures housing AFW system items are seismically Class I designed.

7

l Attachment (A)

Comprising:

F.S.A.R. Section 5-A - Structural Design Bases (5 pages)

F.S.A.R. Questions (7 pages)

Loading Combinations (1 page) l

APPENDIX 5-A SA STRUCTURAL DESIGN RASES 5A.1 GENERAL The design bases for structures for normal operating conditions are governed by the applicable building design codes. The design bases for epecific systems and equipment are stated in the appropriate FSAR Section. The de-sign basis for the maximum loss-of-coolant incident and seismic conditions is that there be no loss of-function if that function is related to public safety.

SA.2 CLASSES OF STRUCTURES. SYSTEMS AND EQUIPMENT SA.2.1 l CLASS 1b Class 1 structures, systems, and equipment are those whose failure could cause uncontrolled release of radioactivity or those essential for immediate and long-term operation following a loss-of-coolant incident. When a system as a whole is referred to as Class 1, portions not associated with loss-of-function of the system may be designated as Class 2.

The following are typical Class 1 structures:

Containment structure shell The auxiliary buildine below elevation 69'-0" Enclosures for the critical service water pumps, critical salt water pumps, and purf14 mrv feedvater numpa

.Sunoorts for Class 1 avstem connonenta.

Typical Class 1 equipment and systens are:

Reactor vessel and internals including control rods and control rod drives Other primary coolant system ccaponents (steam generators, pressurizer, pumps, etc..) and piping, including vent and drain piping inside the containment Containment penetrations up to and including the first isolation valve outside the containment Atmospheric dump and main steam safety valves and associated piping from main steam headers Penetration room ventilation du'cting.

SA-1

l Spent fuel storage racks Auxiliary feedvater nuno. condensate storane tank. and associated oicina Main emergency generator including fuel supply Control boards, switchaear. load centers, batteries, and cable runs Servina class 1 equipmen,t Critical service water system Critical salt water system Containment structure spray system, including refueling water tank Containment structure air cooling system Low-pressure safety injection and shutdown cooling system High-pressure safety injection system Chemical and volume control system Safety injection tanks and piping Spent fuel pool purification system All equipment in the radioactive waste processing systems except the reactor coolant and miscellaneous waste evaporators.

(Failure of the evaporators has been assumed, and the resultant offsite dose was calculated. The dose was shown to be well 23 24 below Part 100 limits with accident meteorology. Consequently, in accordance with Safety Guide 29, the l

evaporators are not required to be Seismic Class I.)

5.A.2.2 CLASS 2 Class 2 structures, systems, and equipment are those whose failure would not result in the release of radioactivity and would not prevent reactor shutdown.

The failure of Class 2 structures, systems, and equipment may interrupt power i

generation.

5A.3 DESIGN BASES f

5A.3.1 l CLASS 1 STRUCTURE DESIGN f

SA.3.1.1 Normal Operation For loads to be encountered during normal plant operation (including operating basis earthquake loads), Class 1 structures are designed in accordance with design methods of accepted standards and codes insofar as they are applicable.

5A.3.1.2 LOCI. Seismic and Tornado Loads j

\\

The Class 1 structures are in general proportioned to maintain elastic behavior when subjected to various combinations of dead loads, thermal loads, LOCI loads, s.4==4e and tornado loads. The upper limit of elastic behavior is considered to be the yield strength of the effective load-carrying structural materials. The yield SA-2 Rev.4/13/73

4 strength (Y) for reinforced concrete structures is considered to be the ultimate resisting capacity as calculated from the " Ultimate Strength Design" portion of the ACI-318-63 code when 6 is taken as unity. Reinforced concrete structures are designed for ductile behavior whenever possible, i.e., with steel stresses controlling the design.

The final de=fon of class 1 structures (except the Containment Structure) satisfies the most severe of the following load combination equations.

Y 1/6 (1.25D + 1.OR + 1.25E)

Y l

l 2 1/6 (1.25D + 1.25H + 1.25E)

Y A 1/6 (1.0D + 1.OR + 1.OE')

Y Y ? 1/6 (1.0D + 1.0H + 1.0E')

The final design of the Containment Structure satisfies the following load combinations and factors (factored load cases):

YY 1/6 (1.05D + 1.5P + 1.0TA + 1.0F)

YT 1/6 (1.05D + 1.25P + 1.0TA + 1.25H + 1.25E + 1.0F)

Y Y 1/6 (1.05D + 1.25H + 1.OR + 1.0F + 1.25E + 1.0T,)

Y I 1/6 (1.05D + 1.25H + 1.0F + 1.25W + 1.0 T )

o Y f 1/6 (l.OD + 1.0P + 1.0TA + 1.0H + 1.0E' + 1.0F)

Y ? 1/6 (1.0D + 1.0H + 1.OR + 1.0E' + 1.0F + 1.0T )

o (Wind, W, is to replace earthquake, E, in the above formulae where wind stresses control)

(0.90 D is used where dead load subtracts from critical stress in the above equations.)

However, limited yielding or erosion of barriers is allowable under load conditions including the design basis earthquake (E') and under jet or missile forces, provided the deflection is checked to ensure that the affected Class 1 systems and equipment do not suffer loss-of inction and the structure re-tains its required integrity.

Y = required yield strength of the structure.

D = dead load of structure and equipment plus any other permanent loads contributing stress, such as soil or hydrostatic loads.

In addition, a portion of " live load" is added when such load is expected to be present when the plant is operating. An allowance is also made for future permanent loads.

SA-3

R = force and/or pressure on structure due to rupture of any one pipe.

16 H = force on structure due to thermal expansion of restrained pipes under operating conditions.

E = cperating basis earthquake load.

E'= design basis earthauake load, w = tornado wind load.

P = LOCI pressure load.

F = final prestress load.

T = thermal load due to the incident temperature gradient through the g

wall and expansion of the liner. It is based on a temperature corresponding to the factored LOCI pressure.

T, = thermal load due to the normal operating temperature gradient through the walls.

$ = yield capacitv reduction factor as follows:

0.90 for reinforced concrete in flexure.

0.85 for tension, shear, bond, and anchorage in reinforced concrete.

0.75 for spirally reinforce 4 concrete compression members.

0.70 for tied compression aambers.

0.90 for fabricated structural steel.

0.90 for unprestressed reinforcing steel in direct tension.

0.95 for prestressed tendono in direct tension.

The Containment Structure and engineered safety systems components are protected by barriers from all credible missiles which might be generated from the primary system during a LOCI.

The final design of the missile barrier and equipment support structures in-side the containment were reviewed to assure that they can withstand appli-cable pressure loads, jet forces, pipe reactions and earthquake loads without loss-of-function. The deflections or deformations of structures and supports were checked to assure that the functions of the containment and engineered safety features are not impaired.

5A.3.1.3 Tornado Forces Class 1 structures are designed to resist the effects of a tornado These structures are analyzed for tornado loading (not coincident with LOCI or earthquake) on the following basis:

Differential bursting pressure between the inside and outside of a.

the containment structure is assumed to be 3 pounds per square inch positive pressure.

Mov.10/20/72) 5A-4 y

v-e-wg w,,.

.g-

,--%s.,i,.r U

T-*

--T' P"

~T"--"--

-~

b.

Lateral force is asenmed as the force caused by a tornado funnel having a peripheral tangential velocity of 300 mph and a forward progression of 60 mph. The applicable portions of wind design methods described in ASCE Paper 3269 are used, particularly for shape factors. The provietons for" gust fac-tors and variation of wind velocity with height do not apply.

c.

Torsion on the containment structure is computed from the drag on a cylinder resulting from a 300 mph rotary wind centered over the structure, d.

A tornado driven missile equivalent to a 4000 pound automo-bile flying through the air at 50 mph and at not more than 25 feet above the ground or a 4 inch by 12 inch by 12 ft. long piece of wood traveling end-on at 300 mph at any height.

Except for local crushing at the missile impact area,the allowable stresses to resist the effects of tornadoes are 90 percent of the yield of the reinforcing steel and 85 percent of the ultimate strength of the concrete.

SA.3.1.4 Seismic Forces (E and E')

AEC oublication TID 7024. " Nuclear Reactors and Earthquakes," is used as the basic design guide for seismic analysis.

The'bperating basis earthquake" used for this plant is a maximum ground acceleration of 0.08g horizontally and 0.053g vertically, acting simul-taneously. The'Besien basis earthouake" is a ground acceleration of 0.15e horizontally and U. lor: vertically. actine simultaneous 1v.

The maximum stresses at a narticular location resultine from the simultangangly

_ occurring vertical and horizontal accelerations are added directiv with stresses cevelocea trom otner load conditions.

Seismic loads on structures. systems, and equipment are determined by realistic evninatinn nf dvnnmie nronerties and the acceferations from the_ acceleration spectrum curves in Section 2.

% Critical Damping (translational)

" Operating Basis

" Design Basis Earthquake" (E)

Earthquake" (E')

Welded steel plate assemblies 1

1 Welded steel framed structures 2

2 Bolted or riveted steel framed structures 2.5 2.5 Reinforced concrete equipment supports 2

3 Reinforced concrete frames and buildings 3

5 Prestressed concrete structures 2

5 Steel piping 0.5 0.5 Soil 2

3 SA-5

~

l 4.28 QUESTION Identify the method of seismic analysis (modal analysis, response spectra, modal analysis time history, equivalent static load, or empirical test analysis) that was employed in the design of Class I (seismic) system, components and structures other than the Containment Structure.

ANSWER 1.

Class I (seismic) structures:

A complete dynamic analysis, including soil structure interaction, similar to the containment structure, was performed on each Class I (seismic) structure.

The method used to determine the scismic response resulting from the Operating Basis and Design Basis Earthquake is described in Sections 2.6.5 and 5.1.3.2.b of FSAR.

l9 2.

Equipment, systems and components :

The analysis of Class I (seismic) equipment, systems and components located at various levels of the structures, were performed by modal analysis floor response spectra method.

The floor response spectra curves were generated by subjecting the building model to the selected base excitation, then determining the maximum response of a single degree of freedom system, of varying natural period of vibration and for several values of damping, at each floor elevation.

Rev. 4/25/72 4.28-1

f 4.33 QUESTION With respect to seismic design criteria for piping and equipment, the use of static coefficients alone may not adequately account for structural amplification and the response of flexible components.

Provide the bases for the value chosen and justification for the use of static design analysis by demonstrating the results thus obtained are conservative when compared with the results delivered by the application of an appropriate multi-degree-of-freedom system analysis.

J ANSWER For the design of Class I (seismic) piping and equipment, coefficients were based on the floor response spectrum curves. These curves were generated using the time history technique for both horizontal and vertical direction, for various damping values, and at designated floor elevations in the Class I (seismic) structures. This time-history method is based on a dynamic analysis of muti-degree-of-freedom system.

The use of these curves for Class I (seismic) piping and equipment is explained in our response to Questions 4.34.1 through 4.34.3.

i i

4.33-1 l

I 1

i s

4.34 QUESTION Submit the basis for the method used to determine the possible combined horizontal and vertical amplified response loadings for the seismic design of structures, systems and components including the following:

4.34.1 The possible com; '.ned horizontal and vertical response loading for seismic design of the structure and floors.

ANSWER The response of the structure and floors to the design basis and operating basis earthquake was computed using the response spectrum technique.

This method, described in Section 5.1.3.2b of FSAR, computes the horizontal response in the direction that will give maximum stresses.

For the response of the structure in vertical direction, the struc-ture was reduced into one-degree system.

The responses (shears, moments, and inertia forces) in both vertical and horizontal direction were combined to produce maximum loading on the

- structures or portions of the structures.

A multi-mass and multi-degree of freedom analysis was the original intent for determining the response of Class I structures in the vertical direction.

However, the thick concrete members of the Class I structures produced a large 9

extensional stiffness of the members in the vertical direction, with respect to the relatively lower soil stiffness, hence resulting in a singular flex-ibility matrix for such a multi-degree of freedom system.

An investigation showed that the vertical degrees of freedom were constrained, that is, tney moved approximately the same amount at the same time. Thus all the constrained vertical degrees of freedom were reduced into one independent vertical degree 2

of freedom for the structure.

4.34.1-1 Rev. 4/25/72

-- ~

4'.34.2 QUESTION 6

The possible combined horizontal and vertical amplified response loading for the seismic design of equipment and components, including the ef fect of the seismic response of the structures and floors.

ANSWER.

The spectrum response curves, for Class I (seismic) equipment and components, were generated using the time-history technique of seismic analysis.

6 These curves were generated for two horizontal directions (North-South and East-West) and for the vertical direction, using various damping values at designated floor elevations in the structures.

The following was included in the analysis of all Class I (seismic) 10 squipment for their seismic design:

Determine which response curve is applicable, using information a.

from the specification concerning equipment location, and the appropriate damping value, b.

Evaluate the natural frequency (frequencies) of the equipment in both horizontal and vertical airections. The horizontal frequency (frequencies) shall b2 computed in the direction l

that will give the highest stresses.

Utilizing the natural frequency (frequencies) enter the c.

applicable spectrum response curve to read the maximum response acceleration.

d ".

For equipment and systems modeled as mu!ti-degree systems, the acceleration per mode shall be combined by the normal mode method. We have examined the effect of adding closely spaced 12 modes linearly and find that allowable stress levels are not exceeded.

4.34.2-1 Rev. 7/28/72

r e.

The horizontal and vertical seismic forces are equal to the mass of the equipment times the respective spectrum acceleration.

f.

Both horizontal and vertical forces shall be applied simultane-ously at the center of gravity of the equipment or at lemped mass point.

g.

Seismic stresses shall be computed and combined with all other stresses that might exist in critical components.

h.

Stresses from the Operating Basis Earthquake, when combined with normal operating stresses, shall be kept at or below the applicable code allowable stresses,

i. Stresses from the Design Basis Earthquake, when combined with normal operating stresses, shall be kept at or below yield strength of the material provided that no-loss-of function can occur.
j. For equipment, where analysis is not reliable, vibration tests shall be employed to verify the seismic adequacy of the equip-ment. The test procedure shall be submitted for approval.

4.34.2-2

+ - - -

4.34.3 QUESTION j

The possible combined horizontal and vertical response loading for seismic design of piping, instrumentation, including the effect of the seismic response of the building, floors, sup-ports, equipment, and components.

ANSWER A multi-mass, response spectrum, modal analysis method was 6

employed in the seismic analysis of Class I (seismic) piping including support systems and instrumentation. The natural frequencies and mode' shape for the system were calculated, and the maximum response accelerations were determined using the appropriate spectrum response curves in the horizontal and vertical direction. The spectrum response curves are generated using the time-history of the floor, which includes the seismic response of the building.

The horizontal and vertical seismic forces were applied simultaneously. Shear stresses, moments, and deflections were determined for the piping system and restraints. The load and stresses due to seismic loadings were assumed to be acting simultaneously with operating weights end longitudinal pressure loads.

4.34.3-1 Rev.

1/28/72

j 4.34.3 QUESTION The possible combined horizontal and vertical response loading for seismic design of piping, instrumentation, including the effect of the seismic response of the building, floors, sup-

~ ports, equipment, and components.

ANSWER A multi-mass response spectrum model analysis method was employed in the seismic analysis of Class I (seismic) piping including support systems and instrumentation. The natural frequencies and mode shape for the system were calculated, and the maximum response accelerations were determined using the appropriate spectrum response curves in the horizontal and vertical direction. The spectrum response curves are generated using the time-history of the floor, which includes the seismic response of the building.

The horizontal and vertical seismic forces were applied simultaneously. Shear stresses, moments, and deflections were determined for the piping system and restraints. The load and stresses due to seismic loadings were assumed to be acting simultaneously with operating weights and longitudinal pressure loads.

i l

4.34.3-1

,Usec For AR LOADING COMBINATIONS (23-inch and Larger Pipe) 2 System.

Loading Condition Design Limits Design Limits Operating For for for Condition Piping Pipe Supports Piping Design PD 2SE (t,-A)

Do - 2y (t,-A)

Normal a.

PO + DW AISC Sh Upset a.

PO + DW + RVC AISC 1.2 Sh b.

PO + DW + OBE + RVO Faulted a.

PO + DW + SSE AISC Sy b.

PO + DW + SSE + RVO Thermal (SE+ Q

~~

a Where:

PD Design Pressure S

=

Allowable Stress @ ambient

=

4 PO Operating Pressure temperature (B31.1.0, 1967)

=

W Piping Weight S

=

(1.25Sc + 0.25Sh) (B31.1.0,1967) a =

OBE Operational Basis Earthquake t,

Minimum required wall thickness in

=

=

int.hes SSE Safe Shutdown Earthquake D

=

Outside diameter of pipe in inches

=

9 RVC - Relief valve-closed system SE Maaimum allowable stress in material

=

(transient)

A Additional thickness to provide for

=

S.

Thermal Expansion mechanical strength of the pipe

=

g E

Anchor Point Displacements y

a coefficient having values given

=

=

RVO Relief Valve-Open System table 104.1.2(a)2 of B31.1.0,1967

=

(Sustained) h Allowable Stress @ operating

=

temperature (B31.1.0,1967)

Attachment (B)

Comprising:

l Auxiliary Feedvater Systen Schematic (1 page)

Key to Schematic (1 page)

I t

d E

R 0

J D

g------_.-.4__--_______,

id j g o q

h 3 2 U

l i_

3 y e

i f,

+

fJa j

s i

e

+

eu a

a r<E T

l

(; ;o

?p I

1 g

aa a

h 1

\\

4 u3 0 I~~

~

ff:

>@ $U ) _$

3 s2 a 0

i.

ee

, I.,J d,,. a m

T II k

tp 3 f Il b

i

,__a 4

m 4[l 8$

4 E

ri I?

.e i

i III

  • Y a

>XJ 4

0 l

i uf v35 t _ _' _s m*

VN tu vs b

b Q<

i.______,'

I I

Eg 2

QP 6

_7__h I

'D4 I

-i 1-g

", J",au, 4

i g

m n '

y a vN r

d 5

l e

->___ss m__)

.f

(*

i tm_+-____

g,i y

, i, d

8 l 4I p

i e

i TV i

i 0

t l

k l #I Q

L_a (p)

I 2

7 i

, y'i L I

I D',

~.v~

i v -

~-

r

_>______J g

t___--__r____

gg,

$4 2D 3)1 Mc ~

95 w v4 U

o o

+

rs n

s -

.I I

i i

e 1

I 4

J.

d

_L jf d {-

? *,.p J

=

XX 5

a?*

M et bl 48 s u

o p

21

[oj jj j KVA N e@

3A 3 Y

l l v

1 i

C ST - Con o s.us 4Tn. S,o % c-s rA u W

>Q

- blo R M A t. tx Opto \\/4tv e.

- NO R tA A LLN CL_oSED NLV E

,CouTAtuMEMT 8 v i u O i O Cr g

Pa.oe.,-RAviou 1

@. pgEc s vRE luciC' TOR.

o h - Ftovv R e.s ra i c.rio n h -

Ptow No?.it IE

@ - C u n.a n ov To Puto, m,c

@ - H4uo lu cic avot Courut 9 - c.o u r n.oc v4u-t h - M OToR.

W490 $ w sTC H h-LE. VEL

( 9 0 I C, A ro R.

Lavtt

'Ta.4 vs M n Ts.g

' bole.00eo V At v e_

~

{ A - C. H E_c K VA Lv s-McRu A tty CLobED-C A C.T vA rt D CooTROL Y4 Lv G.

l G T'R A P l

Q TO R810 E CORTR.ot Y LVE Fo-F:snu. Opqo FAl-F4it. 4 E-

.I.S A s c C c.o s t o 1

AC f

F t ow N o _r i_ r_

l h

A Fw/S Scwes4 Tit L Ecr t"D. U " i7 )

Cetvgg7 C t i ns hluCLEAA SOW E B-Pu wr s utsr 2 o s 2 C//a/si l

1

,.