CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | 26 February 2020 | Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | Safe Shutdown Surveillance Frequency Control Program |
CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process | 26 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process | Surveillance Frequency Control Program |
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | 27 April 2009 | Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | Safe Shutdown Fitness for Duty |
GNRO-2002/00083, Technical Specification Bases Update to NRC for Period Dated September 12, 2002 | 12 September 2002 | Technical Specification Bases Update to NRC for Period Dated September 12, 2002 | |
GNRO-2002/00086, Technical Specification Base Update to the NRC for Period Dated October 01, 2002 for Grand Gulf Station, License NPF-29 | 1 October 2002 | Technical Specification Base Update to the NRC for Period Dated October 01, 2002 for Grand Gulf Station, License NPF-29 | Missed surveillance |
GNRO-2002/00091, Technical Specification Bases Update to NRC for Period Dated 10/25/2002 | 25 October 2002 | Technical Specification Bases Update to NRC for Period Dated 10/25/2002 | |
GNRO-2002/00098, Technical Specification Update to NRC for Period Dated December 9, 2002 | 9 December 2002 | Technical Specification Update to NRC for Period Dated December 9, 2002 | |
GNRO-2003/00025, License Amendment Request, Proposed Changes to Primary Containment and Drywell Isolation Instrumentation Requirements, Ldc 2003-033 | 8 May 2003 | License Amendment Request, Proposed Changes to Primary Containment and Drywell Isolation Instrumentation Requirements, Ldc 2003-033 | Safe Shutdown Reactor Vessel Water Level |
GNRO-2003/00027, Technical Specification Bases Update to the NRC for Period Dated April 25, 2003 | 25 April 2003 | Technical Specification Bases Update to the NRC for Period Dated April 25, 2003 | Reactor Vessel Water Level Anticipated operational occurrence |
GNRO-2003/00044, Supplement to Amendment Request Removal of Mode Restrictions for Surveillance Testing of the Division 3 Battery | 7 August 2003 | Supplement to Amendment Request Removal of Mode Restrictions for Surveillance Testing of the Division 3 Battery | |
GNRO-2003/00053, Application for Technical Specification (TS) Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process. | 24 October 2003 | Application for Technical Specification (TS) Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process. | Incorporated by reference Scram Discharge Volume |
GNRO-2003/00064, Technical Specification Bases Update to the NRC for Period Dated November 20, 2003 for Grand Gulf Nuclear Station | 20 November 2003 | Technical Specification Bases Update to the NRC for Period Dated November 20, 2003 for Grand Gulf Nuclear Station | |
GNRO-2004/00002, Technical Specification Bases Update to the NRC for Period Dated January 22, 2004 | 22 January 2004 | Technical Specification Bases Update to the NRC for Period Dated January 22, 2004 | Reactor Vessel Water Level |
GNRO-2004/00013, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LDC-2003/102 | 18 February 2004 | Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LDC-2003/102 | Incorporated by reference |
GNRO-2004/00014, Technical Specification Bases Update to NRC for Period Dated February 12, 2004 | 12 February 2004 | Technical Specification Bases Update to NRC for Period Dated February 12, 2004 | |
GNRO-2004/00058, Technical Specification Bases Update to the NRC for Period Dated October 18, 2004 | 18 October 2004 | Technical Specification Bases Update to the NRC for Period Dated October 18, 2004 | |
GNRO-2005/00027, Technical Specification Bases Update to the NRC for Period Dated May 5,2005 | 5 May 2005 | Technical Specification Bases Update to the NRC for Period Dated May 5,2005 | |
GNRO-2005/00038, License Amendment Request - Use of Relief Valves to Isolate Penetration Flow Paths for Grand Gulf Nuclear Station, Unit 1 | 27 June 2005 | License Amendment Request - Use of Relief Valves to Isolate Penetration Flow Paths for Grand Gulf Nuclear Station, Unit 1 | High Radiation Area |
GNRO-2005/00053, Technical Specification Bases Update to the NRC for Period Dated August 23, 2005 | 23 August 2005 | Technical Specification Bases Update to the NRC for Period Dated August 23, 2005 | |
GNRO-2005/00067, Technical Specification Bases Update to the NRC for Period Dated December 5, 2005 | 5 December 2005 | Technical Specification Bases Update to the NRC for Period Dated December 5, 2005 | |
GNRO-2006/00003, Technical Requirements Manual Update to the NRC for Period Dated January 17, 2006 | 17 January 2006 | Technical Requirements Manual Update to the NRC for Period Dated January 17, 2006 | |
GNRO-2006/00008, Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 | 16 February 2006 | Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 | Stroke time |
GNRO-2006/00030, Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 | 15 May 2006 | Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 | |
GNRO-2006/00036, License Amendment Request, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) | 1 November 2006 | License Amendment Request, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372) | Incorporated by reference |
GNRO-2006/00054, Technical Specification Bases Update to the NRC for Period Dated September 28, 2006 | 28 September 2006 | Technical Specification Bases Update to the NRC for Period Dated September 28, 2006 | |
GNRO-2007/00004, License Amendment Request, Request for a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control Material | 18 January 2007 | License Amendment Request, Request for a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control Material | Shutdown Margin |
GNRO-2007/00019, Technical Specification Bases Update to the NRC for Period Dated March 30, 2007 | 30 March 2007 | Technical Specification Bases Update to the NRC for Period Dated March 30, 2007 | Hydrostatic |
GNRO-2007/00021, Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 2007 | 11 April 2007 | Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 2007 | |
GNRO-2007/00043, Technical Specification Bases Update to the NRC for Period Dated June 13, 2007 | 13 June 2007 | Technical Specification Bases Update to the NRC for Period Dated June 13, 2007 | |
GNRO-2007/00049, Technical Specification Bases Update to the NRC for Period Dated July 25, 2007 | 25 July 2007 | Technical Specification Bases Update to the NRC for Period Dated July 25, 2007 | |
GNRO-2007/00050, Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability | 7 August 2007 | Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability | Safe Shutdown Incorporated by reference Recently irradiated fuel Fire Protection Program Grace period |
GNRO-2007/00073, Technical Specification Bases Update to the NRC for Period Dated December 03, 2007 | 3 December 2007 | Technical Specification Bases Update to the NRC for Period Dated December 03, 2007 | High Radiation Area |
GNRO-2008/00013, License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing | 11 September 2008 | License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing | Safe Shutdown Offsite Circuit |
GNRO-2008/00025, Technical Specification Bases Update to the NRC for Period Dated March 5, 2008 | 5 March 2008 | Technical Specification Bases Update to the NRC for Period Dated March 5, 2008 | |
GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 | 2 September 2008 | Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 | Safe Shutdown Temporary Modification Incorporated by reference Fire Protection Program |
GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 | 22 October 2008 | Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 | |
GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 | 23 January 2009 | Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 | Scram Discharge Volume Overtravel |
GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 | 4 March 2009 | Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 | Safe Shutdown |
GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 | 22 April 2009 | Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 | Safe Shutdown |
GNRO-2009/00062, License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits | 27 October 2009 | License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits | Reactor Vessel Water Level Anticipated operational occurrence |
GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 | 20 January 2010 | Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 | Reactor Vessel Water Level Fuel cladding |
GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update | 27 May 2010 | Technical Specification Bases & Technical Requirements Manual Update | Anticipated operational occurrence Fuel cladding |
GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | 6 April 2011 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | Grab sample Pressure Boundary Leakage |
GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update | 21 December 2012 | Technical Requirements Manual and Technical Specification Bases Update | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Squib Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Fuel cladding Pressure Boundary Leakage Power change |
GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints | 1 August 2014 | License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints | Functionality Assessment |
GNRO-2014/00050, Correction of Technical Specification Typographical Error | 31 July 2014 | Correction of Technical Specification Typographical Error | |
GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | 29 August 2014 | Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | High Radiation Area Offsite Dose Calculation Manual Earthquake Grace period |
GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | 29 August 2014 | Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | High Radiation Area Scram Discharge Volume Pressure Boundary Leakage Offsite Circuit |
GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 | 27 March 2015 | Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 | |
GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density | 27 March 2015 | Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density | |