Issue date | Title | Topic | |
---|---|---|---|
L-95-005, Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan | 30 April 1995 | Technical Evaluation Rept on Third 10-yr Interval Inservice Insp Program Plan | Hydrostatic VT-2 Incorporated by reference |
ML19305D404 | 29 February 1980 | Safety Evaluation Rept,Inservice Testing Program. | Stroke time Hydrostatic Exemption Request Power-Operated Valves Power Operated Valves |
ML19331D994 | 21 July 1980 | Primary Coolant Sys Pressure Isolation Valves,Vt Yankee Unit 1, Technical Evaluation Rept | |
ML20029A639 | 30 September 1990 | Review of Huxy Code for Determining Radiation View Factors for Vermont Yankee, Technical Evaluation Rept | |
ML20042A962 | 11 February 1982 | Operating Reactor Power Operated Relief Valves & ECCS Repts, Request for Addl Info | |
ML20056D271 | 30 June 1993 | TER Pump & Valve Inservice Testing Program Vermont Yankee Nuclear Power Station | Ultimate heat sink Stroke time Scram Discharge Volume Power-Operated Valves |
ML20063H271 | 31 January 1994 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01: Vermont Yankee, Technical Evalution Rept | |
ML20064L492 | 30 June 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept | Fuel cladding Power change |
ML20065C835 | 31 May 1990 | Conformance to Reg Guide 1.97:Vermont Yankee, Technical Evaluation Rept | Post Accident Monitoring Fuel cladding |
ML20070T732 | 30 November 1982 | Control of Heavy Loads (C-10) VT Yankee Nuclear Power Station, Draft Technical Evaluation Rept.Request for Addl Info Encl | Safe Shutdown Non-Destructive Examination Coatings Nondestructive Examination Control of Heavy Loads |
ML20071J566 | 2 September 1982 | VT Yankee Nuclear Power Station Inservice Insp Program, Technical Evaluation Rept | Hydrostatic Nondestructive Examination Incorporated by reference |
ML20071N830 | 3 September 1982 | Adequacy of Station Electric Distribution Sys Voltages, Technical Evaluation Rept | Offsite Circuit |
ML20076B623 | 27 September 1982 | ECCS Repts (F-47) TMI Action Plan Requirements,Vt Yankee Atomic Power Station, Technical Evaluation Rept | |
ML20082A639 | 30 September 1994 | Review of Technical Issues Related to Long Term Solution I-D 'Regional Exclusion w/Flow-Biased APRM Scram.' | |
ML20090H684 | 16 March 1984 | Monitoring of Electric Power to Reactor Protection Sys for Vermont Yankee Nuclear Power Station, Technical Evaluation Rept | |
ML20092A752 | 15 June 1984 | Control of Heavy Loads (C-10),Vermont Yankee Nuclear Power Station, Technical Evaluation Rept | Safe Shutdown Coatings Nondestructive Examination Control of Heavy Loads Liquid penetrant |
ML20093A583 | 31 July 1983 | Technical Evaluation of Integrity of Vermont Yankee Nuclear Power Station Reactor Coolant Boundary Piping Sys | Weld Overlay Pressure boundary leak Dissimilar Metal Weld |
ML20093C382 | 27 September 1983 | Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors, Technical Evaluation Rept | Finite Element Analysis Earthquake |
ML20100F061 | 30 November 1995 | TER on Ipe,Front End Analysis | Mission time Internal Flooding Probabilistic Risk Assessment |
ML20100F068 | 20 November 1995 | TER of IPE Submittal,Human Reliability Analysis, Final Rept | Internal Flooding Temporary Modification |
ML20100F086 | 30 November 1995 | TER of Vermont Yankee Ipe,Back End Submittal, Final Rept | Probabilistic Risk Assessment Hardened vent Weak link |
ML20106B289 | 31 July 1992 | Technical Evaluation Rept of FROSSTEY-2 Fuel Performance Code | |
ML20106J647 | 9 August 1984 | Evaluation of Detailed Control Room Design Review Program Plan Vermont Yankee Nuclear Power Plant | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20128F413 | 3 May 1985 | In-Progress Audit of Dcrdr for Vermont Yankee Nuclear Power Plant | |
ML20134D193 | 31 July 1996 | Review of Plant Implementation of Soultion I-D:Use of LAPUR-5 for Exclusion Region Calculations | |
ML20138G789 | 15 October 1985 | Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic ...), Item 1.2 `Post-Trip Review:Data & Info Capabilities' for Vermont Yankee Nuclear Power Station | |
ML20148C607 | 31 January 1988 | Review of the Natural Circulation Effect in the Vermont Yankee SPENT-FUEL Pool.Docket No. 50-271.(Vermont Yankee Nuclear Power Corp) | |
ML20149F131 | 11 January 1988 | Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee & Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20149F169 | 11 January 1988 | Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20150D900 | 17 March 1988 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co | |
ML20150D909 | 17 March 1988 | Mod 1,deobligating Funds from Total Obligated Amount of Contract & to Correct FIN Number,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites | |
ML20153H047 | 20 February 1986 | Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20153H085 | 20 February 1986 | Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Company | |
ML20155B739 | 1 June 1988 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Telephone Co | |
ML20155B753 | 1 June 1988 | Corrected Mod 1,restoring Funds That Was Deobligated & Providing Final Increment of Funding to Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee, Pilgrim & Seabrook Resident Sites | |
ML20197F819 | 25 August 1982 | Proposed Design Mods & Tech Specs Changes on Grid Voltage Degradation for Vermont Yankee Nuclear Power Station, Technical Evaluation Rept | Safe Shutdown |
ML20206S713 | 8 April 1987 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co | |
ML20206S787 | 8 April 1987 | Mod 1,changing Billing Address as Result of NRC Reorganization,To Local Telephone Svc for Yankee Rowe, Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites | |
ML20211N398 | 23 February 1987 | Notification of Contract Execution: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20211N426 | 23 February 1987 | Contract: Local Telephone Svc for Yankee Rowe,Vermont Yankee,Maine Yankee,Pilgrim & Seabrook Resident Sites, Awarded to New England Bell Telephone Co | |
ML20214H094 | 14 July 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Vermont Yankee Nuclear Station, Supplemental Technical Evaluation Rept | |
ML20235M394 | 30 June 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components: Vermont Yankee, Informal Rept | |
ML20235N447 | 30 June 1987 | Final Technical Evaluation Rept:Review & Evaluation of RELAP5YA Computer Code & Vermont Yankee LOCA Licensing Analysis Model for Use in Small & Large Break BWR Locas, Informal Rept | Coast down |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20236P205 | 10 August 1987 | Notification of Contract Execution,Mod 1,to Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee,Pilgrim & Seabrook Resident Sites. Contractor:New England Bell Telephone Co | |
ML20236P218 | 10 August 1987 | Mod 1,increasing Total Amount of Contract,To Local Telephone Svc for Yankee Rowe,Vermont Yankee,Main Yankee, Pilgrim & Seabrook Resident Sites | |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20246P328 | 31 May 1988 | Technical Evaluation Rept for Evaluation of ODCM Updated Through Rev 4,Vermont Yankee Nuclear Power Station | Grab sample Offsite Dose Calculation Manual |