Issue date | Title | Topic | |
---|---|---|---|
IR 05000458/2018406 | 10 January 2018 | River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for Information | Cyber Security |
ML021290044 | 14 May 2002 | Request for Additional Information Arkansas Nuclear One Unit 1, Arkasas Nuclear One, Unit 2, Grand Gulf, Indian Point Units 1, 2, and 3, Fitzpatrick, Pilgrim, Riverbend and Waterford Unit 3 | Exemption Request |
ML023050102 | 15 July 2002 | Attachment 2, River Bend, RAI, Piping Evaluation | |
ML040770110 | 3 December 2003 | E-mail - Draft RAI Reactor Core Isolation Cooling Pump - Attachment 1 | |
ML041820237 | 24 June 2004 | Request for Additional Information Security Plan Sections 1-9 | |
ML050450584 | 3 May 2004 | E-mail Dated 05/03/04 RAI Questions Regarding RBS Drywell Test Interval Intervention | |
ML050450589 | 6 May 2004 | E-mail RAI for Proposed QAPM, Rev. 9 | |
ML050970440 | 5 April 2005 | RAI on Proposed Upgraded Emergency Actions Levels (Eals) | Safe Shutdown Reactor Vessel Water Level Offsite Dose Calculation Manual Earthquake |
ML052380340 | 19 August 2005 | RAI Related to the Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading Operations | Nondestructive Examination |
ML072080002 | 31 July 2007 | Request for Additional Information Proposed License Transfer and Conforming License Amendment Request | |
ML081820006 | 9 July 2008 | Request for Additional Information, Related to Response to NRC Bulletin 2007-01, Security Officer Attentiveness. | |
ML083190830 | 19 December 2008 | Request for Additional Information, License Amendment Request to Revise Technical Specification 3.7.5, Main Turbine Bypass System | Feedwater Controller Failure |
ML083390757 | 28 January 2009 | Request for Additional Information, Relief Request CEP-ISI-011 for the Third 120-Month Inservice Inspection Interval | Probabilistic Risk Assessment |
ML090350379 | 5 February 2009 | Request for Additional Information, Relief Request CEP-ISI-011 for the Third 120-Month Inservice Inspection Interval | Probabilistic Risk Assessment |
ML091970549 | 16 July 2009 | Email Request for Additional Information Regarding Requests for Relief (RR) RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010 and RBS-ISI-011 | Nondestructive Examination |
ML092680611 | 14 October 2009 | Entergy Gulf States Louisiana, Llc'S Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) - Request for Additional Information | Decommissioning Funding Plan |
ML100110291 | 11 January 2010 | Email, Request for Additional Information, Relief Request RBS-ISI-013, to Implement Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 | Mission time Probabilistic Risk Assessment |
ML100110380 | 11 January 2010 | Email Request for Additional Information, Round 2, Requests for Relief (RR) RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010, and RBS-ISI-011 | |
ML100290384 | 30 April 2010 | Audit Report - 12/8/2009 Audit of the Technical Adequacy of Probabilistic Risk Assessment for Risk-Informed Relief Request Based on Code Case N-716 | Mission time Probabilistic Risk Assessment Large early release frequency |
ML100700360 | 11 March 2010 | Request for Additional Information, Entergy Gulf States Louisiana Llc'S Status of Decommissioning Funding Assurance (70% Regulated) | |
ML101330272 | 13 May 2010 | Request for Additional Information Regarding 24 Month Cycle | |
ML101450309 | 25 May 2010 | Request for Additional Information Email, Relief Request RBS-ISI-014, Proposed Alternative to Examination Requirements for Reactor Pressure Vessel Weld Inspections, for Third 10-Year Inservice Inspection Interval | |
ML102510225 | 7 September 2010 | Request for Additional Information E-mail, Round 2, Relief Request RBS-ISI-014, Proposed Alternative to Examination Requirements for Reactor Pressure Vessel Weld Inspections,Third 10-Year Inservice Inspection Interval (ME2818) | |
ML102930282 | 20 October 2010 | Email, Request for Additional Information Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | |
ML103550152 | 21 December 2010 | Request for Additional Information Email, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML110630136 | 4 March 2011 | E-mail, Generic Request for Additional Information, License Amendment Request to Revise License Condition and Approve Cyber Security Plan | Cyber Security |
ML111540107 | 2 June 2011 | Request for Additional Information 2011 Decommissioning Funding Status Report | |
ML111670731 | 24 June 2011 | Threshold Determination Under 10 CFR 50.80 - Request for Additional Information | |
ML112710512 | 28 September 2011 | Email, Request for Additional Information Request to Relocate the Alternate Emergency Operations Facility from 23 Miles to 28 Miles for the Technical Support Center | |
ML113210384 | 28 November 2011 | Request for Additional Information, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies | |
ML120090163 | 9 January 2012 | Email, Request for Additional Information - Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints | |
ML120250177 | 25 January 2012 | Email, Request for Additional Information, Round 2, Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints | |
ML120320214 | 1 February 2012 | Email, Request for Additional Information, Relief Requests RBS-ISI-016 for Pressure Retaining Welds in Pumps and Valves and RBS-ISI-017 for Pressure Retaining Welds in Control Rod Housings | |
ML120520135 | 21 February 2012 | Supplemental Information Needed for Acceptance of Requested Licensing Action; Relief Request RBS-R&R-2011-001 - Use of ASME Code Case N-804 for Third 10-Year Inservice Inspection Interval | Non-Destructive Examination |
ML120530635 | 22 February 2012 | E-mail, Request for Additional Information Regarding Proposed Emergency Action Levels Using Nuclear Energy Institute 99-01, Rev. 5 | |
ML12056A047 | 12 March 2012 | Enclosure 1 - Recommendation 2.1: Seismic | High winds Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency Earthquake Generic Issues Program |
ML12056A048 | 12 March 2012 | Enclosure 2 - Recommendation 2.1: Flooding | High winds Ultimate heat sink Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic | Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding | Unanalyzed Condition High winds Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML12056A051 | 12 March 2012 | Enclosure 5 - Recommendation 9.3: Emergency Preparedness | Fukushima Dai-Ichi Earthquake |
ML120720409 | 12 March 2012 | Email, Request for Additional Information, Amendment Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 / Revise Allowable Values for Certain Functions | |
ML120960449 | 5 April 2012 | ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat | |
ML12142A048 | 21 May 2012 | Email, Request for Additional Information, License Amendment Request, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III Bus | Offsite Circuit |
ML12220A546 | 7 August 2012 | Request for Additional Information E-mail, Round 3, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions | |
ML12278A386 | 4 October 2012 | ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs | |
ML13023A328 | 23 January 2013 | Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC ME970 | |
ML13030A263 | 23 January 2013 | Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC Nos. | |
ML13149A376 | 29 May 2013 | Request for Additional Information Email Regarding Relief Request RBS-ISI-018 | |
ML13161A161 | 10 June 2013 | Request for Additional Information Email (Revises 5/29/13 Rai), Request for Relief RBS-ISI-018 for Reactor Pressure Vessel Support Skirt, Second 10-Year Inservice Inspection Interval | |
ML13179A193 | 3 July 2013 | Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) | FLEX Spent Fuel Pool Instrumentation |