Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000458/201840610 January 2018River Bend Station - Notification of Cyber Security Inspection (NRC Inspection Report 05000458/2018406) and Request for InformationCyber Security
ML02129004414 May 2002Request for Additional Information Arkansas Nuclear One Unit 1, Arkasas Nuclear One, Unit 2, Grand Gulf, Indian Point Units 1, 2, and 3, Fitzpatrick, Pilgrim, Riverbend and Waterford Unit 3Exemption Request
ML02305010215 July 2002Attachment 2, River Bend, RAI, Piping Evaluation
ML0407701103 December 2003E-mail - Draft RAI Reactor Core Isolation Cooling Pump - Attachment 1
ML04182023724 June 2004Request for Additional Information Security Plan Sections 1-9
ML0504505843 May 2004E-mail Dated 05/03/04 RAI Questions Regarding RBS Drywell Test Interval Intervention
ML0504505896 May 2004E-mail RAI for Proposed QAPM, Rev. 9
ML0509704405 April 2005RAI on Proposed Upgraded Emergency Actions Levels (Eals)Safe Shutdown
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Earthquake
ML05238034019 August 2005RAI Related to the Use of the Fuel Building Cask Handling Crane for Dry Spent Fuel Cask Loading OperationsNondestructive Examination
ML07208000231 July 2007Request for Additional Information Proposed License Transfer and Conforming License Amendment Request
ML0818200069 July 2008Request for Additional Information, Related to Response to NRC Bulletin 2007-01, Security Officer Attentiveness.
ML08319083019 December 2008Request for Additional Information, License Amendment Request to Revise Technical Specification 3.7.5, Main Turbine Bypass SystemFeedwater Controller Failure
ML08339075728 January 2009Request for Additional Information, Relief Request CEP-ISI-011 for the Third 120-Month Inservice Inspection IntervalProbabilistic Risk Assessment
ML0903503795 February 2009Request for Additional Information, Relief Request CEP-ISI-011 for the Third 120-Month Inservice Inspection IntervalProbabilistic Risk Assessment
ML09197054916 July 2009Email Request for Additional Information Regarding Requests for Relief (RR) RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010 and RBS-ISI-011Nondestructive Examination
ML09268061114 October 2009Entergy Gulf States Louisiana, Llc'S Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) - Request for Additional InformationDecommissioning Funding Plan
ML10011029111 January 2010Email, Request for Additional Information, Relief Request RBS-ISI-013, to Implement Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716Mission time
Probabilistic Risk Assessment
ML10011038011 January 2010Email Request for Additional Information, Round 2, Requests for Relief (RR) RBS-ISI-007, RBS-ISI-008, RBS-ISI-009, RBS-ISI-010, and RBS-ISI-011
ML10029038430 April 2010Audit Report - 12/8/2009 Audit of the Technical Adequacy of Probabilistic Risk Assessment for Risk-Informed Relief Request Based on Code Case N-716Mission time
Probabilistic Risk Assessment
Large early release frequency
ML10070036011 March 2010Request for Additional Information, Entergy Gulf States Louisiana Llc'S Status of Decommissioning Funding Assurance (70% Regulated)
ML10133027213 May 2010Request for Additional Information Regarding 24 Month Cycle
ML10145030925 May 2010Request for Additional Information Email, Relief Request RBS-ISI-014, Proposed Alternative to Examination Requirements for Reactor Pressure Vessel Weld Inspections, for Third 10-Year Inservice Inspection Interval
ML1025102257 September 2010Request for Additional Information E-mail, Round 2, Relief Request RBS-ISI-014, Proposed Alternative to Examination Requirements for Reactor Pressure Vessel Weld Inspections,Third 10-Year Inservice Inspection Interval (ME2818)
ML10293028220 October 2010Email, Request for Additional Information Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML10355015221 December 2010Request for Additional Information Email, License Amendment Request to Revise License Condition and Approve Cyber Security PlanCyber Security
ML1106301364 March 2011E-mail, Generic Request for Additional Information, License Amendment Request to Revise License Condition and Approve Cyber Security PlanCyber Security
ML1115401072 June 2011Request for Additional Information 2011 Decommissioning Funding Status Report
ML11167073124 June 2011Threshold Determination Under 10 CFR 50.80 - Request for Additional Information
ML11271051228 September 2011Email, Request for Additional Information Request to Relocate the Alternate Emergency Operations Facility from 23 Miles to 28 Miles for the Technical Support Center
ML11321038428 November 2011Request for Additional Information, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
ML1200901639 January 2012Email, Request for Additional Information - Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints
ML12025017725 January 2012Email, Request for Additional Information, Round 2, Amendment Request to Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints
ML1203202141 February 2012Email, Request for Additional Information, Relief Requests RBS-ISI-016 for Pressure Retaining Welds in Pumps and Valves and RBS-ISI-017 for Pressure Retaining Welds in Control Rod Housings
ML12052013521 February 2012Supplemental Information Needed for Acceptance of Requested Licensing Action; Relief Request RBS-R&R-2011-001 - Use of ASME Code Case N-804 for Third 10-Year Inservice Inspection IntervalNon-Destructive Examination
ML12053063522 February 2012E-mail, Request for Additional Information Regarding Proposed Emergency Action Levels Using Nuclear Energy Institute 99-01, Rev. 5
ML12056A04712 March 2012Enclosure 1 - Recommendation 2.1: SeismicHigh winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Generic Issues Program
ML12056A04812 March 2012Enclosure 2 - Recommendation 2.1: FloodingHigh winds
Ultimate heat sink
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: SeismicUnanalyzed Condition
Ultimate heat sink
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: FloodingUnanalyzed Condition
High winds
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML12056A05112 March 2012Enclosure 5 - Recommendation 9.3: Emergency PreparednessFukushima Dai-Ichi
Earthquake
ML12072040912 March 2012Email, Request for Additional Information, Amendment Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 / Revise Allowable Values for Certain Functions
ML1209604495 April 2012ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat
ML12142A04821 May 2012Email, Request for Additional Information, License Amendment Request, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III BusOffsite Circuit
ML12220A5467 August 2012Request for Additional Information E-mail, Round 3, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions
ML12278A3864 October 2012ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs
ML13023A32823 January 2013Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC ME970
ML13030A26323 January 2013Entergy Fleet and ISFSI-Request for Additional Information Email, Indirect and Direct License Transfer Sand Conforming Amendments for Arkansas Nuclear One 1 and 2; Grand Gulf 1 and Early Site Permit; River Bend 1, and Waterford 3 (TAC Nos.
ML13149A37629 May 2013Request for Additional Information Email Regarding Relief Request RBS-ISI-018
ML13161A16110 June 2013Request for Additional Information Email (Revises 5/29/13 Rai), Request for Relief RBS-ISI-018 for Reactor Pressure Vessel Support Skirt, Second 10-Year Inservice Inspection Interval
ML13179A1933 July 2013Request for Additional Information, Overall Integrated Plan in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)FLEX
Spent Fuel Pool Instrumentation