Letter Sequence RAI |
|---|
|
|
MONTHYEARML13018A1002009-01-20020 January 2009 Drift Study for ABB Model ITE-27H Undervoltage Relays Project stage: Other ML13018A1072009-01-20020 January 2009 Drift Study for General Electric Model NGV13B Undervoltage Relays Project stage: Other ML13018A1032009-01-26026 January 2009 Drift Study for ABB ITE-62 Timers Project stage: Other ML13018A1102009-02-11011 February 2009 Drift Study for Agastat ETR Series Time Delay Relays Project stage: Other RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating Project stage: Request RBG-47193, License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes2011-12-0808 December 2011 License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes Project stage: Request ML12261A4912012-01-31031 January 2012 Licensee Calculations Related to License Amendment Request to Revise TS 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions Project stage: Request ML1203202222012-02-0101 February 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification (TS) 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions Project stage: Acceptance Review ML1207204092012-03-12012 March 2012 Email, Request for Additional Information, Amendment Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 / Revise Allowable Values for Certain Functions Project stage: RAI ML1207603762012-03-16016 March 2012 Email, Request for Additional Information, Round 2, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions Project stage: RAI ML12125A3062012-05-0202 May 2012 Response to Request for Additional Information on License Amendment Request 2011-05 Project stage: Response to RAI ML12220A5462012-08-0707 August 2012 Request for Additional Information E-mail, Round 3, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions Project stage: RAI RBG-47279, Response to Request for Additional Information on License Amendment Request 2011-052012-09-0505 September 2012 Response to Request for Additional Information on License Amendment Request 2011-05 Project stage: Response to RAI RBG-47281, Notification of Spent Fuel Cask Use2012-09-0505 September 2012 Notification of Spent Fuel Cask Use Project stage: Request ML12291A7632012-10-16016 October 2012 Email, License Amendment Request for Degraded Voltage Surveillance Frequency Extension; Revised Calculations and White Paper Which Discusses Methodology Used for Revision Project stage: Request ML13023A1092012-10-16016 October 2012 Dv/Lop Calculations (ME7767) Project stage: Other ML13022A2202012-11-0707 November 2012 Email Agastat ETR Relay Catalog Project stage: Request ML13022A1952012-11-0707 November 2012 ABB Model 27H Under-Voltage Relays in Calc G13.18.6.2-ENS*006 Project stage: Request ML13022A1922012-11-0707 November 2012 Email ABB Model 27H Under-Voltage Relays in Calc G13.18.6.2-ENS*006 Project stage: Request ML13022A1382012-11-0707 November 2012 Email ABB 62K Manual for 62-2 Relay in Uncertainty Calculation G13.18.6.2-ENS*006 (TAC No. ME7767 Project stage: Other ML13022A2242012-11-0707 November 2012 Agastat ETR Relay Information Project stage: Request ML12341A0032012-12-0505 December 2012 Email, Request for Additional Information, Round 3, Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise Allowable Values for Certain Functions Project stage: RAI RBG-47321, Response to Request for Additional Information on License Amendment Request 2011-052013-01-0909 January 2013 Response to Request for Additional Information on License Amendment Request 2011-05 Project stage: Response to RAI ML13018A0842013-01-17017 January 2013 Email from Licensee Drift Study Calculations Project stage: Other RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 Project stage: Supplement ML13060A2102013-03-29029 March 2013 Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain Functions Project stage: Approval 2012-02-01
[Table View] |
Email, Request for Additional Information, Amendment Request to Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 / Revise Allowable Values for Certain Functions| ML120720409 |
| Person / Time |
|---|
| Site: |
River Bend  |
|---|
| Issue date: |
03/12/2012 |
|---|
| From: |
Wang A Plant Licensing Branch IV |
|---|
| To: |
Burmeister B, Clark J, Williamson D, Wang A Entergy Operations, Office of Nuclear Reactor Regulation |
|---|
| Wang, A B, NRR/DORL/LPLIV, 415-1445 |
| References |
|---|
| TAC ME7767 |
| Download: ML120720409 (2) |
|
Text
From:
Wang, Alan Sent:
Monday, March 12, 2012 1:03 PM To:
Wang, Alan; 'BURMEISTER, BARRY M'; 'Joseph Clark (JCLARK@entergy.com)';
WILLIAMSON, DANNY H Cc:
Burkhardt, Janet; Lent, Susan
Subject:
River Bend Station, Unit 1 (RBS) Request for Additional Information Regarding Degraded Voltage Surveillance Frequency Extension TS Change (ME7767)
Barry, Danny and Joey, By letter dated December 8, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML11349A246), Entergy Operations, Inc (Entergy, the licensee) submitted Entergy Letter RBG-47193, License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes. In this letter, Entergy submitted a request to extend the frequency of Surveillance Requirement (SR) 3.3.8.1.3 (calibration of loss of power instrumentation) from 18 to 24 months and revise certain allowable values in TS 3.3.8.1, Loss of Power Instrumentation.
The NRC staff has determined that the following additional information is needed to complete our review. This request was discussed with Mr. Danny Williamson of your staff on March 12, 2012, and it was agreed that a response would be provided within 30 days from the issuance of this email. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov..
This amendment request proposes revisions to the loss of voltage setpoint allowable values and Degraded Voltage Time Delay (No LOCA) allowable values in Technical Specification (TS)
Table 3.3.8.1-1. Following questions pertain to changes to the setpoint allowable values:
- 1. In section 3.2 of the license amendment request (LAR) the licensee states:
Because all Class 1 E motors were purchased to be capable of starting and accelerating their driven equipment with motor terminal voltages of 70 or 80 percent of motor nameplate voltage without affecting performance or equipment life, no operability concerns exist for any equipment. However, a group of the motor operated valves (MOVs) governed by GL 89-10 was determined to have insufficient voltage to pick up their torque switch, allowing potential failure after reaching their safety position. Thus, although the valves maintain their operability, full functionality was not maintained under existing analysis. To bring the valves back to full functionality, River Bend Station used the results of the offsite grid stability studies and modified the offsite power requirements to ensure that grid voltage is no lower than 97.5%, up from the current limit of 95%.
- a. Provide a brief summary of the evaluation that demonstrates that all Class 1E motors have adequate starting and running voltages based on the setpoint values specified in TS Table 3.3.8.1 rather than higher voltage shown on the grid stability study. Verify that protective devices such as relays, thermal overloads, fuses and contactors will not actuate during the start sequence.
- b. Provide details on how the grid voltage is maintained at or above 97.5%. If grid operator actions are required, then validate that MOVs will remain functional and perform their intended safety functions with the safety bus
voltages at the degraded voltage relay set point as specified in TS Table 3.3.8.1.
- c. Verify that plant modifications and replacement equipment installed since the original plant construction have maintained 70 or 80 percent minimum voltage operating requirements.
Alan Wang Project Manager (River Bend Station)
Nuclear Regulatory Commission Division of Operating Reactor Licensing